ML021340543: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:J. Barnie Beasley, Jr., P.E. Southern Nuclear Vice President              Operating Company, Inc.
{{#Wiki_filter:J. Barnie Beasley, Jr., P.E.
40 Inverness Center Parkway Post Office Box 1295 L         iffluAR I
Vice President Southern Nuclear Operating Company, Inc.
MonFO "TIO 8Q==SUR WWJSNS SAEGUARDS INFORMATION)
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 L
UPNS-PRTON- THIS PAGE ISD)ECONTROLLED III I II  I I I II i i in nil I II I I ii iI T Birmingham, Alabama 35201 Tel 205.992.7110 A
iffluAR MonFO "TIO 8Q==SUR WWJSNS SAEGUARDS INFORMATION)
Fax 205.992.0403 SOUTHERN May 8, 2002                                                                                     COMPANY Energy to Serve Your Worlds" Docket Nos.: 50-424                                                                 LCV 1604-C 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant - Units 1 and 2 Revised Response to Security Order Interim Compensatory Measure B.4.e Ladies and Gentlemen:
UPNS-PRTON-THIS PAGE IS D)ECONTROLLED Tel 205.992.7110 Fax 205.992.0403 May 8, 2002 Docket Nos.: 5 0-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant - Units 1 and 2 Revised Response to Security Order Interim Compensatory Measure B.4.e Ladies and Gentlemen:
By letter dated March 18, 2002, Southern Nuclear Operating Company (SNC) provided responses to the Interim Compensatory Measures (ICM) contained in the February 25, 2002 Order to modify the Operating Licenses for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. SNC hereby revises its response to ICM B.4.e as shown in the enclosure to this letter. This information is being provided in accordance with the provisions of 10 CFR 50.4 (f).
By {{letter dated|date=March 18, 2002|text=letter dated March 18, 2002}}, Southern Nuclear Operating Company (SNC) provided responses to the Interim Compensatory Measures (ICM) contained in the February 25, 2002 Order to modify the Operating Licenses for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. SNC hereby revises its response to ICM B.4.e as shown in the enclosure to this letter. This information is being provided in accordance with the provisions of 10 CFR 50.4 (f).
J. B. Beasley, Jr. states that he is a Vice President of Southern Nuclear Operating Company and is authorized to execute this oath on behalf of Southern Nuclear Operating Company, and to the best of his knowledge and belief, the facts set forth in this letter are true.
J. B. Beasley, Jr. states that he is a Vice President of Southern Nuclear Operating Company and is authorized to execute this oath on behalf of Southern Nuclear Operating Company, and to the best of his knowledge and belief, the facts set forth in this letter are true.
Sincerely, AJB easley, r.
Sincerely, AJB easley, r.
Sworn to and subscribed before me this               _         day of                       ,   2002.
Sworn to and subscribed before me this _
I)                     /
day of  
Notary Public My commission expires:                 /1     /6 1-I                  SAFEGARD INFORMATIN
, 2002.
( ENCLOSURE CONTAINS SAFEGUARDS INFORMATION )
I)  
UPON SEPARATION THIS PAGE ISDECONTROLLED    )
/
Notary Public My commission expires:
/1 /6 1-
SAFEGARD INFORMATIN ENCLOSURE CONTAINS SAFEGUARDS INFORMATION )
UPON SEPARATION THIS PAGE IS DECONTROLLED
)
SOUTHERN A COMPANY Energy to Serve Your Worlds" LCV 1604-C I
(
I III I II I I I
II i i in nil I II I I
i i i I T


(       _E*&UAM WNORMATION,               )
(
( ENCLOSURE CONTAINS SAFEGUARDS INFORMATION I
_E*&UAM WNORMATION,
( UPON SEPARATION THIS PAGE ISDECONTROLLED U. S. Nuclear Regulatory Commission LCV 1604-C Page 2 JBB/BHW
( ENCLOSURE CONTAINS SAFEGUARDS INFORMATION
(
UPON SEPARATION THIS PAGE IS DECONTROLLED U. S. Nuclear Regulatory Commission LCV 1604-C Page 2 JBB/BHW  


==Enclosure:==
==Enclosure:==
Line 39: Line 51:
SNC Document Management U. S. Nuclear Regulatory Commission Mr. L.A. Reyes, Regional Administrator Mr. F. Rinaldi, Licensing Project Manager, NRR (w/o enclosure)
SNC Document Management U. S. Nuclear Regulatory Commission Mr. L.A. Reyes, Regional Administrator Mr. F. Rinaldi, Licensing Project Manager, NRR (w/o enclosure)
Mr. J. Zeiler, Senior Resident Inspector, Vogtle (w/o enclosure)
Mr. J. Zeiler, Senior Resident Inspector, Vogtle (w/o enclosure)
( ENCLOSURE CONTAINS SAFEGUARDS INFORMATION )
( ENCLOSURE CONTAINS SAFEGUARDS INFORMATION  
(   UPON SEPARATION THIS PAGE ISDECONTROLLED  )}}
)
(
UPON SEPARATION THIS PAGE IS DECONTROLLED
)
) I}}

Latest revision as of 18:28, 16 January 2025

Revised Response to Security Order Interim Compensatory Measure B.4.e
ML021340543
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/08/2002
From: Beasley J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LCV 1604-C
Download: ML021340543 (2)


Text

J. Barnie Beasley, Jr., P.E.

Vice President Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 L

iffluAR MonFO "TIO 8Q==SUR WWJSNS SAEGUARDS INFORMATION)

UPNS-PRTON-THIS PAGE IS D)ECONTROLLED Tel 205.992.7110 Fax 205.992.0403 May 8, 2002 Docket Nos.: 5 0-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant - Units 1 and 2 Revised Response to Security Order Interim Compensatory Measure B.4.e Ladies and Gentlemen:

By letter dated March 18, 2002, Southern Nuclear Operating Company (SNC) provided responses to the Interim Compensatory Measures (ICM) contained in the February 25, 2002 Order to modify the Operating Licenses for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. SNC hereby revises its response to ICM B.4.e as shown in the enclosure to this letter. This information is being provided in accordance with the provisions of 10 CFR 50.4 (f).

J. B. Beasley, Jr. states that he is a Vice President of Southern Nuclear Operating Company and is authorized to execute this oath on behalf of Southern Nuclear Operating Company, and to the best of his knowledge and belief, the facts set forth in this letter are true.

Sincerely, AJB easley, r.

Sworn to and subscribed before me this _

day of

, 2002.

I)

/

Notary Public My commission expires:

/1 /6 1-

SAFEGARD INFORMATIN ENCLOSURE CONTAINS SAFEGUARDS INFORMATION )

UPON SEPARATION THIS PAGE IS DECONTROLLED

)

SOUTHERN A COMPANY Energy to Serve Your Worlds" LCV 1604-C I

(

I III I II I I I

II i i in nil I II I I

i i i I T

(

_E*&UAM WNORMATION,

( ENCLOSURE CONTAINS SAFEGUARDS INFORMATION

(

UPON SEPARATION THIS PAGE IS DECONTROLLED U. S. Nuclear Regulatory Commission LCV 1604-C Page 2 JBB/BHW

Enclosure:

Revised Response to Interim Compensatory Measure B.4.e (Safeguards Information) cc: Southern Nuclear Operating Company Mr. J. T. Gasser (w/o enclosure)

Mr. M. Sheibani (w/o enclosure)

SNC Document Management U. S. Nuclear Regulatory Commission Mr. L.A. Reyes, Regional Administrator Mr. F. Rinaldi, Licensing Project Manager, NRR (w/o enclosure)

Mr. J. Zeiler, Senior Resident Inspector, Vogtle (w/o enclosure)

( ENCLOSURE CONTAINS SAFEGUARDS INFORMATION

)

(

UPON SEPARATION THIS PAGE IS DECONTROLLED

)

) I