05000272/LER-1982-045, Corrected LER 82-045/04L-0:on 820710,waste Monitor Tank Sample Discarded Before Composite Samples Assembled.Caused by Technician Inadvertently Pouring Out Sample.Personnel Counseled Re Procedures.Simulated Sample Made: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000272/LER-1982-045, Forwards Corrected LER 82-045/04L-0.Detailed Event Analysis Encl]]
| number = ML20065R906
| issue date = 07/28/1982
| title = Corrected LER 82-045/04L-0:on 820710,waste Monitor Tank Sample Discarded Before Composite Samples Assembled.Caused by Technician Inadvertently Pouring Out Sample.Personnel Counseled Re Procedures.Simulated Sample Made
| author name = Frahm R
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000272
| license number =
| contact person =
| document report number = LER-82-045-04L, LER-82-45-4L, NUDOCS 8210290361
| package number = ML20065R878
| document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| page count = 1
}}
{{LER
| Title = Corrected LER 82-045/04L-0:on 820710,waste Monitor Tank Sample Discarded Before Composite Samples Assembled.Caused by Technician Inadvertently Pouring Out Sample.Personnel Counseled Re Procedures.Simulated Sample Made
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000272
| LER year = 2082
| LER number = 45
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:
}}
 
{{LER-Nav}}

Latest revision as of 04:24, 6 January 2021