Emergency Plan Implementing Procedures Cooper Nuclear Station, NRC Docket 50-298, DPR-46 Pursuant to the requirements of 10 CFR 50, Appendix E, Section V. "Implementing Procedures,'
Emergency Plan Implementing Procedures Cooper Nuclear Station, NRC Docket 50-298, DPR-46 Pursuant to the requirements of 10 CFR 50, Appendix E, Section V. "Implementing Procedures,'
Nebraska Public Power District is transmitting the following Emergency Plan Implementing Procedures (EPIPs):
Nebraska Public Power District is transmitting the following Emergency Plan Implementing Procedures (EPIPs):
EPIP 5.7ENS         Revision  0              "ENS Communicator" EPIP 5.7.2           Revision  17              "Shift Supervisor EPIP" EPIP  5.7.6           Revision  35              "Notification" EPIP 5.7.21         Revision   25             "Maintaining Emergency Preparedness Emergency Exercises, Drills, Tests, and Evaluations" EPIP 5.7.23          Revision 4                "Activation of the JIC" EPIP 5.7.25          Revision 16                "Recovery Operations" Should you have any questions concerning this matter, please contact me.
EPIP 5.7ENS EPIP 5.7.2 EPIP 5.7.6 EPIP 5.7.21 EPIP 5.7.23 EPIP 5.7.25 Revision 0 Revision 17 Revision 35 Revision 25 Revision 4 Revision 16 "ENS Communicator" "Shift Supervisor EPIP" "Notification" "Maintaining Emergency Preparedness Emergency Exercises, Drills, Tests, and Evaluations" "Activation of the JIC" "Recovery Operations" Should you have any questions concerning this matter, please contact me.  
    /
/  
  'ce~
'ce~
A. Hutton Plant Manager
A. Hutton Plant Manager  
/nr Enclosures cc: Regional Administrator w/enclosures (2)                                 NPG Distribution w/o enclosures USNRC - Region IV Records w/o enclosures Senior Resident Inspector w/enclosures USNRC Cooper Nuclear Station P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http //wwv.nppd.com
/nr Enclosures cc: Regional Administrator w/enclosures (2)
USNRC - Region IV Senior Resident Inspector w/enclosures USNRC NPG Distribution w/o enclosures Records w/o enclosures Cooper Nuclear Station P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http //wwv.nppd.com


I     ATTACHMENT 3         LIST OF REGULATORY COMMITMENTS Correspondence Number:         NLS2002091 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2002091 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT                                 OR OUTAGE None i
COMMITTED DATE COMMITMENT OR OUTAGE None 1-1i t
1-1i t
PROCEDURE 0.42 REVISION 11 PAGE 13 OF 16 i
i i
i i
PROCEDURE 0.42                    REVISION 11            PAGE 13 OF 16


USE: REFERENCE   E:     /80 CNS OPERATIONS                      MANUAL                              EFEC PROCEURE 57ENSEFFECTIVE:                                             6/28/02 PROCEDURE                   5.7ENS                               APOA:SR APPROVAL: SORC OWNER: EP MGR ENS COMMUNICATOR                                                   DEPARTMENT: EP
USE: REFERENCE CNS OPERATIONS MANUAL EFEC E:  
: 1. P U R P O SE ............................................................                                                     1
/80 PROCEURE 57ENSEFFECTIVE:
: 2. PRECAUTIONS AND LIMITATIONS .....................................                                                            1
6/28/02 PROCEDURE 5.7ENS APOA:SR APPROVAL: SORC OWNER: EP MGR ENS COMMUNICATOR DEPARTMENT: EP
: 3. IN STRU CTIO N S .......................................................                                                     1
: 1.
: 4. R E C O R D S ............................................................                                                   3 ATTACHMENT 1                   INSTRUCTIONS FOR USE OF HELLO DIRECT HEADSET
P U R P O SE............................................................
                                      . .. . . . . .. . . . . . .. . . . .. .. . . . . . . . .. . . . . . . .. . . .. . . . .. . .4 ATTACHMENT 2                   NRC COMMUNICATION GUIDE .......................                                               5 ATTACHMENT 3                   ENS COMMUNICATOR QUESTION TRACKING LOG .....                                                 6 ATTACHMENT 4                   INFORMATION SHEET ..............................                                             9
1
: 1. PURPOSE This procedure outlines the ERO duties performed by the ENS Communicator during a declared emergency. The ENS Communicator provides continuous communication with the NRC when requested to do so.
: 2.
: 2. PRECAUTIONS AND LIMITATIONS
PRECAUTIONS AND LIMITATIONS 1
[ ] 2.1     This procedure does not need to be performed in the sequence listed as long as the user ensures all applicable steps are performed in a logical sequence and procedure intent and results are not altered.
: 3.
: 3. INSTRUCTIONS
IN STRU CTIO N S.......................................................
[ ] 3.1     Assume of ENS Communicator position.
1
[ ]     3.1.1       Verify communications devices function.
: 4.
[1         3.1.1.1             Telephone.
R E C O R D S............................................................
[1         3.1.1.2             ENS telephone.
3 ATTACHMENT 1 INSTRUCTIONS FOR USE OF HELLO DIRECT HEADSET  
[ ]         3.1.1.3             If available, HELLO direct headset (Attachment 1 has instructions for operating HELLO direct headset).
................................................... 4 ATTACHMENT 2 NRC COMMUNICATION GUIDE.......................
[ ] 3.2     Maintain a log on Attachment 3 using guidance in Attachment 2.
5 ATTACHMENT 3 ENS COMMUNICATOR QUESTION TRACKING LOG..... 6 ATTACHMENT 4 INFORMATION SHEET..............................
I       PROCEDURE 5.7ENS                                 I               REVISION 0             1       PAGE 1 OF 9               1
9
: 1.
PURPOSE This procedure outlines the ERO duties performed by the ENS Communicator during a declared emergency. The ENS Communicator provides continuous communication with the NRC when requested to do so.
: 2.
PRECAUTIONS AND LIMITATIONS
[ ] 2.1 This procedure does not need to be performed in the sequence listed as long as the user ensures all applicable steps are performed in a logical sequence and procedure intent and results are not altered.
: 3.
INSTRUCTIONS
[ ] 3.1 Assume of ENS Communicator position.
[ ]
3.1.1 Verify communications devices function.
[1 3.1.1.1 Telephone.
[1 3.1.1.2 ENS telephone.
[ ]
3.1.1.3 If available, HELLO direct headset (Attachment 1 has instructions for operating HELLO direct headset).
[ ] 3.2 Maintain a log on Attachment 3 using guidance in Attachment 2.
I PROCEDURE 5.7ENS I
REVISION 0 1
PAGE 1 OF 9 1


[ ] 3.3   Obtain a turnover from the Control Room Shift Communicator.
[ ] 3.3 Obtain a turnover from the Control Room Shift Communicator.
[ ]   3.3.1     Obtain a copy of the Notification Reports previously sent to the State, County, or NRC or other information provided to the NRC.
[ ]
[ ] 3.4   Report to the Emergency Director when ready to assume responsibilities.
3.3.1 Obtain a copy of the Notification Reports previously sent to the State, County, or NRC or other information provided to the NRC.
[ ] 3.5   Verify that the NRC Senior Resident Inspector or another assigned NRC Inspector was contacted by the Shift Communicator.
[ ] 3.4 Report to the Emergency Director when ready to assume responsibilities.
[ ]   3.5.1     If not contacted, then page NRC Inspector. Phone and pager numbers for the NRC Resident staff are located in the Emergency Telephone Directory - "Federal Tab".
[ ] 3.5 Verify that the NRC Senior Resident Inspector or another assigned NRC Inspector was contacted by the Shift Communicator.
[ ] 3.6   Establish communications with the NRC Operations Center (NRCOC) via ENS.
[ ]
[ ]   3.6.1     If the ENS line become inoperable, contact the NRC Operations Duty Officer via the commercial phone number located in the Emergency Telephone Directory - "Federal Tab".
3.5.1 If not contacted, then page NRC Inspector. Phone and pager numbers for the NRC Resident staff are located in the Emergency Telephone Directory - "Federal Tab".
[ ] 3.7   Perform ENS communications.
[ ] 3.6 Establish communications with the NRC Operations Center (NRCOC) via ENS.
[ ]   3.7.1     Use NRC Information Notice 98-08 (Attachment 2 as a guide for anticipating potential questions from the NRC with regard to plant status.
[ ]
[ ]   3.7.2     Maintain a log of key information discussed with the NRC on Attachment 3 or a similar form.
3.6.1 If the ENS line become inoperable, contact the NRC Operations Duty Officer via the commercial phone number located in the Emergency Telephone Directory - "Federal Tab".
[ ] 3.7 Perform ENS communications.
[ ]
3.7.1 Use NRC Information Notice 98-08 (Attachment 2 as a guide for anticipating potential questions from the NRC with regard to plant status.
[ ]
3.7.2 Maintain a log of key information discussed with the NRC on or a similar form.
[ I NOTE - ENS Communicator may leave communications for brief periods to obtain information.
[ I NOTE - ENS Communicator may leave communications for brief periods to obtain information.
[ ] 3.8   Review proposed responses with the Emergency Director or specific designee prior to responding to the NRC, except for plant data clarifications, general system design, or other basic info known with certainty.
[ ] 3.8 Review proposed responses with the Emergency Director or specific designee prior to responding to the NRC, except for plant data clarifications, general system design, or other basic info known with certainty.
[ ] 3.9   Conduct shift turnover as necessary.
[ ] 3.9 Conduct shift turnover as necessary.
[ ]   3.9.1     Review log of past events and open questions.
[ ]
[ ]   3.9.2     Ensure NRCOC Duty Officer is aware of new Communicator by name.
3.9.1 Review log of past events and open questions.
I       PROCEDURE 5.7ENS               I       REVISION 0               PAGE 2 OF 9
[ ]
3.9.2 Ensure NRCOC Duty Officer is aware of new Communicator by name.
I PROCEDURE 5.7ENS I
REVISION 0 PAGE 2 OF 9


[ ] 3.10 Inform Emergency Director to request Licencing Department to review ENS Communicator Logs for 50.72 applicability.
[ ] 3.10 Inform Emergency Director to request Licencing Department to review ENS Communicator Logs for 50.72 applicability.
[]   3.10.1   Include a copy of Attachment 3 and additional logs documenting information provided to NRC as part of the Post-Event Review paperwork per Procedure 2.0.6.
[ ]
: 4. RECORDS
3.10.1 Include a copy of Attachment 3 and additional logs documenting information provided to NRC as part of the Post-Event Review paperwork per Procedure 2.0.6.
[ ] 4.1   Entire procedure and supporting logs following an actual emergency is given to Emergency Preparedness Coordinator (quality record upon completion).
: 4.
I       PROCEDURE 5.7ENS             I     REVISION 0           1   PAGE 3 OF 9       1
RECORDS
[ ] 4.1 Entire procedure and supporting logs following an actual emergency is given to Emergency Preparedness Coordinator (quality record upon completion).
I PROCEDURE 5.7ENS I
REVISION 0 1
PAGE 3 OF 9 1


ATTACHMENT 1           INSTRUCTIONS FOR USE OF HELLO DIRECT HEADSET TO INITIATE 1.1   Put on telephone headset and pull microphone boom to the full down position.
ATTACHMENT 1 INSTRUCTIONS FOR USE OF HELLO DIRECT HEADSET TO INITIATE 1.1 Put on telephone headset and pull microphone boom to the full down position.
1.2   Lift telephone handset from cradle and set aside.
1.2 Lift telephone handset from cradle and set aside.
1.3   Dial telephone number.
1.3 Dial telephone number.
1.4   Talk on black headset when party answers.
1.4 Talk on black headset when party answers.
1.4.1     The microphone may be muted by raising it halfway. This allows the user to shut off the microphone and still hear the conversation of others on the intercom.
1.4.1 The microphone may be muted by raising it halfway. This allows the user to shut off the microphone and still hear the conversation of others on the intercom.
1.4.2     A rotating volume control wheel is located on the headset, earphone side, above where the microphone is attached.
1.4.2 A rotating volume control wheel is located on the headset, earphone side, above where the microphone is attached.
: 2. TO TERMINATE 2.1   Return telephone handset to cradle.
: 2.
2.2   Put headset microphone boom in full up position.
TO TERMINATE 2.1 Return telephone handset to cradle.
2.3   Return headset to base.
2.2 Put headset microphone boom in full up position.
I     PROCEDURE 5.7ENS               I       REVISION 0           1   PAGE 4 OF 9
2.3 Return headset to base.
I PROCEDURE 5.7ENS I
REVISION 0 1
PAGE 4 OF 9


C HM E N T 2       N R C C O M M U N ICATIO N G U ID E The level of communication between NRC and CNS will depend on the development and the significance of the event.
C H M E N T 2 N R C C O M M U N ICA TIO N G U ID E The level of communication between NRC and CNS will depend on the development and the significance of the event.
In Communicating with the NRCOC, attempt the following:
In Communicating with the NRCOC, attempt the following:
o     Take control of communications.
o Take control of communications.
o     Direct the NRC to provide single specific questions.
o Direct the NRC to provide single specific questions.
o     Write down the question, then verify (e.g., three part communication).
o Write down the question, then verify (e.g., three part communication).
o     Provide answer personally only if answer is something you know with certainty and pertains to plant data clarification, general system design, etc.
o Provide answer personally only if answer is something you know with certainty and pertains to plant data clarification, general system design, etc.
o     Use references (Procedures, Drawings, Manuals, etc.), where applicable, to verify answer. Never say "I think ..... "; hearsay is unacceptable.
o Use references (Procedures, Drawings, Manuals, etc.), where applicable, to verify answer. Never say "I think..... "; hearsay is unacceptable.
o     Other questions should be reviewed with Emergency Director or TSC Director if related to emergency actions or policy (state/counties actions, PARs) prior to releasing information to the NRC.
o Other questions should be reviewed with Emergency Director or TSC Director if related to emergency actions or policy (state/counties actions, PARs) prior to releasing information to the NRC.
o     As guide to information inquiry: Plant Systems - Ops EOP Advisor, Security Security Coordinator, Design Basis - Engineering Coordinator.
o As guide to information inquiry: Plant Systems - Ops EOP Advisor, Security Security Coordinator, Design Basis - Engineering Coordinator.
The following is a list of sample questions that may be asked during an emergency and should be verified with the Emergency Director prior to reply:
The following is a list of sample questions that may be asked during an emergency and should be verified with the Emergency Director prior to reply:
o     Is there any change to the classification? If so, what is the reason?
o Is there any change to the classification? If so, what is the reason?
o     What is the ongoing/imminent damage to the facility, including affected equipment and safety features?
o What is the ongoing/imminent damage to the facility, including affected equipment and safety features?
o     Have toxic or radiological releases occurred or been projected, including changes in the release rate? If so, what are the projected on-site and off-site releases, and what is the basis of assessment?
o Have toxic or radiological releases occurred or been projected, including changes in the release rate? If so, what are the projected on-site and off-site releases, and what is the basis of assessment?
o     What are the health effect/consequences to on-site/off-site people? How many on-site/off-site people are/will be affected and to what extent?
o What are the health effect/consequences to on-site/off-site people? How many on-site/off-site people are/will be affected and to what extent?
o       Is the event under control? When was control established or what is the planned action to bring the event under control? What is the mitigative action underway or planned?
o Is the event under control? When was control established or what is the planned action to bring the event under control? What is the mitigative action underway or planned?
o       What on-site protective measures have been taken or planned?
o What on-site protective measures have been taken or planned?
o       What off-site protective actions have been recommended to State/local officials?
o What off-site protective actions have been recommended to State/local officials?
o       What is the status of State/local/other Federal agencies' response, if known?
o What is the status of State/local/other Federal agencies' response, if known?
o       If applicable, what is the status of public information activities, such as alarm, broadcast, or press releases (CNS/State/local/other Federal agencies)? Has a Joint Information Center been activated?
o If applicable, what is the status of public information activities, such as alarm, broadcast, or press releases (CNS/State/local/other Federal agencies)? Has a Joint Information Center been activated?
PROCEDURE 5.7ENS                   I         REVISION 0                   PAGE 5 OF 9
PROCEDURE 5.7ENS I
REVISION 0 PAGE 5 OF 9


ATTACHMENT 3                               ENS COMMUNICATOR QUESTION TRACKING LOG DATE:
ATTACHMENT 3 ENS COMMUNICATOR QUESTION TRACKING LOG DATE:
RESPONSE/INFORMATION TIME OF                 QUESTION/INFORMATION                             NAME OF       PROVIDED (INCLUDING     CLOSED           TIME INQUIRY                                 REQUESTED                       REQUESTOR     REFERENCE DOCUMENTS)             (I)     CLOSED t                                                       I
RESPONSE/INFORMATION TIME OF QUESTION/INFORMATION NAME OF PROVIDED (INCLUDING CLOSED TIME INQUIRY REQUESTED REQUESTOR REFERENCE DOCUMENTS)
                +                                                                                               t             1-4                                                     1           I                           t
(I)
_____________  L _____________________________________________                   a                             ___________  ____________
CLOSED PROCEDURE 5.7ENS REVISION 0 1
PROCEDURE 5.7ENS                                              REVISION 0          1        PAGE 6 OF 9
PAGE 6 OF 9 t
I
+
t 1-4 1
I t
L _____________________________________________
a  


ATTACHMENT 3   ENS COMMUNICATOR QUESTION TRACKING LOG DATE:
ATTACHMENT 3 ENS COMMUNICATOR QUESTION TRACKING LOG DATE:
RESPONSE/INFORMATION TIME OF   QUESTION/INFORMATION     NAME OF       PROVIDED (INCLUDING     CLOSED TIME INQUIRY         REQUESTED           REQUESTOR     REFERENCE DOCUMENTS)         (__)   CLOSED 4-                                     +                           +
RESPONSE/INFORMATION TIME OF QUESTION/INFORMATION NAME OF PROVIDED (INCLUDING CLOSED TIME INQUIRY REQUESTED REQUESTOR REFERENCE DOCUMENTS)
4-                         4           4                                   t I      PROCEDURE 5.7ENS                REVISION 0          1        PAGE7 OF9
(__)
CLOSED I
PROCEDURE 5.7ENS REVISION 0 1
PAGE7 OF9 4-  
+  
+
4-4 4
t


ATTACHMENT 3                               ENS COMMUNICATOR QUESTION TRACKING LOG DATE:
ATTACHMENT 3 ENS COMMUNICATOR QUESTION TRACKING LOG DATE:
RESPONSE/INFORMATION TIME OF         QUESTION/INFORMATION                           NAME OF       PROVIDED (INCLUDING       CLOSED       TIME INQUIRY                         REQUESTED                     REQUESTOR     REFERENCE DOCUMENTS)           (I)   CLOSED
RESPONSE/INFORMATION TIME OF QUESTION/INFORMATION NAME OF PROVIDED (INCLUDING CLOSED TIME INQUIRY REQUESTED REQUESTOR REFERENCE DOCUMENTS)
        .1.                                                   4                                       I
(I)
        .1 _____________________________________________       a           h                             ___________
CLOSED PROCEDURE 5.7ENS REVISION 0 PAGE8 OF 9
PROCEDURE 5.7ENS                                              REVISION 0                    PAGE8 OF 9
.1.
4 I
.1 _____________________________________________
a h  


ATTACHMENT 4     INFORMATION SHEET REFERENCES 1.1   CODES AND STANDARDS 1.1.1 NPPD Emergency Plan for CNS.
ATTACHMENT 4 INFORMATION SHEET REFERENCES 1.1 CODES AND STANDARDS 1.1.1 NPPD Emergency Plan for CNS.
1.1.2 NUREG 0654/FEMA-REP-1, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
1.1.2 NUREG 0654/FEMA-REP-1, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
1.1.3 10CFR50.72.
1.1.3 10CFR50.72.
1.2   PROCEDURES 1.2.1 Conduct of Operations Procedure 2.0.6, Operational Event Response and Review.
1.2 PROCEDURES 1.2.1 Conduct of Operations Procedure 2.0.6, Operational Event Response and Review.
1.3   MISCELLANEOUS 1.3.1 NRC Information Notice 98-08.
1.3 MISCELLANEOUS 1.3.1 NRC Information Notice 98-08.
1.3.2 Emergency Telephone Directory - "Federal Tab".
1.3.2 Emergency Telephone Directory - "Federal Tab".
I     PROCEDURE 5.7ENS         I       REVISION 0         1   PAGE 9 OF9 9
I PROCEDURE 5.7ENS I
REVISION 0 1
PAGE 9 OF9 9


USE: REFERENCE EFEC   E: 6 CNS OPERATIONS MANUAL EPIP PROCEDURE 5.7.2                                             APPROVA: SORC APPROVAL: SORC OWNER: R. J. FISCHER EP SHIFT SUPERVISOR EPIP                                             DEPARTMNT
USE: REFERENCE CNS OPERATIONS MANUAL EFEC E:
                                                                                .DEPARTMENT: EP
6 EPIP PROCEDURE 5.7.2 APPROVA: SORC APPROVAL: SORC OWNER: R. J. FISCHER SHIFT SUPERVISOR EPIP DEPARTMNT EP
: 1. P UR P O SE ............................................................                               1
.DEPARTMENT: EP
: 2. PRECAUTIONS AND LIMITATIONS .....................................                                      1
: 1.
: 3. REQU IREM EN TS ......................................................                                 1
P U R P O SE............................................................
: 4. INITIAL A CTIO NS .....................................................                               2
1
: 5. RECORDS .............................................................                                 2 ATTACHMENT 1                 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT                           ... 3 ATTACHMENT 2                 ACTIONS FOR AN ALERT ............................                       8 ATTACHMENT 3                 ACTIONS FOR SITE AREA EMERGENCY ..............                         14 ATTACHMENT 4                 ACTIONS FOR GENERAL EMERGENCY ...............                           21 ATTACHMENT 5                 SHIFT SUPERVISOR ACTIONS WHEN ANOTHER INDIVIDUAL IS EMERGENCY DIRECTOR .............                         27 ATTACHMENT 6                 ALTERNATE NOTIFICATION METHODS ..............                           28 ATTACHMENT 7                 EMERGENCY DIRECTOR TURNOVER ................                           31 ATTACHMENT 8                 ANNOUNCEMENTS WITH ERFS ACTIVATED ..........                           34 ATTACHMENT 9                 INFORMATION SHEET .............................                         35
: 2.
: 1. PURPOSE This procedure provides a series of actions to be taken by Shift Supervisor upon declaration of an Emergency Classification.
PRECAUTIONS AND LIMITATIONS 1
: 2. PRECAUTIONS AND LIMITATIONS
: 3.
[ ] 2.1   Shift Supervisor shall initially assume role of Emergency Director and will be Emergency Director until relieved by another qualified Emergency Director.
REQU IREM EN TS......................................................
[ ] 2.2   If an Alert, a Site Area Emergency, or General Emergency is reached, do not reclassify to a lower classification or terminate Emergency until Emergency Response Facilities are activated.
1
: 3. REQUIREMENTS
: 4.
[ ] 3.1   An Emergency has been declared per Procedure 5.7.1.
INITIAL A CTIO NS.....................................................
[ ] 3.2   Procedure steps in Section 4 and Attachments 1, 2, 3, and 4 may be performed out of listed order, if needed to more efficiently deal with emergency situation.
2
PROCEDURE 5.7.2                                 1             REVISION 17       1 PAGE 1 OF 37
: 5.
: 4. INITIAL ACTIONS
RECORDS.............................................................
[] 4.1  Shift Supervisor, immediately following classification of an emergency, should announce following to Control Room Staff:
2 ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT  
[]    4.1.1    Time of classification.                                Time:
... 3 ATTACHMENT 2 ACTIONS FOR AN ALERT............................
[]    4.1.2    Level of emergency classification.                      Class:
8 ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY..............
[]    4.1.3    EAL on which classification is based.                  EAL #:
14 ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY...............
[]    4.1.4    Description of condition causing classification.
21 ATTACHMENT 5 SHIFT SUPERVISOR ACTIONS WHEN ANOTHER INDIVIDUAL IS EMERGENCY DIRECTOR.............
[I 4.2  Ensure Shift Communicator has been called to Control Room.
27 ATTACHMENT 6 ALTERNATE NOTIFICATION METHODS..............
[I 4.3  Enter Attachment for applicable Classification Level.
28 ATTACHMENT 7 EMERGENCY DIRECTOR TURNOVER................
[]    4.3.1    Attachment 1, ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT.
31 ATTACHMENT 8 ANNOUNCEMENTS WITH ERFS ACTIVATED..........
[]    4.3.2    Attachment 2, ACTIONS FOR AN ALERT.
34 ATTACHMENT 9 INFORMATION SHEET.............................
[]    4.3.3    Attachment 3, ACTIONS FOR SITE AREA EMERGENCY.
35
[I    4.3.4    Attachment 4, ACTIONS FOR GENERAL EMERGENCY.
: 1.
: 5. RECORDS
PURPOSE This procedure provides a series of actions to be taken by Shift Supervisor upon declaration of an Emergency Classification.
[] 5.1  Completed portions and Attachments are sent to the EP Manager for CNS Records (quality records upon completion).
: 2.
I      PROCEDURE 5.7.2              1      REVISION 17            1  PAGE 2 OF 37    1
PRECAUTIONS AND LIMITATIONS
[ ] 2.1 Shift Supervisor shall initially assume role of Emergency Director and will be Emergency Director until relieved by another qualified Emergency Director.
[ ] 2.2 If an Alert, a Site Area Emergency, or General Emergency is reached, do not reclassify to a lower classification or terminate Emergency until Emergency Response Facilities are activated.
: 3.
REQUIREMENTS
[ ] 3.1 An Emergency has been declared per Procedure 5.7.1.
[ ] 3.2 Procedure steps in Section 4 and Attachments 1, 2, 3, and 4 may be performed out of listed order, if needed to more efficiently deal with emergency situation.
PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 1 OF 37


I   ATTACHMENT 1             ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT
INITIAL ACTIONS 4.1 Shift Supervisor, immediately following classification of an emergency, should announce following to Control Room Staff:
: 1. ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT
[ ]
[]   1.1   Inform ERO personnel of Notification of Unusual Event via CNS Automated Notification System (ANS).
4.1.1 Time of classification.
[]     1.1.1     On telephone with ANS Activation Module, activate ANS by:
[]
[1       1.1.1.1     Picking up telephone.
[]
[ ]       NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.
[]
[ ]       1.1.1.2     When dial tone received, depress ACTIVATE DIALOGICS pushbutton.
4.2 4.3
[]         1.1.1.3   When voice asks for Scenario Password, depress one of following:
[]
[ ]     a. "100 SCENARIO" pushbutton for normal NOUE.
[]
[ ]     b. "222 SCENARIO" pushbutton to activate on-site ERFs.
[]
[ ]     c. "333 SCENARIO" pushbutton to activate AEOF.
[I Time:
[ ]       1.1.1.4   When ANS tells you goodby, hang up.
4.1.2 Level of emergency classification.
[]     1.1.2     If ANS or telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per Attachment 6.
Class:
4.1.3 EAL on which classification is based.
EAL #:
4.1.4 Description of condition causing classification.
Ensure Shift Communicator has been called to Control Room.
Enter Attachment for applicable Classification Level.
4.3.1, ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT.
4.3.2, ACTIONS FOR AN ALERT.
4.3.3, ACTIONS FOR SITE AREA EMERGENCY.
4.3.4, ACTIONS FOR GENERAL EMERGENCY.
RECORDS 5.1 Completed portions and Attachments are sent to the EP Manager for CNS Records (quality records upon completion).
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 2 OF 37 1
: 4.
[ ]
[I
[I
: 5.
[]
 
I ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT
: 1.
[]
ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT 1.1 Inform ERO personnel of Notification of Unusual Event via CNS Automated Notification System (ANS).
[ ]
1.1.1 On telephone with ANS Activation Module, activate ANS by:
[1 1.1.1.1 Picking up telephone.
[ ]
NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.
[ ]
1.1.1.2 When dial tone received, depress ACTIVATE DIALOGICS pushbutton.
[ ]
1.1.1.3 When voice asks for Scenario Password, depress one of following:
[ ]
: a.  
"100 SCENARIO" pushbutton for normal NOUE.
[ ]
: b.  
"222 SCENARIO" pushbutton to activate on-site ERFs.
[ ]
: c.  
"333 SCENARIO" pushbutton to activate AEOF.
[ ]
1.1.1.4 When ANS tells you goodby, hang up.
[ ]
1.1.2 If ANS or telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per.
[ ] NOTE 1 - Accountability and personnel assembly is not required at NOUE level; however, it may be performed.
[ ] NOTE 1 - Accountability and personnel assembly is not required at NOUE level; however, it may be performed.
[] NOTE 2 - Accountability should not be performed if performing accountability will additionally THREATEN PERSONNEL SAFETY.©
[] NOTE 2 - Accountability should not be performed if performing accountability will additionally THREATEN PERSONNEL SAFETY.©
[] 1.2   Determine if personnel assembly and accountability will be performed.
[]
[ ]     1.2.1     If accountability will not be performed, go to Step 1.3.
1.2 Determine if personnel assembly and accountability will be performed.
[]     1.2.2     If accountability will be performed, go to Step 1.4.
[ ]
I       PROCEDURE 5.7.2                 1       REVISION 17           1   PAGE 3 OF 37   ]
1.2.1 If accountability will not be performed, go to Step 1.3.
[ ]
1.2.2 If accountability will be performed, go to Step 1.4.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 3 OF 37  
]


ATTACHMENT 1           ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT
ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT
[ ] NOTE - Personnel assembly and accountability is not required at NOUE level; however, it may be performed.
[ ] NOTE - Personnel assembly and accountability is not required at NOUE level; however, it may be performed.
[ ] 1.3 If personnel assembly and accountability will not be performed, perform following:
[ ]
[I   1.3.1   If desired, fill in blanks of Step 1.3.3:
1.3 If personnel assembly and accountability will not be performed, perform following:
[ ]     1.3.1.1     In (1), give a brief description of emergency event and if applicable, location.
[I All personnel stay clear of (2)
[ ]     1.3.1.2     In (2), provide following as needed:©
I PROCEDURE 5.7.2 1
                                "*    Locations that should be avoided due to emergency conditions.
REVISION 17 1
                                "*    Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel.
PAGE 4 OF 37 1.3.1 If desired, fill in blanks of Step 1.3.3:
                                "*    Any precautions needed for security events/severe weather conditions.
[ ]
[1    1.3.2   Activate Emergency Alarm for 10 seconds.
1.3.1.1 In (1), give a brief description of emergency event and if applicable, location.
[l    1.3.3   Make following announcement over station Gaitronics:
[ ]
Attention All Station Personnel, at               Emergency Director declared
1.3.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.
Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel.
Any precautions needed for security events/severe weather conditions.
1.3.2 Activate Emergency Alarm for 10 seconds.
1.3.3 Make following announcement over station Gaitronics:
Attention All Station Personnel, at Emergency Director declared
[time]
[time]
a Notification of Unusual Event.
a Notification of Unusual Event.
There is (1)
There is (1)
All personnel stay clear of (2)
[1
Activate Emergency Alarm for 10 seconds and repeat announcement.
[l Activate Emergency Alarm for 10 seconds and repeat announcement.
I      PROCEDURE 5.7.2                1      REVISION 17          1    PAGE 4 OF 37


ATTACHMENT 1             ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT
ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT
[ ] NOTE - Accountability should not be performed, if performing accountability will additionally THREATEN PERSONNEL SAFETY.©
[ ] NOTE - Accountability should not be performed, if performing accountability will additionally THREATEN PERSONNEL SAFETY.©
[ ]1.4       If assembly and accountability is desired for NOUE, perform following:
[ ]1.4 If assembly and accountability is desired for NOUE, perform following:
[1     1.4.1     If desired, fill in blanks of Step 1.4.3.
[1 1.4.1 If desired, fill in blanks of Step 1.4.3.
[ ]       1.4.1.1     In (1), give a brief description of emergency event and if applicable, location.
[ ]
[1       1.4.1.2     In (2), provide following as needed:©
1.4.1.1 In (1), give a brief description of emergency event and if applicable, location.
                                    "*    Locations that should be avoided due to emergency conditions.
[1 1.4.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.
                                    "*    Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel.
Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel.
                                    "*    Any precautions needed for security events/severe weather conditions.
Any precautions needed for security events/severe weather conditions.
[]     1.4.2     Activate Emergency Alarm for 10 seconds.
[ ]
[]     1.4.3     Make following announcement over station Gaitronics:
1.4.2 Activate Emergency Alarm for 10 seconds.
Attention All Station Personnel, at               Emergency Director declared a
[ ]
1.4.3 Make following announcement over station Gaitronics:
Attention All Station Personnel, at Emergency Director declared a
[time]
[time]
Notification of Unusual Event.
Notification of Unusual Event.
Line 218: Line 337:
All personnel stay clear of (2)
All personnel stay clear of (2)
Activate Emergency Alarm for 10 seconds and repeat announcement.
Activate Emergency Alarm for 10 seconds and repeat announcement.
PROCEDURE 5.7.2                 1       REVISION 17           1   PAGE 5 OF 37
PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 5 OF 37


I   ATTACHMENT 1             ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT                       I
I ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT I
[ ]   1.5   Record time announcement completed.                                Time:
[ ]
[ ] 1.6      Direct someone to complete CNS Notification form per Procedure 5.7.6.
1.5 Record time announcement completed.
[ ]    1.6.1    For NOUE, recommended PAR is "None".
[ ]    1.6.2    Review and sign completed Notification form to authorize transmittal to state and local authorities.
[ ] 1.7      Ensure initial notification with PAR, to responsible state and local governmental agencies completed within 15 minutes of declaration.
[ ]    1.7.1    Record time state and local authorities contacted.        Time:
[ ] 1.8      During performance of subsequent steps in this Attachment, monitor plant conditions and re-evaluate emergency classification as conditions change per Procedure 5.7.1. Escalate to a higher emergency classification if conditions warrant.
[ ]    1.8.1    If reclassification is performed, ensure NRC notification 1 hour time limit is completed and tracked.
[ ]    1.8.2    If reclassification is performed, proceed to Step 1.11.
[ ]1.9      Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies and not later than 1 hour after time of declaration of Notification of Unusual Event.
[ 1    1.9.1    Record time NRC duty officer is contacted.                Time:
[]    1.10  If assembly and accountability is being performed for NOUE, perform following:
[1      1.10.1  Ensure Designated Assembly Area Supervisor for the Control Room is completing initial accountability of Operations personnel per Procedure 5.7.10.
[]      1.10.2  Ensure initial accountability completed within 30 minutes per Procedure 5.7.10.
[]      1.10.2.1    Record time initial accountability completed.
Time:
Time:
I         PROCEDURE 5.7.2               1       REVISION 17           1   PAGE 6 OF 37     j
[ ] 1.6 Direct someone to complete CNS Notification form per Procedure 5.7.6.
[ ]
1.6.1 For NOUE, recommended PAR is "None".
[ ]
1.6.2 Review and sign completed Notification form to authorize transmittal to state and local authorities.
[ ] 1.7 Ensure initial notification with PAR, to responsible state and local governmental agencies completed within 15 minutes of declaration.
[ ]
1.7.1 Record time state and local authorities contacted.
Time:
[ ] 1.8 During performance of subsequent steps in this Attachment, monitor plant conditions and re-evaluate emergency classification as conditions change per Procedure 5.7.1. Escalate to a higher emergency classification if conditions warrant.
[ ]
1.8.1 If reclassification is performed, ensure NRC notification 1 hour time limit is completed and tracked.
[ ]
1.8.2 If reclassification is performed, proceed to Step 1.11.
[ ]1.9 Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies and not later than 1 hour after time of declaration of Notification of Unusual Event.
[ 1 1.9.1 Record time NRC duty officer is contacted.
[]
1.10 Time:
If assembly and accountability is being performed for NOUE, perform following:
[1 1.10.1 Ensure Designated Assembly Area Supervisor for the Control Room is completing initial accountability of Operations personnel per Procedure 5.7.10.
[ ]
1.10.2 Ensure initial accountability completed within 30 minutes per Procedure 5.7.10.
[ ]
1.10.2.1 Record time initial accountability completed.
Time:
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 6 OF 37 j


ATTACHMENT 1           ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT
ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT
[ ] 1.11   If escalating to another emergency classification, perform following:
[ ]
[ ]   1.11.1   Announce following to Control Room Staff:
1.11 If escalating to another emergency classification, perform following:
[ ]       1.11.1.1     Time of classification.                     Time:
[ ]
[1       1.11.1.2     Level of emergency classification.           Class:
1.11.1 Announce following to Control Room Staff:
[ ]       1.11.1.3     EAL on which classification is based.       EAL#:
[ ]
[ ]       1.11.1.4   Description of condition causing classification.
1.11.1.1 Time of classification.
[ ]   1.11.2   Exit this Attachment and enter Attachment for applicable Classification level.
Time:
  ] NOTE - Normally Shift Supervisor remains Emergency Director when at a Notification of Unusual Event. However, another qualified Emergency Director may relieve Shift Supervisor as Emergency Director.
[1 1.11.1.2 Level of emergency classification.
[ ] 1.12   Turnover Emergency Director duties when relieved by another qualified Emergency Director.
Class:
[ ]   1.12.1   Use Attachment 7 to turnover to oncoming Emergency Director.
[ ]
[]   1.12.2   Announce to Control Room who Emergency Director is.
1.11.1.3 EAL on which classification is based.
[3   1.12.3   Exit this Attachment and enter Attachment 5.
EAL#:
[ ]1.13   Terminate emergency, if appropriate per Procedure 5.7.6.
[ ]
[ ]   1.13.1     If emergency is terminated, provide notification of termination to responsible state and local governmental agencies per Procedure 5.7.6.
1.11.1.4 Description of condition causing classification.
I         PROCEDURE 5.7.2               1       REVISION 17         1   PAGE 7 OF 37
[ ]
1.11.2 Exit this Attachment and enter Attachment for applicable Classification level.  
] NOTE - Normally Shift Supervisor remains Emergency Director when at a Notification of Unusual Event. However, another qualified Emergency Director may relieve Shift Supervisor as Emergency Director.
[ ]
1.12 Turnover Emergency Director duties when relieved by another qualified Emergency Director.
[ ]
1.12.1 Use Attachment 7 to turnover to oncoming Emergency Director.
[ ]
1.12.2 Announce to Control Room who Emergency Director is.
[ 3 1.12.3 Exit this Attachment and enter Attachment 5.
[ ]1.13 Terminate emergency, if appropriate per Procedure 5.7.6.
[ ]
1.13.1 If emergency is terminated, provide notification of termination to responsible state and local governmental agencies per Procedure 5.7.6.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 7 OF 37


ATTACHMENT 2           ACTIONS FOR AN ALERT ACTIONS FOR AN ALERT
ATTACHMENT 2 ACTIONS FOR AN ALERT ACTIONS FOR AN ALERT
[ ]   CAUTION - Do not re-activate Automated Notification System if Emergency Response Facilities are already being activated.
[ ]
[ ] 1.1   If not previously performed, initiate ERO activation by:
CAUTION - Do not re-activate Automated Notification System if Emergency Response Facilities are already being activated.
      ]   1.1.1     Determine if ERO personnel will report to on-site Facilities or to AEOF.
[ ] 1.1 If not previously performed, initiate ERO activation by:  
[]   1.1.2     On telephone with ANS Activation Module, activate ANS by:
]
[ ]       1.1.2.1     Picking up telephone.
1.1.1 Determine if ERO personnel will report to on-site Facilities or to AEOF.
[]     NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.
[ ]
[ ]       1.1.2.2   When dial tone received, depress ACTIVATE DIALOGICS pushbutton.
1.1.2 On telephone with ANS Activation Module, activate ANS by:
[ ]       1.1.2.3     When voice asks for Scenario Password, depress one of following:
[ ]
[1     a. "222 SCENARIO" pushbutton to activate on-site ERFs.
1.1.2.1 Picking up telephone.
[ ]     b. "333 SCENARIO" pushbutton to activate AEOF.
[]
[ ]       1.1.2.4     When ANS tells you goodby, hang up.
NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.
[ ]   1.1.3     If ANS or telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per Attachment 6.
[ ]
1.1.2.2 When dial tone received, depress ACTIVATE DIALOGICS pushbutton.
[ ]
1.1.2.3 When voice asks for Scenario Password, depress one of following:
[1
: a.  
"222 SCENARIO" pushbutton to activate on-site ERFs.
[ ]
: b.  
"333 SCENARIO" pushbutton to activate AEOF.
[ ]
1.1.2.4 When ANS tells you goodby, hang up.
[ ]
1.1.3 If ANS or telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per Attachment 6.
[ ]NOTE - Accountability will be performed if not previously performed and performing accountability will not additionally THREATEN PERSONNEL SAFETY.©
[ ]NOTE - Accountability will be performed if not previously performed and performing accountability will not additionally THREATEN PERSONNEL SAFETY.©
[ 1.2   Determine if personnel assembly and accountability will be performed.
[
[ ]   1.2.1     If accountability will be performed, go to Step 1.3.
1.2 Determine if personnel assembly and accountability will be performed.
[]   1.2.2     If accountability will not be performed, go to Step 1.4.
[ ]
I       PROCEDURE 5.7.2               1       REVISION 17           1   PAGE 8 OF 37
1.2.1 If accountability will be performed, go to Step 1.3.
[ ]
1.2.2 If accountability will not be performed, go to Step 1.4.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 8 OF 37


ATTACHMENT 2         ACTIONS FOR AN ALERT 1.3 Notify personnel and initiate personnel assembly and accountability by:
ATTACHMENT 2 ACTIONS FOR AN ALERT 1.3 Notify personnel and initiate personnel assembly and accountability by:
[ ]   1.3.1   If desired, fill in blanks below for Step 1.3.3.
[ ]
[]     1.3.1.1     In (1), give a brief description of emergency event and if applicable, location.
1.3.1 If desired, fill in blanks below for Step 1.3.3.
[ ]     1.3.1.2     In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.
[ ]
1.3.1.1 In (1), give a brief description of emergency event and if applicable, location.
[ ]
1.3.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.
Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
Any precautions needed for security events/severe weather conditions.
Any precautions needed for security events/severe weather conditions.
[ ]   1.3.2   Activate Emergency Alarm for 10 seconds.
[ ]
[]   1.3.3   Announce following over station Gaitronics:
1.3.2 Activate Emergency Alarm for 10 seconds.
Attention All Station Personnel, at _,             Emergency Director
[ ]
1.3.3 Announce following over station Gaitronics:
Attention All Station Personnel, at _,
Emergency Director
[time]
[time]
declared an ALERT.
declared an ALERT.
Line 290: Line 464:
All personnel stay clear of (2)
All personnel stay clear of (2)
Activate Emergency Alarm for 10 seconds and repeat announcement.
Activate Emergency Alarm for 10 seconds and repeat announcement.
PROCEDURE 5.7.2                 1       REVISION 17           1   PAGE 9 OF 37
PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 9 OF 37


ATTACHMENT 2           ACTIONS FOR AN ALERT 1.4   Notify station personnel WITHOUT personnel assembly and accountability by:
ATTACHMENT 2 ACTIONS FOR AN ALERT 1.4 Notify station personnel WITHOUT personnel assembly and accountability by:
[]   1.4.1   If desired, fill in blanks below for Step 1.4.3.
[ ]
[ ]     1.4.1.1     In (1), give a brief description of emergency event and if applicable, location.
1.4.1 If desired, fill in blanks below for Step 1.4.3.
[1       1.4.1.2     In (2), provide following as needed:©
[ ]
                              "*    Locations that should be avoided due to emergency conditions.
1.4.1.1 In (1), give a brief description of emergency event and if applicable, location.
                              "*    Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
[1 1.4.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.
                              "*    Any precautions needed for security events/severe weather conditions.
Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
[1   1.4.2   Activate Emergency Alarm for 10 seconds.
Any precautions needed for security events/severe weather conditions.
[]   1.4.3   Announce following over station Gaitronics:
[1 1.4.2 Activate Emergency Alarm for 10 seconds.
Attention All Station Personnel, at               Emergency Director
[ ]
1.4.3 Announce following over station Gaitronics:
Attention All Station Personnel, at Emergency Director
[time]
[time]
declared an ALERT.
declared an ALERT.
Line 307: Line 485:
All personnel stay clear of (2)
All personnel stay clear of (2)
Activate Emergency Alarm for 10 seconds and repeat announcement.
Activate Emergency Alarm for 10 seconds and repeat announcement.
I     PROCEDURE 5.7.2                 1       REVISION 17           1   PAGE 10 OF 37
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 10 OF 37


ATTACHMENT 2             ACTIONS FOR AN ALERT
ATTACHMENT 2 ACTIONS FOR AN ALERT
[1 1.5   Record time announcement completed.                               Time:
[1 1.5 Record time announcement completed.
[ ]1.6     Direct on watch individual to complete CNS Notification form per Procedure 5.7.6.
Time:
[1     1.6.1     For an ALERT, recommended PAR is "None".
[ ]1.6 Direct on watch individual to complete CNS Notification form per Procedure 5.7.6.
[ ]   1.6.2     Review and sign completed Notification form to authorize transmittal to state and local authorities.
[1 1.6.1 For an ALERT, recommended PAR is "None".
[I  1.7   Ensure initial notification with PAR to responsible state and local governmental agencies is completed within 15 minutes of declaration of emergency class per Procedure 5.7.6.
[ ]
[]    1.7.1     Record time state and local authorities contacted.       Time:
1.6.2 Review and sign completed Notification form to authorize transmittal to state and local authorities.
[ ] 1.8   If not previously performed, ensure ERO pager activation has occurred by one of the following methods:
1.7 Ensure initial notification with PAR to responsible state and local governmental agencies is completed within 15 minutes of declaration of emergency class per Procedure 5.7.6.
[]     1.8.1     Activation of Control Room or Shift Manager's pager, or
1.7.1 Record time state and local authorities contacted.
[]     1.8.2     ANS activation by calling Ext. 5560 and verifying ANS indicates an active scenario.
Time:
[ ]1.9     If ANS fails to activate pagers, have an individual concurrently activate backup notification methods per Attachment 6.
[ ]
[ ] 1.10   During performance of subsequent steps in this Attachment, monitor plant conditions and re-evaluate emergency classification as conditions change per Procedure 5.7.1. Escalate to a higher emergency classification if conditions warrant.
1.8 If not previously performed, ensure ERO pager activation has occurred by one of the following methods:
[I]   1.10.1   If reclassification is performed, ensure NRC and ERDS 1 hour time limits are completed and tracked.
[ ]
[]     1.10.2   If reclassification is performed, proceed to Step 1.19.
1.8.1 Activation of Control Room or Shift Manager's pager, or
[ ] 1.11   If a release is in progress, have a dose calculation performed per Procedure 5.7.17 to determine if a higher classification is warranted.
[ ]
I       PROCEDURE 5.7.2                 1       REVISION 17         1   PAGE 11 OF 37
1.8.2 ANS activation by calling Ext. 5560 and verifying ANS indicates an active scenario.
[ ]1.9 If ANS fails to activate pagers, have an individual concurrently activate backup notification methods per Attachment 6.
[ ]
1.10 During performance of subsequent steps in this Attachment, monitor plant conditions and re-evaluate emergency classification as conditions change per Procedure 5.7.1. Escalate to a higher emergency classification if conditions warrant.
[I]
1.10.1 If reclassification is performed, ensure NRC and ERDS 1 hour time limits are completed and tracked.
[ ]
1.10.2 If reclassification is performed, proceed to Step 1.19.
[ ]
1.11 If a release is in progress, have a dose calculation performed per Procedure 5.7.17 to determine if a higher classification is warranted.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 11 OF 37
[I
[]


ATTACHMENT 2             ACTIONS FOR AN ALERT                                           I
ATTACHMENT 2 ACTIONS FOR AN ALERT I
[ ] 1.12 Ensure Emergency Response Data Systems (ERDS) is activated using PMIS START/STOP Menu. This shall be done as soon as possible but not later than 1 hour after time of declaration of an ALERT or higher classification.
[ ] 1.12 Ensure Emergency Response Data Systems (ERDS) is activated using PMIS START/STOP Menu. This shall be done as soon as possible but not later than 1 hour after time of declaration of an ALERT or higher classification.
[ ]   1.12.1   Record time ERDS activated.                             Time:
[ ]
[]   1.13   Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies, and not later than 1 hour after declaration of emergency.
1.12.1 Record time ERDS activated.
[1     1.13.1   Record Time NRC duty officer is contacted.               Time:
[]
[]   1.14   Ensure initial accountability of Operations personnel is completed.
1.13 Time:
[1]1.15   If any of following conditions exist, concurrently enter Procedure 5.7.14 for Stable Iodine Thyroid Blocking:
Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies, and not later than 1 hour after declaration of emergency.
[ ]   1.15.1     Fuel cladding has been determined to be lost, or
[1 1.13.1 Record Time NRC duty officer is contacted.
[I     1.15.2     Calculated dose of >_25 rem (CDE) to thyroid is likely to be received, or
[]
[ ]   1.15.3     Life saving operation is to be undertaken in areas where high levels of radio-iodine are suspected and no current air analysis is available.
1.14 Time:
[1] 1.16 Ensure initial accountability completed by:
Ensure initial accountability of Operations personnel is completed.
[ ]   1.16.1   Within 30 minutes, ensure Security Coordinator reports when initial accountability is complete.
[1 ]1.15 If any of following conditions exist, concurrently enter Procedure 5.7.14 for Stable Iodine Thyroid Blocking:
[ ]   1.16.2   If accountability was not initiated due to personnel safety concerns, monitor plant/site conditions and when personnel safety concern has passed, initiate personnel assembly and accountability.
[ ]
[1     1.16.3   Record time initial accountability completed.           Time:
1.15.1 Fuel cladding has been determined to be lost, or
[1]1.17     Consider dismissal of all non-ERO personnel from station at ALERT classification per Procedure 5.7.11.
[I 1.15.2 Calculated dose of >_ 25 rem (CDE) to thyroid is likely to be received, or
[1   1.18   During an ALERT or higher class emergency, perform follow-up notifications to state and local agencies at least every 60 minutes or sooner if there is a significant change in status of emergency per Procedure 5.7.6.
[ ]
I         PROCEDURE 5.7.2               1       REVISION 17           1 PAGE 12 OF 37
1.15.3 Life saving operation is to be undertaken in areas where high levels of radio-iodine are suspected and no current air analysis is available.
[1]
1.16 Ensure initial accountability completed by:
[ ]
1.16.1 Within 30 minutes, ensure Security Coordinator reports when initial accountability is complete.
[ ]
1.16.2 If accountability was not initiated due to personnel safety concerns, monitor plant/site conditions and when personnel safety concern has passed, initiate personnel assembly and accountability.
[1 1.16.3 Record time initial accountability completed.
Time:
[1 ]1.17 Consider dismissal of all non-ERO personnel from station at ALERT classification per Procedure 5.7.11.
[1 1.18 During an ALERT or higher class emergency, perform follow-up notifications to state and local agencies at least every 60 minutes or sooner if there is a significant change in status of emergency per Procedure 5.7.6.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 12 OF 37


ATTACHMENT 2           ACTIONS FOR AN ALERT                                         I
ATTACHMENT 2 ACTIONS FOR AN ALERT I
[1I 1.19 If reclassifying to another emergency classification, perform following:
[1I I
[ ]   1.19.1   Announce following to Control Room Staff.
PROCEDURE 5.7.2 1
[ ]       1.19.1.1     Time of classification.                       Time:
REVISION 17 1
[ ]       1.19.1.2     Level of emergency classification.           Class:
PAGE 13 OF 37 1.19 If reclassifying to another emergency classification, perform following:
1]       1.19.1.3     EAL on which classification is based.         EAL:
[ ]
[ ]       1.19.1.4     Description of condition causing classification.
1.19.1 Announce following to Control Room Staff.
[]   1.19.2     Exit this Attachment and enter Attachment for applicable Classification level.
[ ]
[]  1.20 Turnover Emergency Director duties when relieved by another qualified Emergency Director.
1.19.1.1 Time of classification.
[]   1.20.1     Use Attachment 7 to turnover to oncoming Emergency Director.
Time:
[]   1.20.2     Announce to Control Room Staff who Emergency Director is.
[ ]
[1   1.20.3     Exit this Attachment and enter Attachment 5.
1.19.1.2 Level of emergency classification.
I        PROCEDURE 5.7.2                1        REVISION 17          1  PAGE 13 OF 37
Class:
1 ]
1.19.1.3 EAL on which classification is based.
EAL:
[ ]
1.19.1.4 Description of condition causing classification.
[ ]
1.19.2 Exit this Attachment and enter Attachment for applicable Classification level.
1.20 Turnover Emergency Director duties when relieved by another qualified Emergency Director.
[ ]
1.20.1 Use Attachment 7 to turnover to oncoming Emergency Director.
[ ]
1.20.2 Announce to Control Room Staff who Emergency Director is.
[1 1.20.3 Exit this Attachment and enter Attachment 5.
[]


ATTACHMENT 3             ACTIONS FOR SITE AREA EMERGENCY ACTIONS FOR SITE AREA EMERGENCY SI CAUTION - Do not re-activate Automated Notification System if Emergency Response Facilities are already being activated.
ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY ACTIONS FOR SITE AREA EMERGENCY SI CAUTION - Do not re-activate Automated Notification System if Emergency Response Facilities are already being activated.
[1   1.1   If not previously performed, initiate ERO Activation by:
[1 1.1 If not previously performed, initiate ERO Activation by:
[]   1.1.1     Determine if ERO personnel will report to on-site Facilities or to AEOF.
[ ]
[]   1.1.2     On telephone with ANS Activation Module, activate ANS by:
1.1.1 Determine if ERO personnel will report to on-site Facilities or to AEOF.
[ ]       1.1.2.1     Picking up telephone.
[ ]
[ ]       NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.
1.1.2 On telephone with ANS Activation Module, activate ANS by:
[1       1.1.2.2     When Dial Tone received, depress ACTIVATE DIALOGICS pushbutton.
[ ]
[ ]       1.1.2.3     When voice asks for Scenario Password, depress one of following:
1.1.2.1 Picking up telephone.
[ ]     a. "222 SCENARIO" pushbutton to activate on-site ERFs.
[ ]
[]     b. "333 SCENARIO" pushbutton to Activate AEOF.
NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.
[]       1.1.2.4     When ANS tells you goodby, hang up.
[1 1.1.2.2 When Dial Tone received, depress ACTIVATE DIALOGICS pushbutton.
[ ]   1.1.3     If ANS or telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per Attachment 6.
[ ]
[ ] NOTE - Accountability will be performed if not previously performed and performing accountability will not additionally THREATEN PERSONNEL SAFETY©.
1.1.2.3 When voice asks for Scenario Password, depress one of following:
[ ]1.2     Determine if personnel assembly and accountability will be performed.
[ ]
[]   1.2.1     If accountability will be performed, go to Step 1.3.
: a.  
[1   1.2.2     If accountability will not be performed, go to Step 1.4.
"222 SCENARIO" pushbutton to activate on-site ERFs.
I         PROCEDURE 5.7.2               1       REVISION 17           1   PAGE 14 OF 37
[]
: b.  
"333 SCENARIO" pushbutton to Activate AEOF.
[ ]
1.1.2.4 When ANS tells you goodby, hang up.
[ ]
1.1.3 If ANS or telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per.
[ ]
NOTE - Accountability will be performed if not previously performed and performing accountability will not additionally THREATEN PERSONNEL SAFETY©.
[ ]1.2 Determine if personnel assembly and accountability will be performed.
[ ]
1.2.1 If accountability will be performed, go to Step 1.3.
[1 1.2.2 If accountability will not be performed, go to Step 1.4.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 14 OF 37


ATTACHMENT 3         ACTIONS FOR SITE AREA EMERGENCY
ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY
[1 1.3 Notify personnel and initiate personnel assembly and accountability by:
[1 1.3 Notify personnel and initiate personnel assembly and accountability by:
[1   1.3.1   If desired, fill in blanks below for Step 1.3.3.
[1 1.3.1 If desired, fill in blanks below for Step 1.3.3.
[ ]     1.3.1.1     In (1), give a brief description of emergency event and if applicable, location.
[ ]
[1       1.3.1.2     In (2), provide following as needed:©
1.3.1.1 In (1), give a brief description of emergency event and if applicable, location.
                              "*    Locations that should be avoided due to emergency conditions.
[1 1.3.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.
                              "*    Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
                              "*    Any precautions needed for security events/severe weather conditions.
Any precautions needed for security events/severe weather conditions.
[]   1.3.2   Activating Emergency Alarm for 10 seconds.
[ ]
[ ]   1.3.3   Announce following over station Gaitronics:
1.3.2 Activating Emergency Alarm for 10 seconds.
Attention All Station Personnel, At               Emergency Director
[ ]
1.3.3 Announce following over station Gaitronics:
Attention All Station Personnel, At Emergency Director
[time]
[time]
declared a SITE     AREA   EMERGENCY.
declared a SITE AREA EMERGENCY.
There is (1)
There is (1)
All personnel report to your Designated Assembly Areas for initial accountability.
All personnel report to your Designated Assembly Areas for initial accountability.
All personnel stay clear of (2)
All personnel stay clear of (2)
Activate Emergency Alarm for 10 seconds and repeat announcement.
Activate Emergency Alarm for 10 seconds and repeat announcement.
I     PROCEDURE 5.7.2                 1       REVISION 17           1   PAGE 15 OF 37
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 15 OF 37


I   ATTACHMENT 3           ACTIONS FOR SITE AREA EMERGENCY
I ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY
[] 1.4   Notify station personnel WITHOUT personnel assembly and accountability by:
[]
[]    1.4.1     If desired, fill in blanks below for Step 1.4.3.
1.4
[ ]       1.4.1.1     In (1), give a brief description of emergency event and if applicable, location.
[]
[1       1.4.1.2     In (2), provide following as needed:©
[1
                                "*    Locations that should be avoided due to emergency conditions.
[1]
                                "*    Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
Notify station personnel WITHOUT personnel assembly and accountability by:
                                "*    Any precautions needed for security events/severe weather conditions.
1.4.1 If desired, fill in blanks below for Step 1.4.3.
[1    1.4.2   Activate Emergency Alarm for 10 seconds.
[ ]
[1]  1.4.3   Announce following over station Gaitronics:
1.4.1.1 In (1), give a brief description of emergency event and if applicable, location.
Attention All Station Personnel, at               Emergency Director
[1 1.4.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.
Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
Any precautions needed for security events/severe weather conditions.
1.4.2 Activate Emergency Alarm for 10 seconds.
1.4.3 Announce following over station Gaitronics:
Attention All Station Personnel, at Emergency Director
[time]
[time]
declared a SITE AREA EMERGENCY.
declared a SITE AREA EMERGENCY.
Line 411: Line 656:
All personnel stay clear of (2)
All personnel stay clear of (2)
Activate Emergency Alarm for 10 seconds and repeat announcement.
Activate Emergency Alarm for 10 seconds and repeat announcement.
[ ] 1.5   Record time announcement completed.                                 Time:
[ ] 1.5 Record time announcement completed.
I       PROCEDURE 5.7.2                 1       REVISION 17         1   PAGE 16 OF 37 j
Time:
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 16 OF 37 j


I   ATTACHMENT 3           ACTIONS FOR SITE AREA EMERGENCY
I ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY
[ J 1.6   Make a Protective Action Recommendation (PAR) as part of initial notifications to responsible state and local governmental agencies.
[ J 1.6 Make a Protective Action Recommendation (PAR) as part of initial notifications to responsible state and local governmental agencies.
[ ]   1.6.1     If no release in progress, PAR is "None".
[ ]
[ ]   1.6.2     If release in progress, perform following as needed:
1.6.1 If no release in progress, PAR is "None".
[ ]     1.6.2.1     If dose calculation cannot be completed in time to meet 15 minute notification time limits, perform initial notifications with PAR of "None" and update when dose information needed for a PAR is available.
[ ]
[]       1.6.2.2     Have dose calculation performed per Procedure 5.7.17.
1.6.2 If release in progress, perform following as needed:
[]       1.6.2.3     Use projected doses and Procedure 5.7.20 to make PARs.
[ ]
[ ] 1.7   Direct on watch individual to complete CNS Notification form per Procedure 5.7.6.
1.6.2.1 If dose calculation cannot be completed in time to meet 15 minute notification time limits, perform initial notifications with PAR of "None" and update when dose information needed for a PAR is available.
[]     1.7.1   Review and sign completed Notification form to authorize transmitt*al to state and local authorities.
[ ]
[]  1.8  Ensure initial notification to responsible state and local governmental agencies is completed within 15 minutes of each declaration of an emergency class per Procedure 5.7.6.
1.6.2.2 Have dose calculation performed per Procedure 5.7.17.
[I    1.8.1   Record time state and local authorities contacted.       Time:
[ ]
[l  1.9  If not previously performed, ensure ERO pager activation has occurred by one of the following methods:
1.6.2.3 Use projected doses and Procedure 5.7.20 to make PARs.
[]    1.9.1   Activation of Control Room or Shift Manager's pager, or
[ ]
[1    1.9.2   ANS activation by calling Ext. 5560 and verifying ANS indicates an active scenario.
1.7 Direct on watch individual to complete CNS Notification form per Procedure 5.7.6.
[]  1.10  If ANS fails to activate pagers, have an individual concurrently activate backup notification methods per Attachment 6.
[ ]
I       PROCEDURE 5.7.2               1       REVISION 17           1   PAGE 17 OF 37   1
1.7.1 Review and sign completed Notification form to authorize transmitt*
1.8
[I
[l 1.9
[
[
]
1 al to state and local authorities.
Ensure initial notification to responsible state and local governmental agencies is completed within 15 minutes of each declaration of an emergency class per Procedure 5.7.6.
1.8.1 Record time state and local authorities contacted.
Time:
If not previously performed, ensure ERO pager activation has occurred by one of the following methods:
1.9.1 Activation of Control Room or Shift Manager's pager, or 1.9.2 ANS activation by calling Ext. 5560 and verifying ANS indicates an active scenario.
If ANS fails to activate pagers, have an individual concurrently activate backup notification methods per Attachment 6.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 17 OF 37 1
[]
[]
1.10


ATTACHMENT 3           ACTIONS FOR SITE AREA EMERGENCY
ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY
[ ] 1.11 During performance of subsequent steps in this Attachment, monitor plant conditions and re-evaluate emergency classification as conditions change per Procedure 5.7.1. Escalate to higher classification if conditions warrant.
[ ] 1.11 During performance of subsequent steps in this Attachment, monitor plant conditions and re-evaluate emergency classification as conditions change per Procedure 5.7.1. Escalate to higher classification if conditions warrant.
[1]   1.11.1   If reclassification is performed, ensure NRC and ERDS 1 hour time limits are completed and tracked.
[1]
[ ]   1.11.2   If reclassification is performed, proceed to Step 1.21.
1.11.1 If reclassification is performed, ensure NRC and ERDS 1 hour time limits are completed and tracked.
[]  1.12 If not previously performed, ensure Emergency Response Data Systems (ERDS) is activated using PMIS START/STOP Menu. This shall be done as soon as possible but not later than 1 hour after declaration of an ALERT or higher classification.
[ ]
[1     1.12.1   Record time ERDS activated.                             Time:
1.11.2 If reclassification is performed, proceed to Step 1.21.
[ ] 1.13 If release in progress or suspected, have additional dose calculations performed per Procedure 5.7.17 to determine projected off-site doses for use in determining classification and PAR.
1.12 If not previously performed, ensure Emergency Response Data Systems (ERDS) is activated using PMIS START/STOP Menu. This shall be done as soon as possible but not later than 1 hour after declaration of an ALERT or higher classification.
[] 1.14 Monitor plant conditions and meteorological conditions for changes in PAR.
[1 1.12.1 Record time ERDS activated.
[1     1.14.1   If a change in PAR occurs, complete notifications to responsible state and local governmental agencies within 15 minutes of declaration of the change per Procedure 5.7.6.
Time:
[]     1.14.2   If a change in PAR occurs, complete notification to NRC immediately after notification of responsible state and local governmental agencies, and not later than 1 hour after declaration of the change per Procedure 5.7.6.
[ ] 1.13 If release in progress or suspected, have additional dose calculations performed per Procedure 5.7.17 to determine projected off-site doses for use in determining classification and PAR.
[ ] 1.15   Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies, and not later than 1 hour after declaration of each emergency classification.
[]
[ ]   1.15.1   Record Time NRC duty officer is contacted.               Time:
1.14 Monitor plant conditions and meteorological conditions for changes in PAR.
[1 1.16   If not previously performed, ensure initial accountability of Operations personnel is completed.
[1 1.14.1 If a change in PAR occurs, complete notifications to responsible state and local governmental agencies within 15 minutes of declaration of the change per Procedure 5.7.6.
I       PROCEDURE 5.7.2                 1       REVISION 17           1   PAGE 18 OF 37 J
[ ]
1.14.2 If a change in PAR occurs, complete notification to NRC immediately after notification of responsible state and local governmental agencies, and not later than 1 hour after declaration of the change per Procedure 5.7.6.
[ ]
1.15 Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies, and not later than 1 hour after declaration of each emergency classification.
[ ]
1.15.1 Record Time NRC duty officer is contacted.
[1 1.16 Time:
If not previously performed, ensure initial accountability of Operations personnel is completed.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 18 OF 37 J
[]


S ATTACHMENT 3           ACTIONS FOR SITE AREA EMERGENCY
S ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY
[1 1.17 If any of following conditions exist, concurrently enter Procedure 5.7.14 for Stable Iodine Thyroid Blocking:
[1
[ ]   1.17.1   Fuel cladding has been determined to be lost, or
[1 I
[ ]   1.17.2   A calculated dose of > 25 rem (CDE) to thyroid is likely to be received, or
PROCEDURE 5.7.2 1
[ ]   1.17.3   Life saving operation is to be undertaken in areas where high levels of radio-iodine are suspected and no current air analysis is available.
REVISION 17 1
[1 1.18 If not previously performed, ensure initial accountability completed by:
PAGE 19 OF 37 1.17 If any of following conditions exist, concurrently enter Procedure 5.7.14 for Stable Iodine Thyroid Blocking:
[ ]   1.18.1   Within 30 minutes, ensure Security Coordinator reports when initial accountability is complete.
[ ]
[ ]   1.18.2   If accountability was not initiated due to personnel safety concerns, monitor plant/site conditions and when personnel safety concern has passed, initiate personnel assembly and accountability.
1.17.1 Fuel cladding has been determined to be lost, or
[ ]   1.18.3   Record time initial accountability completed.             Time:
[ ]
[] 1.19 Evacuate all non-ERO personnel per Procedure 5.7.11.
1.17.2 A calculated dose of > 25 rem (CDE) to thyroid is likely to be received, or
[] 1.20 Perform follow-up notifications to state and local agencies at least every 60 minutes or sooner if there is a significant change in status of emergency per Procedure 5.7.6.
[ ]
[I 1.21 If escalating to another emergency classification, perform following:
1.17.3 Life saving operation is to be undertaken in areas where high levels of radio-iodine are suspected and no current air analysis is available.
[1]   1.21.1   Announce following to Control Room Staff:
1.18 If not previously performed, ensure initial accountability completed by:
[1       1.21.1.1   Time of classification.                       Time:
[ ]
[1       1.21.1.2   Level of emergency classification.           Class:
1.18.1 Within 30 minutes, ensure Security Coordinator reports when initial accountability is complete.
[ ]       1.21.1.3   EAL on which classification is based.       EAL #:
[ ]
[1       1.21.1.4   Description of condition causing classification.
1.18.2 If accountability was not initiated due to personnel safety concerns, monitor plant/site conditions and when personnel safety concern has passed, initiate personnel assembly and accountability.
[1     1.21.2   Exit this Attachment and enter Attachment for applicable Classification level.
[ ]
I       PROCEDURE 5.7.2              1      REVISION 17          1    PAGE 19 OF 37
1.18.3 Record time initial accountability completed.
Time:
1.19 Evacuate all non-ERO personnel per Procedure 5.7.11.
1.20 Perform follow-up notifications to state and local agencies at least every 60 minutes or sooner if there is a significant change in status of emergency per Procedure 5.7.6.
1.21 If escalating to another emergency classification, perform following:
[1 ]
1.21.1 Announce following to Control Room Staff:
[1 1.21.1.1 Time of classification.
Time:
[1 1.21.1.2 Level of emergency classification.
Class:
[ ]
1.21.1.3 EAL on which classification is based.
EAL #:
[1 1.21.1.4 Description of condition causing classification.
[1 1.21.2 Exit this Attachment and enter Attachment for applicable Classification level.
[
[
]
]
[I


I ATTACHMENT 3         ACTIONS FOR SITE AREA EMERGENCY                       I 1.22  Turnover Emergency Director duties when relieved by another qualified Emergency Director.
I ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY I
[]    1.22.1 Use Attachment 7 to turnover to oncoming Emergency Director.
Turnover Emergency Director duties when relieved by another qualified Emergency Director.
[]    1.22.2 Announce to Control Room Staff who Emergency Director is.
1.22.1 Use Attachment 7 to turnover to oncoming Emergency Director.
[I    1.22.3 Exit this Attachment and enter Attachment 5.
1.22.2 Announce to Control Room Staff who Emergency Director is.
I     PROCEDURE 5.7.2           1     REVISION 17         1 PAGE 20 OF 37
1.22.3 Exit this Attachment and enter Attachment 5.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 20 OF 37 1.22
[]
[]
[I


ATTACHMENT 4             ACTIONS FOR GENERAL EMERGENCY ACTIONS FOR GENERAL EMERGENCY
ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY ACTIONS FOR GENERAL EMERGENCY
[ ]I CAUTION - Do not re-activate Automated Notification System if Emergency Response Facilities are already being activated.
[ ]I CAUTION - Do not re-activate Automated Notification System if Emergency Response Facilities are already being activated.
[ ] 1.1   If not previously performed, initiate ERO activation by:
[ ]
[]   1.1.1     Determine if ERO personnel will report to on-site Facilities or to AEOF.
1.1 If not previously performed, initiate ERO activation by:
[]   1.1.2     On telephone with ANS Activation Module, activate ANS by:
[ ]
[]       1.1.2.1     Picking up telephone.
1.1.1 Determine if ERO personnel will report to on-site Facilities or to AEOF.
[]       NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.
[ ]
[]       1.1.2.2     When dial tone received, depress ACTIVATE DIALOGICS pushbutton.
1.1.2 On telephone with ANS Activation Module, activate ANS by:
[]       1.1.2.3     When voice asks for Scenario Password, depress one of following:
[ ]
[]     a. "222 SCENARIO" pushbutton to activate on-site ERFs.
1.1.2.1 Picking up telephone.
[]     b. "333 SCENARIO" pushbutton to activate AEOF.
[ ]
[]         1.1.2.4   When ANS tells you goodby, hang up.
NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.
[ ]   1.1.3     If ANS telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per Attachment 6.
[ ]
1.1.2.2 When dial tone received, depress ACTIVATE DIALOGICS pushbutton.
[ ]
1.1.2.3 When voice asks for Scenario Password, depress one of following:
[ ]
: a.  
"222 SCENARIO" pushbutton to activate on-site ERFs.
[ ]
: b.  
"333 SCENARIO" pushbutton to activate AEOF.
[ ]
1.1.2.4 When ANS tells you goodby, hang up.
[ ]
1.1.3 If ANS telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per.
[ ] NOTE - Accountability will be performed if not previously performed and performing accountability will not additionally THREATEN PERSONNEL SAFETY.©
[ ] NOTE - Accountability will be performed if not previously performed and performing accountability will not additionally THREATEN PERSONNEL SAFETY.©
[]   1.2   Determine if personnel assembly and accountability will be performed.
[ ]
[]   1.2.1     If accountability will be performed, go to Step 1.3.
1.2 Determine if personnel assembly and accountability will be performed.
[]   1.2.2     If accountability will not be performed, go to Step 1.4.
[ ]
I       PROCEDURE 5.7.2                       REVISION 17           1   PAGE 21 OF 37 1
1.2.1 If accountability will be performed, go to Step 1.3.
[ ]
1.2.2 If accountability will not be performed, go to Step 1.4.
I PROCEDURE 5.7.2 REVISION 17 1
PAGE 21 OF 37 1


ATTACHMENT 4           ACTIONS FOR GENERAL EMERGENCY
ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY
[ ] 1.3   Notify personnel and initiate personnel assembly and accountability by:
[ ]
[1   1.3.1   If desired, fill in blanks below for Step 1.3.3.
1.3 Notify personnel and initiate personnel assembly and accountability by:
[]       1.3.1.1     In (1), give a brief description of emergency event and if applicable, location.
[1 1.3.1 If desired, fill in blanks below for Step 1.3.3.
[]       1.3.1.2     In (2), provide following as needed:©
[ ]
                                "*    Locations that should be avoided due to emergency conditions.
1.3.1.1 In (1), give a brief description of emergency event and if applicable, location.
                                "*    Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
[ ]
                                "*    Any precautions needed for security events/severe weather conditions.
1.3.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.
      ]   1.3.2   Activate Emergency Alarm for 10 seconds.
Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
[]   1.3.3   Announce following over station Gaitronics:
Any precautions needed for security events/severe weather conditions.  
Attention All Station Personnel, at               Emergency Director
]
1.3.2 Activate Emergency Alarm for 10 seconds.
[ ]
1.3.3 Announce following over station Gaitronics:
Attention All Station Personnel, at Emergency Director
[time]
[time]
declared a GENERAL EMERGENCY.
declared a GENERAL EMERGENCY.
Line 508: Line 833:
All personnel stay clear of (2)
All personnel stay clear of (2)
Activate Emergency Alarm for 10 seconds and repeat announcement.
Activate Emergency Alarm for 10 seconds and repeat announcement.
I       PROCEDURE 5.7.2                 1       REVISION 17           1   PAGE 22 OF 37
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 22 OF 37


I   ATTACHMENT 4           ACTIONS FOR GENERAL EMERGENCY                                     I
I ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY I
[] 1.4 Notify station personnel WITHOUT personnel assembly and accountability by:
[]
[1  1.4.1     If desired, fill in blanks below for Step 1.4.3.
1.4
[ ]       1.4.1.1     In (1), give a brief description of emergency event and if applicable, location.
[1
[1       1.4.1.2     In (2), provide following as needed:©
[I
                                "*    Locations that should be avoided due to emergency conditions.
[I Notify station personnel WITHOUT personnel assembly and accountability by:
                                "*    Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
1.4.1 If desired, fill in blanks below for Step 1.4.3.
                                "*    Any precautions needed for security events/severe weather conditions.
[ ]
[I    1.4.2   Activate Emergency Alarm for 10 seconds.
1.4.1.1 In (1), give a brief description of emergency event and if applicable, location.
[I  1.4.3     Announce following over station Gaitronics:
[1 1.4.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.
Attention All Station Personnel, at               Emergency Director
Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
Any precautions needed for security events/severe weather conditions.
1.4.2 Activate Emergency Alarm for 10 seconds.
1.4.3 Announce following over station Gaitronics:
Attention All Station Personnel, at Emergency Director
[time]
[time]
declared a GENERAL EMERGENCY.
declared a GENERAL EMERGENCY.
Line 526: Line 857:
All personnel stay clear of (2)
All personnel stay clear of (2)
Activate Emergency Alarm for 10 seconds and repeat announcement.
Activate Emergency Alarm for 10 seconds and repeat announcement.
[] 1.5   Record time announcement completed.                                 Time:
[ ] 1.5 Record time announcement completed.
I       PROCEDURE 5.7.2                 1     REVISION 17           1   PAGE 23 OF 37
Time:
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 23 OF 37


ATTACHMENT 4           ACTIONS FOR GENERAL EMERGENCY
ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY  
  ] 1.6 Make a Protective Action Recommendation (PAR) as part of initial notifications to responsible state and local governmental agencies.
]
[1   1.6.1     If no release in progress, automatic minimum PARs for a GENERAL EMERGENCY are:
1.6 Make a Protective Action Recommendation (PAR) as part of initial notifications to responsible state and local governmental agencies.
* Evacuation of 2 mile radius,
[1 1.6.1 If no release in progress, automatic minimum PARs for a GENERAL EMERGENCY are:
* Evacuation of 5 miles downwind of site and,
Evacuation of 2 mile radius, Evacuation of 5 miles downwind of site and, Go indoors and monitor EAS/EBS for remainder of 10 mile Emergency Planning Zone (EPZ).
* Go indoors and monitor EAS/EBS for remainder of 10 mile Emergency Planning Zone (EPZ).
[ J 1.6.2 If release in progress, perform following as needed:
[ J   1.6.2     If release in progress, perform following as needed:
[ ]
[ ]       1.6.2.1     If dose calculation cannot be completed in time to meet 15 minute notification time limits, perform initial notifications with Automatic minimum PARs and update if dose information indicates need to expand PAR.
1.6.2.1 If dose calculation cannot be completed in time to meet 15 minute notification time limits, perform initial notifications with Automatic minimum PARs and update if dose information indicates need to expand PAR.
[ J       1.6.2.2     Have dose calculation performed per Procedure 5.7.17.
[ J 1.6.2.2 Have dose calculation performed per Procedure 5.7.17.
[1       1.6.2.3     Use projected doses and Procedure 5.7.20 to make PARs.
[1 1.6.2.3 Use projected doses and Procedure 5.7.20 to make PARs.
[ ]       1.6.2.4     If dose based PAR is greater than current PAR, perform notifications to responsible state and local governmental agencies to update them of expanded PAR.
[ ]
[ ] 1.7   Direct on watch individual to complete CNS Notification form per Procedure 5.7.6.
1.6.2.4 If dose based PAR is greater than current PAR, perform notifications to responsible state and local governmental agencies to update them of expanded PAR.
[ ]   1.7.1     Review and sign completed Notification form to authorize transmittal to state and local authorities.
[ ] 1.7 Direct on watch individual to complete CNS Notification form per Procedure 5.7.6.
[ ] 1.8   Ensure initial notification to responsible state and local governmental agencies is completed within 15 minutes of each declaration of an emergency class per Procedure 5.7.6.
[ ]
[ ]   1.8.1     Record time state and local authorities contacted.         Time:
1.7.1 Review and sign completed Notification form to authorize transmittal to state and local authorities.
[ ] 1.9   If not previously performed, ensure ERO pager activation has occurred by one of the following methods:
[ ] 1.8 Ensure initial notification to responsible state and local governmental agencies is completed within 15 minutes of each declaration of an emergency class per Procedure 5.7.6.
[]   1.9.1     Activation of Control Room or Shift Manager's pager, or I       PROCEDURE 5.7.2                 1       REVISION 17           1   PAGE 24 OF 37
[ ]
1.8.1 Record time state and local authorities contacted.
Time:
[ ]
1.9 If not previously performed, ensure ERO pager activation has occurred by one of the following methods:
[ ]
1.9.1 Activation of Control Room or Shift Manager's pager, or I
PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 24 OF 37


ATTACHMENT 4             ACTIONS FOR GENERAL EMERGENCY
ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY
[ ]     1.9.2     ANS activation by calling Ext. 5560 and verifying ANS indicates an active scenario.
[ ]
[ ]1.10   If ANS fails to activate pagers, have an individual concurrently activate backup notification methods per Attachment 6.
1.9.2 ANS activation by calling Ext. 5560 and verifying ANS indicates an active scenario.
[ ] 1.11   If not previously performed, ensure Emergency Response Data Systems (ERDS) is activated using PMIS START/STOP Menu. This shall be done as soon as possible but not later than 1 hour after time of declaration of an ALERT or higher classification.
[ ]1.10 If ANS fails to activate pagers, have an individual concurrently activate backup notification methods per Attachment 6.
[ ]     1.11.1   Record time ERDS activated.                               Time:
[ ]
[ ] 1.12   If release in progress, have additional dose calculations performed per Procedure 5.7.17 to determine projected off-site doses for use in determining PAR.
1.11 If not previously performed, ensure Emergency Response Data Systems (ERDS) is activated using PMIS START/STOP Menu. This shall be done as soon as possible but not later than 1 hour after time of declaration of an ALERT or higher classification.
[ ]
1.11.1 Record time ERDS activated.
Time:
[ ] 1.12 If release in progress, have additional dose calculations performed per Procedure 5.7.17 to determine projected off-site doses for use in determining PAR.
[ 1 1.13 Monitor plant conditions and meteorological conditions for changes in PAR.
[ 1 1.13 Monitor plant conditions and meteorological conditions for changes in PAR.
[ ]     1.13.1   If a change in PAR occurs, complete notifications to responsible state and local governmental agencies within 15 minutes of declaration of the change per Procedure 5.7.6.
[ ]
[1     1.13.2   If a change in PAR occurs, complete notification to NRC immediately after notification of responsible state and local governmental agencies, and not later than 1 hour after declaration of the change per Procedure 5.7.6.
1.13.1 If a change in PAR occurs, complete notifications to responsible state and local governmental agencies within 15 minutes of declaration of the change per Procedure 5.7.6.
[ ] 1.14   Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies, and not later than 1 hour after declaration of each emergency classification.
[1 1.13.2 If a change in PAR occurs, complete notification to NRC immediately after notification of responsible state and local governmental agencies, and not later than 1 hour after declaration of the change per Procedure 5.7.6.
[ ]   1.14.1   Record Time NRC duty officer is contacted.               Time:
[ ]
[ ]1.15     If not previously performed, ensure initial accountability of Operations personnel is completed.
1.14 Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies, and not later than 1 hour after declaration of each emergency classification.
[ ]1.16     If any of following conditions exist, concurrently enter Procedure 5.7.14 for Stable Iodine Thyroid Blocking:
[ ]
[1     1.16.1   Fuel cladding has been determined to be lost, or
1.14.1 Record Time NRC duty officer is contacted.
[ ]   1.16.2   Calculated dose of   Ž!25 rem (CDE) to thyroid is likely to be received, or PROCEDURE 5.7.2                         REVISION 17               PAGE 25 OF 37     _
Time:
[ ]1.15 If not previously performed, ensure initial accountability of Operations personnel is completed.
[ ]1.16 If any of following conditions exist, concurrently enter Procedure 5.7.14 for Stable Iodine Thyroid Blocking:
[1 1.16.1 Fuel cladding has been determined to be lost, or
[ ]
1.16.2 Calculated dose of Ž! 25 rem (CDE) to thyroid is likely to be received, or PROCEDURE 5.7.2 REVISION 17 PAGE 25 OF 37  


I   ATTACHMENT 4           ACTIONS FOR GENERAL EMERGENCY                                   I
I ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY I
[]     1.16.3   Life saving operation is to be undertaken in areas where high levels of radio iodine are suspected and no current air analysis is available.
[ ]
[   1.17   If not previously performed, ensure initial accountability completed by:
1.16.3 Life saving operation is to be undertaken in areas where high levels of radio iodine are suspected and no current air analysis is available.
[ ]   1.17.1   Within 30 minutes, ensure Security Coordinator reports when initial accountability is complete.
[
[ ]   1.17.2   If accountability was not initiated due to personnel safety concerns, monitor plant/site conditions and when personnel safety concern has passed, initiate personnel assembly and accountability.
1.17 If not previously performed, ensure initial accountability completed by:
[1     1.17.3   Record time initial accountability completed.           Time:
[ ]
[ ] 1.18   Ensure evacuation of all non-ERO personnel has been initiated per Procedure 5.7.11.
1.17.1 Within 30 minutes, ensure Security Coordinator reports when initial accountability is complete.
[ J 1.19   Perform follow-up notifications to state and local agencies at least every 60 minutes or sooner if there is a significant change in status of emergency per Procedure 5.7.6.
[ ]
[ ]1.20   Turn-over ED duties when relieved by another qualified Emergency Director.
1.17.2 If accountability was not initiated due to personnel safety concerns, monitor plant/site conditions and when personnel safety concern has passed, initiate personnel assembly and accountability.
[ ]   1.20.1   Use Attachment 7 to turnover to oncoming Emergency Director.
[1 1.17.3 Record time initial accountability completed.
[ ]   1.20.2   Announce to Control Room who Emergency Director is.
Time:
[ ]   1.20.3   Exit this Attachment and enter Attachment 5.
[ ]
I       PROCEDURE 5.7.2               1       REVISION 17         1   PAGE 26 OF 37
1.18 Ensure evacuation of all non-ERO personnel has been initiated per Procedure 5.7.11.
[ J 1.19 Perform follow-up notifications to state and local agencies at least every 60 minutes or sooner if there is a significant change in status of emergency per Procedure 5.7.6.
[ ]1.20 Turn-over ED duties when relieved by another qualified Emergency Director.
[ ]
1.20.1 Use Attachment 7 to turnover to oncoming Emergency Director.
[ ]
1.20.2 Announce to Control Room who Emergency Director is.
[ ]
1.20.3 Exit this Attachment and enter Attachment 5.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 26 OF 37


ATTACHMENT 5         SHIFT SUPERVISOR ACTIONS WHEN ANOTHER INDIVIDUAL IS EMERGENCY DIRECTOR
ATTACHMENT 5 SHIFT SUPERVISOR ACTIONS WHEN ANOTHER INDIVIDUAL IS EMERGENCY DIRECTOR
: 1. SHIFT SUPERVISOR ACTIONS WHEN ANOTHER INDIVIDUAL IS EMERGENCY DIRECTOR
: 1.
SHIFT SUPERVISOR ACTIONS WHEN ANOTHER INDIVIDUAL IS EMERGENCY DIRECTOR
[ ] NOTE - Perform following steps concurrently, as needed.
[ ] NOTE - Perform following steps concurrently, as needed.
[ ] 1.1   Notify Emergency Director when changes in plant conditions are discovered that warrant reclassifying to a higher classification.
[ ] 1.1 Notify Emergency Director when changes in plant conditions are discovered that warrant reclassifying to a higher classification.
[ J 1.2   If requested, have emergency announcements made per Attachment 8 when changes in emergency classifications are made.
[ J 1.2 If requested, have emergency announcements made per Attachment 8 when changes in emergency classifications are made.
[ ] 1.3   Notify Emergency Director of any significant changes in plant conditions.
[ ] 1.3 Notify Emergency Director of any significant changes in plant conditions.
[ ] 1.4   Notify Emergency Director of any emergent equipment repairs needed.
[ ] 1.4 Notify Emergency Director of any emergent equipment repairs needed.
[ ] 1.5   Notify Emergency Director when changes in plant conditions warrant changes in TSC and OSC priorities.
[ ] 1.5 Notify Emergency Director when changes in plant conditions warrant changes in TSC and OSC priorities.
[ ]1.6   Notify Operations Coordinator in TSC of additional support needed from TSC or OSC that is not being obtained through the ED.
[ ]1.6 Notify Operations Coordinator in TSC of additional support needed from TSC or OSC that is not being obtained through the ED.
[ ] 1.7   Coordinate dispatch of Station Operators from Control Room with Chem/RP Coordinator.
[ ] 1.7 Coordinate dispatch of Station Operators from Control Room with Chem/RP Coordinator.
[ ]1.8   If SAMG entry is required, implement Procedure 5.9SAMG.
[ ]1.8 If SAMG entry is required, implement Procedure 5.9SAMG.
[ ]   1.8.1     Record time Decision Making Authority is transferred to Operations Coordinator.
[ ]
1.8.1 Record time Decision Making Authority is transferred to Operations Coordinator.
Time:
Time:
I       PROCEDURE 5.7.2             1       REVISION 17         1   PAGE 27 OF 37
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 27 OF 37


ATTACHMENT 6           ALTERNATE NOTIFICATION METHODS
ATTACHMENT 6 ALTERNATE NOTIFICATION METHODS
[ ] 1.1 If CNS ANS is unavailable, activate backup pagers by performing following:
[ ]
[1   1.1.1     If desired, script an addition to voice mail message per Step 1.4.
1.1 If CNS ANS is unavailable, activate backup pagers by performing following:
[1   1.1.2     On telephone with ANS Activation Module, pick up telephone.
[1 1.1.1 If desired, script an addition to voice mail message per Step 1.4.
[1   1.1.3     Press ACTIVATE BACKUP pushbutton.
[1 1.1.2 On telephone with ANS Activation Module, pick up telephone.
[]   1.1.4     When prompted for password, press PASSWORD pushbutton.
[1 1.1.3 Press ACTIVATE BACKUP pushbutton.
[1   1.1.5     When prompted for scenario and after tone, press"         SCENARIO" pushbutton.
[ ]
Scenario Description                 Scenario Number Notification of Unusual Event Declared                 100 ERF Activation - Respond to Plant                   222 ERF Activation - Respond to AEOF                   333
1.1.4 When prompted for password, press PASSWORD pushbutton.
[ ] 1.1.6     After hearing message, "Thank you for using ATS", HANG UP.
[1 1.1.5 When prompted for scenario and after tone, press" SCENARIO" pushbutton.
[] 1.2 If telephone with ANS Activation Module is not available and CNS ANS is available, perform following:
Scenario Description Scenario Number Notification of Unusual Event Declared 100 ERF Activation - Respond to Plant 222 ERF Activation - Respond to AEOF 333
[ ]   1.2.1   Complete CNS ANS code below by performing following:
[ ]
[]       1.2.1.1     Obtain Emergency Directors Password and write it in blocks.
1.1.6 After hearing message, "Thank you for using ATS", HANG UP.
[]       1.2.1.2       Determine and enter appropriate scenario code.
[ ]
Scenario Description                 Scenario Number Notification of Unusual Event Declared                 100 ERF Activation - Respond to Plant                   222 ERF Activation - Respond to AEOF                   333
1.2 If telephone with ANS Activation Module is not available and CNS ANS is available, perform following:
[]   NOTE - Hanging up phone while ANS is activating may cause ANS to lock up.
[ ]
[3   1.2.2   Activate CNS ANS by dialing and providing following information when requested:
1.2.1 Complete CNS ANS code below by performing following:
Extension                   8579 ED PASSWORD                               #
[ ]
PROCEDURE 5.7.2                       REVISION 17             PAGE 28 OF 37
1.2.1.1 Obtain Emergency Directors Password and write it in blocks.
[ ]
1.2.1.2 Determine and enter appropriate scenario code.
Scenario Description Scenario Number Notification of Unusual Event Declared 100 ERF Activation - Respond to Plant 222 ERF Activation - Respond to AEOF 333
[ ]
NOTE - Hanging up phone while ANS is activating may cause ANS to lock up.
[ 3 1.2.2 Activate CNS ANS by dialing and providing following information when requested:
Extension 8579 ED PASSWORD PROCEDURE 5.7.2 REVISION 17 PAGE 28 OF 37


I   ATTACHMENT 6           ALTERNATE NOTIFICATION METHODS                                   I Scenario Number                           #
I ATTACHMENT 6 ALTERNATE NOTIFICATION METHODS I
Confirm Event Code         2 If you do not wish to record a "Current Scenario Message", press 3#.
Scenario Number Confirm Event Code 2
If you do not wish to record a "Current Scenario Message", press 3#.
If desired to record a "Current Scenario Message":
If desired to record a "Current Scenario Message":
When ask about "Current Scenario Message", press 2.
When ask about "Current Scenario Message", press 2.
Line 619: Line 994:
Listen to message and follow voice mail instructions to modify or accept as desired.
Listen to message and follow voice mail instructions to modify or accept as desired.
To activate chosen scenario and message, press 3#.
To activate chosen scenario and message, press 3#.
[ ]   1.2.3     Record Time of Completion:
[ ]
[ ]1.3   If telephone with ANS Activation Module is not available, AND CNS ANS is not available, activate all ERO pagers by:
1.2.3 Record Time of Completion:
f ]   1.3.1     If desired, script an addition to voice mail message per Step 1.4.
[ ]1.3 If telephone with ANS Activation Module is not available, AND CNS ANS is not available, activate all ERO pagers by:
[ ]   1.3.2     Obtain password from Shift Supervisor cubicle sealed envelope.
f ]
[ ]   1.3.3     Determine and enter appropriate scenario code below:
1.3.1 If desired, script an addition to voice mail message per Step 1.4.
Scenario Description                 Scenario Number Notification of Unusual Event Declared                 100 ERF Activation - Respond to Plant                   222 ERF Activation - Respond to AEOF                   333
[ ]
[]   1.3.4     Dial below number and providing following information when requested:
1.3.2 Obtain password from Shift Supervisor cubicle sealed envelope.
Dial 402       633     0469 on any telephone.
[ ]
When prompted, ENTER password When prompted, ENTER "numeric message"                         8_28255 522.
1.3.3 Determine and enter appropriate scenario code below:
Scenario Description Scenario Number Notification of Unusual Event Declared 100 ERF Activation - Respond to Plant 222 ERF Activation - Respond to AEOF 333
[ ]
1.3.4 Dial below number and providing following information when requested:
Dial 402 633 0469 on any telephone.
When prompted, ENTER password When prompted, ENTER "numeric message" 8_28255 522.
After hearing the message "Thank you for using ATS", HANG UP.
After hearing the message "Thank you for using ATS", HANG UP.
PROCEDURE 5.7.2                 1       REVISION 17         1   PAGE 29 OF 37 j
PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 29 OF 37 j


ATTACHMENT 6           ALTERNATE NOTIFICATION METHODS
ATTACHMENT 6 ALTERNATE NOTIFICATION METHODS
[ ]   1.3.5     Record Time of Completion:
[ ]
1.3.5 Record Time of Completion:
[ J NOTE - Step 1.4 is not necessary if CNS Automated Notification System is operational.
[ J NOTE - Step 1.4 is not necessary if CNS Automated Notification System is operational.
[ 1 1.4   If needed to provide Emergency responders more specific information prior to arrival at CNS, record a voice mail message by:
[ 1 1.4 If needed to provide Emergency responders more specific information prior to arrival at CNS, record a voice mail message by:
[1     1.4.1   Dial 5200 (voice mail).
[1 1.4.1 Dial 5200 (voice mail).
[ ]   1.4.2   Enter mailbox number, 5522, and #.
[ ]
[]     1.4.3   Enter password, 5522 and #.
1.4.2 Enter mailbox number, 5522, and #.
[ ]   1.4.4   Enter 8, 2 (mailbox greeting).
[ ]
[]     1.4.5   Enter 1 (external greeting).
1.4.3 Enter password, 5522 and #.
[]     1.4.6   Enter 2; wait until end of greeting.
[ ]
[ ]   1.4.7   Enter 5 (record command).
1.4.4 Enter 8, 2 (mailbox greeting).
[ ]   1.4.8   Provide desired information as an addition to the external greeting.
[ ]
[ ]   1.4.9   Enter # when completed.
1.4.5 Enter 1 (external greeting).
[ ]   1.4.10   Enter 8, 3 (exits voice mail).
[ ]
I       PROCEDURE 5.7.2               1     REVISION 17         1   PAGE 30 OF 37     1
1.4.6 Enter 2; wait until end of greeting.
[ ]
1.4.7 Enter 5 (record command).
[ ]
1.4.8 Provide desired information as an addition to the external greeting.
[ ]
1.4.9 Enter # when completed.
[ ]
1.4.10 Enter 8, 3 (exits voice mail).
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 30 OF 37 1


ATTACHMENT 7           EMERGENCY DIRECTOR TURNOVER
ATTACHMENT 7 EMERGENCY DIRECTOR TURNOVER
[1   1.1   Emergency Classification Status, circle applicable Classification:
[1 1.1 Emergency Classification Status, circle applicable Classification:
Unusual Event     Alert   Site Area Emergency         General Emergency
Unusual Event Alert Site Area Emergency General Emergency
[ ]1.2     EAL Classification is based upon EAL #:
[ ]1.2 EAL Classification is based upon EAL #:
[ ] 1.3     Initiating Events:
[ ]
[ ] 1.4     Previous EAL #s Entered:
1.3 Initiating Events:
[]   1.5   Status of emergency procedure implementation and mitigating actions.
[ ] 1.4 Previous EAL #s Entered:
[I    1.5.1    Off-Site Notification Form IS / IS NOT Completed
[]
[I    1.5.2    Off-Site Notifications - Last Notification #:
1.5
Local & States     NOT NOTIFIED           IN PROGRESS             NOTIFIED Time Completed:
[I
NRC Duty Officer       NOT NOTIFIED           IN PROGRESS           NOTIFIED Time Completed:
[I Status 1.5.1 1.5.2 of emergency procedure implementation and mitigating actions.
[ ]   1.5.3     Protective Action Recommendations made.
Off-Site Notification Form IS / IS NOT Completed Off-Site Notifications - Last Notification #:
NONE     YES     (Complete Table Below)
Local & States NOT NOTIFIED IN PROGRESS NOTIFIED Time Completed:
I I I,   Go indoors and I monitor EAS/EBS None --     Evacuate Sectors.                 in Sectors 0-2 Miles--
NRC Duty Officer NOT NOTIFIED IN PROGRESS NOTIFIED Time Completed:
M iles  ',          f-------------44---------------------
[ ]
1.5.3 Protective Action Recommendations made.
NONE YES (Complete Table Below)
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 31 OF 37 1
I, Go indoors and I
I I monitor EAS/EBS None --
Evacuate Sectors.
in Sectors  
*-- Miles--
f-------------44---------------------
4-----
4-----
2-5 Miles      ------- 4-------------------
0-2 M iles ',
les 1----        l                            4------------
les ------- 4-------------------
5-10 Miles'''
4------------
I        PROCEDURE 5.7.2                1        REVISION 17                1    PAGE 31 OF 37  1
l 2-5 Miles 1 5-10 Miles'''


ATTACHMENT 7       EMERGENCY DIRECTOR TURNOVER
ATTACHMENT 7 EMERGENCY DIRECTOR TURNOVER
[   1.5.4 Status of Personnel Assembly and Accountability per Procedure 5.7.10.
[
[I   1.5.5 Status of Stable Iodine Thyroid Blocking per Procedure 5.7.14.
1.5.4 Status of Personnel Assembly and Accountability per Procedure 5.7.10.
Not Implemented     Implemented and Status is:
[I 1.5.5 Status of Stable Iodine Thyroid Blocking per Procedure 5.7.14.
[ ]   1.5.6 Status of dismissal and or evacuation of non-ERO personnel per Procedure 5.7.11.
Not Implemented Implemented and Status is:
Not Started   Started and Status is:
[ ]
[ ]   1.5.7 Radiological conditions release above ODAM limits in progress (circle):
1.5.6 Status of dismissal and or evacuation of non-ERO personnel per Procedure 5.7.11.
YES     NO
Not Started Started and Status is:
[ ]   1.5.8 Status of Release Rate Determinations per Procedure 5.7.16.
[ ]
Not Started   Started and Status is:
1.5.7 Radiological conditions release above ODAM limits in progress (circle):
I     PROCEDURE 5.7.2           1     REVISION 17         1 PAGE 32 OF 37 j
YES NO
[ ]
1.5.8 Status of Release Rate Determinations per Procedure 5.7.16.
Not Started Started and Status is:
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 32 OF 37 j


SATTACHMENT 7           EMERGENCY DIRECTOR TURNOVER
SATTACHMENT 7 EMERGENCY DIRECTOR TURNOVER
[]     1.5.9   Status of Dose Calculations per Procedure 5.7.17.
[ ]
Not Started     Started and Status is:
1.5.9 Status of Dose Calculations per Procedure 5.7.17.
[1 1.6   Reactor Status (circle):   OPERATING       SHUTDOWN
Not Started Started and Status is:
[ ] 1.7   Fission Product Barrier and Safety System Status (circle):
[1 1.6 Reactor Status (circle):
Fuel Cladding:   Intact   Potential Loss   Lost Primary Coolant:     Intact   Potential Loss   Lost Primary Containment:       Intact   Potential Loss   Lost Secondary Containment:       Intact   Potential Loss   Lost
OPERATING SHUTDOWN
[ ] 1.8   Evolutions in Progress:
[ ] 1.7 Fission Product Barrier and Safety System Status (circle):
  ] 1.9   Off-Site Assistance Requests:
Fuel Cladding:
[ ] 1.10   Site Priorities:
Intact Potential Loss Lost Primary Coolant:
I       PROCEDURE 5.7.2               1       REVISION 17         1 PAGE 33 OF 37
Intact Potential Loss Lost Primary Containment:
Intact Potential Loss Lost Secondary Containment:
Intact Potential Loss Lost
[ ] 1.8 Evolutions in Progress:  
]
1.9 Off-Site Assistance Requests:
[ ]
1.10 Site Priorities:
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 33 OF 37


ATTACHMENT 8           ANNOUNCEMENTS WITH ERFS ACTIVATED                                 I
ATTACHMENT 8 ANNOUNCEMENTS WITH ERFS ACTIVATED I
[] 1.1   Notify station personnel of Emergency Classification changes by:
[]
[1I  1.1.1   If desired, fill in blanks below for Step 1.1.3.
1.1
[1       1.1.1.1     In (1), give a brief description of emergency event and if applicable, location.
[1I
[]       1.1.1.2     In (2), provide following as needed:©
[]
                              "*    Locations that should be avoided due to emergency conditions.
[1 There is (1)
                              "*    Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
All personnel stay clear of (2)
                              "*    Any precautions needed for security events/severe weather conditions.
I PROCEDURE 5.7.2 1
[]    1.1.2   Activate Emergency Alarm for 10 seconds.
REVISION 17 1
[1    1.1.3   Announce following over station Gaitronics:
PAGE 34 OF 37 Notify station personnel of Emergency Classification changes by:
Attention All Station Personnel, at               Emergency Director
1.1.1 If desired, fill in blanks below for Step 1.1.3.
[1 1.1.1.1 In (1), give a brief description of emergency event and if applicable, location.
[ ]
1.1.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.
Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.
Any precautions needed for security events/severe weather conditions.
1.1.2 Activate Emergency Alarm for 10 seconds.
1.1.3 Announce following over station Gaitronics:
Attention All Station Personnel, at Emergency Director
[time]
[time]
declared a (an)
declared a (an)
[emergency classification]
[emergency classification]
There is (1)
All personnel stay clear of (2)
Activate Emergency Alarm for 10 seconds and repeat announcement.
Activate Emergency Alarm for 10 seconds and repeat announcement.
I      PROCEDURE 5.7.2                1      REVISION 17          1  PAGE 34 OF 37


ATTACHMENT 9           INFORMATION SHEET DISCUSSION 1.1 The responsibility and authority to classify events and make emergency declarations rests with the Emergency Director. The Shift Supervisor shall initially assume the role of the Emergency Director and remain so until relieved by another qualified Emergency Director. Certain actions may still need to be performed by the Shift Supervisor, as requested by the Emergency Director, after command and control of the emergency response has been transferred to the EOF.
ATTACHMENT 9 INFORMATION SHEET DISCUSSION 1.1 The responsibility and authority to classify events and make emergency declarations rests with the Emergency Director. The Shift Supervisor shall initially assume the role of the Emergency Director and remain so until relieved by another qualified Emergency Director. Certain actions may still need to be performed by the Shift Supervisor, as requested by the Emergency Director, after command and control of the emergency response has been transferred to the EOF.
1.2 Four standardized emergency classifications have been established; they are:
1.2 Four standardized emergency classifications have been established; they are:
1.2.1     NOTIFICATION OF UNUSUAL EVENT (NOUE).
1.2.1 NOTIFICATION OF UNUSUAL EVENT (NOUE).
1.2.2     ALERT.
1.2.2 ALERT.
1.2.3     SITE AREA EMERGENCY (SAE).
1.2.3 SITE AREA EMERGENCY (SAE).
1.2.4     GENERAL EMERGENCY (GE).
1.2.4 GENERAL EMERGENCY (GE).
1.3 The rationale for the NOUE and ALERT classes is to provide early and prompt recognition and notification of minor events which could lead to more serious consequences or which might be indicative of more serious conditions which are not yet fully realized.
1.3 The rationale for the NOUE and ALERT classes is to provide early and prompt recognition and notification of minor events which could lead to more serious consequences or which might be indicative of more serious conditions which are not yet fully realized.
1.4 The SAE and GE classes reflect conditions where significant radiological releases are likely or are occurring or there is actual or imminent substantial core degradation or melting with potential for loss of containment. These classifications warrant full mobilization of Emergency Response Organizations and the alerting of the public.
1.4 The SAE and GE classes reflect conditions where significant radiological releases are likely or are occurring or there is actual or imminent substantial core degradation or melting with potential for loss of containment. These classifications warrant full mobilization of Emergency Response Organizations and the alerting of the public.
1.5 Upon the declaration of any emergency classification, prompt notification is made to the responsible state and local governmental agencies to ensure sufficient emergency response personnel are mobilized and respond to the event in accordance with their respective radiological emergency response plans.
1.5 Upon the declaration of any emergency classification, prompt notification is made to the responsible state and local governmental agencies to ensure sufficient emergency response personnel are mobilized and respond to the event in accordance with their respective radiological emergency response plans.
1.6 All on-site Emergency Response Facilities are activated following the declaration of an ALERT or higher classification. Activation of Facilities and/or assembly and accountability activities may be delayed if determined by the Emergency Director that personnel safety would be threatened. Facility activation and/or assembly and accountability shall be accomplished as soon as practical after safety concerns pass.
1.6 All on-site Emergency Response Facilities are activated following the declaration of an ALERT or higher classification. Activation of Facilities and/or assembly and accountability activities may be delayed if determined by the Emergency Director that personnel safety would be threatened. Facility activation and/or assembly and accountability shall be accomplished as soon as practical after safety concerns pass.
I     PROCEDURE 5.7.2               1     REVISION 17             1 PAGE 35 OF 37
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 35 OF 37


ATTACHMENT 9           INFORMATION SHEET 1.7   Representatives from federal and state agencies may dispatch personnel to the EOF. The decision to make prompt notification of the general public will be made at a SAE or GE by the appropriate governmental agencies.
ATTACHMENT 9 INFORMATION SHEET 1.7 Representatives from federal and state agencies may dispatch personnel to the EOF. The decision to make prompt notification of the general public will be made at a SAE or GE by the appropriate governmental agencies.
1.8   Assessment of meteorological data, radiological dose projections, and other parameters will be made to determine the type of Protective Action Recommendations (PARs) necessary for the protection of the general public.
1.8 Assessment of meteorological data, radiological dose projections, and other parameters will be made to determine the type of Protective Action Recommendations (PARs) necessary for the protection of the general public.
Off-site authorities will implement appropriate protective actions for affected populations based on those PARs, as well as other data they have assembled.
Off-site authorities will implement appropriate protective actions for affected populations based on those PARs, as well as other data they have assembled.
The general public will be kept informed of events by media facilities with periodic releases of updated information.
The general public will be kept informed of events by media facilities with periodic releases of updated information.
1.9   Contracted service companies, sponsor utilities, and other industry resources may be alerted and requested to render assistance, as appropriate. In addition, federal resources may be called upon for assistance.
1.9 Contracted service companies, sponsor utilities, and other industry resources may be alerted and requested to render assistance, as appropriate. In addition, federal resources may be called upon for assistance.
1.10   The Emergency Director shall escalate, terminate, or reduce the emergency classification as conditions warrant.
1.10 The Emergency Director shall escalate, terminate, or reduce the emergency classification as conditions warrant.
: 2. REFERENCES 2.1   CODES AND STANDARDS 2.1.1     NPPD Emergency Plan for CNS.
: 2.
2.1.2     NUREG 0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
REFERENCES 2.1 CODES AND STANDARDS 2.1.1 NPPD Emergency Plan for CNS.
2.1.3     NUREG BR-0150, Volume 1, Revision 1.
2.1.2 NUREG 0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
2.2   PROCEDURES 2.2.1     Emergency Plan Implementing Procedure 5.7.1, Emergency Classification.
2.1.3 NUREG BR-0150, Volume 1, Revision 1.
2.2.2     Emergency Plan Implementing Procedure 5.7.6, Notification.
2.2 PROCEDURES 2.2.1 Emergency Plan Implementing Procedure 5.7.1, Emergency Classification.
2.2.3     Emergency Plan Implementing Procedure 5.7.10, Personnel Assembly and Accountability.
2.2.2 Emergency Plan Implementing Procedure 5.7.6, Notification.
2.2.4     Emergency Plan Implementing Procedure 5.7.11, Evacuation of Non-Designated Site Personnel.
2.2.3 Emergency Plan Implementing Procedure 5.7.10, Personnel Assembly and Accountability.
I       PROCEDURE 5.7.2               1     REVISION 17           1 PAGE 36 OF 37     1
2.2.4 Emergency Plan Implementing Procedure 5.7.11, Evacuation of Non-Designated Site Personnel.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 36 OF 37 1


ATTACHMENT 9     INFORMATION SHEET 2.2.5 Emergency Plan Implementing Procedure 5.7.14, Stable Iodine Thyroid Blocking (KI).
ATTACHMENT 9 INFORMATION SHEET 2.2.5 Emergency Plan Implementing Procedure 5.7.14, Stable Iodine Thyroid Blocking (KI).
2.2.6 Emergency Plan Implementing Procedure 5.7.16, Release Rate Determination.
2.2.6 Emergency Plan Implementing Procedure 5.7.16, Release Rate Determination.
2.2.7 Emergency Plan Implementing Procedure 5.7.17, Dose Assessment.
2.2.7 Emergency Plan Implementing Procedure 5.7.17, Dose Assessment.
2.2.8 Emergency Plan Implementing Procedure 5.7.20, Protective Action Recommendations.
2.2.8 Emergency Plan Implementing Procedure 5.7.20, Protective Action Recommendations.
2.2.9 Severe Accident Procedure 5.9SAMG, Severe Accident Management Guidance.
2.2.9 Severe Accident Procedure 5.9SAMG, Severe Accident Management Guidance.
2.3 MISCELLANEOUS 2.3.1 CNS Emergency Telephone Directory.
2.3 MISCELLANEOUS 2.3.1 CNS Emergency Telephone Directory.
2.3.2 NRC Information Notice 83-28.
2.3.2 NRC Information Notice 83-28.
2.3.3 NRC Inspection Report 94-11.
2.3.3 NRC Inspection Report 94-11.
2.3.4 © NRC Inspection Report 98-12. Affects NOTES prior to Steps 1.2 and 1.4 on Attachment 1, Steps 1.3.1.2 and 1.4.1.2 on Attachment 1, NOTE prior to Step 1.2 on Attachment 2, Steps 1.3.1.2, and 1.4.1.2 on Attachment 2, NOTE prior to Step 1.2 on Attachment 3, Steps 1.3.1.2 and 1.4.1.2 on Attachment 3, NOTE prior to Step 1.2 on Attachment 4, Steps 1.3.1.2 and 1.4.1.2 on Attachment 4, and Step 1.1.1.2 on Attachment 8.
2.3.4  
2.3.5 RCR 2001-0354, Action 13.
© NRC Inspection Report 98-12. Affects NOTES prior to Steps 1.2 and 1.4 on Attachment 1, Steps 1.3.1.2 and 1.4.1.2 on Attachment 1, NOTE prior to Step 1.2 on Attachment 2, Steps 1.3.1.2, and 1.4.1.2 on, NOTE prior to Step 1.2 on Attachment 3, Steps 1.3.1.2 and 1.4.1.2 on Attachment 3, NOTE prior to Step 1.2 on, Steps 1.3.1.2 and 1.4.1.2 on Attachment 4, and Step 1.1.1.2 on Attachment 8.
I     PROCEDURE 5.7.2         1     REVISION 17           1   PAGE 37 OF 37     1
2.3.5 RCR 2001-0354, Action 13.
I PROCEDURE 5.7.2 1
REVISION 17 1
PAGE 37 OF 37 1


USE: REFERENCE
USE: REFERENCE CNS OPERATIONS MANUAL EFEC E:  
* EFEC   E:       /80 CNS OPERATIONS MANUAL APPROVA:      S/RC EPIP PROCEDURE 5.7.6                                             APPROVAL: SORC NOTIFICATION                                               OWNER: R. J. FISCHER DEPARTMENT: EP
/80 EPIP PROCEDURE 5.7.6 APPROVA: S/RC APPROVAL: SORC NOTIFICATION OWNER: R. J. FISCHER DEPARTMENT: EP
: 1. P U R P O SE ............................................................                                 1
: 1.
: 2. PRECAUTIONS AND LIMITATIONS .....................................                                          1
P U R P O SE............................................................
: 3. ENTRY CONDITIONS ..................................................                                       2
1
: 4. CONTROL ROOM ACTIONS .............................................                                         2
: 2.
: 5. E O F A CTIO N S ........................................................                                 3
PRECAUTIONS AND LIMITATIONS 1
: 6. RECORDS ............................................                                   ............... 3 ATTACHMENT 1                   COMPLETING NOTIFICATION FORM WITH CNS-DOSE AVAILABLE ........................................                         4 ATTACHMENT 2                   COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE ....................................                         5 ATTACHMENT 3                   COOPER NUCLEAR STATION NOTIFICATION REPORT . . 8 ATTACHMENT 4                   SHIFT COMMUNICATOR .............................                           9 ATTACHMENT 5                   OFF-SITE COMMUNICATOR .........................                           11 ATTACHMENT 6                   INFORMATION SHEET .............................                           13
: 3.
: 1. PURPOSE Provide instructions for initial, follow-up, and termination notifications to responsible State and Local governmental agencies, NRC notifications, initial generation of press releases to the Media, and notifications to other off-site support agencies.
ENTRY CONDITIONS..................................................
: 2. PRECAUTIONS AND LIMITATIONS
2
[1 2.1     Initial notifications to State/Local agencies shall be performed within 15 minutes of each declaration of an Emergency and/or change in Protective Action Recommendations (PARs).©
: 4.
[ ]2.2     NRC notification shall be performed immediately following notification of responsible State and Local governmental agencies, and not later than 1 hour after the time of declaration of one of the emergency classes.
CONTROL ROOM ACTIONS.............................................
[ ] 2.3     At an ALERT or higher classification, follow-up notifications to responsible State and Local governmental agencies shall be performed approximately every 60 minutes, or sooner if there is a significant change in the status of the emergency.© PROCEDURE 5.7.6                                               REVISION 35         PAGE 1 OF 15
2
: 5.
E O F A CTIO N S........................................................
3
: 6.
RECORDS............................................
3 ATTACHMENT 1 COMPLETING NOTIFICATION FORM WITH CNS-DOSE AVAILABLE........................................
4 ATTACHMENT 2 COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE....................................
5 ATTACHMENT 3 COOPER NUCLEAR STATION NOTIFICATION REPORT.. 8 ATTACHMENT 4 SHIFT COMMUNICATOR.............................
9 ATTACHMENT 5 OFF-SITE COMMUNICATOR.........................
11 ATTACHMENT 6 INFORMATION SHEET.............................
13
: 1.
PURPOSE Provide instructions for initial, follow-up, and termination notifications to responsible State and Local governmental agencies, NRC notifications, initial generation of press releases to the Media, and notifications to other off-site support agencies.
: 2.
PRECAUTIONS AND LIMITATIONS
[1 2.1 Initial notifications to State/Local agencies shall be performed within 15 minutes of each declaration of an Emergency and/or change in Protective Action Recommendations (PARs).©
[ ]2.2 NRC notification shall be performed immediately following notification of responsible State and Local governmental agencies, and not later than 1 hour after the time of declaration of one of the emergency classes.
[ ] 2.3 At an ALERT or higher classification, follow-up notifications to responsible State and Local governmental agencies shall be performed approximately every 60 minutes, or sooner if there is a significant change in the status of the emergency.© PROCEDURE 5.7.6 REVISION 35 PAGE 1 OF 15


[1   2.4 Section 8, "Release Information" of the Notification Report, is completed only when both of the following conditions exist:
[1 2.4 Section 8, "Release Information" of the Notification Report, is completed only when both of the following conditions exist:
[ ]   2.4.1     Follow-up notification.
[ ]
[ ]   2.4.2     A release of Airborne Radioactive material greater than ODAM limits is occurring or occurred during the event.
2.4.1 Follow-up notification.
[ J 2.5   Notification of termination to off-site agencies shall be performed within 1 hour after the termination of the emergency.
[ ]
  ] 2.6   If the Control Room must be evacuated and off-site notification responsibilities have not been transferred to the EOF, the Shift Communicator shall perform off-site notifications over the State Notification Telephone from the TSC or EOF.
2.4.2 A release of Airborne Radioactive material greater than ODAM limits is occurring or occurred during the event.
[ ] 2.7   If making a notification for an Emergency that occurred but was not reported (e.g., the condition occurred yesterday but was not caught at that time), make the notification to State/Local agencies by performing an initial notification with the Event Declared and Terminated as the same time.
[ J 2.5 Notification of termination to off-site agencies shall be performed within 1 hour after the termination of the emergency.  
II] 2.8   The Emergency Director shall be immediately notified of any difficulties or delays in completing this procedure.
]
: 3. ENTRY CONDITIONS
2.6 If the Control Room must be evacuated and off-site notification responsibilities have not been transferred to the EOF, the Shift Communicator shall perform off-site notifications over the State Notification Telephone from the TSC or EOF.
[ ] 3.1   An Emergency has been declared per Procedure 5.7.1.
[ ] 2.7 If making a notification for an Emergency that occurred but was not reported (e.g., the condition occurred yesterday but was not caught at that time), make the notification to State/Local agencies by performing an initial notification with the Event Declared and Terminated as the same time.
: 4. CONTROL ROOM ACTIONS
II]
[]   4.1   NOTIFICATIONS FROM CONTROL ROOM.
2.8 The Emergency Director shall be immediately notified of any difficulties or delays in completing this procedure.
[ ]   4.1.1     Emergency Director (ED) direct Operator or Shift Technical Engineer to complete Notification Report per Attachment 1.
: 3.
[ ]   4.1.2     ED review form for accuracy.
ENTRY CONDITIONS
[ ]   4.1.3     ED add remarks to the remarks section as appropriate.
[ ]
[1   4.1.4     ED sign form including date/time.
3.1 An Emergency has been declared per Procedure 5.7.1.
[ ]   4.1.5     If FAX available, ED authorize notification to be faxed to State/Local agencies, NRC Operations Center, TSC, and EOF by providing password to Operator or Shift Technical Engineer.
: 4.
[]   4.1.6     ED direct Shift Communicator to make notifications per Attachment 4.
CONTROL ROOM ACTIONS
PROCEDURE 5.7.6                       REVISION 35               PAGE 2 OF 15
[]
: 5. EOF ACTIONS
4.1 NOTIFICATIONS FROM CONTROL ROOM.
[]   5.1 NOTIFICATIONS FROM EOF
[ ]
[]   5.1.1   Emergency Director (ED) direct Rad Assessment Supervisor or OPS/EOP Advisor to complete Notification Report per Attachment 1.
4.1.1 Emergency Director (ED) direct Operator or Shift Technical Engineer to complete Notification Report per Attachment 1.
[ ] 5.1.2   ED review form for accuracy.
[ ]
[ J 5.1.3   ED add remarks to the remarks section as appropriate.
4.1.2 ED review form for accuracy.
[]   5.1.4   ED sign form including date/time.
[ ]
[]   5.1.5   If FAX available, ED authorize notification to be faxed to State/Local agencies, NRC Operations Center, TSC, and EOF by providing password to Rad Assessment Supervisor or OPS/EOP Advisor.
4.1.3 ED add remarks to the remarks section as appropriate.
[ ] 5.1.6   ED direct Off-Site Communicator to make notifications per Attachment 5.
[1 4.1.4 ED sign form including date/time.
: 6. RECORDS
[ ]
  ] 6.1 Attachments 3, 4, and 5 from actual events shall be forwarded to the EP Manager within 5 working days of their completion (Quality Record upon completion).
4.1.5 If FAX available, ED authorize notification to be faxed to State/Local agencies, NRC Operations Center, TSC, and EOF by providing password to Operator or Shift Technical Engineer.
I       PROCEDURE 5.7.6             1     REVISION 35           1   PAGE 3 OF 15
[ ]
4.1.6 ED direct Shift Communicator to make notifications per.
PROCEDURE 5.7.6 REVISION 35 PAGE 2 OF 15
: 5.
EOF ACTIONS
[]
5.1 NOTIFICATIONS FROM EOF
[ ]
5.1.1 Emergency Director (ED) direct Rad Assessment Supervisor or OPS/EOP Advisor to complete Notification Report per Attachment 1.
[ ]
5.1.2 ED review form for accuracy.
[ J 5.1.3 ED add remarks to the remarks section as appropriate.
[ ]
5.1.4 ED sign form including date/time.
[ ]
5.1.5 If FAX available, ED authorize notification to be faxed to State/Local agencies, NRC Operations Center, TSC, and EOF by providing password to Rad Assessment Supervisor or OPS/EOP Advisor.
[ ]
5.1.6 ED direct Off-Site Communicator to make notifications per.
: 6.
RECORDS  
] 6.1 Attachments 3, 4, and 5 from actual events shall be forwarded to the EP Manager within 5 working days of their completion (Quality Record upon completion).
I PROCEDURE 5.7.6 1
REVISION 35 1
PAGE 3 OF 15


ATTACHMENT 1         COMPLETING NOTIFICATION FORM WITH CNS-DOSE AVAILABLE
ATTACHMENT 1 COMPLETING NOTIFICATION FORM WITH CNS-DOSE AVAILABLE
[ ] ]CAUTION - If CNS-DOSE is not available, notify ED and complete Notification Form using Attachment 2.
[ ] ]CAUTION - If CNS-DOSE is not available, notify ED and complete Notification Form using Attachment 2.
: 1. COMPUTER DOSE PROJECTION/AUTOMATED NOTIFICATION REPORT
: 1.
[ ] 1.1   On a PMIS terminal, enter turn-on code "DOSE".
COMPUTER DOSE PROJECTION/AUTOMATED NOTIFICATION REPORT
[ ] 1.2   Complete Notification Report using on-line instructions.
[ ]
  ] 1.3   Deliver printed Notification Report to the ED to complete the remarks section and approve the notification.
1.1 On a PMIS terminal, enter turn-on code "DOSE".
[ 1.4   Verify ED signature, date, and time are on the Notification Report and fax using the on-line instructions.
[ ]
[ ] 1.5   Provide completed Notification Report to the Communicator.
1.2 Complete Notification Report using on-line instructions.  
I       PROCEDURE 5.7.6               1     REVISION 35           1 PAGE 4 OF 15     j
]
1.3 Deliver printed Notification Report to the ED to complete the remarks section and approve the notification.
[
1.4 Verify ED signature, date, and time are on the Notification Report and fax using the on-line instructions.
[ ]
1.5 Provide completed Notification Report to the Communicator.
I PROCEDURE 5.7.6 1
REVISION 35 1
PAGE 4 OF 15 j


ATTACHMENT 2         COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE
ATTACHMENT 2 COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE
: 1. COMPLETE NOTIFICATION FORM
: 1.
[ ] 1.1   Obtain copy of Attachment 3, Notification Report.
COMPLETE NOTIFICATION FORM
[ ]
1.1 Obtain copy of Attachment 3, Notification Report.
[ ] NOTE 1 - Initial Notifications: Steps 1.2 through 1.19 and 1.28 are required.
[ ] NOTE 1 - Initial Notifications: Steps 1.2 through 1.19 and 1.28 are required.
[1]NOTE 2 - Follow-Up Notifications: Steps 1.2 through 1.28 are required.
[1 ]NOTE 2 - Follow-Up Notifications: Steps 1.2 through 1.28 are required.
[ ] NOTE 3 - Termination Notifications: Steps 1.2 through 1.9 are required.
[ ] NOTE 3 - Termination Notifications: Steps 1.2 through 1.9 are required.  
  ] 1.2   Notification Report Number: Enter 1 or the next sequential number if more than one has been generated during the event.
]
[ ] 1.3   Time of Transmittal: Leave blank.
1.2 Notification Report Number: Enter 1 or the next sequential number if more than one has been generated during the event.
[ ] 1.4   Initial or Follow-Up Report:
[ ]
[ ]   1.4.1   Check Initial Report for EAL classifications or change in PAR.
1.3 Time of Transmittal: Leave blank.
[ ]   1.4.2   Check Follow-Up Report for all others including termination.
[ ]
[ ] 1.5   Name of CNS Communicator: Leave blank.
1.4 Initial or Follow-Up Report:
[ ] 1.6   Classification: Check the Emergency Classification.
[ ]
[ ] 1.7   EAL Number: Enter the EAL number (e.g., 1.1.2).
1.4.1 Check Initial Report for EAL classifications or change in PAR.
[ ] 1.8   Event Declared (Date/Time): Enter time and date of the Emergency Declaration in military format (e.g., 14:18).
[ ]
[ ] 1.9   Event Terminated (Date/Time): Enter time and date of the termination in military format (e.g., 14:18).
1.4.2 Check Follow-Up Report for all others including termination.
RELEASE                                                     DEFAULT POINT                   PRIMARY             BACKUP         VALUES 13 mph and D CNS DOSE or 100 M MET         60 M MET           abi   C ERP                                                            Stability Class All Others         CNS DOSE or 10 M MET         60 M MET     8 mph and D Points                                         I             I Stability Class
[ ]
[ ] 1.10 Wind Speed: Enter wind speed in MPH.
1.5 Name of CNS Communicator: Leave blank.
I       PROCEDURE 5.7.6               1     REVISION 35           1   PAGE 5 OF 15
[ ]  
 
===1.6 Classification===
Check the Emergency Classification.
[ ]
1.7 EAL Number: Enter the EAL number (e.g., 1.1.2).
[ ]
1.8 Event Declared (Date/Time): Enter time and date of the Emergency Declaration in military format (e.g., 14:18).
[ ]
1.9 Event Terminated (Date/Time): Enter time and date of the termination in military format (e.g., 14:18).
RELEASE DEFAULT POINT PRIMARY BACKUP VALUES 13 mph and D ERP CNS DOSE or 100 M MET 60 M MET abi C
Stability Class All Others CNS DOSE or 10 M MET 60 M MET 8 mph and D Points I
I Stability Class
[ ]
1.10 Wind Speed: Enter wind speed in MPH.
I PROCEDURE 5.7.6 1
REVISION 35 1
PAGE 5 OF 15


ATTACHMENT 2           COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE
ATTACHMENT 2 COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE
[ ] 1.11 Wind From: Enter the direction (e.g., if the wind is coming from the east, enter 90.
[ ] 1.11 Wind From: Enter the direction (e.g., if the wind is coming from the east, enter 90.
[ ] NOTE - If it is currently raining, SPDS MET will have message "It is raining".
[ ] NOTE - If it is currently raining, SPDS MET will have message "It is raining".
[ ] 1.12   Precipitation (Yes/No): Check Yes if there is precipitation. Check No if it is not.
[ ] 1.12 Precipitation (Yes/No): Check Yes if there is precipitation. Check No if it is not.
[ ] 1.13   Stability Classification (A-G): Check Stability Class (A-G).
[ ]
[1   1.14   Release Status (Is/Was/Will-Be):
1.13 Stability Classification (A-G): Check Stability Class (A-G).
[]     1.14.1   Is: Enter Is if release is currently in excess of ODAM limits or no release in progress/expected.
[1 1.14 Release Status (Is/Was/Will-Be):
[1     1.14.2   Was: Enter Was if release is now less than ODAM limits.
[ ]
[1     1.14.3   Will-Be: Enter Will-Be if release in excess of ODAM limits is expected.
1.14.1 Is: Enter Is if release is currently in excess of ODAM limits or no release in progress/expected.
[   1.15   Release Type (None/Airborne/Liquid):
[1 1.14.2 Was: Enter Was if release is now less than ODAM limits.
        ]   1.15.1   None: Check None if releases are currently below ODAM limits.
[1 1.14.3 Will-Be: Enter Will-Be if release in excess of ODAM limits is expected.
[ ]     1.15.2   Airborne: Check Airborne if release is, was, or will-be in excess of ODAM limits for airborne activity.
[
[1     1.15.3   Liquid: Check Liquid if release is, was, or will-be in excess of ODAM limits for liquid activity.
1.15 Release Type (None/Airborne/Liquid):  
[1   1.16   Protective Action Recommendations: Enter PARs. Verify PAR includes previous PARs if they have changed.
]
[ ]1.17     Prognosis (Stable/Unstable):
1.15.1 None: Check None if releases are currently below ODAM limits.
[]     1.17.1   Check Stable if the event is not likely to degrade.
[ ]
[1     1.17.2   Check Unstable if the event is degrading (e.g., RPV level is lowering or Containment Rad Monitors are trending upward).
1.15.2 Airborne: Check Airborne if release is, was, or will-be in excess of ODAM limits for airborne activity.
[1   1.18   Plant Status (at Power/Shutdown): Check appropriate box.
[1 1.15.3 Liquid: Check Liquid if release is, was, or will-be in excess of ODAM limits for liquid activity.
PROCEDURE 5.7.6                       REVISION 35               PAGE 6 OF 15
[1 1.16 Protective Action Recommendations: Enter PARs. Verify PAR includes previous PARs if they have changed.
[ ]1.17 Prognosis (Stable/Unstable):
[ ]
1.17.1 Check Stable if the event is not likely to degrade.
[1 1.17.2 Check Unstable if the event is degrading (e.g., RPV level is lowering or Containment Rad Monitors are trending upward).
[1 1.18 Plant Status (at Power/Shutdown): Check appropriate box.
PROCEDURE 5.7.6 REVISION 35 PAGE 6 OF 15


ATTACHMENT 2           COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE
ATTACHMENT 2 COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE
[ ] 1.19 Remarks: Enter information that will be useful to the off-site agencies in understanding the event, pla       onditions, or release information. If dose projections at 10 miles are g     r-tha*o rqetua!;l1 REM TEDE or 5 REM CDE, verify that this in the remarks section.
[ ]
[ ] 1.20 Section 8, "Release Information" of the Notification Report is completed only when both of the following conditions exist:
1.19 Remarks: Enter information that will be useful to the off-site agencies in understanding the event, pla onditions, or release information. If dose projections at 10 miles are g r-tha*o rqetua!;l1 REM TEDE or 5 REM CDE, verify that this in the remarks section.
[ ]   1.20.1   Follow-up notification.
[ ]
[ ]   1.20.2   A release of airborne radioactive material greater than ODAM limits is occurring or occurred during the event.
1.20 Section 8, "Release Information" of the Notification Report is completed only when both of the following conditions exist:
[ ] 1.21 Release From: Check the location that was or is exceeding ODAM limits.
[ ]
[ ] 1.22 Release Height: 100 M for ERP and 10 M for any building release. Other is checked if the release is not from a building.
1.20.1 Follow-up notification.
  ] 1.23 Release Duration: If duration is unknown, use the default of 4 hours.
[ ]
1.20.2 A release of airborne radioactive material greater than ODAM limits is occurring or occurred during the event.
[ ] 1.21 Release From: Check the location that was or is exceeding ODAM limits.
[ ] 1.22 Release Height: 100 M for ERP and 10 M for any building release. Other is checked if the release is not from a building.  
]
1.23 Release Duration: If duration is unknown, use the default of 4 hours.
[ ]1.24 Start Time: Enter release start time (e.g., 14:18)
[ ]1.24 Start Time: Enter release start time (e.g., 14:18)
[ ] 1.25 Stop Time: Enter release stop time if known; otherwise, enter "UNK".
[ ]
[ ] 1.26 Release Rate (pCi/sec): Enter release rate in jCi/sec.
1.25 Stop Time: Enter release stop time if known; otherwise, enter "UNK".
[ ] 1.27   Projected Integrated Dose (Rem) and Projected Dose Rate (Rem/hr):
[ ]
1.26 Release Rate (pCi/sec): Enter release rate in jCi/sec.
[ ]
1.27 Projected Integrated Dose (Rem) and Projected Dose Rate (Rem/hr):
Are obtained from CNS DOSE or by hand calculations per Procedure 5.7.17.
Are obtained from CNS DOSE or by hand calculations per Procedure 5.7.17.
[ ] 1.28   Deliver to ED to add remarks, signature, date, and time.
[ ]
I       PROCEDURE 5.7.6               1       REVISION 35           1   PAGE 7 OF 15
1.28 Deliver to ED to add remarks, signature, date, and time.
I PROCEDURE 5.7.6 1
REVISION 35 1
PAGE 7 OF 15


ATTACHMENT 3                       COOPER NUCLEAR STATION NOTIFICATION REPORT Notification Report Number:                                                   Time of Transmittal:
ATTACHMENT 3 COOPER NUCLEAR STATION NOTIFICATION REPORT Notification Report Number:
[   Initial Report (Complete Sections 1-7 only)                                                                         [ ] Follow-Up Report
Time of Transmittal:
: 1) Name of CNS Communicator:                                                                         Call Back Number: 402-825
[
: 2) Classification: [ ] NOUE; [ ]-Alert; [1 Site Area; [                       General .                 . EAL Number:
Initial Report (Complete Sections 1-7 only)
Event Declared (DaterTime):                                       i Event Terminated (Date/Time):
[ ] Follow-Up Report
: 3) Meteorological               Wind Speed:               MPH       Wind From:                 Degrees   I Precipitation: [ ] Yes [ ] No Conditions                                                   I Stability Class: [ ]A; [ ]B; [ ]C;               ]D;[ ]E;         ]F;[ ]G
: 1) Name of CNS Communicator:
: 4) ODAM Airborne Release Values:                         There     [ ]is         [ ] no         Release of Radioactive Material Greater ERP = 7.28E5 pCi/sec                                                                       than ODAM Limits.
Call Back Number: 402-825
TG Bldg = 3.6E4 pCi/sec RX Bldg = 3.3E4 pCilsec ARW Bldg = 3.6E4 pCi/sec                                           will be       a liquid
: 2) Classification: [ ] NOUE; [ ]-Alert; [1 Site Area; [
: 5) Protective Action Recommendations (PARS): General Emergency Automatic PAR - Evacuate 2 mi radius/5 mi Sdownwind,           go indoors, and monitor EAS/EBS                     remainder 10 mi EPZ.
General.
Evacuate     Sectors           I Go     indoors   and monitor     EAS/EBS         in Sectors
EAL Number:
-------------      -None.      . 4, 4---------------------------------------------.--------------
Event Declared (DaterTime):
0-2 Miles
i Event Terminated (Date/Time):
                ----------       4-------------------- 4------------------------------------------
: 3) Meteorological Wind Speed:
2-5 2-  Miles,,
MPH Wind From:
Ms4   -----------            -----------------------                4-             ---------------------------------------
Degrees I Precipitation: [ ] Yes [ ] No Conditions I
5-10 Miles                                                                     _ ___
Stability Class: [ ]A; [ ]B; [ ]C;  
: 6) Prognosis: [] Stable; [ ] Unstable                                           I Plant Status: []at Power; []Shutdown
]D;[ ]E;  
: 7) Remarks:                                                                         -
]F;[ ]G
: 8) Release Information             (required on follow-up Notification with                   airborne release >ODAM limits):
: 4) ODAM Airborne Release Values:
Release From: [_] ERP; [ ] Reactor Building; [_Turbine Building; [1 Aug-------                      Radwaste Building;[ ]Other:
There [ ]is
                  --------------------------                                                                      r-----------------------
[ ] no Release of Radioactive Material Greater ERP = 7.28E5 pCi/sec than ODAM Limits.
Release Height: []100 M (ERP); [ ] 10 M (RB, TB, ARWB); [ ] Other:                               _ ----------
TG Bldg = 3.6E4 pCi/sec RX Bldg = 3.3E4 pCilsec ARW Bldg = 3.6E4 pCi/sec will be a liquid
ft J1 Release Rate (pCilsec)
: 5) Protective Action Recommendations (PARS): General Emergency Automatic PAR - Evacuate 2 mi radius/5 mi downwind, go indoors, and monitor EAS/EBS remainder 10 mi EPZ.
Estimated Duration:                             (Hours)                                       Noble gas:                           pCi/sec Start Time:                                                                         Iodides:               N/A Stop Time:                                                                         Particulate:           N/A
S
---------------          I-----------------------------------------------------------------                     Dose      Rate (Rem/hr)
-None Evacuate Sectors I Go indoors and monitor EAS/EBS in Sectors 4---------
Distance                       Projected     Integrated     Dose   (Rem)             i           Projected 4 ----------    x--------------- ------- -----
4 0-2 Miles ----------
    . . Plant From    .. . . -...4 .. . .. TEDE . . ..   . ..     -    CDE (Thyroid)              ,            TEDE              ,
4-------------------- 4------------------------------------------
4-- - - CDE- (Thyroid)
2-5 Miles,,
Site-Boundar---------------------------                                  --        --------------
2-Ms4 4-5-10 Miles
4                         ---------------------
: 6) Prognosis: [] Stable; [ ] Unstable I Plant Status: []at Power; []Shutdown
Site Boundar~y
: 7) Remarks:
-    ---------        4                                                                I-2 Miles 2-Miles-------------- --------------------- 4------------------- 4-------------------
: 8) Release Information (required on follow-up Notification with airborne release >ODAM limits):
5Miles                                       tt+
Release From: [_] ERP; [ ] Reactor Building; [_Turbine Building; [1 Aug Radwaste Building;[ ]Other:
    ---Mie         ----------------                  +----------------+---------------+-----------------------------
r-----------------------
10 Miles           I                                                                                                     __          ___
Release Height: []100 M (ERP); [ ] 10 M (RB, TB, ARWB); [ ] Other: _
Emergency Director Signature:                                                             Date:                         Time:
ft 1 Release Rate (pCilsec)
PROCEDURE 5.7.6                                               REVISION 35                                   PAGE 8 OF 15
J Estimated Duration:
(Hours)
Noble gas:
pCi/sec Start Time:
Iodides:
N/A Stop Time:
Particulate:
N/A I-----------------------------------------------------------------
Distance Projected Integrated Dose (Rem) i Projected Dose Rate (Rem/hr) 4 -----
x--------------- -------
From Plant TEDE CDE (Thyroid)
TEDE CDE (Thyroid)
.......4............
4--
Site-Boundar---------------------------
4 Site Boundar~y 4
I -
2 Miles 2-Miles-------------- --------------------- 4------------------- 4-------------------
5Miles tt+  
--- Mie  
+----------------+---------------+-----------------------------
10 Miles I
Emergency Director Signature:
Date:
Time:
PROCEDURE 5.7.6 REVISION 35 PAGE 8 OF 15


ATTACHMENT 4               SHIFT COMMUNICATOR Notification Report Number:
ATTACHMENT 4 SHIFT COMMUNICATOR Notification Report Number:  
] 1.1       When directed to perform notification to State and Local Government agencies, perform the following:
] 1.1 When directed to perform notification to State and Local Government agencies, perform the following:
[]       1.1.1     Verify ED signature/date/time and remarks section (optional) on Notification Report.
[ ]
[]       1.1.2     Print your name and call back number on Notification Report, Block 1.
1.1.1 Verify ED signature/date/time and remarks section (optional) on Notification Report.
[1       1.1.3     Contact State/Local Agencies using State Notification Telephone System by pressing the "Group Call" button or 7450 from any phone.
[ ]
NOTIFY FOLLOWING                           :SPEED:
1.1.2 Print your name and call back number on Notification Report, Block 1.
II       TIME AGENCIES                 PHONE       DIAL II #: ON     LINE:                   NAME OF CONTACT NEMA via Nebraska State                         04 Patrol ------------                                   I------------- -            -    ------------------------------------
[ 1 1.1.3 Contact State/Local Agencies using State Notification Telephone System by pressing the "Group Call" button or 7450 from any phone.
Nemaha County EOC via             State       20 Nemaha County Sheriff           Notification--------I------I                         ------------------------
NOTIFY FOLLOWING
Atchison County EOC via         Telephone Atchison County Sheriff           System       19 Missouri SEMA via                               22 Missouri Highway Patrol
: SPEED:
[ ]       NOTE - If communication is lost with one or more agencies, continue to make notifications to on-line parties. When notifications are complete, call back agencies missing and make report.
TIME II AGENCIES PHONE DIAL #: ON LINE:
[ ]       1.1.4     Record time last party on line as "Time of Transmittal" on Notification Report.
NAME OF CONTACT II NEMA via Nebraska State 04 Patrol ------------
[]       1.1.5     When all parties are on line, verify that they have received the faxed notification. Only information on the form is allowed to be communicated unless authorized by the ED.
I ------------- -
[1       1.1.5.1     If FAX not received, read the Notification Report line by line.
Nemaha County EOC via State 20 Nemaha County Sheriff Notification--------I------I Atchison County EOC via Telephone Atchison County Sheriff System 19 Missouri SEMA via 22 Missouri Highway Patrol
[ ]       1.1.6     Notify ED notification to State/Local agencies is complete and time follow-up notification is required.
[ ]
PROCEDURE 5.7.6                 1       REVISION 35                                   PAGE 9 OF 15
NOTE - If communication is lost with one or more agencies, continue to make notifications to on-line parties. When notifications are complete, call back agencies missing and make report.
[ ]
1.1.4 Record time last party on line as "Time of Transmittal" on Notification Report.
[ ]
1.1.5 When all parties are on line, verify that they have received the faxed notification. Only information on the form is allowed to be communicated unless authorized by the ED.
[1 1.1.5.1 If FAX not received, read the Notification Report line by line.
[ ]
1.1.6 Notify ED notification to State/Local agencies is complete and time follow-up notification is required.
PROCEDURE 5.7.6 1
REVISION 35 PAGE 9 OF 15


ATTACHMENT 4           SHIFT COMMUNICATOR
ATTACHMENT 4 SHIFT COMMUNICATOR
[ ] 1.2   Contact NRC Headquarters via ENS immediately after Step 1.1.6 and not later than 60 minutes after declaration of an emergency.
[ ] 1.2 Contact NRC Headquarters via ENS immediately after Step 1.1.6 and not later than 60 minutes after declaration of an emergency.
NRC   CNS TELEPHONE           ALTERNATE             PERSON CONTACTED       TIME Dial # on Phone       ETD or Speed Sticker               Dial - 10
NRC CNS TELEPHONE ALTERNATE PERSON CONTACTED TIME Dial # on Phone ETD or Speed Sticker Dial - 10  
  ] 1.3. When contacted by ENS Communicator in TSC, transfer NRC notification responsibilities and notify ED. ENS communications from the TSC are performed in accordance with Procedure 5.7ENS.
] 1.3.
NAME OF ENS COMMUNICATOR                           PERFORMED BY           TIME
When contacted by ENS Communicator in TSC, transfer NRC notification responsibilities and notify ED. ENS communications from the TSC are performed in accordance with Procedure 5.7ENS.
[ ] 1.4. When contacted by Off-Site Communicator in EOF, transfer off-site notification responsibilities and notify ED.
NAME OF ENS COMMUNICATOR PERFORMED BY TIME
NAME OF OFF-SITE COMMUNICATOR                         PERFORMED BY           TIME Communicator Signature:                                               Date:
[ ] 1.4.
PROCEDURE 5.7.6                       REVISION 35         PAGE 10 OF 15
When contacted by Off-Site Communicator in EOF, transfer off-site notification responsibilities and notify ED.
NAME OF OFF-SITE COMMUNICATOR PERFORMED BY TIME Communicator Signature:
Date:
PROCEDURE 5.7.6 REVISION 35 PAGE 10 OF 15


ATTACHMENT 5           OFF-SITE COMMUNICATOR Notification Report Number:
ATTACHMENT 5 OFF-SITE COMMUNICATOR Notification Report Number:
[ ] 1.1     When directed to perform notification to State and Local Government agencies, perform the following:
[ ] 1.1 When directed to perform notification to State and Local Government agencies, perform the following:
[1     1.1.1     Verify ED signature/date/time and remarks section on Notification Report.
[1 1.1.1 Verify ED signature/date/time and remarks section on Notification Report.
[ ]     1.1.2     Print your name and call back number on Notification Report, Block 1.
[ ]
[]     1.1.3     Contact State/Local agencies using State Notification Telephone System by pressing the "Group Call" button or 7450 from any phone.
1.1.2 Print your name and call back number on Notification Report, Block 1.
NOTIFY FOLLOWING                               TIME AGENCIES               PHONE         ON LINE                                   NAME OF CONTACT NEMA via Nebraska State Patrol -
[ ]
State L...................-----------------------
1.1.3 Contact State/Local agencies using State Notification Telephone System by pressing the "Group Call" button or 7450 from any phone.
Nemaha County EOC via       :    S                                 I Nemaha County Sheriff         Notification Telephone   L------
NOTIFY FOLLOWING TIME AGENCIES PHONE ON LINE NAME OF CONTACT NEMA via Nebraska State Patrol -
Atchison County EOC via         System Atchison County Sheriff L   -    - -  -  -    I -  -  -  -  - - - - - - - - - - - - - - - - -
L...................-----------------------
Missouri SEMA via Missouri Highway Patrol
State Nemaha County EOC via S
[ ]     NOTE - If communication is lost with one or more agencies, continue to make notifications to on-line parties. When notifications are complete, call back agencies missing and make report.
I Nemaha County Sheriff Notification Telephone L------
[ ]     1.1.4   Record time last party on line as "Time of Transmittal" on Notification Report.
Atchison County EOC via System Atchison County Sheriff L
[1       1.1.5   When all parties are on line, verify that they have received the faxed notification. Only information on the form is allowed to be communicated unless authorized by the ED.
I Missouri SEMA via Missouri Highway Patrol
[ ]     1.1.5.1     If FAX not received, read the Notification Report line by line.
[ ]
[ ]     1.1.6   Notify ED that notification to State/Local agencies is complete and time follow-up notification is required.
NOTE - If communication is lost with one or more agencies, continue to make notifications to on-line parties. When notifications are complete, call back agencies missing and make report.
PROCEDURE 5.7.6                 1             REVISION 35                               PAGE 11 OF 15       j
[ ]
1.1.4 Record time last party on line as "Time of Transmittal" on Notification Report.
[1 1.1.5 When all parties are on line, verify that they have received the faxed notification. Only information on the form is allowed to be communicated unless authorized by the ED.
[ ]
1.1.5.1 If FAX not received, read the Notification Report line by line.
[ ]
1.1.6 Notify ED that notification to State/Local agencies is complete and time follow-up notification is required.
PROCEDURE 5.7.6 1
REVISION 35 PAGE 11 OF 15 j


ATTACHMENT 5           OFF-SITE COMMUNICATOR
ATTACHMENT 5 OFF-SITE COMMUNICATOR
[ ] 1.2   Perform notifications to the following support agencies, as soon as possible, after the declaration of an ALERT or higher emergency classification, but not until after all notifications are completed as required in Section 1.
[ ] 1.2 Perform notifications to the following support agencies, as soon as possible, after the declaration of an ALERT or higher emergency classification, but not until after all notifications are completed as required in Section 1.
AGENCY               PHONE                 PERSON CONTACTED                 TIME INPO                   (800) 321-0614 American Nuclear       (860) 561-3433 Insurers (ANI)
AGENCY PHONE PERSON CONTACTED TIME INPO (800) 321-0614 American Nuclear (860) 561-3433 Insurers (ANI)
Communicator Signature:                                                     Date:
Communicator Signature:
I       PROCEDURE 5.7.6                 1     REVISION 35           1   PAGE 12 OF 15 ]
Date:
I PROCEDURE 5.7.6 1
REVISION 35 1
PAGE 12 OF 15  
]


ATTACHMENT 6         INFORMATION SHEET
ATTACHMENT 6 INFORMATION SHEET
: 1. DISCUSSION 1.1 All notifications and communications will be handled from the Control Room (CR) until the Technical Support Center (TSC) and Emergency Operations Facility (EOF) are activated. The responsibility of generating press releases to the media may be transferred to NPPD Corporate Communications Department personnel prior to activation of the Joint Information Center (JIC).
: 1. DISCUSSION 1.1 All notifications and communications will be handled from the Control Room (CR) until the Technical Support Center (TSC) and Emergency Operations Facility (EOF) are activated. The responsibility of generating press releases to the media may be transferred to NPPD Corporate Communications Department personnel prior to activation of the Joint Information Center (JIC).
1.2 During a declared Emergency at CNS, Emergency notifications to the State of Nebraska; State of Missouri; Atchison County, Missouri; and Nemaha County, Nebraska are accomplished through the State Notification Telephone System.
1.2 During a declared Emergency at CNS, Emergency notifications to the State of Nebraska; State of Missouri; Atchison County, Missouri; and Nemaha County, Nebraska are accomplished through the State Notification Telephone System.
The CNS State Notification Telephone System is a conference-calling system.
The CNS State Notification Telephone System is a conference-calling system.
When the handset to this hotline is picked up, and the "Group Call" button is pushed, dedicated telephones will automatically ring at Nebraska State Patrol, Missouri Highway Patrol, Atchison County Sheriffs Department, and Nemaha County Sheriffs Department. The utilization of law enforcement agencies as initial points of contact provides for 24 hour coverage. The dedicated lines listed also have extension lines which ring at the following facilities respectively: Nebraska Emergency Management Agency EOC, Missouri State Emergency Management Agency EOC, Atchison County EOC, and Nemaha County EOC. Once the EOCs become operational, notifications may be made using the extension lines at the EOCs with concurrence between the respective EOC and law enforcement agency.
When the handset to this hotline is picked up, and the "Group Call" button is pushed, dedicated telephones will automatically ring at Nebraska State Patrol, Missouri Highway Patrol, Atchison County Sheriffs Department, and Nemaha County Sheriffs Department. The utilization of law enforcement agencies as initial points of contact provides for 24 hour coverage. The dedicated lines listed also have extension lines which ring at the following facilities respectively: Nebraska Emergency Management Agency EOC, Missouri State Emergency Management Agency EOC, Atchison County EOC, and Nemaha County EOC. Once the EOCs become operational, notifications may be made using the extension lines at the EOCs with concurrence between the respective EOC and law enforcement agency.
1.3   Notifications to the NRC are normally accomplished through the Emergency Notification System (ENS). The Emergency Notification System is a dedicated telephone system which is manned 24 hours by the Duty Officer at the NRC Headquarters Operations Center.
1.3 Notifications to the NRC are normally accomplished through the Emergency Notification System (ENS). The Emergency Notification System is a dedicated telephone system which is manned 24 hours by the Duty Officer at the NRC Headquarters Operations Center.
1.4   During any notification activity, if the primary communications system fails, communication methods shall be attempted such as alternate telephones, National Warning System (NAWAS), base station radio, or relay through a third party. Alternate telephone numbers are listed in the Emergency Telephone Directory.
1.4 During any notification activity, if the primary communications system fails, communication methods shall be attempted such as alternate telephones, National Warning System (NAWAS), base station radio, or relay through a third party. Alternate telephone numbers are listed in the Emergency Telephone Directory.
1.5   At an ALERT or higher emergency classification, to receive continuous and detailed information, the NRC will likely request an open line of communication with the Control Room (CNS) until the TSC is operational.
1.5 At an ALERT or higher emergency classification, to receive continuous and detailed information, the NRC will likely request an open line of communication with the Control Room (CNS) until the TSC is operational.
I     PROCEDURE 5.7.6               1       REVISION 35         1   PAGE 13 OF 15
I PROCEDURE 5.7.6 1
REVISION 35 1
PAGE 13 OF 15


ATTACHMENT 6         INFORMATION SHEET 1.6 The Public Affairs Duty Officer (PADO) shall be notified by pager by the CNS ANS and instructed to contact the Shift Communicator in the Control Room.
ATTACHMENT 6 INFORMATION SHEET 1.6 The Public Affairs Duty Officer (PADO) shall be notified by pager by the CNS ANS and instructed to contact the Shift Communicator in the Control Room.
Upon being contacted by the PADO, the Shift Communicator will ensure all information from the Initial CNS Notification Report is relayed to the PADO.
Upon being contacted by the PADO, the Shift Communicator will ensure all information from the Initial CNS Notification Report is relayed to the PADO.
In such cases, that it is not feasible to relay the information via telephone in a timely manner, the Notification Report may be faxed to the PADO. PADO functions shall be superseded by the activation of the Joint Information Center (JIC). The JIC shall receive follow-up information from the Technical Information Coordinator in the EOF.
In such cases, that it is not feasible to relay the information via telephone in a timely manner, the Notification Report may be faxed to the PADO. PADO functions shall be superseded by the activation of the Joint Information Center (JIC). The JIC shall receive follow-up information from the Technical Information Coordinator in the EOF.
1.7 The On-Call Emergency Preparedness Coordinator should assume the responsibility of coordinating press releases after being notified and responding to a Notification of Unusual Event (NOUE).
1.7 The On-Call Emergency Preparedness Coordinator should assume the responsibility of coordinating press releases after being notified and responding to a Notification of Unusual Event (NOUE).
1.7.1     Assist the Shift Communicator in ensuring communications are established with the PADO and information from the CNS Notification Reports is relayed to the PADO per Procedure 5.7.23.
1.7.1 Assist the Shift Communicator in ensuring communications are established with the PADO and information from the CNS Notification Reports is relayed to the PADO per Procedure 5.7.23.
1.7.2     This responsibility shall be for the period immediately after the declaration of the NOUE and continue until the responsibility is transferred to appropriate NPPD Corporate Communications Department personnel.
1.7.2 This responsibility shall be for the period immediately after the declaration of the NOUE and continue until the responsibility is transferred to appropriate NPPD Corporate Communications Department personnel.
1.7.3     Any press release that is generated during this period should be reviewed and approved by the Emergency Director.
1.7.3 Any press release that is generated during this period should be reviewed and approved by the Emergency Director.
1.8 Authorized Representatives of the Governors of Nebraska and Missouri may be represented in the EOF and set up Forward Command Posts at some other location.
1.8 Authorized Representatives of the Governors of Nebraska and Missouri may be represented in the EOF and set up Forward Command Posts at some other location.
: 2. REFERENCES 2.1   CODES AND STANDARDS 2.1.1     10CFR50.
: 2.
2.1.2     NPPD Emergency Plan for CNS.
REFERENCES 2.1 CODES AND STANDARDS 2.1.1 10CFR50.
2.2   PROCEDURES 2.2.1     Emergency Plan Implementing Procedure 5.7.1, Emergency Classification.
2.1.2 NPPD Emergency Plan for CNS.
PROCEDURE 5.7.6                       REVISION 35               PAGE 14 OF 15
2.2 PROCEDURES 2.2.1 Emergency Plan Implementing Procedure 5.7.1, Emergency Classification.
PROCEDURE 5.7.6 REVISION 35 PAGE 14 OF 15


ATTACHMENT 6   INFORMATION SHEET 2.3 MISCELLANEOUS 2.3.1 CNS Emergency Telephone Directory.
ATTACHMENT 6 INFORMATION SHEET 2.3 MISCELLANEOUS 2.3.1 CNS Emergency Telephone Directory.
2.3.2 NRC Inspection Report 89-35, Item 1.
2.3.2 NRC Inspection Report 89-35, Item 1.
2.3.3 NCR 93-52.
2.3.3 NCR 93-52.
2.3.4 NRC Inspection Report 94-11.
2.3.4 NRC Inspection Report 94-11.
2.3.5 NRC Inspection Report 94-29, Item 1.
2.3.5 NRC Inspection Report 94-29, Item 1.
2.3.6 QA Observation 93-05A.
2.3.6 QA Observation 93-05A.
2.3.7 QA Report 86-06.
2.3.7 QA Report 86-06.
2.3.8 RCR 2001-0181, Action #2, Require State/Local Notification within 15 minutes of a PAR or change in PAR.
2.3.8 RCR 2001-0181, Action #2, Require State/Local Notification within 15 minutes of a PAR or change in PAR.
2.4   NRC COMMITMENTS 2.4.1 © NRC Inspection Report 92-14. Commitment affects Steps 2.1 and 2.3.
2.4 NRC COMMITMENTS 2.4.1  
2.4.2 © NRC Inspection Report 98-12 (NLS980074-05 and NLS980074-06).
© NRC Inspection Report 92-14. Commitment affects Steps 2.1 and 2.3.
2.4.2  
© NRC Inspection Report 98-12 (NLS980074-05 and NLS980074-06).
Commitment affects Steps 2.1 and 2.3.
Commitment affects Steps 2.1 and 2.3.
I     PROCEDURE 5.7.6           1     REVISION 35         1 PAGE 15 OF 15     ý
I PROCEDURE 5.7.6 1
REVISION 35 1
PAGE 15 OF 15  
ý


CNS OPERATIONS MANUAL                                                     USE: INFORMATION EPIP PROCEDURE 5.7.21                                                     EFFECTIVE: 7/15/02 APPROVAL: SORC OWNE:S. C MAINTAINING EMERGENCY PREPAREDNESS -
CNS OPERATIONS MANUAL USE: INFORMATION EPIP PROCEDURE 5.7.21 EFFECTIVE: 7/15/02 APPROVAL: SORC MAINTAINING EMERGENCY PREPAREDNESS -
EMERGENCY EXERCISES, DRILLS,                                                     DEPARTMENT: EP TESTS, AND EVALUATIONS                                                     DEPARTMENT:_EP
OWNE:S. C EMERGENCY EXERCISES, DRILLS, DEPARTMENT: EP TESTS, AND EVALUATIONS DEPARTMENT:_EP
: 1. PU R P O SE ............................................................                                                               1
: 1.
: 2. SENIOR MANAGER OF SITE SUPPORT INSTRUCTIONS                                                         ...................                 1
PU R P O SE............................................................
: 3. EMERGENCY PREPAREDNESS MANAGER INSTRUCTIONS ................                                                                           2
1
: 4. R E C O R D S ............................................................                                                             4 ATTACHMENT             1       EP     PROGRAM               MAINTENANCE               CHECKLIST                   ............       5 ATTACHMENT 2                   QUARTERLY EP MAINTENANCE CHECKLIST ..........                                                           7 ATTACHMENT 3                   EMERGENCY PLAN 6 YEAR ELEMENT                                           DEMONSTRATION
: 2.
                                      . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .o   ... 10 ATTACHMENT 4                   EPIP ANNUAL REVIEW .............................                                                       11 ATTACHMENT             5       EP     EXERCISE               CHECKLIST           ..........................                           13 ATTACHMENT 6                   INSTRUCTIONS FOR EQUIPMENT INVENTORIES (ATTACHMENTS 7 THOUGH 14) .....................                                                       14 ATTACHMENT 7                   EMERGENCY EQUIPMENT MAINTAINED AT CONTROL R O O M ............................................                                                   16 ATTACHMENT 8                   EMERGENCY EQUIPMENT AT OSC ..................                                                         17 ATTACHMENT 9                   EMERGENCY RESCUE EQUIPMENT LOCKER .........                                                           18 ATTACHMENT 10 EMERGENCY EQUIPMENT                                                 MAINTAINED                   AT     AOSC       .... 19 ATTACHMENT 11 EMERGENCY EQUIPMENT MAINTAINED AT EOF ..... 20 ATTACHMENT 12 EMERGENCY EQUIPMENT MAINTAINED AT AEOF .... 24 ATTACHMENT 13 EMERGENCY EQUIPMENT MAINTAINED FOR AM BULANCE ......................................                                                     26 ATTACHMENT 14 EMERGENCY EQUIPMENT MAINTAINED AT HOSPITAL
SENIOR MANAGER OF SITE SUPPORT INSTRUCTIONS...................
                                        . . . . . . . . . . . . .. . . . . . . . . . . .. . . . . . . . . . . . . . . . .. . . . . . . 2 7 ATTACHMENT             15       INFORMATION                     SHEET .............................                                   28
1
: 1. PURPOSE This procedure provides instructions for documenting the completion of periodic surveillances, tests, drills, and training. Periodic test and reviews of components of the Emergency Planning Program (e.g., facilities, equipment, Emergency Plan, and Emergency Plan Implementing Procedures, etc.) are conducted to ensure availability, operability, and reliability.
: 3.
: 2. SENIOR MANAGER OF SITE SUPPORT INSTRUCTIONS 2.1     Review completed documentation of Attachment 1, EP Program Maintenance Checklist, on an annual basis.
EMERGENCY PREPAREDNESS MANAGER INSTRUCTIONS................
PROCEDURE 5.7.21                                 1             REVISION 25                             PAGE 1 OF 32
2
: 4.
R E C O R D S............................................................
4 ATTACHMENT 1 EP PROGRAM MAINTENANCE CHECKLIST............
5 ATTACHMENT 2 QUARTERLY EP MAINTENANCE CHECKLIST..........
7 ATTACHMENT 3 EMERGENCY PLAN 6 YEAR ELEMENT DEMONSTRATION  
...............................................o  
... 1 0 ATTACHMENT 4 EPIP ANNUAL REVIEW.............................
11 ATTACHMENT 5 EP EXERCISE CHECKLIST..........................
13 ATTACHMENT 6 INSTRUCTIONS FOR EQUIPMENT INVENTORIES (ATTACHMENTS 7 THOUGH 14).....................
14 ATTACHMENT 7 EMERGENCY EQUIPMENT MAINTAINED AT CONTROL R O O M............................................
16 ATTACHMENT 8 EMERGENCY EQUIPMENT AT OSC..................
17 ATTACHMENT 9 EMERGENCY RESCUE EQUIPMENT LOCKER.........
18 ATTACHMENT 10 EMERGENCY EQUIPMENT MAINTAINED AT AOSC....
19 ATTACHMENT 11 EMERGENCY EQUIPMENT MAINTAINED AT EOF.....
20 ATTACHMENT 12 EMERGENCY EQUIPMENT MAINTAINED AT AEOF....
24 ATTACHMENT 13 EMERGENCY EQUIPMENT MAINTAINED FOR AM BULANCE......................................
26 ATTACHMENT 14 EMERGENCY EQUIPMENT MAINTAINED AT HOSPITAL  
......................................... 2 7 ATTACHMENT 15 INFORMATION SHEET.............................
28
: 1.
PURPOSE This procedure provides instructions for documenting the completion of periodic surveillances, tests, drills, and training. Periodic test and reviews of components of the Emergency Planning Program (e.g., facilities, equipment, Emergency Plan, and Emergency Plan Implementing Procedures, etc.) are conducted to ensure availability, operability, and reliability.
: 2.
SENIOR MANAGER OF SITE SUPPORT INSTRUCTIONS 2.1 Review completed documentation of Attachment 1, EP Program Maintenance Checklist, on an annual basis.
PROCEDURE 5.7.21 1
REVISION 25 PAGE 1 OF 32


2.2 Ensure State and County Emergency Management officials are made aware of non-emergency events that have a potential for media interest.
2.2 Ensure State and County Emergency Management officials are made aware of non-emergency events that have a potential for media interest.
2.2.1     Inform Emergency Preparedness (EP) of event.
2.2.1 Inform Emergency Preparedness (EP) of event.
2.2.2   Verify EP has informed appropriate Emergency Management officials.
2.2.2 Verify EP has informed appropriate Emergency Management officials.
2.3 Ensure State and County Emergency Management officials are made aware of the following on an annual basis:
2.3 Ensure State and County Emergency Management officials are made aware of the following on an annual basis:
2.3.1   Significant changes to the Emergency Plan/EPIPs.
2.3.1 Significant changes to the Emergency Plan/EPIPs.
2.3.2   Emergency Action Levels (EALs).
2.3.2 Emergency Action Levels (EALs).
2.4   Ensure that biennial exercises are performed with state and county Emergency Response Agencies.
2.4 Ensure that biennial exercises are performed with state and county Emergency Response Agencies.
: 3. EMERGENCY PREPAREDNESS MANAGER INSTRUCTIONS 3.1   At the beginning of each calendar year:
: 3.
3.1.1   Review the items on Attachment 1, EP Program Maintenance Checklist, and establish a working schedule.
EMERGENCY PREPAREDNESS MANAGER INSTRUCTIONS 3.1 At the beginning of each calendar year:
3.2   Maintain awareness of status of completion of Attachment 1, EP Program Maintenance Checklist.
3.1.1 Review the items on Attachment 1, EP Program Maintenance Checklist, and establish a working schedule.
3.2.1     Response actions performed as part of actual plant emergencies may be credited towards the following drills or tests:
3.2 Maintain awareness of status of completion of Attachment 1, EP Program Maintenance Checklist.
3.2.1.1     Integrated facility activation drill.
3.2.1 Response actions performed as part of actual plant emergencies may be credited towards the following drills or tests:
3.2.1.2     Call out phone test/drill.
3.2.1.1 Integrated facility activation drill.
3.2.1.3     RP drill.
3.2.1.2 Call out phone test/drill.
3.2.1.4     Off-Site agency communications drill.
3.2.1.3 RP drill.
3.2.1.5     Medical drill.
3.2.1.4 Off-Site agency communications drill.
3.2.2   For actual plant emergencies, a post-event critique should be performed utilizing the format in EPDG #2, H-1, CNS Drill and Exercise Manual, Attachment 10 - Critique Process.
3.2.1.5 Medical drill.
I     PROCEDURE 5.7.21                       REVISION 25             PAGE 2 OF 32
3.2.2 For actual plant emergencies, a post-event critique should be performed utilizing the format in EPDG #2, H-1, CNS Drill and Exercise Manual, Attachment 10 - Critique Process.
I PROCEDURE 5.7.21 REVISION 25 PAGE 2 OF 32


3.2.3     Evolutions incorporated within a multiple scope drill/exercise may count as drill or test completion, as example:
3.2.3 Evolutions incorporated within a multiple scope drill/exercise may count as drill or test completion, as example:
3.2.3.1     RP drill, medical drill, or off-site communications drill as part of quarterly integrated facility activated drill or annual exercise.
3.2.3.1 RP drill, medical drill, or off-site communications drill as part of quarterly integrated facility activated drill or annual exercise.
3.2.4   Notification of ERO and Governmental Agencies including:
3.2.4 Notification of ERO and Governmental Agencies including:
3.2.4.1     Weekly tests of Automated Notification system.
3.2.4.1 Weekly tests of Automated Notification system.
3.2.4.2     Quarterly off-hours ERO call-in test (at least one per year should be manual).
3.2.4.2 Quarterly off-hours ERO call-in test (at least one per year should be manual).
3.2.4.3     Quarterly verification and update of Emergency Telephone Directory.
3.2.4.3 Quarterly verification and update of Emergency Telephone Directory.
3.2.5   NRC Performance Indicators:
3.2.5 NRC Performance Indicators:
3.2.5.1     Prepare and submit in accordance with Administrative Procedure 0-PI-01.
3.2.5.1 Prepare and submit in accordance with Administrative Procedure 0-PI-01.
3.3   Ensure completion of the items on Attachment 2, Quarterly EP Maintenance Checklist.
3.3 Ensure completion of the items on Attachment 2, Quarterly EP Maintenance Checklist.
3.4   Ensure the completion of the items on Attachment 3, Emergency Plan 6 Year Element Demonstration.
3.4 Ensure the completion of the items on Attachment 3, Emergency Plan 6 Year Element Demonstration.
3.5   Ensure the completion of the items on Attachment 4, EPIP Annual Review.
3.5 Ensure the completion of the items on Attachment 4, EPIP Annual Review.
3.6   Ensure the completion of the items on Attachment 5, EP Exercise Checklist.
3.6 Ensure the completion of the items on Attachment 5, EP Exercise Checklist.
3.7   Maintain awareness of the status of the Alert and Notification System (ANS) operability.
3.7 Maintain awareness of the status of the Alert and Notification System (ANS) operability.
3.8   Ensure the following is performed for Biennial Exercises:
3.8 Ensure the following is performed for Biennial Exercises:
3.8.1     Schedule a date for the exercise in coordination with the primary State and County emergency response agencies.
3.8.1 Schedule a date for the exercise in coordination with the primary State and County emergency response agencies.
3.8.2   Provide the opportunity for State and County response agencies to participate in an exercise.
3.8.2 Provide the opportunity for State and County response agencies to participate in an exercise.
I     PROCEDURE 5.7.21               1       REVISION 25           1 PAGE 3 OF 32     j
I PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 3 OF 32 j


3.8.3   Coordinate NPPD efforts with other participating personnel, organizations, and agencies.
3.8.3 Coordinate NPPD efforts with other participating personnel, organizations, and agencies.
3.8.3.1   If the Federal Emergency Management Agency (FEMA) is evaluating State and County emergency response, ensure the exercise scenario is developed within the time frames specified by the regulations, as defined in Attachment 5, EP Exercise Checklist.
3.8.3.1 If the Federal Emergency Management Agency (FEMA) is evaluating State and County emergency response, ensure the exercise scenario is developed within the time frames specified by the regulations, as defined in Attachment 5, EP Exercise Checklist.
3.8.4   Discuss and evaluate annual exercise performance with plant management, NPPD controller/evaluators, and principal participants.
3.8.4 Discuss and evaluate annual exercise performance with plant management, NPPD controller/evaluators, and principal participants.
: 4. RECORDS 4.1   Attachments 1 through 5 are sent to CNS Records (quality record upon final review).
: 4.
I     PROCEDURE 5.7.21             1       REVISION 25           1   PAGE 4 OF 32   ]
RECORDS 4.1 Attachments 1 through 5 are sent to CNS Records (quality record upon final review).
I PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 4 OF 32  
]


I ATTACHMENT 1           EP PROGRAM MAINTENANCE CHECKLIST                     I Year:
I ATTACHMENT 1 EP PROGRAM MAINTENANCE CHECKLIST I
SEMI-ANNUAL/ANNUAL/BIENNIAL EP MAINTENANCE ITEMS 1.1   Radiological Protection Drill (Semi-Annual).
Year:
1.1.1   (January - June).                           D ate:
SEMI-ANNUAL/ANNUAL/BIENNIAL EP MAINTENANCE ITEMS 1.1 Radiological Protection Drill (Semi-Annual).
1.1.2   (July - December).                         D ate:
1.1.1 (January - June).
1.2   Radiological Monitoring Drill (Annual).             D ate:
D 1.1.2 (July - December).
1.3   Biennial Exercise (include Attachment 5, EP Exercise   ate:
D 1.2 Radiological Monitoring Drill (Annual).
Checklist).
D 1.3 Biennial Exercise (include Attachment 5, EP Exercise Checklist).
1.3.1   FEMA Evaluated (even years only).             [ ]Yes;[ ]No 1.4   Annual Off-Site Agencies Communications Drill.       D ate:
1.3.1 FEMA Evaluated (even years only).
1.5   Annual Unannounced Communications Drill.             D ate:
1.4 Annual Off-Site Agencies Communications Drill.
1.6   Annual Medical Drill.                               D ate:
D 1.5 Annual Unannounced Communications Drill.
1.7   Emergency Plan Review.
D 1.6 Annual Medical Drill.
1.7.1   Emergency Plan Review (Annual).             Date:
D 1.7 Emergency Plan Review.
1.7.2   Letters of Agreement Certification (Annual D ate:
1.7.1 Emergency Plan Review (Annual).
D 1.7.2 Letters of Agreement Certification (Annual D
Confirmation).
Confirmation).
1.7.3   EPIP Review (Annual).                       D ate:
1.7.3 EPIP Review (Annual).
1.8   Media Day (Annual).                                 Date:
D 1.8 Media Day (Annual).
1.9   Public Information Brochure (Annual).               Date:
D 1.9 Public Information Brochure (Annual).
1.10 Review and update 6 Year Plan (Annual) (include Attachment 3, Emergency Plan 6 Year Element         D ate:
D 1.10 Review and update 6 Year Plan (Annual) (include, Emergency Plan 6 Year Element D
Demonstration).
Demonstration).
1.11 Significant Emergency Plan/EPIP Changes, Emergency Action Levels (EALs) Meeting with State/County       D ate:
1.11 Significant Emergency Plan/EPIP Changes, Emergency Action Levels (EALs) Meeting with State/County D
Emergency Management (Annual).
Emergency Management (Annual).
1.12 Hospital Training (Annual).                         D)ate:
1.12 Hospital Training (Annual).
PROCEDURE 5.7.21                   REVISION 25       PAGE 5 OF 32
D ate:
ate:
ate:
ate:
[ ]Yes;[ ]No ate:
ate:
ate:
ate:
ate:
ate:
ate:
ate:
ate:
ate:
)ate:
PROCEDURE 5.7.21 REVISION 25 PAGE 5 OF 32


I   ATTACHMENT 1           EP PROGRAM MAINTENANCE CHECKLIST Year:
I ATTACHMENT 1 EP PROGRAM MAINTENANCE CHECKLIST Year:
1.13   Off-Site Agency Training (Annual).
1.13 Off-Site Agency Training (Annual).
1.13.1   Nebraska.                                       Date:
1.13.1 Nebraska.
1.13.2   Missouri.                                       Date:
1.13.2 Missouri.
1.13.3   Iowa.                                           Date:
1.13.3 Iowa.
1.13.4   Kansas.                                         Date:
1.13.4 Kansas.
1.13.5   Local Agencies.                                 Date:
1.13.5 Local Agencies.
1.14   Annual Training Review of ERO.
1.14 Annual Training Review of ERO.
1.14.1   Solicit verification of annual ERO training   Date:
1.14.1 Solicit verification of annual ERO training completion from the Training Department.
completion from the Training Department.
1.14.2 Review training completion feedback and remove any ERO members not qualified.
1.14.2   Review training completion feedback and remove Date:
1.15 EP Department Training Review (Annual).
any ERO members not qualified.
Completed By:
1.15   EP Department Training Review (Annual).                 Date:
Emergency Preparedness Coordinator Reviewed By:
Completed By:                                                      Date:
Date:
Emergency Preparedness Coordinator Reviewed By:                                                       Date:
Date:
Emergency Preparedness Manager I       PROCEDURE 5.7.21               1       REVISION 25     1 PAGE 6 OF 32 j
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Emergency Preparedness Manager I
PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 6 OF 32 j


I   ATTACHMENT 2         QUARTERLY EP MAINTENANCE CHECKLIST Quarter:                    Year:
I ATTACHMENT 2 QUARTERLY EP MAINTENANCE CHECKLIST Quarter:
EMERGENCY RESPONSE FACILITY SURVEILLANCE 1.1   Quarterly Emergency Equipment Inventory.
EMERGENCY RESPONSE FACILITY SURVEILLANCE 1.1 Quarterly Emergency Equipment Inventory.
1.1.1   Control Room (Attachment 7).             Date:
1.1.1 Control Room (Attachment 7).
1.1.2   OSC (Attachment 8).                     Date:
1.1.2 OSC (Attachment 8).
1.1.3   Emergency Rescue (Attachment 9).         Date:
1.1.3 Emergency Rescue (Attachment 9).
1.1.4   AOSC (Attachment 10).                   Date:
1.1.4 AOSC (Attachment 10).
1.1.5   EOF (Attachment 11).                     Date:
1.1.5 EOF (Attachment 11).
1.1.6   AEOF (Attachment 12).                   Date:
1.1.6 AEOF (Attachment 12).
1.1.7   Ambulance (Attachment 13).               Date:
1.1.7 Ambulance (Attachment 13).
1.1.8   Hospital (Attachment 14).               Date:
1.1.8 Hospital (Attachment 14).
1.2   TSC.                                             Date:
1.2 TSC.
1.2.1   Monthly Facility Survey (Per EPDG #2).
1.2.1 Monthly Facility Survey (Per EPDG #2).
1.2.1.1   Month 1.                     Date:
1.3 OSC.
1.2.1.2    Month 2.                     Date:
1.3.1 1.4 EOF.
1.2.1.3    Month 3.                     Date:
1.4.1 1.2.1.1 Month 1.
1.3  OSC.                                             Date:
1.2.1.2 Month 2.
1.3.Monthly Facility Survey (Per EPDG #2).
1.2.1.3 Month 3.
1.3.1.1   Month 1.                     Date:
Monthly Facility Survey (Per EPDG #2).
1.3.1.2   Month 2.                     Date:
1.3.1.1 Month 1.
1.3.1.3   Month 3.                     Date:
1.3.1.2 Month 2.
1.4   EOF.                                             Date:
1.3.1.3 Month 3.
1.4.1   Monthly Facility Survey (Per EPDG #2).
Monthly 1.4.1.1 1.4.1.2 1.4.1.3 Facility Survey (Per EPDG #2).
1.4.1.1  Month 1.                     Date:
Month 1.
1.4.1.2  Month 2.                      Date:
Month 2.
1.4.1.3  Month 3.                      Date:
Month 3.
I     PROCEDURE 5.7.21           1       REVISION 25 1 PAGE 7 OF 32
Year:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
I PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 7 OF 32


I   ATTACHMENT 2           QUARTERLY EP MAINTENANCE CHECKLIST Quarter:                          Year:
I ATTACHMENT 2 QUARTERLY EP MAINTENANCE CHECKLIST Quarter:
: 2. STAFF AUGMENTATION METHODOLOGIES 2.1   Weekly Test of Automated Emergency Notification System (Autodialer).
: 2.
2.1.1   Week 1.                                           Date:
STAFF AUGMENTATION METHODOLOGIES 2.1 Weekly Test of Automated Emergency Notification System (Autodialer).
2.1.2   Week 2.                                           Date:
2.1.1 Week 1.
2.1.3   Week 3.                                           Date:
2.1.2 Week 2.
2.1.4   Week 4.                                           Date:
2.1.3 Week 3.
2.1.5   Week 5.                                           Date:
2.1.4 Week 4.
2.1.6   Week 6.                                           Date:
2.1.5 Week 5.
2.1.7     Week 7.                                         Date:
2.1.6 Week 6.
2.1.8     Week 8.                                         Date:
2.1.7 Week 7.
2.1.9     Week 9.                                         Date:
2.1.8 Week 8.
2.1.10   Week 10.                                         Date:
2.1.9 Week 9.
2.1.11   Week 11.                                         Date:
2.1.10 Week 10.
2.1.12   Week 12.                                         Date:
2.1.11 Week 11.
2.1.13   Week 13.                                         Date:
2.1.12 Week 12.
2.2   Quarterly Review and Update of Emergency Telephone         Date:
2.1.13 Week 13.
Directory.
2.2 Quarterly Review and Update of Emergency Telephone Directory.
2.3   Quarterly Performance Indicator (PI) Drill and Critique   Date:
2.3 Quarterly Performance Indicator (PI) Drill and Critique Report.
Report.
2.3.1 Quarterlv Trend Report (Drill Critique and Issue Year:
2.3.1   Quarterlv Trend Report (Drill Critique and Issue Review per EPDG # 2, Section H-i, Drill and     Date:
Date:
Exercise Manual).© 2.4   Quarterly Off-Hours ERO Call-in Phone Test or Staff       Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Date:
Review per EPDG # 2, Section H-i, Drill and Date:
Exercise Manual).© 2.4 Quarterly Off-Hours ERO Call-in Phone Test or Staff Date:
Augmentation Drill.
Augmentation Drill.
2.5   Quarterly Self-Assessment.                               Date:
2.5 Quarterly Self-Assessment.
: 3. QUARTERLY SUBMITTAL OF EP PERFORMANCE INDICATORS 3.1   Participation.                                           Date:
Date:
3.2   Drill and Exercise Performance.                           Date:
: 3.
3.3   Alert and Notification System.                           Date:
QUARTERLY SUBMITTAL OF EP PERFORMANCE INDICATORS 3.1 Participation.
I       PROCEDURE 5.7.21             1     REVISION 25           1 PAGE 8 OF 32 ]
Date:
3.2 Drill and Exercise Performance.
Date:
3.3 Alert and Notification System.
Date:
I PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 8 OF 32  
]


I ATTACHMENT 2     QUARTERLY EP MAINTENANCE CHECKLIST Quarter:                 Year:
I ATTACHMENT 2 QUARTERLY EP MAINTENANCE CHECKLIST Quarter:
Year:
NOTES:
NOTES:
i     PROCEDURE 5.7.21     1     REVISION 25     PAGE 9 OF 32
i PROCEDURE 5.7.21 1
REVISION 25 PAGE 9 OF 32


ATTACHMENT 3         EMERGENCY PLAN 6 YEAR ELEMENT DEMONSTRATION YEAR LAST   YEAR NEXT   COMPLETION ELEMENT                 PERFORMED   SCHEDULED       DATE Two off hours staffing Exercises (6 p.m. - 4 a.m.) one must be unannounced Activation of Joint Information Center Use of fire control teams Use of medical support personnel Use of Security personnel for prompt access to emergency equipment or support Use of one or more portions of backup communications for notification Field monitoring Capability for determining the magnitude and impact of the particular components of a release Capability of post-accident coolant sampling and analysis Assembly and accountability Initial recovery planning activities Unannounced off hours drill including Staff Augmentation I         PROCEDURE 5.7.21           1     REVISION 25     1 PAGE 10 OF 32 j
ATTACHMENT 3 EMERGENCY PLAN 6 YEAR ELEMENT DEMONSTRATION YEAR LAST YEAR NEXT COMPLETION ELEMENT PERFORMED SCHEDULED DATE Two off hours staffing Exercises (6 p.m. - 4 a.m.) one must be unannounced Activation of Joint Information Center Use of fire control teams Use of medical support personnel Use of Security personnel for prompt access to emergency equipment or support Use of one or more portions of backup communications for notification Field monitoring Capability for determining the magnitude and impact of the particular components of a release Capability of post-accident coolant sampling and analysis Assembly and accountability Initial recovery planning activities Unannounced off hours drill including Staff Augmentation I
PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 10 OF 32 j


ATTACHMENT 4           EPIP ANNUAL REVIEW Emergency Plan Implementing Procedures (Annual)
ATTACHMENT 4 EPIP ANNUAL REVIEW Emergency Plan Implementing Procedures (Annual)
Revision   Date   PCR Year:                               Number   Reviewed Y N 5.7.1   Emergency Classification 5.7.2   Shift Supervisor EPIP 5.7.6   Notification 5.7.7   Activation of TSC 5.7.8   Activation of OSC 5.7.8.1   Activation of Alternate OSC 5.7.9   Activation of EOF 5.7.9.1   Activation of Alternate EOF 5.7.10   Personnel Assembly and Accountability 5.7.11   Early Dismissal/Evacuation of Site Personnel 5.7.12   Emergency Radiation Exposure Control 5.7.13   Personnel Monitoring and Decontamination 5.7.14   Stable Iodine Thyroid Blocking (KI) 5.7.15   OSC Team Dispatch 5.7.16   Release Rate Determination 5.7.17   Dose Assessment 5.7.18   Off-Site and Site Boundary Monitoring 5.7.19   On-Site Radiological Monitoring 5.7.20   Protective Action Recommendations Maintaining Emergency Preparedness 5.7.21   Emergency Exercises, Drills, Tests, and Evaluations 5.7.22   Communications 5.7.23   Activation of the JIC 5.7.24   Medical Emergency PROCEDURE 5.7.21                     REVISION 25         PAGE 11 OF 32 j
Revision Date PCR Year:
Number Reviewed Y N 5.7.1 Emergency Classification 5.7.2 Shift Supervisor EPIP 5.7.6 Notification 5.7.7 Activation of TSC 5.7.8 Activation of OSC 5.7.8.1 Activation of Alternate OSC 5.7.9 Activation of EOF 5.7.9.1 Activation of Alternate EOF 5.7.10 Personnel Assembly and Accountability 5.7.11 Early Dismissal/Evacuation of Site Personnel 5.7.12 Emergency Radiation Exposure Control 5.7.13 Personnel Monitoring and Decontamination 5.7.14 Stable Iodine Thyroid Blocking (KI) 5.7.15 OSC Team Dispatch 5.7.16 Release Rate Determination 5.7.17 Dose Assessment 5.7.18 Off-Site and Site Boundary Monitoring 5.7.19 On-Site Radiological Monitoring 5.7.20 Protective Action Recommendations Maintaining Emergency Preparedness 5.7.21 Emergency Exercises, Drills, Tests, and Evaluations 5.7.22 Communications 5.7.23 Activation of the JIC 5.7.24 Medical Emergency PROCEDURE 5.7.21 REVISION 25 PAGE 11 OF 32 j


ATTACHMENT 4         EPIP ANNUAL REVIEW Emergency Plan Implementing Procedures (Annual)
ATTACHMENT 4 EPIP ANNUAL REVIEW Emergency Plan Implementing Procedures (Annual)
Revision   Date   PCR Year:                                 Number   Reviewed YI N 5.7.25   Recovery Operations 5.7.26   Long-Term Environmental Monitoring 5.7.27   Alert and Notification System 5.7.27.1   EAS Tone-Activated Radio Malfunction 2.7.27.2   False Activation of Alert and Notification System Sirens Administration of Positional Instruction Manuals (PIMS)
Revision Date PCR Year:
I         PROCEDURE 5.7.21             1     REVISION 25       1 PAGE 12 OF 32
Number Reviewed YI N 5.7.25 Recovery Operations 5.7.26 Long-Term Environmental Monitoring 5.7.27 Alert and Notification System 5.7.27.1 EAS Tone-Activated Radio Malfunction 2.7.27.2 False Activation of Alert and Notification System Sirens Administration of Positional Instruction Manuals (PIMS)
I PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 12 OF 32


ATTACHMENT 5         EP EXERCISE CHECKLIST Year:
ATTACHMENT 5 EP EXERCISE CHECKLIST Year:
: 1. Exercise Date Selection.                                       Date:
: 1.
: 2. ERO Participant Notification.                                   Date:
Exercise Date Selection.
: 3. Scenario Development Personnel Assigned.                       Date:
Date:
: 4. Controllers[Evaluators Assigned.                               Date:
: 2.
: 5. Exercise Objectives.
ERO Participant Notification.
5.1   Emergency Preparedness Manager Approval.                 Date:
Date:
5.2   Submitted to Licensing (75 Day NRC Submittal, even years Date:
: 3.
Scenario Development Personnel Assigned.
Date:
: 4.
Controllers[Evaluators Assigned.
Date:
: 5.
Exercise Objectives.
5.1 Emergency Preparedness Manager Approval.
Date:
5.2 Submitted to Licensing (75 Day NRC Submittal, even years Date:
only).
only).
: 6. Exercise Scenario.
: 6.
6.1   Provided to Nebraska Emergency Management Agency         Date:
Exercise Scenario.
6.1 Provided to Nebraska Emergency Management Agency Date:
(EMA).
(EMA).
6.2   Provided to Missouri EMA.                               Date:
6.2 Provided to Missouri EMA.
6.3   Sixty Day (Prior to Exercise) FEMA Submittal, even years Date:
Date:
6.3 Sixty Day (Prior to Exercise) FEMA Submittal, even years Date:
only).
only).
6.4   Provided to Licensing (45 Day NRC Submittal, even years Date:
6.4 Provided to Licensing (45 Day NRC Submittal, even years Date:
only).
only).
: 7. Post Exercise Critique Date:                                   Date:
: 7.
: 8. Site Oversight Review Committee (SORC) Critique Report         Date:
Post Exercise Critique Date:
Date:
: 8.
Site Oversight Review Committee (SORC) Critique Report Date:
Review.
Review.
I     PROCEDURE 5.7.21               1   REVISION 25         1 PAGE 13 OF 32 J
I PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 13 OF 32 J


ATTACHMENT 6           INSTRUCTIONS FOR EQUIPMENT INVENTORIES (ATTACHMENTS 7 THOUGH 14)
ATTACHMENT 6 INSTRUCTIONS FOR EQUIPMENT INVENTORIES (ATTACHMENTS 7 THOUGH 14)
INSTRUCTIONS 1.1   PM cards, from the CNS Maintenance Planning Office, shall be issued to those departments responsible for emergency equipment inventory once per quarter.
INSTRUCTIONS 1.1 PM cards, from the CNS Maintenance Planning Office, shall be issued to those departments responsible for emergency equipment inventory once per quarter.
Emergency equipment inventory shall also be performed after each use.
Emergency equipment inventory shall also be performed after each use.
1.1.1     The Radiological Protection Department is responsible for the inventory of emergency equipment listed on Attachments 7, 8, 10, 11, 12, 13, and 14.
1.1.1 The Radiological Protection Department is responsible for the inventory of emergency equipment listed on Attachments 7, 8, 10, 11, 12, 13, and 14.
1.1.2     The Maintenance Department is responsible for the inventory of emergency rescue equipment listed on Attachment 9.
1.1.2 The Maintenance Department is responsible for the inventory of emergency rescue equipment listed on Attachment 9.
1.2   Personnel responsible for emergency equipment inventory shall obtain an emergency locker seal prior to opening an Emergency Locker. A supply of locker seals shall be maintained by the Emergency Preparedness Department.
1.2 Personnel responsible for emergency equipment inventory shall obtain an emergency locker seal prior to opening an Emergency Locker. A supply of locker seals shall be maintained by the Emergency Preparedness Department.
1.3   The inventory shall be performed utilizing the appropriate attachment of this procedure.
1.3 The inventory shall be performed utilizing the appropriate attachment of this procedure.
NOTE - An operability check need not be performed on communication equipment listed in this procedure that is located in the TSC, OSC, or EOF. Testing of these communication devices is conducted by the Emergency Preparedness Staff on a periodic basis.
NOTE - An operability check need not be performed on communication equipment listed in this procedure that is located in the TSC, OSC, or EOF. Testing of these communication devices is conducted by the Emergency Preparedness Staff on a periodic basis.
1.4   Emergency equipment shall be inventoried, inspected, equipment calibration stickers checked, and an operability check shall be performed on all emergency equipment/instruments.
1.4 Emergency equipment shall be inventoried, inspected, equipment calibration stickers checked, and an operability check shall be performed on all emergency equipment/instruments.
1.5   Operability, calibration, and equipment maintenance shall be conducted per normal station procedures.
1.5 Operability, calibration, and equipment maintenance shall be conducted per normal station procedures.
1.6   During inspection, any equipment found inoperative or out of calibration shall be replaced in a timely manner.
1.6 During inspection, any equipment found inoperative or out of calibration shall be replaced in a timely manner.
1.7   During inspection, if any deficiency of inventory is discovered, contact the Emergency Preparedness Department.
1.7 During inspection, if any deficiency of inventory is discovered, contact the Emergency Preparedness Department.
I     PROCEDURE 5.7.21               1       REVISION 25             PAGE 14 OF 32 j
I PROCEDURE 5.7.21 1
REVISION 25 PAGE 14 OF 32 j


ATTACHMENT 6           INSTRUCTIONS FOR EQUIPMENT INVENTORIES (ATTACHMENTS 7 THOUGH 14) 1.8   Instruments or equipment may be routinely removed from inventory for purposes of calibration or repair. Instruments and equipment being removed for calibration or repair should be immediately replaced with similar reserve instruments or equipment, where such reserves exist. Instruments or equipment for which there are not reserves should be returned to inventory immediately upon completion of calibration or repair activities.
ATTACHMENT 6 INSTRUCTIONS FOR EQUIPMENT INVENTORIES (ATTACHMENTS 7 THOUGH 14) 1.8 Instruments or equipment may be routinely removed from inventory for purposes of calibration or repair. Instruments and equipment being removed for calibration or repair should be immediately replaced with similar reserve instruments or equipment, where such reserves exist. Instruments or equipment for which there are not reserves should be returned to inventory immediately upon completion of calibration or repair activities.
1.9   During the inventory process, the expiration date of the supply of Potassium Iodide (KI) located within the emergency response facilities shall be checked.
1.9 During the inventory process, the expiration date of the supply of Potassium Iodide (KI) located within the emergency response facilities shall be checked.
If the expiration date is within 3 months from the date of the inventory currently being performed, contact the Emergency Preparedness Department and advise them of the expiration date. Emergency Preparedness Department personnel shall order a new supply of KI or receive an extension of the expiration date from the manufacturer.
If the expiration date is within 3 months from the date of the inventory currently being performed, contact the Emergency Preparedness Department and advise them of the expiration date. Emergency Preparedness Department personnel shall order a new supply of KI or receive an extension of the expiration date from the manufacturer.
1.10   Upon completion of the emergency equipment inventory, the PM card shall be signed off, indicating inventory is complete, and sent to the Emergency Preparedness Department for review. Emergency Preparedness Department will return the PM card to CNS Maintenance Planning Office. Documentation of emergency equipment inventories shall be kept on file at CNS Maintenance Planning Office.
1.10 Upon completion of the emergency equipment inventory, the PM card shall be signed off, indicating inventory is complete, and sent to the Emergency Preparedness Department for review. Emergency Preparedness Department will return the PM card to CNS Maintenance Planning Office. Documentation of emergency equipment inventories shall be kept on file at CNS Maintenance Planning Office.
I     PROCEDURE 5.7.21                       REVISION 25           1 PAGE 15 OF 32 j
I PROCEDURE 5.7.21 REVISION 25 1
PAGE 15 OF 32 j


ATTACHMENT 7         EMERGENCY EQUIPMENT MAINTAINED AT CONTROL ROOM NOTE - The air breathing equipment is not within the Emergency Locker, but the cases are located near the Emergency Locker for convenience, inspection, and maintenance.
ATTACHMENT 7 EMERGENCY EQUIPMENT MAINTAINED AT CONTROL ROOM NOTE - The air breathing equipment is not within the Emergency Locker, but the cases are located near the Emergency Locker for convenience, inspection, and maintenance.
ITEM                                     QUANTITY
ITEM QUANTITY
: 1. Coveralls, Paper                                                       25 Pairs
: 1.
: 2. Shoe Covers, Disposable 14"                                           24 Pairs
Coveralls, Paper 25 Pairs
: 3. Gloves, Disposable                                                     2 Boxes
: 2.
: 4. Geiger-Mueller Survey Meter (Range 0-50 mrem/hr)                       1 Each
Shoe Covers, Disposable 14" 24 Pairs
: 5. Ion-Chamber Survey Instrument (Range 0-50 rem/hr)                       3 Each
: 3.
: 6. Dosimeter, Direct Reading Electronic                                   6 Each
Gloves, Disposable 2 Boxes
: 7. Spare Batteries ("AA" Cell)                                           12 Each
: 4.
: 8. Thyroid Blocking Tablets (KI) Check Expiration Date Per Step 1.9     20 Bottles
Geiger-Mueller Survey Meter (Range 0-50 mrem/hr) 1 Each
: 9. Radiation Warning Sign And Appropriate Inserts                         4 Each
: 5.
: 10. Radiation Barrier Rope, 200'                                             1 Coil
Ion-Chamber Survey Instrument (Range 0-50 rem/hr) 3 Each
: 11. Radiation Warning Tape                                                   1 Roll
: 6.
: 12. First Aid Kit                                                             1 Each
Dosimeter, Direct Reading Electronic 6 Each
: 13. Plastic Bag, Large                                                       6 Each
: 7.
: 14. Duct Tape, 2"                                                           3 Rolls
Spare Batteries ("AA" Cell) 12 Each
: 15. Self-Contained Breathing Apparatus (With Voice Communicators)           6 Each
: 8.
: 16. Full Face Respirators With Single Particulate Canisters                 6 Each
Thyroid Blocking Tablets (KI) Check Expiration Date Per Step 1.9 20 Bottles
: 17. Full Face Respirators With Single Particulate Canisters And Voice         6 Each Communicators
: 9.
: 18. Spare Air Cylinders                                                       6 Each
Radiation Warning Sign And Appropriate Inserts 4 Each
: 19. Spare Respirator Canister                                               12 Each
: 10.
: 20. Hand Lantern, With 6 Volt Battery                                         2 Each
Radiation Barrier Rope, 200' 1 Coil
: 21. Flashlight, With Two "D" Cell Batteries                                   8 Each
: 11.
: 22. Spare Battery For Hand Lantern (6 Volt)                                   2 Each
Radiation Warning Tape 1 Roll
: 23. Spare Batteries ("D" Cell, 12 Per Box)                                     1 Box
: 12.
: 24. Spare Battery (9 Volt)                                                   24 Each
First Aid Kit 1 Each
: 25. General Arrangement Drawing                                               1 Set
: 13.
: 26. Step-Off Pad                                                             1 Each
Plastic Bag, Large 6 Each
: 27. Radiation Monitor (Frisker)                                               1 Each
: 14.
: 28. Spare Batteries ("C" Cell)                                               15 Each
Duct Tape, 2" 3 Rolls
: 29. Spare Batteries (30 Volt)                                                 2 Each
: 15.
: 30. Meals-Ready-To-Eat (MREs)©                                             > 20 Each
Self-Contained Breathing Apparatus (With Voice Communicators) 6 Each
: 31. Smear Book (10 Smears Per Book)                                         10 Each PROCEDURE 5.7.21                   REVISION 25               PAGE 16 OF 32
: 16.
Full Face Respirators With Single Particulate Canisters 6 Each
: 17.
Full Face Respirators With Single Particulate Canisters And Voice 6 Each Communicators
: 18.
Spare Air Cylinders 6 Each
: 19.
Spare Respirator Canister 12 Each
: 20.
Hand Lantern, With 6 Volt Battery 2 Each
: 21.
Flashlight, With Two "D" Cell Batteries 8 Each
: 22.
Spare Battery For Hand Lantern (6 Volt) 2 Each
: 23.
Spare Batteries ("D" Cell, 12 Per Box) 1 Box
: 24.
Spare Battery (9 Volt) 24 Each
: 25. General Arrangement Drawing 1 Set
: 26. Step-Off Pad 1 Each
: 27. Radiation Monitor (Frisker) 1 Each
: 28.
Spare Batteries ("C" Cell) 15 Each
: 29.
Spare Batteries (30 Volt) 2 Each
: 30.
Meals-Ready-To-Eat (MREs)©  
> 20 Each
: 31.
Smear Book (10 Smears Per Book) 10 Each PROCEDURE 5.7.21 REVISION 25 PAGE 16 OF 32


ATTACHMENT 8         EMERGENCY EQUIPMENT AT OSC ITEM                                 QUANTITY
ATTACHMENT 8 EMERGENCY EQUIPMENT AT OSC ITEM QUANTITY
: 1. Flashlight, With Two "D" Cell Batteries                             25 Each
: 1.
: 2. Masking Tape                                                         6 Rolls
Flashlight, With Two "D" Cell Batteries 25 Each
: 3. Particulate Filter, 2"                                                 1 Box
: 2.
: 4. Charcoal And Silver Zeolite Cartridge                               10 Each
Masking Tape 6 Rolls
: 5. Air Sample Plastic Bag And Label                                     20 Each
: 3.
: 6. Smear Book (10 Smears Per Book)                                     10 Each
Particulate Filter, 2" 1 Box
: 7. Spare Batteries ("D" Cell, 12 Per Box)                               2 Boxes
: 4.
: 8. Spare Batteries ("AA" Cell)                                           4 Each
Charcoal And Silver Zeolite Cartridge 10 Each
: 9. Step-Off Pad                                                         4 Each
: 5.
: 10. Protective Clothing (Full Set)                                       6 Each
Air Sample Plastic Bag And Label 20 Each
: 11. Self-Contained Breathing Apparatus                                   8 Each
: 6.
: 12. Spare Bottle For SCBA                                               12 Each
Smear Book (10 Smears Per Book) 10 Each
: 13. Thyroid Blocking Tablets (KI) Check Expiration Date Per Step 1.9   100 Bottles
: 7.
: 14. Survey Instrument Ion-Chamber (Range 0 to 50 rem/hr)                 2 Each
Spare Batteries ("D" Cell, 12 Per Box) 2 Boxes
: 15. I&C/Electrical Tool Kit                                               4 Each
: 8.
: 16. Volt Ohmmeter                                                         2 Each
Spare Batteries ("AA" Cell) 4 Each
: 17. Coveralls, Paper                                                     25 Pairs
: 9.
: 18. Shoe Covers, Disposable 14"                                         25 Pairs
Step-Off Pad 4 Each
: 19. Gloves, Disposable                                                     1 Box
: 10.
: 20. Radiation Barrier Rope, 200'                                           1 Roll
Protective Clothing (Full Set) 6 Each
: 21. Radiation Monitor (Frisker)                                           2 Each
: 11.
: 22. Radiation Warning Sign With Appropriate Inserts                       12 Each
Self-Contained Breathing Apparatus 8 Each
: 23. Mechanical Maintenance Tool Kit                                       2 Each
: 12.
: 24. Continuous Air Monitor                                                 1 Each
Spare Bottle For SCBA 12 Each
: 25. PD-1 Area Radiation Monitor                                             3 Each
: 13.
: 26. Personnel Radiation Monitor                                             1 Each
Thyroid Blocking Tablets (KI) Check Expiration Date Per Step 1.9 100 Bottles
: 27. Gloves, Electrical, Low Voltage                                         1 Pair
: 14.
: 28. Continuous Air Monitor Particulate Filter (CNSNO 35881)               10 Each
Survey Instrument Ion-Chamber (Range 0 to 50 rem/hr) 2 Each
: 29. Hard Hat                                                               10 Each
: 15.
: 30. Safety Glasses                                                         10 Each
I&C/Electrical Tool Kit 4 Each
: 31. Ear Plugs                                                               1 Box
: 16.
: 32. Portable Air Sampler                                                   1 Each
Volt Ohmmeter 2 Each
: 33. Spare Battery (9 Volt)                                                 12 Each
: 17.
: 34. Spare Battery ("C" Cell)                                               12 Each
Coveralls, Paper 25 Pairs
: 35. Geiger-Mueller Survey Instrument (Range 0-50 mrem/hr)                   1 Each PROCEDURE 5.7.21                     REVISION 25           PAGE 17 OF 32
: 18.
Shoe Covers, Disposable 14" 25 Pairs
: 19.
Gloves, Disposable 1 Box
: 20.
Radiation Barrier Rope, 200' 1 Roll
: 21.
Radiation Monitor (Frisker) 2 Each
: 22.
Radiation Warning Sign With Appropriate Inserts 12 Each
: 23.
Mechanical Maintenance Tool Kit 2 Each
: 24.
Continuous Air Monitor 1 Each
: 25.
PD-1 Area Radiation Monitor 3 Each
: 26.
Personnel Radiation Monitor 1 Each
: 27.
Gloves, Electrical, Low Voltage 1 Pair
: 28.
Continuous Air Monitor Particulate Filter (CNSNO 35881) 10 Each
: 29. Hard Hat 10 Each
: 30.
Safety Glasses 10 Each
: 31.
Ear Plugs 1 Box
: 32.
Portable Air Sampler 1 Each
: 33.
Spare Battery (9 Volt) 12 Each
: 34.
Spare Battery ("C" Cell) 12 Each
: 35.
Geiger-Mueller Survey Instrument (Range 0-50 mrem/hr) 1 Each PROCEDURE 5.7.21 REVISION 25 PAGE 17 OF 32


ATTACHMENT 9         EMERGENCY RESCUE EQUIPMENT LOCKER ITEM                           DESCRIPTION                   UNIT QUANTITY
ATTACHMENT 9 EMERGENCY RESCUE EQUIPMENT LOCKER ITEM DESCRIPTION UNIT QUANTITY
: 1. Wrecking Bars                                       Each       2
: 1.
: 2. Bolt Cutters                                         Each       2
Wrecking Bars Each 2
: 3. Hacksaw and Blades                                   Each       2
: 2.
: 4. Come-Along                                           Each       1
Bolt Cutters Each 2
: 5. Cable Sling, 1/2" x 3'                               Each       2
: 3.
: 6. Cable Sling, 1/2" x 6'                               Each       2
Hacksaw and Blades Each 2
: 7. Hydraulic Jack, 3 Ton                               Each       1
: 4.
: 8. Hydraulic Jack, 5 Ton                               Each       1
Come-Along Each 1
: 9. Sledge Hammer, Various Sizes                         Each       4
: 5.
: 10. Porta Power                                         Each       1
Cable Sling, 1/2" x 3' Each 2
: 11. Web Slings (2" - 20' Long, 2" - 10' Long)           Each       4
: 6.
: 12. Sound Powered Phones                                 Each       1
Cable Sling, 1/2" x 6' Each 2
: 13. Safety Belt and Line                                 Each       1
: 7.
: 14. Fire Axe                                             Each       1
Hydraulic Jack, 3 Ton Each 1
: 15. Crow Bar                                             Each       1
: 8.
: 16. 200' - 3 Part Block and Tackle                       Each       1
Hydraulic Jack, 5 Ton Each 1
: 17. Battery Lanterns                                     Each       2
: 9.
: 18. Spare Batteries for Battery Lanterns                 Each       2 I       PROCEDURE 5.7.21               1     REVISION 25 1   PAGE 18 OF 32 1
Sledge Hammer, Various Sizes Each 4
: 10.
Porta Power Each 1
: 11.
Web Slings (2" - 20' Long, 2" - 10' Long)
Each 4
: 12.
Sound Powered Phones Each 1
: 13.
Safety Belt and Line Each 1
: 14.
Fire Axe Each 1
: 15.
Crow Bar Each 1
: 16.
200' - 3 Part Block and Tackle Each 1
: 17.
Battery Lanterns Each 2
: 18.
Spare Batteries for Battery Lanterns Each 2
I PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 18 OF 32 1


I ATTACHMENT 10         EMERGENCY EQUIPMENT MAINTAINED AT AOSC
I ATTACHMENT 10 EMERGENCY EQUIPMENT MAINTAINED AT AOSC
: 1. GENERAL SUPPLIES AND PROTECTION EQUIPMENT ITEMS                             QUANTITY
: 1.
: 1. Coveralls, Paper                                             25 Pair
GENERAL SUPPLIES AND PROTECTION EQUIPMENT ITEMS QUANTITY
: 2. Shoe Covers                                                 25 Pair
: 1.
: 3. Gloves, Disposable                                             1 Box
Coveralls, Paper 25 Pair
: 4. PD-1 Area Radiation Monitor                                   3 Each
: 2.
: 5. Continuous Air Monitor                                       1 Each
Shoe Covers 25 Pair
: 6. Radiation Monitor (Frisker)                                   1 Each
: 3.
: 7. Flashlight, With 2 "D" Cell Batteries                         8 Each
Gloves, Disposable 1 Box
: 8. Spare Batteries ("D" Cell, 12 Per Box)                         1 Box
: 4.
: 9. Book Of Team-Dispatch Forms (Procedure 5.7.15,               1 Each Attachment 1)
PD-1 Area Radiation Monitor 3 Each
: 10. Thyroid Blocking Tablets (KI) Check Expiration Date         20 Bottles Per Step 1.9
: 5.
: 11. Step-Off Pad                                                 2 Each
Continuous Air Monitor 1 Each
: 12. Continuous Air Monitor Particulate Filter (CNSNO 35881)     10 Each
: 6.
: 13. Spare Batteries ("AA" Cell, 4 Per Box)                         1 Box PROCEDURE 5.7.21                     REVISION 25         PAGE 19 OF 32
Radiation Monitor (Frisker) 1 Each
: 7.
Flashlight, With 2 "D" Cell Batteries 8 Each
: 8.
Spare Batteries ("D" Cell, 12 Per Box) 1 Box
: 9.
Book Of Team-Dispatch Forms (Procedure 5.7.15, 1 Each )
: 10.
Thyroid Blocking Tablets (KI) Check Expiration Date 20 Bottles Per Step 1.9
: 11.
Step-Off Pad 2 Each
: 12.
Continuous Air Monitor Particulate Filter (CNSNO 35881) 10 Each
: 13.
Spare Batteries ("AA" Cell, 4 Per Box) 1 Box PROCEDURE 5.7.21 REVISION 25 PAGE 19 OF 32


ATTACHMENT 11         EMERGENCY EQUIPMENT MAINTAINED AT EOF PROTECTION EQUIPMENT NOTE - The air breathing equipment is not within the Emergency Locker, but the cases are near the Emergency Locker for convenience, inspection, and maintenance.
ATTACHMENT 11 EMERGENCY EQUIPMENT MAINTAINED AT EOF PROTECTION EQUIPMENT NOTE - The air breathing equipment is not within the Emergency Locker, but the cases are near the Emergency Locker for convenience, inspection, and maintenance.
ITEM                                 QUANTITY
ITEM QUANTITY
: 1. Coveralls, Paper                                                 25 Each
: 1.
: 2. Shoe Covers, Disposable 14"                                       25 Pairs
Coveralls, Paper 25 Each
: 3. Gloves, Disposable                                                   1 Box
: 2.
: 4. Extendable Probe Survey Instrument (Range 0-1,000 remlhr)           1 Each
Shoe Covers, Disposable 14" 25 Pairs
: 5. Ion-Chamber Survey Instrument (Range 0-50 rem/hr)                   1 Each
: 3.
: 6. Geiger-Mueller Survey Instrument (Range 0-50 mrem/hr)               1 Each
Gloves, Disposable 1 Box
: 7. Sample Holder With Pancake Type Detector                           1 Each
: 4.
: 8. Scaler Electronic Package (MS-2)                                   1 Each
Extendable Probe Survey Instrument (Range 0-1,000 remlhr) 1 Each
: 9. Dosimeter, Direct Reading, Electronic                               1 Each
: 5.
: 10. Spare Batteries ("AA" Cell)                                       8 Each
Ion-Chamber Survey Instrument (Range 0-50 rem/hr) 1 Each
: 11. Filters For Air Sampler; 2"                                         1 Box
: 6.
: 12. Charcoal Cartridge For Air Sampler                               10 Each
Geiger-Mueller Survey Instrument (Range 0-50 mrem/hr) 1 Each
: 13. Silver Zeolite Cartridge For Air Sampler                           10 Each
: 7.
: 14. Extension Cord, Electric (50')                                     2 Each
Sample Holder With Pancake Type Detector 1 Each
: 15. PD-1 Area Radiation Monitor                                       3 Each
: 8.
: 16. Continuous Air Monitor                                             1 Each
Scaler Electronic Package (MS-2) 1 Each
: 17. Self-Contained Breathing Apparatus                                 4 Each
: 9.
: 18. Spare 45 Air Cylinder                                             4 Each
Dosimeter, Direct Reading, Electronic 1 Each
: 19. Tape, Duct, 2"                                                     3 Rolls
: 10.
: 20. Plastic Sheeting, 20' x 20'                                       2 Sheets
Spare Batteries ("AA" Cell) 8 Each
: 21. Plastic Bag, Small                                                   1 Box
: 11.
: 22. Plastic Bag, Large                                                 6 Each
Filters For Air Sampler; 2" 1 Box
: 23. Radiation Warning Sign with Appropriate Inserts                   12 Each
: 12.
: 24. Smear Book (10 Smears Per Book)                                   20 Each
Charcoal Cartridge For Air Sampler 10 Each
: 25. Radiation Barrier Rope, 200'                                         1 Coil
: 13.
: 26. Radiation Warning Tape                                               1 Roll
Silver Zeolite Cartridge For Air Sampler 10 Each
: 27. Hand Lantern With 6 Volt Battery                                   1 Each
: 14.
: 28. Flashlight, With Two "D" Cell Batteries                           8 Each
Extension Cord, Electric (50')
: 29. Spare Battery For Hand Lantern (6 Volt)                             1 Each
2 Each
: 30. Spare Batteries ("D" Cell, 12 Per Box)                               1 Box PROCEDURE 5.7.21                     REVISION 25             PAGE 20 OF 32
: 15.
PD-1 Area Radiation Monitor 3 Each
: 16.
Continuous Air Monitor 1 Each
: 17.
Self-Contained Breathing Apparatus 4 Each
: 18.
Spare 45 Air Cylinder 4 Each
: 19.
Tape, Duct, 2" 3 Rolls
: 20.
Plastic Sheeting, 20' x 20' 2 Sheets
: 21.
Plastic Bag, Small 1 Box
: 22.
Plastic Bag, Large 6 Each
: 23.
Radiation Warning Sign with Appropriate Inserts 12 Each
: 24.
Smear Book (10 Smears Per Book) 20 Each
: 25.
Radiation Barrier Rope, 200' 1 Coil
: 26.
Radiation Warning Tape 1 Roll
: 27.
Hand Lantern With 6 Volt Battery 1 Each
: 28.
Flashlight, With Two "D" Cell Batteries 8 Each
: 29.
Spare Battery For Hand Lantern (6 Volt) 1 Each
: 30.
Spare Batteries ("D" Cell, 12 Per Box) 1 Box PROCEDURE 5.7.21 REVISION 25 PAGE 20 OF 32


ATTACHMENT 11         EMERGENCY EQUIPMENT MAINTAINED AT EOF ITEM                               QUANTITY
ATTACHMENT 11 EMERGENCY EQUIPMENT MAINTAINED AT EOF ITEM QUANTITY
: 31. Pocket Knife                                                       1 Each
: 31.
: 32. Small Hand Tool Kit With Straight Slot Screwdriver, Phillips       I Each Screwdriver, Small Pliers, And Small Vise Grip
Pocket Knife 1 Each
: 33. Step-Off Pads                                                     2 Each
: 32.
: 34. Procedure 9.INST.58, Portable Beta-Gamma Counting                 1 Each Instruments
Small Hand Tool Kit With Straight Slot Screwdriver, Phillips I Each Screwdriver, Small Pliers, And Small Vise Grip
: 35. Thyroid Blocking Tablets (KI) Check Expiration Date             200 Bottles Per Step 1.9
: 33.
: 36. Radiation Monitor (Frisker)                                       2 Each
Step-Off Pads 2 Each
: 37. Continuous Air Monitor Particulate Filter (CNSNO 35881)           10 Each
: 34.
: 38. Spare Batteries (9 Volt)                                         12 Each
Procedure 9.INST.58, Portable Beta-Gamma Counting 1 Each Instruments
: 39. Spare Batteries ("C" Cell)                                       6 Each
: 35.
: 40. Portable Air Sampler                                               1 Each
Thyroid Blocking Tablets (KI) Check Expiration Date 200 Bottles Per Step 1.9
: 2. EMERGENCY DOWNWIND SURVEY KIT SUPPLIES (two complete kits are required).
: 36.
Radiation Monitor (Frisker) 2 Each
: 37.
Continuous Air Monitor Particulate Filter (CNSNO 35881) 10 Each
: 38.
Spare Batteries (9 Volt) 12 Each
: 39.
Spare Batteries ("C" Cell) 6 Each
: 40.
Portable Air Sampler 1 Each
: 2.
EMERGENCY DOWNWIND SURVEY KIT SUPPLIES (two complete kits are required).
NOTE - The Downwind Survey Team Supplies (Items 1 through 13) are located in the EOF. Items 14 through 47 may be stored in the Downwind Survey Vehicles.
NOTE - The Downwind Survey Team Supplies (Items 1 through 13) are located in the EOF. Items 14 through 47 may be stored in the Downwind Survey Vehicles.
ITEM                               QUANTITY
ITEM QUANTITY
: 1. Full Face Respirator                                               2 Each
: 1.
: 2. Hand Lantern                                                       1 Each
Full Face Respirator 2 Each
: 3. Spare Battery For Hand Lantern                                     1 Each
: 2.
: 4. Calculator                                                         1 Each
Hand Lantern 1 Each
: 5. Dosimeter, Direct Reading Electronic                               2 Each
: 3.
: 6. Spare Batteries ("AA")                                             4 Each
Spare Battery For Hand Lantern 1 Each
: 7. Hand Held Radio                                                   1 Each
: 4.
: 8. Gieger-Mueller Survey Instrument (Range 0-50 mrem/hr)             1 Each
Calculator 1 Each
: 9. Ion Chamber Survey Instrument (Range 0-50 rem/hr)                 1 Each
: 5.
: 10. Spare Battery ("D" Cell)                                           4 Each
Dosimeter, Direct Reading Electronic 2 Each
: 11. Spare Battery (30 Volt)                                           1 Each
: 6.
: 12. Spare Battery (9 Volt)                                             4 Each
Spare Batteries ("AA")
: 13. Thyroid Blocking Tablets (KI) Check Expiration Date             2 Bottles Per Step 1.9                                                     2_Bottles
4 Each
: 14. Low Cut Rubber Shoes                                               4 Each PROCEDURE 5.7.21                   REVISION 25               PAGE 21 OF 32 j
: 7.
Hand Held Radio 1 Each
: 8.
Gieger-Mueller Survey Instrument (Range 0-50 mrem/hr) 1 Each
: 9.
Ion Chamber Survey Instrument (Range 0-50 rem/hr) 1 Each
: 10.
Spare Battery ("D" Cell) 4 Each
: 11.
Spare Battery (30 Volt) 1 Each
: 12.
Spare Battery (9 Volt) 4 Each
: 13.
Thyroid Blocking Tablets (KI) Check Expiration Date 2 Bottles Per Step 1.9 2_Bottles
: 14.
Low Cut Rubber Shoes 4 Each PROCEDURE 5.7.21 REVISION 25 PAGE 21 OF 32 j


ATTACHMENT11         EMERGENCY EQUIPMENT MAINTAINED AT EOF ITEM                     QUANTITY
ATTACHMENT11 EMERGENCY EQUIPMENT MAINTAINED AT EOF ITEM QUANTITY
: 15. 250 ml Square Bottle                                 6 Each
: 15.
: 16. One Liter Bottle                                     4 Each
250 ml Square Bottle 6 Each
: 17. Masslin Cloths                                     1 Package
: 16.
: 18. One-Piece Plastic Coveralls                           2 Each
One Liter Bottle 4 Each
: 19. Shovel                                               1 Each
: 17.
: 20. Combination Cartridge For Respirator                 8 Each
Masslin Cloths 1 Package
: 21. Masking Tape                                         2 Rolls
: 18.
: 22. Emergency Action Log                                   1 Pad
One-Piece Plastic Coveralls 2 Each
: 23. Procedure 9.EPIN.1, Emergency Air Samplers           1 Each
: 19.
: 24. Plastic Sheeting                                       1 Roll
Shovel 1 Each
: 25. Complete Set Of EPIPs                                 1 Each
: 20.
: 26. Bolt Cutters                                         1 Each
Combination Cartridge For Respirator 8 Each
: 27. Small Plastic Bag                                   50 Each
: 21.
: 28. Grass Shears                                         1 Each
Masking Tape 2 Rolls
: 29. Paper Coveralls                                       4 Each
: 22.
: 30. 2" Air Sample Filters                                 1 Box
Emergency Action Log 1 Pad
: 31. Silver Zeolite Cartridge                             6 Each
: 23.
: 32. Charcoal Cartridge                                   6 Each
Procedure 9.EPIN.1, Emergency Air Samplers 1 Each
: 33. 2" Millipore Air Sample Filters                       1 Box
: 24. Plastic Sheeting 1 Roll
: 34. Air Sampler With Head                                 1 Each
: 25.
: 35. Smear Book (10 Smears Per Book)                     10 Each 36   Radioactive Material Sticker                         50 Each
Complete Set Of EPIPs 1 Each
: 37. Sample Label                                         25 Each
: 26.
: 38. 2 cc Vial                                           10 Each
Bolt Cutters 1 Each
: 39. Plastic Pipet                                       10 Each
: 27.
: 40. Lined Paper Pad                                       1 Pad
Small Plastic Bag 50 Each
: 41. Clipboard                                             2 Each
: 28.
: 42. 10-Mile Radius Map                                   2 Each
Grass Shears 1 Each
: 43. Site Map                                             1 Each
: 29.
: 44. Large Plastic Bags                                   25 Each
Paper Coveralls 4 Each
: 45. Disposable Gloves                                     1 Box
: 30.
: 46. Ink Pens                                             3 Each
2" Air Sample Filters 1 Box
: 47. Tweezers                                             1 Each I     PROCEDURE 5.7.21             1   REVISION 25 F PAGE 22 OF 32
: 31.
Silver Zeolite Cartridge 6 Each
: 32.
Charcoal Cartridge 6 Each
: 33.
2" Millipore Air Sample Filters 1 Box
: 34.
Air Sampler With Head 1 Each
: 35.
Smear Book (10 Smears Per Book) 10 Each 36 Radioactive Material Sticker 50 Each
: 37.
Sample Label 25 Each
: 38.
2 cc Vial 10 Each
: 39.
Plastic Pipet 10 Each
: 40.
Lined Paper Pad 1 Pad
: 41.
Clipboard 2 Each
: 42.
10-Mile Radius Map 2 Each
: 43.
Site Map 1 Each
: 44.
Large Plastic Bags 25 Each
: 45.
Disposable Gloves 1 Box
: 46.
Ink Pens 3 Each
: 47.
Tweezers 1 Each I
PROCEDURE 5.7.21 1
REVISION 25 F
PAGE 22 OF 32


I ATTACHMENT 11         EMERGENCY EQUIPMENT MAINTAINED AT EOF
I ATTACHMENT 11 EMERGENCY EQUIPMENT MAINTAINED AT EOF
: 3. DECONTAMINATION SUPPLIES NOTE - Following supplies are available in or near the EOF Decon Room.
: 3.
ITEM                                 QUANTITY
DECONTAMINATION SUPPLIES NOTE - Following supplies are available in or near the EOF Decon Room.
: 1. Towels                                                           10 Each
ITEM QUANTITY
: 2. Soap                                                             3 Bars
: 1.
: 3. Septisol (Germicide)                                               1 Can
Towels 10 Each
: 4. Lanolin                                                           1 Tube
: 2.
: 5. Swabs, Cotton Tipped, 100s                                     3 Packages
Soap 3 Bars
: 6. Compresses, Gauze, 3" x 3", 100s                               2 Packages
: 3.
: 7. Towels, Paper                                                     1 Roll
Septisol (Germicide) 1 Can
: 8. Beaker, Plastic, 150 ml                                           3 Each
: 4.
: 9. Hand Brush, Soft Bristle                                         2 Each
Lanolin 1 Tube
: 10. Soap, Pumice                                                     2 Bars
: 5.
: 4. FIRST AID AND RESCUE EQUIPMENT ITEM                                 QUANTITY
Swabs, Cotton Tipped, 100s 3 Packages
: 1. First Aid Kit                                                     1 Each
: 6.
: 2. Stretcher                                                         1 Each
Compresses, Gauze, 3" x 3", 100s 2 Packages
: 3. Rope, 1/2" - 50'                                                   1 Coil I     PROCEDURE 5.7.21                   REVISION 25             PAGE 23 OF 32
: 7.
Towels, Paper 1 Roll
: 8.
Beaker, Plastic, 150 ml 3 Each
: 9.
Hand Brush, Soft Bristle 2 Each
: 10.
Soap, Pumice 2 Bars FIRST AID AND RESCUE EQUIPMENT ITEM QUANTITY
: 1.
First Aid Kit 1 Each
: 2.
Stretcher 1 Each
: 3.
Rope, 1/2" - 50' 1 Coil I
PROCEDURE 5.7.21 REVISION 25 PAGE 23 OF 32 4.


ATTACHMENT 12         EMERGENCY EQUIPMENT MAINTAINED AT AEOF PROTECTION EQUIPMENT AND ADMINISTRATIVE SUPPLIES ITEM                             QUANTITY
ATTACHMENT 12 EMERGENCY EQUIPMENT MAINTAINED AT AEOF PROTECTION EQUIPMENT AND ADMINISTRATIVE SUPPLIES ITEM QUANTITY
: 1. Coveralls, Paper                                               50 Each
: 1.
: 2. Shoe Covers, Disposable 14"                                     50 Pairs
Coveralls, Paper 50 Each
: 3. Gloves, Disposable                                             2 Boxes
: 2.
: 4. Gieger-Mueller Survey Instrument (Range 0-50 mrem/hr)           1 Each
Shoe Covers, Disposable 14" 50 Pairs
: 5. Ion-Chamber Survey Instrument (Range 0-50 rem/hr)               1 Each
: 3.
: 6. Sample Holder With Pancake Type Detector                         1 Each
Gloves, Disposable 2 Boxes
: 7. Scaler Electronic Package (MS-2)                                 1 Each
: 4.
: 8. Dosimeter, Direct Reading Electronic                             1 Each
Gieger-Mueller Survey Instrument (Range 0-50 mrem/hr) 1 Each
: 9. Spare Batteries ("AA" cell)                                     4 Each
: 5.
: 10. Portable Air Sampler w/Head (High Volume) (60 Hz, 120 VAC)       1 Each
Ion-Chamber Survey Instrument (Range 0-50 rem/hr) 1 Each
: 11. Inverter (12 VDC To 120 VAC)                                     1 Each
: 6.
: 12. Filter For Air Sampler; 2"                                       1 Box
Sample Holder With Pancake Type Detector 1 Each
: 13. Charcoal Cartridge For Air Sampler                               5 Each
: 7.
: 14. Silver Zeolite Cartridge For Air Sampler                         5 Each
Scaler Electronic Package (MS-2) 1 Each
: 15. Extension Cord, Electric (50')                                   1 Each
: 8.
: 16. Tape, Duct, 2"                                                   3 Rolls
Dosimeter, Direct Reading Electronic 1 Each
: 17. Plastic Sheeting, 20' x 20'                                     2 Sheets
: 9.
: 18. Plastic Bag, Small                                               1 Box
Spare Batteries ("AA" cell) 4 Each
: 19. Plastic Bag, Large                                               6 Each
: 10.
: 20. Radiation Warning Sign With Appropriate Inserts                 12 Each
Portable Air Sampler w/Head (High Volume) (60 Hz, 120 VAC) 1 Each
: 21. Smear Book                                                     20 Each
: 11.
: 22. Radiation Barrier Rope, 200                                       1 Coil
Inverter (12 VDC To 120 VAC) 1 Each
: 23. Radiation Warning Tape                                           1 Roll
: 12.
: 24. Hand Lantern With 6 Volt Battery                                 3 Each
Filter For Air Sampler; 2" 1 Box
: 25. Flashlight, With Two "D" Cell Batteries                         8 Each
: 13.
: 26. Spare Battery For Hand Lantern (6 Volt)                         3 Each
Charcoal Cartridge For Air Sampler 5 Each
: 27. Spare Batteries ("D" Cell)                                       1 Box
: 14.
: 28. Pocket Knife                                                     1 Each
Silver Zeolite Cartridge For Air Sampler 5 Each
: 29. Small Hand Tool Kit With Straight Slot Screwdriver, Phillips     1 Each Screwdriver, Small Pliers, And Small Vise Grip
: 15.
: 30. Shovel                                                           1 Each
Extension Cord, Electric (50')
: 31. Liter Bottle                                                     6 Each
1 Each
: 32. Step-Off Pad                                                     2 Each I     PROCEDURE 5.7.21               1     REVISION 25       1   PAGE 24 OF 32
: 16. Tape, Duct, 2" 3 Rolls
: 17.
Plastic Sheeting, 20' x 20' 2 Sheets
: 18.
Plastic Bag, Small 1 Box
: 19.
Plastic Bag, Large 6 Each
: 20.
Radiation Warning Sign With Appropriate Inserts 12 Each
: 21.
Smear Book 20 Each
: 22.
Radiation Barrier Rope, 200 1 Coil
: 23.
Radiation Warning Tape 1 Roll
: 24.
Hand Lantern With 6 Volt Battery 3 Each
: 25.
Flashlight, With Two "D" Cell Batteries 8 Each
: 26. Spare Battery For Hand Lantern (6 Volt) 3 Each
: 27.
Spare Batteries ("D" Cell) 1 Box
: 28. Pocket Knife 1 Each
: 29.
Small Hand Tool Kit With Straight Slot Screwdriver, Phillips 1 Each Screwdriver, Small Pliers, And Small Vise Grip
: 30.
Shovel 1 Each
: 31.
Liter Bottle 6 Each
: 32.
Step-Off Pad 2 Each I
PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 24 OF 32


ATTACHMENT 12         EMERGENCY EQUIPMENT MAINTAINED AT AEOF ITEM                         QUANTITY
ATTACHMENT 12 EMERGENCY EQUIPMENT MAINTAINED AT AEOF ITEM QUANTITY
: 33. Thyroid Blocking Tablets (KI) Check Expiration Date     60 Bottles Per Step 1.9
: 33.
: 34. Radiation Monitor (Frisker)                                 1 Each
Thyroid Blocking Tablets (KI) Check Expiration Date 60 Bottles Per Step 1.9
: 35. Spare Batteries (9 Volt)                                   6 Each
: 34. Radiation Monitor (Frisker) 1 Each
: 36. Spare Batteries ("C" Cell)                                   1 Box
: 35.
: 2. DECONTAMINATION SUPPLIES ITEM                         QUANTITY
Spare Batteries (9 Volt) 6 Each
: 1. 55 Gallon Radwaste Barrel With Lid                         3 Each
: 36.
: 2. Disposable Coveralls                                       50 Each
Spare Batteries ("C" Cell) 1 Box DECONTAMINATION SUPPLIES ITEM QUANTITY
: 3. Disposable Gloves, 25 Pair/Box                             2 Boxes
: 1.
: 4. 2" Masking Tape                                             3 Rolls
55 Gallon Radwaste Barrel With Lid 3 Each
: 5. Small Poly Bag                                             12 Each
: 2.
: 6. Large Poly Bag                                             36 Each
Disposable Coveralls 50 Each
: 7. Plastic Bucket                                             4 Each
: 3.
: 8. Bar Soap                                                   24 Each
Disposable Gloves, 25 Pair/Box 2 Boxes
: 9. Bath Towel                                                   -50.
: 4.
: 10. Poly Sheeting                                               1 Roll
2" Masking Tape 3 Rolls
: 11. Procedure 9.RADOP.7, Personnel Decontamination           6 Copies
: 5.
: 12. Pumice Soap                                                 2 Bars
Small Poly Bag 12 Each
: 13. Septisol (Germicide)                                         1 Can
: 6.
: 14. Lanolin                                                     1 Tube
Large Poly Bag 36 Each
: 15. Procedure 9.INST.58, Portable Beta-Gamma Counting           1 Each Instruments
: 7.
: 16. Swabs, Cotton Tipped, 100s                               3 Packages
Plastic Bucket 4 Each
: 17. Compresses, Gauze, 3" x 3", 100s                         2 Packages
: 8.
: 18. Towels, Paper                                               1 Roll
Bar Soap 24 Each
: 19. Breaker, Plastic 150 ml                                     3 Each
: 9.
: 20. Hand Brush, Soft Bristle                                   10 Each
Bath Towel  
: 3. FIRST AID AND RESCUE EQUIPMENT ITEM                       QUANTITY
-50.
: 1. First Aid Kit                                               1 Each
: 10.
: 2. Stretcher                                                   1 Each PROCEDURE 5.7.21                   REVISION 25       PAGE 25 OF 32
Poly Sheeting 1 Roll
: 11.
Procedure 9.RADOP.7, Personnel Decontamination 6 Copies
: 12.
Pumice Soap 2 Bars
: 13.
Septisol (Germicide) 1 Can
: 14.
Lanolin 1 Tube
: 15.
Procedure 9.INST.58, Portable Beta-Gamma Counting 1 Each Instruments
: 16.
Swabs, Cotton Tipped, 100s 3 Packages
: 17.
Compresses, Gauze, 3" x 3", 100s 2 Packages
: 18.
Towels, Paper 1 Roll
: 19. Breaker, Plastic 150 ml 3 Each
: 20. Hand Brush, Soft Bristle 10 Each
: 3.
FIRST AID AND RESCUE EQUIPMENT ITEM QUANTITY
: 1.
First Aid Kit 1 Each
: 2.
Stretcher 1 Each PROCEDURE 5.7.21 REVISION 25 PAGE 25 OF 32 2.


ATTACHMENT 13       EMERGENCY EQUIPMENT MAINTAINED FOR AMBULANCE ITEM                       QUANTITY
ATTACHMENT 13 EMERGENCY EQUIPMENT MAINTAINED FOR AMBULANCE ITEM QUANTITY
: 1. Dosimeter, Direct Reading Electronic                     5 Each
: 1.
: 2. TLD Badge                                                 5 Each
Dosimeter, Direct Reading Electronic 5 Each
: 3. Geiger-Mueller Survey Instrument (CPM)                   1 Each
: 2.
: 4. Ion-Chamber Survey Instrument (0-5 rem/hr)               1 Each
TLD Badge 5 Each
: 5. Radiation Tag                                           10 Each
: 3.
: 6. Spare Batteries ("AA" Cell)                               8 Each
Geiger-Mueller Survey Instrument (CPM) 1 Each
: 7. Smear Book                                               5 Each
: 4.
: 8. Form CNS RP-25, TLD Badging Record                       1 Each
Ion-Chamber Survey Instrument (0-5 rem/hr) 1 Each
: 9. Spare Batteries (9 Volt)                                 6 Each
: 5.
: 10. Spare Batteries ("C" Cell)                                 1 Box I       PROCEDURE 5.7.21             1     REVISION 25 1 PAGE 26 OF 32 1
Radiation Tag 10 Each
: 6.
Spare Batteries ("AA" Cell) 8 Each
: 7.
Smear Book 5 Each
: 8.
Form CNS RP-25, TLD Badging Record 1 Each
: 9.
Spare Batteries (9 Volt) 6 Each
: 10. Spare Batteries ("C" Cell) 1 Box I
PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 26 OF 32 1


ATTACHMENT 14       EMERGENCY EQUIPMENT MAINTAINED AT HOSPITAL ITEM                                   QUANTITY
ATTACHMENT 14 EMERGENCY EQUIPMENT MAINTAINED AT HOSPITAL ITEM QUANTITY
: 1. Radiation Barrier Rope                                               1 Roll
: 1.
: 2. Masking Tape                                                       10 Rolls
Radiation Barrier Rope 1 Roll
: 3. Brown Paper                                                           1 Roll
: 2.
: 4. Plastic Sheeting                                                     1 Roll
Masking Tape 10 Rolls
: 5. Applicable Radiation Warning Signs With Inserts, As Appropriate     5 Each
: 3.
: 6. Shoe Covers                                                         15 Pairs
Brown Paper 1 Roll
: 7. Bags, Plastic (Large)                                               10 Each
: 4.
: 8. Bags, Plastic (Small)                                               20 Each
Plastic Sheeting 1 Roll
: 9. Radiation Marking Tape                                               1 Roll
: 5.
: 10. Coveralls, Paper                                                   25 Pairs
Applicable Radiation Warning Signs With Inserts, As Appropriate 5 Each
: 11. Gloves, Rubber Disposable                                           2 Boxes
: 6.
: 12. Cardboard Boxes, - 2'x 3'                                           6 Each
Shoe Covers 15 Pairs
: 13. Masslin Cloths                                                     1 Bundle
: 7.
: 14. Step-Off Pad                                                         1 Each I         PROCEDURE 5.7.21           1     REVISION 25         1   PAGE 27 OF 32 1
Bags, Plastic (Large) 10 Each
: 8.
Bags, Plastic (Small) 20 Each
: 9.
Radiation Marking Tape 1 Roll
: 10.
Coveralls, Paper 25 Pairs
: 11.
Gloves, Rubber Disposable 2 Boxes
: 12.
Cardboard Boxes, - 2'x 3' 6 Each
: 13.
Masslin Cloths 1 Bundle
: 14.
Step-Off Pad 1 Each I
PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 27 OF 32 1


ATTACHMENT 15         INFORMATION SHEET DISCUSSION 1.1   Annual - Once per calendar year (January 1 through December 31).
ATTACHMENT 15 INFORMATION SHEET DISCUSSION 1.1 Annual - Once per calendar year (January 1 through December 31).
1.2   Biennial - Once per two calendar years.
1.2 Biennial - Once per two calendar years.
1.3   DRILLS 1.3.1   Communications Tests and Drills - Communications tests involve the use of emergency communications equipment to verify operability.
1.3 DRILLS 1.3.1 Communications Tests and Drills - Communications tests involve the use of emergency communications equipment to verify operability.
Communications drills involve use of emergency communications equipment to notify and transfer simulated emergency information to off-site governmental agencies.
Communications drills involve use of emergency communications equipment to notify and transfer simulated emergency information to off-site governmental agencies.
1.3.2   Performance Indicator (PI) (ERF) Drill - An ERF drill demonstrated various emergency response capabilities including management and coordination of emergency response, accident assessment, protective action decision-making, and plant system repair and corrective action involving all or certain Emergency Response Facilities (Control Room, Technical Support Center (TSC), Operational Support Center (OSC),
1.3.2 Performance Indicator (PI) (ERF) Drill - An ERF drill demonstrated various emergency response capabilities including management and coordination of emergency response, accident assessment, protective action decision-making, and plant system repair and corrective action involving all or certain Emergency Response Facilities (Control Room, Technical Support Center (TSC), Operational Support Center (OSC),
and Emergency Operations Facility (EOF). These drills are conducted at least four times per calendar year and should be conducted approximately once each calendar quarter. One of these drills is designed to satisfy the requirements of an exercise as defined below.
and Emergency Operations Facility (EOF). These drills are conducted at least four times per calendar year and should be conducted approximately once each calendar quarter. One of these drills is designed to satisfy the requirements of an exercise as defined below.
Non-exercise drills provide opportunity to consider accident management strategies. Supervised instruction can be permitted for these drills, with operating staff having the opportunity to resolve problems (success paths) rather than have controllers intervene.
Non-exercise drills provide opportunity to consider accident management strategies. Supervised instruction can be permitted for these drills, with operating staff having the opportunity to resolve problems (success paths) rather than have controllers intervene.
Additionally, non-exercise drills may focus on on-site training objectives.
Additionally, non-exercise drills may focus on on-site training objectives.
1.3.3   Medical Emergency Drill - A medical emergency drill involves a simulated contaminated individual, with provisions for activation of the plant First Aid/Personnel Decontamination Team. Participation by local support services (i.e., ambulance and off-site medical treatment facility) is tested separately once per year or as part of the annual medical drill. Medical Emergency Drills are conducted at least once every calendar year.
1.3.3 Medical Emergency Drill - A medical emergency drill involves a simulated contaminated individual, with provisions for activation of the plant First Aid/Personnel Decontamination Team. Participation by local support services (i.e., ambulance and off-site medical treatment facility) is tested separately once per year or as part of the annual medical drill. Medical Emergency Drills are conducted at least once every calendar year.
1.3.4   Radiological Monitoring Drill - Radiological monitoring drills include collection and analysis of air samples, testing of communications, and understanding of messages between Radiological Protection supervision and the off-site monitoring teams. A radiological monitoring drill will be conducted at least once every calendar year.
1.3.4 Radiological Monitoring Drill - Radiological monitoring drills include collection and analysis of air samples, testing of communications, and understanding of messages between Radiological Protection supervision and the off-site monitoring teams. A radiological monitoring drill will be conducted at least once every calendar year.
PROCEDURE 5.7.21             1       REVISION 25         1   PAGE 28 OF 32
PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 28 OF 32


ATTACHMENT 15           INFORMATION SHEET 1.3.5   Radiological Protection Drills - Radiological Protection drills test various tasks employed by that department during an emergency condition. Radiological Protection drills are conducted semi-annually and one of the semi-annual drills may be incorporated into the radiological monitoring drill.
ATTACHMENT 15 INFORMATION SHEET 1.3.5 Radiological Protection Drills - Radiological Protection drills test various tasks employed by that department during an emergency condition. Radiological Protection drills are conducted semi-annually and one of the semi-annual drills may be incorporated into the radiological monitoring drill.
1.4   Exercise - An exercise is an event that tests the integrated capability of a major portion of the basic elements existing within the CNS Radiological Emergency Plan. An exercise is required biennially per 10CFR50. Off-site agency participation is required biennially. Exercises are developed, scheduled, and conducted in a manner consistent with the regulations and guidance of 10CFR50, Appendix E, NUREG 0654, and other appropriate regulatory documents. Biennial exercises involving off-site agencies shall be conducted as a Site Area Emergency and should escalate to General Emergency. The exercise scenarios are varied such that all major elements of the Plan are tested at least every 6 years.
1.4 Exercise - An exercise is an event that tests the integrated capability of a major portion of the basic elements existing within the CNS Radiological Emergency Plan. An exercise is required biennially per 10CFR50. Off-site agency participation is required biennially. Exercises are developed, scheduled, and conducted in a manner consistent with the regulations and guidance of 10CFR50, Appendix E, NUREG 0654, and other appropriate regulatory documents. Biennial exercises involving off-site agencies shall be conducted as a Site Area Emergency and should escalate to General Emergency. The exercise scenarios are varied such that all major elements of the Plan are tested at least every 6 years.
1.5   Letter of Agreement (LOA) - Support or assistance from outside agencies is established and maintained through Letters of Agreement or, in some instances, purchase orders/contracts. Letters of Agreement are confirmed annually through correspondence, direct contact, or by telephone. Purchase orders/contracts are renewed as required.
1.5 Letter of Agreement (LOA) - Support or assistance from outside agencies is established and maintained through Letters of Agreement or, in some instances, purchase orders/contracts. Letters of Agreement are confirmed annually through correspondence, direct contact, or by telephone. Purchase orders/contracts are renewed as required.
1.6   Monthly - At least once each calendar month, being the first day of each month until the last unless otherwise specified.
1.6 Monthly - At least once each calendar month, being the first day of each month until the last unless otherwise specified.
1.7   Quarterly - Once per calendar quarter, with the quarters being January through March, April through June, July through September, and October through December.
1.7 Quarterly - Once per calendar quarter, with the quarters being January through March, April through June, July through September, and October through December.
1.8   Semi-Annual - Twice per calendar year, with one time from January 1 to June 30 and one from July 1 to December 31.
1.8 Semi-Annual - Twice per calendar year, with one time from January 1 to June 30 and one from July 1 to December 31.
: 2. RESPONSIBILITIES 2.1   The Emergency Preparedness Manager is responsible for:
: 2.
2.1.1   Planning, scheduling, and coordinating emergency exercises involving off-site agencies.
RESPONSIBILITIES 2.1 The Emergency Preparedness Manager is responsible for:
2.1.2   Reviewing Attachment 1, EP Program Maintenance Checklist, upon completion.
2.1.1 Planning, scheduling, and coordinating emergency exercises involving off-site agencies.
2.1.3   Reviewing results of exercises and major drills.
2.1.2 Reviewing Attachment 1, EP Program Maintenance Checklist, upon completion.
PROCEDURE 5.7.21               1     REVISION 25               PAGE 29 OF 32
2.1.3 Reviewing results of exercises and major drills.
PROCEDURE 5.7.21 1
REVISION 25 PAGE 29 OF 32


ATTACHMENT 15           INFORMATION SHEET 2.2   The Senior Manager of Site Support, with plant management, is responsible for ensuring adequate resources are made available to support and conduct emergency preparedness activities including:
ATTACHMENT 15 INFORMATION SHEET 2.2 The Senior Manager of Site Support, with plant management, is responsible for ensuring adequate resources are made available to support and conduct emergency preparedness activities including:
2.2.1   Exercises and drill scenario development and control.
2.2.1 Exercises and drill scenario development and control.
2.2.2   Exercise and drill participation.
2.2.2 Exercise and drill participation.
2.2.3   Support for maintenance of emergency facilities and equipment.
2.2.3 Support for maintenance of emergency facilities and equipment.
2.3   The Site Oversight Review Committee (SORC) is responsible to review the following:
2.3 The Site Oversight Review Committee (SORC) is responsible to review the following:
2.3.1     Revisions to the CNS Radiological Emergency Plan.
2.3.1 Revisions to the CNS Radiological Emergency Plan.
2.3.2     Revisions to Emergency Plan Implementing Procedures (EPIPs).
2.3.2 Revisions to Emergency Plan Implementing Procedures (EPIPs).
2.3.3     Quarterly PI Drill Critique Report.
2.3.3 Quarterly PI Drill Critique Report.
2.4   The Emergency Preparedness (EP) Manager is responsible for:
2.4 The Emergency Preparedness (EP) Manager is responsible for:
2.4.1     Maintaining awareness of EP activities.
2.4.1 Maintaining awareness of EP activities.
2.4.2   Ensuring coordination of EP drills and exercises in accordance with this procedure.
2.4.2 Ensuring coordination of EP drills and exercises in accordance with this procedure.
2.4.3   Ensuring documentation of EP Program maintenance in Attachment 1, EP Program Maintenance Checklist.
2.4.3 Ensuring documentation of EP Program maintenance in, EP Program Maintenance Checklist.
2.4.4   Ensuring documentation of major element demonstration as indicated on Attachment 3, Emergency Plan 6 Year Element Demonstration.
2.4.4 Ensuring documentation of major element demonstration as indicated on Attachment 3, Emergency Plan 6 Year Element Demonstration.
2.4.5   Ensuring critiques of exercises, drills, and actual events are conducted, documented, and that deficiencies are addressed in accordance with plant corrective action practices.
2.4.5 Ensuring critiques of exercises, drills, and actual events are conducted, documented, and that deficiencies are addressed in accordance with plant corrective action practices.
2.4.6   Ensuring that EPIPs are reviewed through feedback from the following sources:
2.4.6 Ensuring that EPIPs are reviewed through feedback from the following sources:
2.4.6.1   Daily use.
2.4.6.1 Daily use.
2.4.6.2   Drills and exercises.
2.4.6.2 Drills and exercises.
2.4.6.3   Actual events.
2.4.6.3 Actual events.
PROCEDURE 5.7.21                       REVISION 25               PAGE 30 OF 32
PROCEDURE 5.7.21 REVISION 25 PAGE 30 OF 32


ATTACHMENT 15       INFORMATION SHEET 2.4.6.4     Training.
ATTACHMENT 15 INFORMATION SHEET 2.4.6.4 Training.
2.4.6.5     Annual EPIP review as indicated on Attachment 4, EPIP Annual Review.
2.4.6.5 Annual EPIP review as indicated on Attachment 4, EPIP Annual Review.
: 3. REFERENCES 3.1   CODES AND STANDARDS 3.1.1 NPPD Emergency Plan for CNS.
: 3.
REFERENCES 3.1 CODES AND STANDARDS 3.1.1 NPPD Emergency Plan for CNS.
3.1.2 NUREG 0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
3.1.2 NUREG 0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
3.1.3 10CFR50, Domestic Licensing of Production and Utilization Facilities.
3.1.3 10CFR50, Domestic Licensing of Production and Utilization Facilities.
3.1.4 Generic Letter #GL 93-01, Emergency Response Data System Test Program.
3.1.4 Generic Letter #GL 93-01, Emergency Response Data System Test Program.
3.2   PROCEDURES 3.2.1 Administrative Procedure 0-EP-02, Configuration Control of The Automated Notification System (ANS).
3.2 PROCEDURES 3.2.1 Administrative Procedure 0-EP-02, Configuration Control of The Automated Notification System (ANS).
3.2.2 Administrative Procedure 0-PI-01, Performance Indicator Program.
3.2.2 Administrative Procedure 0-PI-01, Performance Indicator Program.
3.2.3 Radiological Protection Procedure 9.EPIN.1, Emergency Air Samplers.
3.2.3 Radiological Protection Procedure 9.EPIN.1, Emergency Air Samplers.
3.2.4 Radiological Protection Procedure 9.INST.58, Portable Beta-Gamma Counting Instruments.
3.2.4 Radiological Protection Procedure 9.INST.58, Portable Beta-Gamma Counting Instruments.
3.2.5 Radiological Protection Procedure 9.RADOP.7, Personnel Contamination.
3.2.5 Radiological Protection Procedure 9.RADOP.7, Personnel Contamination.
3.3   MISCELLANEOUS 3.3.1 QA Finding 92-1900-24.
3.3 MISCELLANEOUS 3.3.1 QA Finding 92-1900-24.
3.3.2 RCR 2002-0014.
3.3.2 RCR 2002-0014.
3.3.3 EPDG #2, Emergency Preparedness Department Guide #2.
3.3.3 EPDG #2, Emergency Preparedness Department Guide #2.
I     PROCEDURE 5.7.21           1       REVISION 25         1   PAGE 31 OF 32
I PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 31 OF 32


ATTACHMENT 15     INFORMATION SHEET 3.3.4 RCR 2001-0075 (QA Audit 01-01).
ATTACHMENT 15 INFORMATION SHEET 3.3.4 RCR 2001-0075 (QA Audit 01-01).
3.3.5 RCR 2002-0520 (QA Audit 02-03).
3.3.5 RCR 2002-0520 (QA Audit 02-03).
3.3.6 RCR 2002-0606.
3.3.6 RCR 2002-0606.
3.4   NRC COMMITMENTS 3.4.1 © NUREG-0737, Item III.D.3.4, Section 5.2, Emergency Provisions (LQA 8000581-11). Commitment affects Step 30 on Attachment 7.
3.4 NRC COMMITMENTS 3.4.1  
3.4.2 © NRC Inspection Report 01-04 (NLS2001081). Commitment affects Step 2.3.1 on Attachment 2.
© NUREG-0737, Item III.D.3.4, Section 5.2, Emergency Provisions (LQA 8000581-11). Commitment affects Step 30 on Attachment 7.
I     PROCEDURE 5.7.21         1     REVISION 25         1 PAGE 32 OF 32
3.4.2  
© NRC Inspection Report 01-04 (NLS2001081). Commitment affects Step 2.3.1 on Attachment 2.
I PROCEDURE 5.7.21 1
REVISION 25 1
PAGE 32 OF 32


USE:
USE: REFERENCE
S:E REFERENCE RNC         (
(
CNS OPERATIONS                    MANUAL CPEION    5.7.                                     EFFECTIVE: 6/28/02 EPIP 5.7.23                                         APPROVAL: SORC OWNER: T. S. HAYNES EP DER    :
CNS OPERATIONS MANUAL S:E RNC CPE ION
ACTIVATION OF THE JIC                                             DEPARTMENT: EP
 
: 1. P U R P O SE ............................................................                             1
===5.7. EFFECTIVE===
: 2. PRECAUTIONS AND LIMITATIONS .....................................                                      1
6/28/02 EPIP 5.7.23 APPROVAL: SORC OWNER: T. S. HAYNES ACTIVATION OF THE JIC DER EP DEPARTMENT: EP
: 3. REQUIREMENTS ......................................................                                   2
: 1.
: 4. INITIAL NOTIFICATION OF THE PADO ..................................                                   2
P U R P O SE............................................................
: 5. PUBLIC AFFAIRS DIRECTOR ...........................................                                   3
1
: 6. FACILITY M ANAGER ..................................................                                   5
: 2.
: 7. TECHNICAL BRIEFER .................................................                                   6
PRECAUTIONS AND LIMITATIONS 1
: 8. M EDIA M O NITOR .....................................................                                 7
: 3.
: 9. DESIGNATED SPOKESPERSON .........................................                                     7
REQUIREMENTS......................................................
: 10. PUBLIC INFORMATION OFFICER .......................................                                     7
2
: 11. RUMOR CONTROL ACTIVITIES .........................................                                     8
: 4.
INITIAL NOTIFICATION OF THE PADO..................................
2
: 5.
PUBLIC AFFAIRS DIRECTOR...........................................
3
: 6.
FACILITY M ANAGER..................................................
5
: 7.
TECHNICAL BRIEFER.................................................
6
: 8.
M EDIA M O NITOR.....................................................
7
: 9.
DESIGNATED SPOKESPERSON.........................................
7
: 10. PUBLIC INFORMATION OFFICER.......................................
7
: 11.
RUMOR CONTROL ACTIVITIES.........................................
8
: 12. PREPARATION AND APPROVAL OF WRITTEN INFORMATION (PRESS)
: 12. PREPARATION AND APPROVAL OF WRITTEN INFORMATION (PRESS)
RE L E A SE S ...........................................................                             8
R E L E A SE S...........................................................
: 13. NEW S CONFERENCES .................................................                                   9
8
: 14. EMPLOYEE INFORMATION ACTIVITIES ................................                                     10
: 13. NEW S CONFERENCES.................................................
: 15. R E C OV ER Y ..........................................................                             10
9
: 16. DEACTIVATION OF THE JIC ..........................................                                   12 ATTACHMENT 1                   PAGER CARRIER INSTRUCTIONS ....................                       13 ATTACHMENT 2                   JIC FLOOR PLAN ..................................                     14 ATTACHMENT 3                   INFORMATION SHEET .............................                       15
: 14. EMPLOYEE INFORMATION ACTIVITIES................................
: 1. PURPOSE This procedure provides notification and activation instructions in the event of a declared emergency at Cooper Nuclear Station (CNS). It provides instructions for the Public Affairs Duty Officer (PADO) to notify Corporate Communications and NPPD management. It also describes the functions of the Joint Information Center (JIC) and the responsibilities of the JIC staff in the event an emergency is declared at CNS.
10
: 2. PRECAUTIONS AND LIMITATIONS
: 15.
[ ] 2.1     The Emergency Director approves all written information releases prior to their release.
R E C O V E R Y..........................................................
[ ] 2.2     Accuracy in receiving information regarding an emergency at CNS is extremely important. Be sure the receiver of each message understands its content. Ensure the information is recorded concisely and the reporting official repeats the information and gives his name.
10
PROCEDURE 5.7.23                               1             REVISION 4         PAGE 1 OF 16
: 16. DEACTIVATION OF THE JIC..........................................
12 ATTACHMENT 1 PAGER CARRIER INSTRUCTIONS....................
13 ATTACHMENT 2 JIC FLOOR PLAN..................................
14 ATTACHMENT 3 INFORMATION SHEET.............................
15
: 1.
PURPOSE This procedure provides notification and activation instructions in the event of a declared emergency at Cooper Nuclear Station (CNS). It provides instructions for the Public Affairs Duty Officer (PADO) to notify Corporate Communications and NPPD management. It also describes the functions of the Joint Information Center (JIC) and the responsibilities of the JIC staff in the event an emergency is declared at CNS.
: 2.
PRECAUTIONS AND LIMITATIONS
[ ]
2.1 The Emergency Director approves all written information releases prior to their release.
[ ] 2.2 Accuracy in receiving information regarding an emergency at CNS is extremely important. Be sure the receiver of each message understands its content. Ensure the information is recorded concisely and the reporting official repeats the information and gives his name.
PROCEDURE 5.7.23 1
REVISION 4 PAGE 1 OF 16


[I  2.3   Accuracy in releasing information regarding an emergency at CNS is also extremely important. Always coordinate with other information gatherers before any information is released to the media or the public.
2.3 Accuracy in releasing information regarding an emergency at CNS is also extremely important. Always coordinate with other information gatherers before any information is released to the media or the public.
[ ] 2.4     It is imperative that all media releases/briefings be documented.
[ ] 2.4 It is imperative that all media releases/briefings be documented.
: 3. REQUIREMENTS
: 3.
[ 1 3.1   An emergency has been declared at CNS per Procedure 5.7.1.
REQUIREMENTS
: 4. INITIAL NOTIFICATION OF THE PADO
[ 1 3.1 An emergency has been declared at CNS per Procedure 5.7.1.
[ ]4.1     The PADO shall be notified by pager of any emergency situation at CNS. The pager will display a return telephone number at CNS.
: 4.
[I   4.2   The PADO shall immediately return a call to the telephone number provided and follow instructions given by the Automated Notification System (ANS).
INITIAL NOTIFICATION OF THE PADO
[ ]4.1 The PADO shall be notified by pager of any emergency situation at CNS. The pager will display a return telephone number at CNS.
[I 4.2 I [1 4.3 The PADO shall immediately return a call to the telephone number provided and follow instructions given by the Automated Notification System (ANS).
This will also provide the PADO with information on how to contact the CNS Communicator.
This will also provide the PADO with information on how to contact the CNS Communicator.
I [1    4.3  Obtain Procedure 5.7.6, Attachment 3, Cooper Nuclear Station Notification Report. Upon establishing contact with the CNS Communicator, identify yourself as the PADO and request all information from the Initial Cooper Nuclear Station Notification Report. In certain cases, the CNS Communicator may not be available to provide you the information via telephone in a timely manner. In such cases, a fax of the Initial Notification Report is acceptable.
Obtain Procedure 5.7.6, Attachment 3, Cooper Nuclear Station Notification Report. Upon establishing contact with the CNS Communicator, identify yourself as the PADO and request all information from the Initial Cooper Nuclear Station Notification Report. In certain cases, the CNS Communicator may not be available to provide you the information via telephone in a timely manner. In such cases, a fax of the Initial Notification Report is acceptable.
      ] 4.4   Repeat the emergency information on Procedure 5.7.6, Attachment 3, back to the CNS Communicator, if received via telephone. Forward the Initial Notification Report to the Public Affairs Director.
] 4.4 Repeat the emergency information on Procedure 5.7.6, Attachment 3, back to the CNS Communicator, if received via telephone. Forward the Initial Notification Report to the Public Affairs Director.
[I   4.4.1   Request the CNS Communicator to fax all Notification Reports to you.
[I 4.4.1 Request the CNS Communicator to fax all Notification Reports to you.
[]   4.4.2   Notify the Vice President - Nuclear of an emergency situation at CNS and relay the information from Procedure 5.7.6, Attachment 3, Cooper Nuclear Station Notification Report.
[ ]
[]   4.4.3   Notify the Chief Executive Officer (CEO) or designee of an emergency situation at CNS and relay the information from Procedure 5.7.6, Attachment 3, Cooper Nuclear Station Notification Report.
4.4.2 Notify the Vice President - Nuclear of an emergency situation at CNS and relay the information from Procedure 5.7.6, Attachment 3, Cooper Nuclear Station Notification Report.
I         PROCEDURE 5.7.23             1       REVISION 4           1   PAGE 2 OF 16
[ ]
4.4.3 Notify the Chief Executive Officer (CEO) or designee of an emergency situation at CNS and relay the information from Procedure 5.7.6, Attachment 3, Cooper Nuclear Station Notification Report.
I PROCEDURE 5.7.23 1
REVISION 4 1
PAGE 2 OF 16
[I


  ] 4.5   Advise the CNS Communicator how to provide you further information. Give him a telephone number where you may be reached or tell him to continue to use the pager system.
]
[]   4.5.1   IN THE EVENT THAT THE JIC NEEDS TO BE ACTIVATED DURING NORMAL OFFICE HOURS (JIC ACTIVATION IS REQUIRED AT A SITE AREA EMERGENCY OR HIGHER CLASSIFICATION. HOWEVER, THE PUBLIC AFFAIRS DIRECTOR AND/OR EMERGENCY DIRECTOR CAN CHOSE TO ACTIVATE AT A LOWER CLASSIFICATION) - Request the NPPD General Office Receptionist to use the building paging system to announce the activation of the JIC. The Public Affairs Director has the responsibility to ensure the JIC is staffed and activated.
4.5 Advise the CNS Communicator how to provide you further information. Give him a telephone number where you may be reached or tell him to continue to use the pager system.
[ ]   NOTE - A print-out of qualified JIC personnel can be found in the Corporate Communications office, Public Affairs Director PIM, and the Facility Manager PIM.
[]
[ ]   4.5.2   In the event that the JIC needs to be activated during non-business hours, the Public Affairs Director has the responsibility to ensure members of the JIC staff are contacted and the JIC is activated.
4.5.1 IN THE EVENT THAT THE JIC NEEDS TO BE ACTIVATED DURING NORMAL OFFICE HOURS (JIC ACTIVATION IS REQUIRED AT A SITE AREA EMERGENCY OR HIGHER CLASSIFICATION. HOWEVER, THE PUBLIC AFFAIRS DIRECTOR AND/OR EMERGENCY DIRECTOR CAN CHOSE TO ACTIVATE AT A LOWER CLASSIFICATION) - Request the NPPD General Office Receptionist to use the building paging system to announce the activation of the JIC. The Public Affairs Director has the responsibility to ensure the JIC is staffed and activated.
: 5. PUBLIC AFFAIRS DIRECTOR
[ ]
[1   5.1   The Public Affairs Director (PAD) is responsible for the following:
NOTE - A print-out of qualified JIC personnel can be found in the Corporate Communications office, Public Affairs Director PIM, and the Facility Manager PIM.
[ ]   5.1.1   Ensuring appropriate JIC staff members have been notified that the JIC is activating.
[ ]
[]   5.1.2   Conducting a roll call to verify JIC Emergency Response positions have been staffed.
4.5.2 In the event that the JIC needs to be activated during non-business hours, the Public Affairs Director has the responsibility to ensure members of the JIC staff are contacted and the JIC is activated.
[ ]   5.1.3   Obtaining a current plant status report from the Emergency Director.
: 5.
[]   5.1.4   Conducting an initial meeting with key JIC personnel to ensure they are ready to assume their emergency response functions.
PUBLIC AFFAIRS DIRECTOR
[]   5.1.5   Declaring the JIC operational.
[1 5.1 The Public Affairs Director (PAD) is responsible for the following:
[]   5.1.6   Contacting the EOF Director to inform him that the JIC is operational.
[ ]
[]   5.1.7   Conducting initial and follow-up meetings with the JIC staff and other agencies to ensure everyone has the latest emergency status information.
5.1.1 Ensuring appropriate JIC staff members have been notified that the JIC is activating.
PROCEDURE 5.7.23                     REVISION 4               PAGE 3 OF 16
[ ]
5.1.2 Conducting a roll call to verify JIC Emergency Response positions have been staffed.
[ ]
5.1.3 Obtaining a current plant status report from the Emergency Director.
[ ]
5.1.4 Conducting an initial meeting with key JIC personnel to ensure they are ready to assume their emergency response functions.
[ ]
5.1.5 Declaring the JIC operational.
[ ]
5.1.6 Contacting the EOF Director to inform him that the JIC is operational.
[ ]
5.1.7 Conducting initial and follow-up meetings with the JIC staff and other agencies to ensure everyone has the latest emergency status information.
PROCEDURE 5.7.23 REVISION 4 PAGE 3 OF 16


[1   5.1.8 Coordinating JIC public relations activities by ensuring following activities are performed:
[1 5.1.8 Coordinating JIC public relations activities by ensuring following activities are performed:
[ ]   5.1.8.1     News conferences.
[ ]
        ]   5.1.8.2     Media monitoring.
5.1.8.1 News conferences.  
[ ]   5.1.8.3     Rumor control.
]
[ ]   5.1.8.4     Employee information.
5.1.8.2 Media monitoring.
[ ]   5.1.9 Contacting the CEO and update him on the emergency status.
[ ]
[ ]   5.1.10 Ensuring appropriate media representatives (AP, Omaha World Herald, etc.) are contacted and informed the JIC is functioning.
5.1.8.3 Rumor control.
[1   5.1.11 Providing the Governmental Affairs office with information concerning the emergency status at CNS.
[ ]
[ ]   5.1.12 Coordinating activities of the JIC with Media Representatives and moderate the news conferences (who speaks, when, where, etc.).
5.1.8.4 Employee information.
[ ]   5.1.13 Taking notes in news conferences and assisting the designated Spokesperson, as necessary.
[ ]
[   5.1.14 Ensuring "press releases" by NPPD are faxed to NRC Region IV Public Information Officer and NRC Operations Center. Fax numbers are located in the Emergency Telephone Directory.
5.1.9 Contacting the CEO and update him on the emergency status.
[1   5.1.15 Ensuring following are notified and provided with CNS status:
[ ]
[]     5.1.15.1     LES Public Information.
5.1.10 Ensuring appropriate media representatives (AP, Omaha World Herald, etc.) are contacted and informed the JIC is functioning.
[]     5.1.15.2   Mid American Energy Corporate Communications.
[1 5.1.11 Providing the Governmental Affairs office with information concerning the emergency status at CNS.
[]   5.1.16 Providing status of JIC support efforts to EOF.
[ ]
[ ]   5.1.17 Providing follow-up contact with the EOF Director, Vice President - Nuclear, and CEO as needed.
5.1.12 Coordinating activities of the JIC with Media Representatives and moderate the news conferences (who speaks, when, where, etc.).
[ ]   5.1.18 The PAD will review the written information releases to ensure following items are included:
[ ]
[1     5.1.18.1   Time of events and declaration.
5.1.13 Taking notes in news conferences and assisting the designated Spokesperson, as necessary.
[]     5.1.18.2   Points of contact and/or telephone numbers for news media.
[
PROCEDURE 5.7.23           1       REVISION 4               PAGE 4 OF 16
5.1.14 Ensuring "press releases" by NPPD are faxed to NRC Region IV Public Information Officer and NRC Operations Center. Fax numbers are located in the Emergency Telephone Directory.
[1 5.1.15 Ensuring following are notified and provided with CNS status:
[ ]
5.1.15.1 LES Public Information.
[ ]
5.1.15.2 Mid American Energy Corporate Communications.
[ ]
5.1.16 Providing status of JIC support efforts to EOF.
[ ]
5.1.17 Providing follow-up contact with the EOF Director, Vice President - Nuclear, and CEO as needed.
[ ]
5.1.18 The PAD will review the written information releases to ensure following items are included:
[1 5.1.18.1 Time of events and declaration.
[ ]
5.1.18.2 Points of contact and/or telephone numbers for news media.
PROCEDURE 5.7.23 1
REVISION 4 PAGE 4 OF 16


[1]   5.1.19   The PAD will send the written information release to the Emergency Director for approval.
[1 ]
[ 1     5.1.19.1   The PAD will issue the information release for final processing after receiving the Emergency Directors approval.
5.1.19 The PAD will send the written information release to the Emergency Director for approval.
: 6. FACILITY MANAGER
[ 1 5.1.19.1 The PAD will issue the information release for final processing after receiving the Emergency Directors approval.
[ ]6.1   The Facility Manager is responsible for following:
: 6.
[]   6.1.1   Assuming responsibility for all office machines, supplies, and their environment throughout the course of the emergency.
FACILITY MANAGER
[]   6.1.2   Ensuring tables and chairs are set up.
[ ]6.1 The Facility Manager is responsible for following:
[]   NOTE - Emergency Planning Implementing Procedures and Emergency Telephone Directories are located in JIC Cabinet #1. Equipment and supplies can be found in JIC Cabinet #2. Two fax machines for the JIC and two fax machines for the States are located in JIC Cabinet #3.
[ ]
      ]   6.1.3   Setting up and verifying operability of all communications equipment.
6.1.1 Assuming responsibility for all office machines, supplies, and their environment throughout the course of the emergency.
[ ]
6.1.2 Ensuring tables and chairs are set up.
[ ]
NOTE - Emergency Planning Implementing Procedures and Emergency Telephone Directories are located in JIC Cabinet #1. Equipment and supplies can be found in JIC Cabinet #2. Two fax machines for the JIC and two fax machines for the States are located in JIC Cabinet #3.  
]
6.1.3 Setting up and verifying operability of all communications equipment.
If any equipment is found to be defective, make arrangements to replace or augment it.
If any equipment is found to be defective, make arrangements to replace or augment it.
[   6.1.4   Ensuring equipment and supplies are available in the media briefing area (microphones, PA system, literature display, etc.).
[
      ]   6.1.5   Establishing and maintaining security by stationing one person at the Board Room Entrance near the General Office Lobby to perform following:
6.1.4 Ensuring equipment and supplies are available in the media briefing area (microphones, PA system, literature display, etc.).  
[ ]     6.1.5.1     Register NPPD, State, Federal agency personnel, and media representatives names and affiliations. Ensure media representatives have Media Press Credentials.
]
[ ]     6.1.5.2     Direct media representatives to briefing area.
6.1.5 Establishing and maintaining security by stationing one person at the Board Room Entrance near the General Office Lobby to perform following:
[ ]     6.1.5.3     If necessary, acquire additional Security personnel (i.e.,
[ ]
6.1.5.1 Register NPPD, State, Federal agency personnel, and media representatives names and affiliations. Ensure media representatives have Media Press Credentials.
[ ]
6.1.5.2 Direct media representatives to briefing area.
[ ]
6.1.5.3 If necessary, acquire additional Security personnel (i.e.,
Columbus Police Department and/or professional security contractor. Guard-Rite Security Services L.L.C. can be contacted at 402-644-8000 or 402-644-7054 (emergencies).
Columbus Police Department and/or professional security contractor. Guard-Rite Security Services L.L.C. can be contacted at 402-644-8000 or 402-644-7054 (emergencies).
[]   6.1.6   Developing a 24 hour schedule for JIC personnel.
[ ]
I       PROCEDURE 5.7.23             1       REVISION 4               PAGE 5 OF 16
6.1.6 Developing a 24 hour schedule for JIC personnel.
I PROCEDURE 5.7.23 1
REVISION 4 PAGE 5 OF 16


[1   6.1.7   Obtaining clerical and administrative support for the JIC staff as necessary.
[1 6.1.7 Obtaining clerical and administrative support for the JIC staff as necessary.
[ ]   6.1.8   The Facility Manager will post a notice for the scheduled news conference near the briefing area.
[ ]
[1   6.1.9   Ensuring the JIC is cleaned up and the appropriate equipment is returned to the General Office when the facility is deactivated.
6.1.8 The Facility Manager will post a notice for the scheduled news conference near the briefing area.
: 7. TECHNICAL BRIEFER 1 7.1   The Technical Briefer is responsible for following:
[1 6.1.9 Ensuring the JIC is cleaned up and the appropriate equipment is returned to the General Office when the facility is deactivated.
[]   7.1.1   Establishing contact with the EOF TIC.
: 7.
[ ]   7.1.2   Receiving technical information for use by the designated Spokesperson in news conferences.
TECHNICAL BRIEFER 1 7.1 The Technical Briefer is responsible for following:
[ ]   7.1.3   Providing technical information to the Public Affairs Director (PAD).
[ ]
[ ]   7.1.4   Assisting in the review of statements to the media by providing clarification of the technical data.
7.1.1 Establishing contact with the EOF TIC.
            ]     7.1.4.1     The type, severity, and extent of the emergency at CNS.
[ ]
            ]     7.1.4.2     The plant's current status (i.e., stable, improving, or deteriorating).
7.1.2 Receiving technical information for use by the designated Spokesperson in news conferences.
            ]     7.1.4.3     Any changes in the emergency classification.
[ ]
[ ]     7.1.4.4     A description of the latest developments regarding the emergency situation.
7.1.3 Providing technical information to the Public Affairs Director (PAD).
[ 1     7.1.4.5     The prognosis for, or magnitude of, any radiological releases from the plant and the associated meteorological conditions.
[ ]
[1     7.1.4.6     A description of those actions taken or currently being undertaken to mitigate the emergency and place the plant in a safe and stable condition.
7.1.4 Assisting in the review of statements to the media by providing clarification of the technical data.  
[1     7.1.4.7     Forward the information release to the PAD.
]
[]   7.1.5   Organizing the appropriate technical information for use in development of news conferences and communiques.
7.1.4.1 The type, severity, and extent of the emergency at CNS.  
I       PROCEDURE 5.7.23             1       REVISION 4           1   PAGE 6 OF 16
]
7.1.4.2 The plant's current status (i.e., stable, improving, or deteriorating).  
]
7.1.4.3 Any changes in the emergency classification.
[ ]
7.1.4.4 A description of the latest developments regarding the emergency situation.
[ 1 7.1.4.5 The prognosis for, or magnitude of, any radiological releases from the plant and the associated meteorological conditions.
[1 7.1.4.6 A description of those actions taken or currently being undertaken to mitigate the emergency and place the plant in a safe and stable condition.
[1 7.1.4.7 Forward the information release to the PAD.
[ ]
7.1.5 Organizing the appropriate technical information for use in development of news conferences and communiques.
I PROCEDURE 5.7.23 1
REVISION 4 1
PAGE 6 OF 16


[1   7.1.6   Responding to technical questions that were asked by the media during news conferences and organize the appropriate responses for use in development of the upcoming news release, if necessary.
[1 7.1.6 Responding to technical questions that were asked by the media during news conferences and organize the appropriate responses for use in development of the upcoming news release, if necessary.
: 8. MEDIA MONITOR
: 8.
[ 8.1   The Media Monitor is responsible for following:
MEDIA MONITOR
[ ]   8.1.1   Assisting in assembling equipment necessary for operation of the public information effort.
[ 8.1 The Media Monitor is responsible for following:
[ 1   8.1.2   Monitoring and recording radio and television network newscasts, particularly the EAS stations associated with CNS. Inform Public Affairs Director (PAD) of any misinformation being generated by or through the media.
[ ]
[ ]   8.1.3   Remaining available to PAD for media monitoring assignments relative to emergency response by the District.
8.1.1 Assisting in assembling equipment necessary for operation of the public information effort.
: 9. DESIGNATED SPOKESPERSON
[ 1 8.1.2 Monitoring and recording radio and television network newscasts, particularly the EAS stations associated with CNS. Inform Public Affairs Director (PAD) of any misinformation being generated by or through the media.
[ ] 9.1   The designated Spokesperson is responsible for following:
[ ]
[ ]   9.1.1   The designated Spokesperson will represent NPPD during news conferences and present prepared statements to the media.
8.1.3 Remaining available to PAD for media monitoring assignments relative to emergency response by the District.
: 9.
DESIGNATED SPOKESPERSON
[ ] 9.1 The designated Spokesperson is responsible for following:
[ ]
9.1.1 The designated Spokesperson will represent NPPD during news conferences and present prepared statements to the media.
: 10. PUBLIC INFORMATION OFFICER
: 10. PUBLIC INFORMATION OFFICER
[1]10.1   The Public Information Officer (PIO) is responsible for:
[1 ]10.1 The Public Information Officer (PIO) is responsible for:
[]   10.1.1 Making arrangements for two laptops and one printer to be brought to the JIC facility.
[ ]
[ ]   10.1.2 Coordinating activities with Public Information Officers from other agencies (state and federal).
10.1.1 Making arrangements for two laptops and one printer to be brought to the JIC facility.
[ ]   10.1.3 The PIO will prepare written information releases for the news media and the public as needed.
[ ]
[ ]   10.1.4 Assisting with the rumor control function in the JIC.
10.1.2 Coordinating activities with Public Information Officers from other agencies (state and federal).
[ ]   10.1.5 Assisting with response to public inquiries, if necessary.
[ ]
[1   10.1.6 Responding to public inquiry calls directed to NPPD at the JIC in cooperation with State and Federal personnel.
10.1.3 The PIO will prepare written information releases for the news media and the public as needed.
[ ]   10.1.7 Provide support to the District's designated Spokesperson.
[ ]
PROCEDURE 5.7.23                     REVISION 4               PAGE 7 OF 16
10.1.4 Assisting with the rumor control function in the JIC.
: 11. RUMOR CONTROL ACTIVITIES
[ ]
[] 11.1   Rumor control personnel shall relay rumors or misinformation and trends in information to the Public Affairs Director (PAD).
10.1.5 Assisting with response to public inquiries, if necessary.
[ ]     11.1.1   PAD will ensure rumors and misinformation are addressed in a timely manner in either a news conference or a telephone call.
[1 10.1.6 Responding to public inquiry calls directed to NPPD at the JIC in cooperation with State and Federal personnel.
        ]   11.1.2   As appropriate, rumors or misinformation regarding state or county activities will referred to the state or county Public Information Officer located in the JIC.
[ ]
10.1.7 Provide support to the District's designated Spokesperson.
PROCEDURE 5.7.23 REVISION 4 PAGE 7 OF 16
: 11.
RUMOR CONTROL ACTIVITIES
[] 11.1 Rumor control personnel shall relay rumors or misinformation and trends in information to the Public Affairs Director (PAD).
[ ]
11.1.1 PAD will ensure rumors and misinformation are addressed in a timely manner in either a news conference or a telephone call.  
]
11.1.2 As appropriate, rumors or misinformation regarding state or county activities will referred to the state or county Public Information Officer located in the JIC.
: 12. PREPARATION AND APPROVAL OF WRITTEN INFORMATION (PRESS)
: 12. PREPARATION AND APPROVAL OF WRITTEN INFORMATION (PRESS)
RELEASES
RELEASES
[ ] 12.1     At a minimum, written information releases should be prepared following activation of the JIC and cancellation of the emergency (i.e., resumption of normal plant operations); however, written information releases should be prepared as events related to the emergency dictate to ensure the news media and the public are kept informed, and to preclude the dissemination of misinformation. Such information releases should also be prepared when a change in emergency classification occurs.
[ ]
[ ] 12.2     The Public Information Officer will prepare written information releases for the news media and the public as needed.
12.1 At a minimum, written information releases should be prepared following activation of the JIC and cancellation of the emergency (i.e., resumption of normal plant operations); however, written information releases should be prepared as events related to the emergency dictate to ensure the news media and the public are kept informed, and to preclude the dissemination of misinformation. Such information releases should also be prepared when a change in emergency classification occurs.
[ ] 12.3     The Technical Briefer will ensure the information release is accurate with regard to following:
[ ] 12.2 The Public Information Officer will prepare written information releases for the news media and the public as needed.
[]     12.3.1 The type, severity, and extent of the emergency at CNS.
[ ] 12.3 The Technical Briefer will ensure the information release is accurate with regard to following:
[]     12.3.2 The plant's current status (i.e., stable, improving, or deteriorating).
[ ]
[1     12.3.3 Any changes in the emergency classification.
12.3.1 The type, severity, and extent of the emergency at CNS.
[1     12.3.4 A description of the latest developments regarding the emergency situation.
[ ]
[ 1     12.3.5 The prognosis for, or magnitude of, any radiological releases from the plant and the associated meteorological conditions.
12.3.2 The plant's current status (i.e., stable, improving, or deteriorating).
[]     12.3.6 A description of those actions taken or currently being undertaken to mitigate the emergency and place the plant in a safe, stable condition.
[1 12.3.3 Any changes in the emergency classification.
[   12.3.7   Forward the information release to the Public Affairs Director (PAD).
[1 12.3.4 A description of the latest developments regarding the emergency situation.
I         PROCEDURE 5.7.23               1       REVISION 4               PAGE 8 OF 16
[ 1 12.3.5 The prognosis for, or magnitude of, any radiological releases from the plant and the associated meteorological conditions.
[]
12.3.6 A description of those actions taken or currently being undertaken to mitigate the emergency and place the plant in a safe, stable condition.
[
12.3.7 Forward the information release to the Public Affairs Director (PAD).
I PROCEDURE 5.7.23 1
REVISION 4 PAGE 8 OF 16


  ] 12.4 The PAD will review the written information releases to ensure following items are included:
]
[ ]   12.4.1   Time of events and declaration.
12.4 The PAD will review the written information releases to ensure following items are included:
[ ]   12.4.2   Points of contact and/or telephone numbers for news media.
[ ]
12.4.1 Time of events and declaration.
[ ]
12.4.2 Points of contact and/or telephone numbers for news media.
[ ]12.5 The PAD will send the written information release to the Emergency Director for approval.
[ ]12.5 The PAD will send the written information release to the Emergency Director for approval.
[ ]   12.5.1   The PAD will generate the information release for final processing after receiving the Emergency Directors approval.
[ ]
[] 12.6 DISTRIBUTION OF WRITTEN INFORMATION RELEASES
12.5.1 The PAD will generate the information release for final processing after receiving the Emergency Directors approval.
[ ]   12.6.1   The PAD's Secretary will distribute copies of the written information releases to following:
[]
[1       12.6.1.1   Facility Manager for inclusion on the media materials desk.
12.6 DISTRIBUTION OF WRITTEN INFORMATION RELEASES
            ]       12.6.1.2   Federal and State Public Information Officers in the JIC.
[ ]
[]       12.6.1.3   Fax copies to the Governmental Affairs Office, NRC Region IV Public Information Officer, NRC Operations Center, LES Public Information, and Mid American Energy Corporate Communications. Fax numbers are located in the Emergency Telephone Directory.
12.6.1 The PAD's Secretary will distribute copies of the written information releases to following:
[ 1 12.6.1.1 Facility Manager for inclusion on the media materials desk.  
]
12.6.1.2 Federal and State Public Information Officers in the JIC.
[ ]
12.6.1.3 Fax copies to the Governmental Affairs Office, NRC Region IV Public Information Officer, NRC Operations Center, LES Public Information, and Mid American Energy Corporate Communications. Fax numbers are located in the Emergency Telephone Directory.
: 13. NEWS CONFERENCES
: 13. NEWS CONFERENCES
[ ] 13.1 News conferences should be conducted as events related to the emergency dictate; however, it is recommended, at a minimum, news conferences be conducted at least once each day, until such time that the plant has been placed in a safe and stable condition.
[ ] 13.1 News conferences should be conducted as events related to the emergency dictate; however, it is recommended, at a minimum, news conferences be conducted at least once each day, until such time that the plant has been placed in a safe and stable condition.
[ ] 13.2 The Public Affairs Director (PAD) should schedule news conferences held in the JIC and announce the time to the media representatives, if possible.
[ ] 13.2 The Public Affairs Director (PAD) should schedule news conferences held in the JIC and announce the time to the media representatives, if possible.
[ 1 13.3 The Facility Manager will post a notice for the scheduled news conference near the briefing area.
[ 1 13.3 The Facility Manager will post a notice for the scheduled news conference near the briefing area.
[ ]13.4   Prior to the news conference the designated Spokesperson, PAD, Public Information Officer, and the appropriate State and Federal personnel shall meet to discuss the content and organization of the news conference.
[ ]13.4 Prior to the news conference the designated Spokesperson, PAD, Public Information Officer, and the appropriate State and Federal personnel shall meet to discuss the content and organization of the news conference.
[ ] 13.5 The PAD should serve as the moderator for all news conferences.
[ ]
PROCEDURE 5.7.23               1       REVISION 4           1   PAGE 9 OF 16
13.5 The PAD should serve as the moderator for all news conferences.
PROCEDURE 5.7.23 1
REVISION 4 1
PAGE 9 OF 16


[ ] 13.6 The designated Spokesperson will present prepared statements to the media during news conferences.
[ ]
[ ] 13.7 The Technical Briefer should respond to technical questions that were asked by the media during news conferences and organize the appropriate responses for use in development of the upcoming news release, if necessary.
13.6 The designated Spokesperson will present prepared statements to the media during news conferences.
: 14. EMPLOYEE INFORMATION ACTIVITIES
[ ]
  ] 14.1 Contact NPPD Regional System Control (Norfolk and Kearney), Transmission Control Center (Doniphan), Gerald Gentleman Station, and Sheldon Station and:
13.7 The Technical Briefer should respond to technical questions that were asked by the media during news conferences and organize the appropriate responses for use in development of the upcoming news release, if necessary.
[1     14.1.1   Inform the area Managers of the emergency status at CNS. Updates need to be sent out as appropriate.
: 14. EMPLOYEE INFORMATION ACTIVITIES  
[ J 14.2   Contact the Customer Care Call Center in Norfolk and have them update the Customer Care Manager or designee of the emergency status at CNS.
]
[ ] 14.3   Notify PAD immediately upon completion of these tasks.
14.1 Contact NPPD Regional System Control (Norfolk and Kearney), Transmission Control Center (Doniphan), Gerald Gentleman Station, and Sheldon Station and:
[ 14.4   Update the area Managers, as appropriate.
[1 14.1.1 Inform the area Managers of the emergency status at CNS. Updates need to be sent out as appropriate.
  ] 14.5   Respond to telephone requests for information, as necessary.
[ J 14.2 Contact the Customer Care Call Center in Norfolk and have them update the Customer Care Manager or designee of the emergency status at CNS.
: 15. RECOVERY
[ ]
  ] 15.1   The Emergency Director at CNS evaluates the effectiveness of corrective actions taken at the Station and determines if the emergency is under control as discussed in Section 9 of the NPPD Emergency Plan for CNS. When the emergency is determined to be under control and at the direction of the Emergency Director, a Recovery Panel is activated. The Panel may consist of following personnel:
14.3 Notify PAD immediately upon completion of these tasks.
[]     15.1.1   Emergency Director.
[
[]     15.1.2   Emergency Operations Facility Director (EOF).
14.4 Update the area Managers, as appropriate.  
[ ]   15.1.3   Technical Support Center Director (TSC).
]
[ ]   15.1.4   Public Affairs Director (JIC).
14.5 Respond to telephone requests for information, as necessary.
[ ]   15.1.5   Radiological Control Manager (EOF).
: 15. RECOVERY  
I         PROCEDURE 5.7.23             1       REVISION 4       -]   PAGE 10 OF 16     1
]
15.1 The Emergency Director at CNS evaluates the effectiveness of corrective actions taken at the Station and determines if the emergency is under control as discussed in Section 9 of the NPPD Emergency Plan for CNS. When the emergency is determined to be under control and at the direction of the Emergency Director, a Recovery Panel is activated. The Panel may consist of following personnel:
[ ]
15.1.1 Emergency Director.
[ ]
15.1.2 Emergency Operations Facility Director (EOF).
[ ]
15.1.3 Technical Support Center Director (TSC).
[ ]
15.1.4 Public Affairs Director (JIC).
[ ]
15.1.5 Radiological Control Manager (EOF).
I PROCEDURE 5.7.23 1
REVISION 4  
-]
PAGE 10 OF 16 1


  ] 15.2 Accuracy in releasing information regarding an emergency at CNS is extremely important. Always coordinate and verify information before a statement is made to the media or the public.
]
  ] 15.3 All actions necessary during recovery operations cannot be anticipated. Most actions necessary during recovery from an accident at CNS will be dependent upon the conditions of the event. Personnel need to be alert, anticipate and identify problem situations, and communicate effectively.
15.2 Accuracy in releasing information regarding an emergency at CNS is extremely important. Always coordinate and verify information before a statement is made to the media or the public.  
]
15.3 All actions necessary during recovery operations cannot be anticipated. Most actions necessary during recovery from an accident at CNS will be dependent upon the conditions of the event. Personnel need to be alert, anticipate and identify problem situations, and communicate effectively.
[ ] 15.4 When the Recovery Panel is activated by the Emergency Director at CNS, JIC activities will be as follows:
[ ] 15.4 When the Recovery Panel is activated by the Emergency Director at CNS, JIC activities will be as follows:
[ ]   15.4.1   The Public Affairs Director will represent the JIC on the Recovery Panel by conference call.
[ ]
[1   15.4.2   Notifying JIC personnel of Recovery Panel activation.
15.4.1 The Public Affairs Director will represent the JIC on the Recovery Panel by conference call.
[ ]   15.4.3   Providing input to the Recovery Panel, as appropriate.
[1 15.4.2 Notifying JIC personnel of Recovery Panel activation.
[]   15.4.4   Providing Legislative Affairs office with current emergency information.
[ ]
15.4.3 Providing input to the Recovery Panel, as appropriate.
[ ]
15.4.4 Providing Legislative Affairs office with current emergency information.
[ ] 15.5 When Recovery Panel activities are terminated, JIC activities will be as follows:
[ ] 15.5 When Recovery Panel activities are terminated, JIC activities will be as follows:
J   15.5.1   The Public Affairs Director will:
J 15.5.1 The Public Affairs Director will:
[ J       15.5.1.1   Brief JIC personnel of any Recovery Panel decisions and information, as appropriate.
[ J 15.5.1.1 Brief JIC personnel of any Recovery Panel decisions and information, as appropriate.
[ ]       15.5.1.2   Ensure the Facility Manager is informed of the CNS emergency status and expected time frame for future actions.
[ ]
[ ]       15.5.1.3   Instruct JIC personnel to continue with facility activities.
15.5.1.2 Ensure the Facility Manager is informed of the CNS emergency status and expected time frame for future actions.
[ ]
15.5.1.3 Instruct JIC personnel to continue with facility activities.
[ ] 15.6 When the decision has been made to initiate the Recovery Organization, JIC activities will be as follows:
[ ] 15.6 When the decision has been made to initiate the Recovery Organization, JIC activities will be as follows:
[]   15.6.1   The Public Affairs Director
[ ]
[ ]       15.6.1.1   Notify JIC personnel of the decision to activate the Recovery Organization.
15.6.1 The Public Affairs Director
[1       15.6.1.2   Contact the Vice President - Nuclear to discuss the expected time frame for maintaining JIC activities.
[ ]
I       PROCEDURE 5.7.23               1       REVISION 4           1   PAGE 11 OF 16       j
15.6.1.1 Notify JIC personnel of the decision to activate the Recovery Organization.
[1 15.6.1.2 Contact the Vice President - Nuclear to discuss the expected time frame for maintaining JIC activities.
I PROCEDURE 5.7.23 1
REVISION 4 1
PAGE 11 OF 16 j


[ ]     15.6.1.3     Deactivate the JIC, as necessary.
[ ]
[]       15.6.1.4     Provide Legislative Affairs office with emergency and recovery operation information.
15.6.1.3 Deactivate the JIC, as necessary.
15.7 Overall activities of the JIC after activation of the Recovery Organization are as follows:
[ ]
[ ]   15.7.1   Support the CEO and his interface with District Board members as well as other governmental officials.
15.6.1.4 Provide Legislative Affairs office with emergency and recovery operation information.
[lI   15.7.2   Ensure all NPPD information provided to state and federal organizations and media sources is current and correct.
15.7 Overall activities of the JIC after activation of the Recovery Organization are as follows:
      ]   15.7.3   Ensure all NPPD information is relayed to the public in a timely manner and without distortion.
[ ]
S] 15.7.4   Ensure sources of misinformation are located and erroneous information is corrected.
15.7.1 Support the CEO and his interface with District Board members as well as other governmental officials.
[lI 15.7.2 Ensure all NPPD information provided to state and federal organizations and media sources is current and correct.
]
15.7.3 Ensure all NPPD information is relayed to the public in a timely manner and without distortion.
S]
15.7.4 Ensure sources of misinformation are located and erroneous information is corrected.
: 16. DEACTIVATION OF THE JIC
: 16. DEACTIVATION OF THE JIC
[ 16.1 The Facility Manager shall supervise the deactivation of the JIC.
[
[ 16.2 All personnel shall restore their work stations to the pre-emergency configurations.
16.1 The Facility Manager shall supervise the deactivation of the JIC.
  ] 16.3 All personnel shall surrender their logs and other records to the Facility Manager.
[
  ] 16.4 The Facility Manager shall forward all logs and other records to the Emergency Preparedness Office at CNS.
16.2 All personnel shall restore their work stations to the pre-emergency configurations.  
I       PROCEDURE 5.7.23               1       REVISION 4           1   PAGE 12 OF 16
]
16.3 All personnel shall surrender their logs and other records to the Facility Manager.  
]
16.4 The Facility Manager shall forward all logs and other records to the Emergency Preparedness Office at CNS.
I PROCEDURE 5.7.23 1
REVISION 4 1
PAGE 12 OF 16


I     ATTACHMENT 1         PAGER CARRIER INSTRUCTIONS The person carrying the pager is responsible for the following:
I ATTACHMENT 1 PAGER CARRIER INSTRUCTIONS The person carrying the pager is responsible for the following:
: 1. Keep the pager "ON" at all times when scheduled to carry the pager.
: 1.
: 2. Familiarity with the operation of the digital display pager, how it operates, what the codes mean, how to reset the pager, etc. If you have questions about the pager use or need an additional copy of the pager operating instructions, contact the CNS Emergency Preparedness Department.
Keep the pager "ON" at all times when scheduled to carry the pager.
: 3. Report to the JIC, as appropriate, when the pager is activated for an emergency as indicated by the display on the pager. The following codes will be displayed on the pager.
: 2.
PAGER CODES AND INFORMATION/ACTIONS  
Familiarity with the operation of the digital display pager, how it operates, what the codes mean, how to reset the pager, etc. If you have questions about the pager use or need an additional copy of the pager operating instructions, contact the CNS Emergency Preparedness Department.
: 3.
Report to the JIC, as appropriate, when the pager is activated for an emergency as indicated by the display on the pager. The following codes will be displayed on the pager.
I PROCEDURE 5.7.23 1
REVISION 4 1
PAGE 13 OF 16 PAGER CODES AND INFORMATION/ACTIONS  


==SUMMARY==
==SUMMARY==
CODE RESPONSE TO CODE 100 NOUE: EP AND PADO RESPONSE ONLY 222 RESPONSE TO CNS IF FIT FOR DUTY 333 RESPOND TO THE ALTERNATE EOF IF FIT FOR DUTY 600 DRILL ERO CALL IN TEST 622 DRILL - RESPOND TO CNS IF FIT FOR DUTY 633 DRILL - RESPOND TO THE ALTERNATE EOF IF FIT FOR DUTY I


CODE                                RESPONSE TO CODE 100        NOUE: EP AND PADO RESPONSE ONLY 222        RESPONSE TO CNS IF FIT FOR DUTY 333        RESPOND TO THE ALTERNATE EOF IF FIT FOR DUTY 600        DRILL ERO CALL IN TEST 622        DRILL - RESPOND TO CNS IF FIT FOR DUTY 633        DRILL - RESPOND TO THE ALTERNATE EOF IF FIT FOR DUTY I
I ATTACHMENT 2 JIC FLOOR PLAN 5-7-23A Figure 1 I
I        PROCEDURE 5.7.23              1      REVISION 4            1  PAGE 13 OF 16
PROCEDURE 5.7.23 1
 
REVISION 4 1
I   ATTACHMENT 2     JIC FLOOR PLAN 5-7-23A Figure 1 I     PROCEDURE 5.7.23       1     REVISION 4 1 PAGE 14 OF 16
PAGE 14 OF 16


ATTACHMENT 3             INFORMATION SHEET DISCUSSION 1.1   The CNS Control Room makes the initial notification to General Office Emergency Response personnel upon declaration of an emergency classification. The JIC may be placed on standby during an ALERT and will be manned and activated upon the declaration of a SITE AREA EMERGENCY or GENERAL EMERGENCY.
ATTACHMENT 3 INFORMATION SHEET DISCUSSION 1.1 The CNS Control Room makes the initial notification to General Office Emergency Response personnel upon declaration of an emergency classification. The JIC may be placed on standby during an ALERT and will be manned and activated upon the declaration of a SITE AREA EMERGENCY or GENERAL EMERGENCY.
1.2   As discussed in the NPPD Emergency Plan for CNS, the JIC is a media briefing area. At this site, NPPD coordinates press briefings with state and federal emergency response personnel. During an emergency response, the major function of the JIC is:
1.2 As discussed in the NPPD Emergency Plan for CNS, the JIC is a media briefing area. At this site, NPPD coordinates press briefings with state and federal emergency response personnel. During an emergency response, the major function of the JIC is:
1.2.1     Coordinate the development and dissemination of information to the news media.
1.2.1 Coordinate the development and dissemination of information to the news media.
1.2.2     Conduct media monitoring.
1.2.2 Conduct media monitoring.
1.2.3     Maintain rumor control.
1.2.3 Maintain rumor control.
1.2.4     Provide NPPD employees with information concerning the emergency.
1.2.4 Provide NPPD employees with information concerning the emergency.
1.3   The JIC is located in the third floor Conference Rooms of the Columbus General Office Building. Attachment 2 shows the floor plan of the JIC.
1.3 The JIC is located in the third floor Conference Rooms of the Columbus General Office Building. Attachment 2 shows the floor plan of the JIC.
1.3.1     At a minimum during emergency response activities, the JIC should be staffed with following personnel:
1.3.1 At a minimum during emergency response activities, the JIC should be staffed with following personnel:
1.3.1.1     Public Affairs Director.
1.3.1.1 Public Affairs Director.
1.3.1.2     Technical Briefer.
1.3.1.2 Technical Briefer.
1.3.1.3     Public Information Officer.
1.3.1.3 Public Information Officer.
1.4   POSITION INSTRUCTION MANUALS (PIMs) 1.4.1     Positional Instruction Manuals (PIMs) contain positional checklists for the activation and operation of the JIC and are to be utilized by all JIC positions. PIMs are numbered and controlled by the Emergency Preparedness Department, labeled by ERO position, and are located in JIC Cabinet #1.
1.4 POSITION INSTRUCTION MANUALS (PIMs) 1.4.1 Positional Instruction Manuals (PIMs) contain positional checklists for the activation and operation of the JIC and are to be utilized by all JIC positions. PIMs are numbered and controlled by the Emergency Preparedness Department, labeled by ERO position, and are located in JIC Cabinet #1.
1.4.1.1     Public Affairs Director - PIM #1.
1.4.1.1 Public Affairs Director - PIM #1.
1.4.1.2     Public Affairs Director Secretary - PIM #2.
1.4.1.2 Public Affairs Director Secretary - PIM #2.
PROCEDURE 5.7.23               1       REVISION 4           1 PAGE 15 OF 16
PROCEDURE 5.7.23 1
REVISION 4 1
PAGE 15 OF 16


I ATTACHMENT 3         INFORMATION SHEET                                         I 1.4.1.3     Designated Spokesperson - PIM #3.
I ATTACHMENT 3 INFORMATION SHEET I
1.4.1.4      Facility Manager - PIM #4.
1.4.1.3 1.4.1.4 1.4.1.5 1.4.1.6 1.4.1.7 1.4.1.8 1.4.1.9 Designated Spokesperson - PIM #3.
1.4.1.5      Technical Briefer - PIM #5.
Facility Manager - PIM #4.
1.4.1.6    Media Monitor - PIM #6.
Technical Briefer - PIM #5.
1.4.1.7    Public Information Officer - PIM #7.
Media Monitor - PIM #6.
1.4.1.8    Rumor Control - PIM #8.
Public Information Officer - PIM #7.
1.4.1.9    Employee Information - PIM #9.
Rumor Control - PIM #8.
: 2. REFERENCE 2.1   Emergency Plan Implementing Procedure 5.7.1, Emergency Classification.
Employee Information - PIM #9.
2.2   Emergency Plan Implementing Procedure 5.7.6, Notification.
: 2.
I     PROCEDURE 5.7.23             1       REVISION 4           1 PAGE 16 OF 16 j
REFERENCE 2.1 Emergency Plan Implementing Procedure 5.7.1, Emergency Classification.
2.2 Emergency Plan Implementing Procedure 5.7.6, Notification.
I PROCEDURE 5.7.23 1
REVISION 4 1
PAGE 16 OF 16 j


USE: REFERENCE EFEC E: /60 CNS  OPERATIONS MANUAL                                          APPROVA: SOR0 EPIP PROCEDURE 5.7.25 APPROVAL: SORC OWNER: J. G. KELSAY RECOVERY OPERATIONS                                               DERTMENT: EP DEPARTMENT: EP
USE: REFERENCE CNS OPERATIONS MANUAL EFEC E:  
: 1. PU RP O SE ............................................................                         1
/60 EPIP PROCEDURE 5.7.25 APPROVA: SOR0 APPROVAL: SORC OWNER: J. G. KELSAY RECOVERY OPERATIONS DERTMENT: EP DEPARTMENT: EP
: 2. PRECAUTIONS AND LIMITATIONS .....................................                                1
: 1.
: 3. REQUIREM ENTS ......................................................                             1
PU R P O SE............................................................
: 4. DETERMINATION OF STATION DAMAGE AND CONTAMINATION ..........                                     2
1
: 5. REPAIR, MODIFICATION, AND DECONTAMINATION ......................                                 3
: 2.
: 6. NRC RESPONSE ......................................................                             3 ATTACHMENT 1                 INFORMATION SHEET ..............................                   5
PRECAUTIONS AND LIMITATIONS 1
: 1. PURPOSE This procedure describes the general guidelines used to determine whether or not an emergency is under control, the damage and radiological surveys necessary prior to recovery operations, and the organizational control of recovery operations.
: 3.
: 2. PRECAUTIONS AND LIMITATIONS
REQUIREM ENTS......................................................
[ ] 2.1     Following any emergency involving radiological hazards, exposure to personnel should be kept as low as reasonably achievable consistent with the nature of the recovery operation required.
1
[ ] 2.2   Recovery operations commence with the station in a controlled, stable condition. No action is to be taken which might jeopardize this condition without the approval of the Site Vice President.
: 4.
[ ] 2.3   Continually monitor station conditions. Be prepared to re-escalate the Emergency Class should conditions degrade.
DETERMINATION OF STATION DAMAGE AND CONTAMINATION..........
: 3. REQUIREMENTS
2
[ ] 3.1   Ensure the following equipment and materials are available, as needed:
: 5.
[]   3.1.1     Recovery operations will be performed using existing station equipment to the maximum extent possible. Special and/or additional equipment will be obtained when required to complete the recovery operation in a safe and efficient manner.
REPAIR, MODIFICATION, AND DECONTAMINATION......................
[ 1 3.2   Radiation levels are stable or decreasing with time.
3
[ ] 3.3   Releases of radioactive materials to the environment have ceased or are controlled within permissible license limits.
: 6.
PROCEDURE 5.7.25                                             REVISION 16         PAGE 1 OF 5
NRC RESPONSE......................................................
3 ATTACHMENT 1 INFORMATION SHEET..............................
5
: 1.
PURPOSE This procedure describes the general guidelines used to determine whether or not an emergency is under control, the damage and radiological surveys necessary prior to recovery operations, and the organizational control of recovery operations.
: 2.
PRECAUTIONS AND LIMITATIONS
[ ] 2.1 Following any emergency involving radiological hazards, exposure to personnel should be kept as low as reasonably achievable consistent with the nature of the recovery operation required.
[ ] 2.2 Recovery operations commence with the station in a controlled, stable condition. No action is to be taken which might jeopardize this condition without the approval of the Site Vice President.
[ ] 2.3 Continually monitor station conditions. Be prepared to re-escalate the Emergency Class should conditions degrade.
: 3.
REQUIREMENTS
[ ] 3.1 Ensure the following equipment and materials are available, as needed:
[ ]
3.1.1 Recovery operations will be performed using existing station equipment to the maximum extent possible. Special and/or additional equipment will be obtained when required to complete the recovery operation in a safe and efficient manner.
[ 1 3.2 Radiation levels are stable or decreasing with time.
[ ] 3.3 Releases of radioactive materials to the environment have ceased or are controlled within permissible license limits.
PROCEDURE 5.7.25 REVISION 16 PAGE 1 OF 5


[ ] 3.4   Fire, flooding, or other similar emergency conditions no longer constitute a hazard to the station or station personnel.
[ ] 3.4 Fire, flooding, or other similar emergency conditions no longer constitute a hazard to the station or station personnel.
[ 3.5   Measures have been successfully instituted to correct or compensate for malfunctioning equipment or barriers designed to contain radioactive materials.
[ 3.5 Measures have been successfully instituted to correct or compensate for malfunctioning equipment or barriers designed to contain radioactive materials.
: 4. DETERMINATION OF STATION DAMAGE AND CONTAMINATION
: 4.
[]   4.1   INITIAL STATION SURVEY
DETERMINATION OF STATION DAMAGE AND CONTAMINATION
[]   4.1.1     For known or significant station damage, and at the discretion of the Plant Manager, survey teams will be formed consisting of Operations, Engineering, Maintenance, and Radiological Protection personnel.
[]
[]   4.1.2     These teams, following pertinent guidance contained in Procedure 5.7.15, will perform an organized survey of the station to ascertain the extent of physical damage and areas of contamination/high radiation. The results of these initial surveys will be used by the Plant Manager and Radiological Manager in planning the detailed surveys described below.
4.1 INITIAL STATION SURVEY
[] 4.2   DETAILED STATION SURVEYS
[ ]
[]   4.2.1     Using the information obtained above, the Radiological Manager will dispatch properly equipped Radiological Protection Technicians to perform detailed surveys of any areas known to contain radiological hazards.
4.1.1 For known or significant station damage, and at the discretion of the Plant Manager, survey teams will be formed consisting of Operations, Engineering, Maintenance, and Radiological Protection personnel.
[]       4.2.1.1     Each area shall be posted and access controlled per Radiological Protection procedures.
[ ]
[1       4.2.1.2     Station Radiological Survey Maps will be used to record the boundaries of these areas.
4.1.2 These teams, following pertinent guidance contained in Procedure 5.7.15, will perform an organized survey of the station to ascertain the extent of physical damage and areas of contamination/high radiation. The results of these initial surveys will be used by the Plant Manager and Radiological Manager in planning the detailed surveys described below.
[ 3     4.2.1.3     Station Chemistry Technicians may be dispatched to take and analyze a reactor coolant sample if conditions dictate.
[]
[]       4.2.1.4     Provisions have been made to take and analyze coolant and containment samples within 3 hours of the time a decision is made that samples are required.
4.2 DETAILED STATION SURVEYS
I       PROCEDURE 5.7.25               1     REVISION 16           1   PAGE 2 OF 5
[ ]
: 5. REPAIR, MODIFICATION, AND DECONTAMINATION
4.2.1 Using the information obtained above, the Radiological Manager will dispatch properly equipped Radiological Protection Technicians to perform detailed surveys of any areas known to contain radiological hazards.
[]   5.1   PLANNING
[ ]
[]     5.1.1   Activities such as modification, decontamination, installation, repair, and maintenance of existing station system components and determining the need for additional manpower, portable shielding, special procedures, environmental concerns, etc., will be discussed, prioritized, and planned.
4.2.1.1 Each area shall be posted and access controlled per Radiological Protection procedures.
[ ]   5.1.2   Scheduling Manager and Maintenance Manager will develop an overall schedule to guide, track, and expedite the recovery effort.
[1 4.2.1.2 Station Radiological Survey Maps will be used to record the boundaries of these areas.
[]   5.2   TRAINING
[ 3 4.2.1.3 Station Chemistry Technicians may be dispatched to take and analyze a reactor coolant sample if conditions dictate.
[]     5.2.1   CNS Training Manager will coordinate the development and conduct of specific training for personnel needed to assist in recovery operations. Special training materials will be developed and training conducted as needed for special work tasks.
[ ]
[ ]5.3     RECOVERY IMPLEMENTATION
4.2.1.4 Provisions have been made to take and analyze coolant and containment samples within 3 hours of the time a decision is made that samples are required.
[]   5.3.1   Normal station practices will be followed concerning maintenance, repair, modification, decontamination, and personnel exposure control wherever practical.
I PROCEDURE 5.7.25 1
[]   5.3.2   Radiological Manager, in coordination with state and federal officials, will periodically estimate total population exposure.
REVISION 16 1
[ J   5.3.3   As recovery operations proceed, any unforeseen problems encountered will be evaluated and factored into the recovery plan. The schedule will be adjusted accordingly.
PAGE 2 OF 5
[]   5.3.4   Technical Specification, Technical Requirements Manual, and Off-Site Dose Assessment Manual compliance will be verified prior to resuming normal station operations.
: 5.
: 6. NRC RESPONSE
REPAIR, MODIFICATION, AND DECONTAMINATION
[ J 6.1   During an accident, NRC response may be expected for all severe events resulting in the declaration of an Emergency Classification. Provisions have been made to accommodate these co-located, advisory personnel.
[]
I       PROCEDURE 5.7.25               1       REVISION 16         1     PAGE 3 OF 5     1
5.1 PLANNING
[ ]
5.1.1 Activities such as modification, decontamination, installation, repair, and maintenance of existing station system components and determining the need for additional manpower, portable shielding, special procedures, environmental concerns, etc., will be discussed, prioritized, and planned.
[ ]
5.1.2 Scheduling Manager and Maintenance Manager will develop an overall schedule to guide, track, and expedite the recovery effort.
[]
5.2 TRAINING
[ ]
5.2.1 CNS Training Manager will coordinate the development and conduct of specific training for personnel needed to assist in recovery operations. Special training materials will be developed and training conducted as needed for special work tasks.
[ ]5.3 RECOVERY IMPLEMENTATION
[ ]
5.3.1 Normal station practices will be followed concerning maintenance, repair, modification, decontamination, and personnel exposure control wherever practical.
[ ]
5.3.2 Radiological Manager, in coordination with state and federal officials, will periodically estimate total population exposure.
[ J 5.3.3 As recovery operations proceed, any unforeseen problems encountered will be evaluated and factored into the recovery plan. The schedule will be adjusted accordingly.
[ ]
5.3.4 Technical Specification, Technical Requirements Manual, and Off-Site Dose Assessment Manual compliance will be verified prior to resuming normal station operations.
: 6.
NRC RESPONSE
[ J 6.1 During an accident, NRC response may be expected for all severe events resulting in the declaration of an Emergency Classification. Provisions have been made to accommodate these co-located, advisory personnel.
I PROCEDURE 5.7.25 1
REVISION 16 1
PAGE 3 OF 5 1


[] 6.2 POST-ACCIDENT
[] 6.2 POST-ACCIDENT
    ] 6.2.1 Depending upon the severity of the event or equipment involved, the NRC may decide to form an Incident Investigation Team for dispatch to the site. Every effort will be made to accommodate and cooperate with this team in their investigation. The primary contact for this team will be the Site Vice President.
]
I     PROCEDURE 5.7.25           1       REVISION 16         1   PAGE 4 OF 5   1
6.2.1 Depending upon the severity of the event or equipment involved, the NRC may decide to form an Incident Investigation Team for dispatch to the site. Every effort will be made to accommodate and cooperate with this team in their investigation. The primary contact for this team will be the Site Vice President.
I PROCEDURE 5.7.25 1
REVISION 16 1
PAGE 4 OF 5 1


ATTACHMENT 1           INFORMATION SHEET DISCUSSION 1.1   Recovery operations allow for the smooth transition from Emergency Response Organization operations to normal operations with the safety of the public and station personnel being of the utmost priority.
ATTACHMENT 1 INFORMATION SHEET DISCUSSION 1.1 Recovery operations allow for the smooth transition from Emergency Response Organization operations to normal operations with the safety of the public and station personnel being of the utmost priority.
1.2   Based on the consideration of general guidelines, the Emergency Director shall determine the emergency to be under control and activate the Recovery Panel as per Section 9.0 of the Emergency Plan.
1.2 Based on the consideration of general guidelines, the Emergency Director shall determine the emergency to be under control and activate the Recovery Panel as per Section 9.0 of the Emergency Plan.
1.3   The purpose of the Recovery Panel is to evaluate emergency termination considerations, plant status parameters, and plan for and implement recovery operations. Based upon Recovery Panel discussions, the Site Vice President or designee may initiate the Recovery Organization.
1.3 The purpose of the Recovery Panel is to evaluate emergency termination considerations, plant status parameters, and plan for and implement recovery operations. Based upon Recovery Panel discussions, the Site Vice President or designee may initiate the Recovery Organization.
1.4   The Recovery Organization as defined in Section 9.0 of the Emergency Plan is made up of the normal Nuclear Power Group organization as Recovery operations will be handled much the same as outage operations, under the control of the Site Vice President or designee.
1.4 The Recovery Organization as defined in Section 9.0 of the Emergency Plan is made up of the normal Nuclear Power Group organization as Recovery operations will be handled much the same as outage operations, under the control of the Site Vice President or designee.
: 2. REFERENCES 2.1   CODES AND STANDARDS 2.1.1     NPPD Emergency Plan for CNS.
: 2.
2.1.2     NUREG 0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
REFERENCES 2.1 CODES AND STANDARDS 2.1.1 NPPD Emergency Plan for CNS.
2.1.3   NUREG 0737, Clarification of TMI Action Plan Requirements, November 1980.
2.1.2 NUREG 0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
2.2   PROCEDURES 2.2.1   Emergency Plan Implementing Procedure 5.7.15, OSC Team Dispatch.
2.1.3 NUREG 0737, Clarification of TMI Action Plan Requirements, November 1980.
2.2.2     Emergency Plan Implementing Procedure 5.7.23, Activation of the JIC.
2.2 PROCEDURES 2.2.1 Emergency Plan Implementing Procedure 5.7.15, OSC Team Dispatch.
I       PROCEDURE 5.7.25               1     REVISION 16         1   PAGE 5 OF 5}}
2.2.2 Emergency Plan Implementing Procedure 5.7.23, Activation of the JIC.
I PROCEDURE 5.7.25 1
REVISION 16 1
PAGE 5 OF 5}}

Latest revision as of 16:27, 16 January 2025

Emergency Plan Implementing Procedures
ML022120558
Person / Time
Site: Cooper 
Issue date: 07/25/2002
From: Hutton J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2002091
Download: ML022120558 (116)


Text

N Nebraska Public Power District Nebraska's Energy Leader NLS2002091 July 25, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Emergency Plan Implementing Procedures Cooper Nuclear Station, NRC Docket 50-298, DPR-46 Pursuant to the requirements of 10 CFR 50, Appendix E, Section V. "Implementing Procedures,'

Nebraska Public Power District is transmitting the following Emergency Plan Implementing Procedures (EPIPs):

EPIP 5.7ENS EPIP 5.7.2 EPIP 5.7.6 EPIP 5.7.21 EPIP 5.7.23 EPIP 5.7.25 Revision 0 Revision 17 Revision 35 Revision 25 Revision 4 Revision 16 "ENS Communicator" "Shift Supervisor EPIP" "Notification" "Maintaining Emergency Preparedness Emergency Exercises, Drills, Tests, and Evaluations" "Activation of the JIC" "Recovery Operations" Should you have any questions concerning this matter, please contact me.

/

'ce~

A. Hutton Plant Manager

/nr Enclosures cc: Regional Administrator w/enclosures (2)

USNRC - Region IV Senior Resident Inspector w/enclosures USNRC NPG Distribution w/o enclosures Records w/o enclosures Cooper Nuclear Station P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http //wwv.nppd.com

I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2002091 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None 1-1i t

PROCEDURE 0.42 REVISION 11 PAGE 13 OF 16 i

i i

USE: REFERENCE CNS OPERATIONS MANUAL EFEC E:

/80 PROCEURE 57ENSEFFECTIVE:

6/28/02 PROCEDURE 5.7ENS APOA:SR APPROVAL: SORC OWNER: EP MGR ENS COMMUNICATOR DEPARTMENT: EP

1.

P U R P O SE............................................................

1

2.

PRECAUTIONS AND LIMITATIONS 1

3.

IN STRU CTIO N S.......................................................

1

4.

R E C O R D S............................................................

3 ATTACHMENT 1 INSTRUCTIONS FOR USE OF HELLO DIRECT HEADSET

................................................... 4 ATTACHMENT 2 NRC COMMUNICATION GUIDE.......................

5 ATTACHMENT 3 ENS COMMUNICATOR QUESTION TRACKING LOG..... 6 ATTACHMENT 4 INFORMATION SHEET..............................

9

1.

PURPOSE This procedure outlines the ERO duties performed by the ENS Communicator during a declared emergency. The ENS Communicator provides continuous communication with the NRC when requested to do so.

2.

PRECAUTIONS AND LIMITATIONS

[ ] 2.1 This procedure does not need to be performed in the sequence listed as long as the user ensures all applicable steps are performed in a logical sequence and procedure intent and results are not altered.

3.

INSTRUCTIONS

[ ] 3.1 Assume of ENS Communicator position.

[ ]

3.1.1 Verify communications devices function.

[1 3.1.1.1 Telephone.

[1 3.1.1.2 ENS telephone.

[ ]

3.1.1.3 If available, HELLO direct headset (Attachment 1 has instructions for operating HELLO direct headset).

[ ] 3.2 Maintain a log on Attachment 3 using guidance in Attachment 2.

I PROCEDURE 5.7ENS I

REVISION 0 1

PAGE 1 OF 9 1

[ ] 3.3 Obtain a turnover from the Control Room Shift Communicator.

[ ]

3.3.1 Obtain a copy of the Notification Reports previously sent to the State, County, or NRC or other information provided to the NRC.

[ ] 3.4 Report to the Emergency Director when ready to assume responsibilities.

[ ] 3.5 Verify that the NRC Senior Resident Inspector or another assigned NRC Inspector was contacted by the Shift Communicator.

[ ]

3.5.1 If not contacted, then page NRC Inspector. Phone and pager numbers for the NRC Resident staff are located in the Emergency Telephone Directory - "Federal Tab".

[ ] 3.6 Establish communications with the NRC Operations Center (NRCOC) via ENS.

[ ]

3.6.1 If the ENS line become inoperable, contact the NRC Operations Duty Officer via the commercial phone number located in the Emergency Telephone Directory - "Federal Tab".

[ ] 3.7 Perform ENS communications.

[ ]

3.7.1 Use NRC Information Notice 98-08 (Attachment 2 as a guide for anticipating potential questions from the NRC with regard to plant status.

[ ]

3.7.2 Maintain a log of key information discussed with the NRC on or a similar form.

[ I NOTE - ENS Communicator may leave communications for brief periods to obtain information.

[ ] 3.8 Review proposed responses with the Emergency Director or specific designee prior to responding to the NRC, except for plant data clarifications, general system design, or other basic info known with certainty.

[ ] 3.9 Conduct shift turnover as necessary.

[ ]

3.9.1 Review log of past events and open questions.

[ ]

3.9.2 Ensure NRCOC Duty Officer is aware of new Communicator by name.

I PROCEDURE 5.7ENS I

REVISION 0 PAGE 2 OF 9

[ ] 3.10 Inform Emergency Director to request Licencing Department to review ENS Communicator Logs for 50.72 applicability.

[ ]

3.10.1 Include a copy of Attachment 3 and additional logs documenting information provided to NRC as part of the Post-Event Review paperwork per Procedure 2.0.6.

4.

RECORDS

[ ] 4.1 Entire procedure and supporting logs following an actual emergency is given to Emergency Preparedness Coordinator (quality record upon completion).

I PROCEDURE 5.7ENS I

REVISION 0 1

PAGE 3 OF 9 1

ATTACHMENT 1 INSTRUCTIONS FOR USE OF HELLO DIRECT HEADSET TO INITIATE 1.1 Put on telephone headset and pull microphone boom to the full down position.

1.2 Lift telephone handset from cradle and set aside.

1.3 Dial telephone number.

1.4 Talk on black headset when party answers.

1.4.1 The microphone may be muted by raising it halfway. This allows the user to shut off the microphone and still hear the conversation of others on the intercom.

1.4.2 A rotating volume control wheel is located on the headset, earphone side, above where the microphone is attached.

2.

TO TERMINATE 2.1 Return telephone handset to cradle.

2.2 Put headset microphone boom in full up position.

2.3 Return headset to base.

I PROCEDURE 5.7ENS I

REVISION 0 1

PAGE 4 OF 9

C H M E N T 2 N R C C O M M U N ICA TIO N G U ID E The level of communication between NRC and CNS will depend on the development and the significance of the event.

In Communicating with the NRCOC, attempt the following:

o Take control of communications.

o Direct the NRC to provide single specific questions.

o Write down the question, then verify (e.g., three part communication).

o Provide answer personally only if answer is something you know with certainty and pertains to plant data clarification, general system design, etc.

o Use references (Procedures, Drawings, Manuals, etc.), where applicable, to verify answer. Never say "I think..... "; hearsay is unacceptable.

o Other questions should be reviewed with Emergency Director or TSC Director if related to emergency actions or policy (state/counties actions, PARs) prior to releasing information to the NRC.

o As guide to information inquiry: Plant Systems - Ops EOP Advisor, Security Security Coordinator, Design Basis - Engineering Coordinator.

The following is a list of sample questions that may be asked during an emergency and should be verified with the Emergency Director prior to reply:

o Is there any change to the classification? If so, what is the reason?

o What is the ongoing/imminent damage to the facility, including affected equipment and safety features?

o Have toxic or radiological releases occurred or been projected, including changes in the release rate? If so, what are the projected on-site and off-site releases, and what is the basis of assessment?

o What are the health effect/consequences to on-site/off-site people? How many on-site/off-site people are/will be affected and to what extent?

o Is the event under control? When was control established or what is the planned action to bring the event under control? What is the mitigative action underway or planned?

o What on-site protective measures have been taken or planned?

o What off-site protective actions have been recommended to State/local officials?

o What is the status of State/local/other Federal agencies' response, if known?

o If applicable, what is the status of public information activities, such as alarm, broadcast, or press releases (CNS/State/local/other Federal agencies)? Has a Joint Information Center been activated?

PROCEDURE 5.7ENS I

REVISION 0 PAGE 5 OF 9

ATTACHMENT 3 ENS COMMUNICATOR QUESTION TRACKING LOG DATE:

RESPONSE/INFORMATION TIME OF QUESTION/INFORMATION NAME OF PROVIDED (INCLUDING CLOSED TIME INQUIRY REQUESTED REQUESTOR REFERENCE DOCUMENTS)

(I)

CLOSED PROCEDURE 5.7ENS REVISION 0 1

PAGE 6 OF 9 t

I

+

t 1-4 1

I t

L _____________________________________________

a

ATTACHMENT 3 ENS COMMUNICATOR QUESTION TRACKING LOG DATE:

RESPONSE/INFORMATION TIME OF QUESTION/INFORMATION NAME OF PROVIDED (INCLUDING CLOSED TIME INQUIRY REQUESTED REQUESTOR REFERENCE DOCUMENTS)

(__)

CLOSED I

PROCEDURE 5.7ENS REVISION 0 1

PAGE7 OF9 4-

+

+

4-4 4

t

ATTACHMENT 3 ENS COMMUNICATOR QUESTION TRACKING LOG DATE:

RESPONSE/INFORMATION TIME OF QUESTION/INFORMATION NAME OF PROVIDED (INCLUDING CLOSED TIME INQUIRY REQUESTED REQUESTOR REFERENCE DOCUMENTS)

(I)

CLOSED PROCEDURE 5.7ENS REVISION 0 PAGE8 OF 9

.1.

4 I

.1 _____________________________________________

a h

ATTACHMENT 4 INFORMATION SHEET REFERENCES 1.1 CODES AND STANDARDS 1.1.1 NPPD Emergency Plan for CNS.

1.1.2 NUREG 0654/FEMA-REP-1, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

1.1.3 10CFR50.72.

1.2 PROCEDURES 1.2.1 Conduct of Operations Procedure 2.0.6, Operational Event Response and Review.

1.3 MISCELLANEOUS 1.3.1 NRC Information Notice 98-08.

1.3.2 Emergency Telephone Directory - "Federal Tab".

I PROCEDURE 5.7ENS I

REVISION 0 1

PAGE 9 OF9 9

USE: REFERENCE CNS OPERATIONS MANUAL EFEC E:

6 EPIP PROCEDURE 5.7.2 APPROVA: SORC APPROVAL: SORC OWNER: R. J. FISCHER SHIFT SUPERVISOR EPIP DEPARTMNT EP

.DEPARTMENT: EP

1.

P U R P O SE............................................................

1

2.

PRECAUTIONS AND LIMITATIONS 1

3.

REQU IREM EN TS......................................................

1

4.

INITIAL A CTIO NS.....................................................

2

5.

RECORDS.............................................................

2 ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT

... 3 ATTACHMENT 2 ACTIONS FOR AN ALERT............................

8 ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY..............

14 ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY...............

21 ATTACHMENT 5 SHIFT SUPERVISOR ACTIONS WHEN ANOTHER INDIVIDUAL IS EMERGENCY DIRECTOR.............

27 ATTACHMENT 6 ALTERNATE NOTIFICATION METHODS..............

28 ATTACHMENT 7 EMERGENCY DIRECTOR TURNOVER................

31 ATTACHMENT 8 ANNOUNCEMENTS WITH ERFS ACTIVATED..........

34 ATTACHMENT 9 INFORMATION SHEET.............................

35

1.

PURPOSE This procedure provides a series of actions to be taken by Shift Supervisor upon declaration of an Emergency Classification.

2.

PRECAUTIONS AND LIMITATIONS

[ ] 2.1 Shift Supervisor shall initially assume role of Emergency Director and will be Emergency Director until relieved by another qualified Emergency Director.

[ ] 2.2 If an Alert, a Site Area Emergency, or General Emergency is reached, do not reclassify to a lower classification or terminate Emergency until Emergency Response Facilities are activated.

3.

REQUIREMENTS

[ ] 3.1 An Emergency has been declared per Procedure 5.7.1.

[ ] 3.2 Procedure steps in Section 4 and Attachments 1, 2, 3, and 4 may be performed out of listed order, if needed to more efficiently deal with emergency situation.

PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 1 OF 37

INITIAL ACTIONS 4.1 Shift Supervisor, immediately following classification of an emergency, should announce following to Control Room Staff:

[ ]

4.1.1 Time of classification.

[]

[]

[]

4.2 4.3

[]

[]

[]

[I Time:

4.1.2 Level of emergency classification.

Class:

4.1.3 EAL on which classification is based.

EAL #:

4.1.4 Description of condition causing classification.

Ensure Shift Communicator has been called to Control Room.

Enter Attachment for applicable Classification Level.

4.3.1, ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT.

4.3.2, ACTIONS FOR AN ALERT.

4.3.3, ACTIONS FOR SITE AREA EMERGENCY.

4.3.4, ACTIONS FOR GENERAL EMERGENCY.

RECORDS 5.1 Completed portions and Attachments are sent to the EP Manager for CNS Records (quality records upon completion).

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 2 OF 37 1

4.

[ ]

[I

[I

5.

[]

I ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT

1.

[]

ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT 1.1 Inform ERO personnel of Notification of Unusual Event via CNS Automated Notification System (ANS).

[ ]

1.1.1 On telephone with ANS Activation Module, activate ANS by:

[1 1.1.1.1 Picking up telephone.

[ ]

NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.

[ ]

1.1.1.2 When dial tone received, depress ACTIVATE DIALOGICS pushbutton.

[ ]

1.1.1.3 When voice asks for Scenario Password, depress one of following:

[ ]

a.

"100 SCENARIO" pushbutton for normal NOUE.

[ ]

b.

"222 SCENARIO" pushbutton to activate on-site ERFs.

[ ]

c.

"333 SCENARIO" pushbutton to activate AEOF.

[ ]

1.1.1.4 When ANS tells you goodby, hang up.

[ ]

1.1.2 If ANS or telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per.

[ ] NOTE 1 - Accountability and personnel assembly is not required at NOUE level; however, it may be performed.

[] NOTE 2 - Accountability should not be performed if performing accountability will additionally THREATEN PERSONNEL SAFETY.©

[]

1.2 Determine if personnel assembly and accountability will be performed.

[ ]

1.2.1 If accountability will not be performed, go to Step 1.3.

[ ]

1.2.2 If accountability will be performed, go to Step 1.4.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 3 OF 37

]

ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT

[ ] NOTE - Personnel assembly and accountability is not required at NOUE level; however, it may be performed.

[ ]

1.3 If personnel assembly and accountability will not be performed, perform following:

[I All personnel stay clear of (2)

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 4 OF 37 1.3.1 If desired, fill in blanks of Step 1.3.3:

[ ]

1.3.1.1 In (1), give a brief description of emergency event and if applicable, location.

[ ]

1.3.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.

Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel.

Any precautions needed for security events/severe weather conditions.

1.3.2 Activate Emergency Alarm for 10 seconds.

1.3.3 Make following announcement over station Gaitronics:

Attention All Station Personnel, at Emergency Director declared

[time]

a Notification of Unusual Event.

There is (1)

[1

[l Activate Emergency Alarm for 10 seconds and repeat announcement.

ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT

[ ] NOTE - Accountability should not be performed, if performing accountability will additionally THREATEN PERSONNEL SAFETY.©

[ ]1.4 If assembly and accountability is desired for NOUE, perform following:

[1 1.4.1 If desired, fill in blanks of Step 1.4.3.

[ ]

1.4.1.1 In (1), give a brief description of emergency event and if applicable, location.

[1 1.4.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.

Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel.

Any precautions needed for security events/severe weather conditions.

[ ]

1.4.2 Activate Emergency Alarm for 10 seconds.

[ ]

1.4.3 Make following announcement over station Gaitronics:

Attention All Station Personnel, at Emergency Director declared a

[time]

Notification of Unusual Event.

There is (1)

All personnel report to your Designated Assembly Areas for initial accountability.

All personnel stay clear of (2)

Activate Emergency Alarm for 10 seconds and repeat announcement.

PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 5 OF 37

I ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT I

[ ]

1.5 Record time announcement completed.

Time:

[ ] 1.6 Direct someone to complete CNS Notification form per Procedure 5.7.6.

[ ]

1.6.1 For NOUE, recommended PAR is "None".

[ ]

1.6.2 Review and sign completed Notification form to authorize transmittal to state and local authorities.

[ ] 1.7 Ensure initial notification with PAR, to responsible state and local governmental agencies completed within 15 minutes of declaration.

[ ]

1.7.1 Record time state and local authorities contacted.

Time:

[ ] 1.8 During performance of subsequent steps in this Attachment, monitor plant conditions and re-evaluate emergency classification as conditions change per Procedure 5.7.1. Escalate to a higher emergency classification if conditions warrant.

[ ]

1.8.1 If reclassification is performed, ensure NRC notification 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time limit is completed and tracked.

[ ]

1.8.2 If reclassification is performed, proceed to Step 1.11.

[ ]1.9 Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies and not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after time of declaration of Notification of Unusual Event.

[ 1 1.9.1 Record time NRC duty officer is contacted.

[]

1.10 Time:

If assembly and accountability is being performed for NOUE, perform following:

[1 1.10.1 Ensure Designated Assembly Area Supervisor for the Control Room is completing initial accountability of Operations personnel per Procedure 5.7.10.

[ ]

1.10.2 Ensure initial accountability completed within 30 minutes per Procedure 5.7.10.

[ ]

1.10.2.1 Record time initial accountability completed.

Time:

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 6 OF 37 j

ATTACHMENT 1 ACTIONS FOR NOTIFICATION OF UNUSUAL EVENT

[ ]

1.11 If escalating to another emergency classification, perform following:

[ ]

1.11.1 Announce following to Control Room Staff:

[ ]

1.11.1.1 Time of classification.

Time:

[1 1.11.1.2 Level of emergency classification.

Class:

[ ]

1.11.1.3 EAL on which classification is based.

EAL#:

[ ]

1.11.1.4 Description of condition causing classification.

[ ]

1.11.2 Exit this Attachment and enter Attachment for applicable Classification level.

] NOTE - Normally Shift Supervisor remains Emergency Director when at a Notification of Unusual Event. However, another qualified Emergency Director may relieve Shift Supervisor as Emergency Director.

[ ]

1.12 Turnover Emergency Director duties when relieved by another qualified Emergency Director.

[ ]

1.12.1 Use Attachment 7 to turnover to oncoming Emergency Director.

[ ]

1.12.2 Announce to Control Room who Emergency Director is.

[ 3 1.12.3 Exit this Attachment and enter Attachment 5.

[ ]1.13 Terminate emergency, if appropriate per Procedure 5.7.6.

[ ]

1.13.1 If emergency is terminated, provide notification of termination to responsible state and local governmental agencies per Procedure 5.7.6.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 7 OF 37

ATTACHMENT 2 ACTIONS FOR AN ALERT ACTIONS FOR AN ALERT

[ ]

CAUTION - Do not re-activate Automated Notification System if Emergency Response Facilities are already being activated.

[ ] 1.1 If not previously performed, initiate ERO activation by:

]

1.1.1 Determine if ERO personnel will report to on-site Facilities or to AEOF.

[ ]

1.1.2 On telephone with ANS Activation Module, activate ANS by:

[ ]

1.1.2.1 Picking up telephone.

[]

NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.

[ ]

1.1.2.2 When dial tone received, depress ACTIVATE DIALOGICS pushbutton.

[ ]

1.1.2.3 When voice asks for Scenario Password, depress one of following:

[1

a.

"222 SCENARIO" pushbutton to activate on-site ERFs.

[ ]

b.

"333 SCENARIO" pushbutton to activate AEOF.

[ ]

1.1.2.4 When ANS tells you goodby, hang up.

[ ]

1.1.3 If ANS or telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per Attachment 6.

[ ]NOTE - Accountability will be performed if not previously performed and performing accountability will not additionally THREATEN PERSONNEL SAFETY.©

[

1.2 Determine if personnel assembly and accountability will be performed.

[ ]

1.2.1 If accountability will be performed, go to Step 1.3.

[ ]

1.2.2 If accountability will not be performed, go to Step 1.4.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 8 OF 37

ATTACHMENT 2 ACTIONS FOR AN ALERT 1.3 Notify personnel and initiate personnel assembly and accountability by:

[ ]

1.3.1 If desired, fill in blanks below for Step 1.3.3.

[ ]

1.3.1.1 In (1), give a brief description of emergency event and if applicable, location.

[ ]

1.3.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.

Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.

Any precautions needed for security events/severe weather conditions.

[ ]

1.3.2 Activate Emergency Alarm for 10 seconds.

[ ]

1.3.3 Announce following over station Gaitronics:

Attention All Station Personnel, at _,

Emergency Director

[time]

declared an ALERT.

There is (1)

All personnel report to your Designated Assembly Areas for initial accountability.

All personnel stay clear of (2)

Activate Emergency Alarm for 10 seconds and repeat announcement.

PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 9 OF 37

ATTACHMENT 2 ACTIONS FOR AN ALERT 1.4 Notify station personnel WITHOUT personnel assembly and accountability by:

[ ]

1.4.1 If desired, fill in blanks below for Step 1.4.3.

[ ]

1.4.1.1 In (1), give a brief description of emergency event and if applicable, location.

[1 1.4.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.

Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.

Any precautions needed for security events/severe weather conditions.

[1 1.4.2 Activate Emergency Alarm for 10 seconds.

[ ]

1.4.3 Announce following over station Gaitronics:

Attention All Station Personnel, at Emergency Director

[time]

declared an ALERT.

There is (1)

All personnel stay clear of (2)

Activate Emergency Alarm for 10 seconds and repeat announcement.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 10 OF 37

ATTACHMENT 2 ACTIONS FOR AN ALERT

[1 1.5 Record time announcement completed.

Time:

[ ]1.6 Direct on watch individual to complete CNS Notification form per Procedure 5.7.6.

[1 1.6.1 For an ALERT, recommended PAR is "None".

[ ]

1.6.2 Review and sign completed Notification form to authorize transmittal to state and local authorities.

1.7 Ensure initial notification with PAR to responsible state and local governmental agencies is completed within 15 minutes of declaration of emergency class per Procedure 5.7.6.

1.7.1 Record time state and local authorities contacted.

Time:

[ ]

1.8 If not previously performed, ensure ERO pager activation has occurred by one of the following methods:

[ ]

1.8.1 Activation of Control Room or Shift Manager's pager, or

[ ]

1.8.2 ANS activation by calling Ext. 5560 and verifying ANS indicates an active scenario.

[ ]1.9 If ANS fails to activate pagers, have an individual concurrently activate backup notification methods per Attachment 6.

[ ]

1.10 During performance of subsequent steps in this Attachment, monitor plant conditions and re-evaluate emergency classification as conditions change per Procedure 5.7.1. Escalate to a higher emergency classification if conditions warrant.

[I]

1.10.1 If reclassification is performed, ensure NRC and ERDS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time limits are completed and tracked.

[ ]

1.10.2 If reclassification is performed, proceed to Step 1.19.

[ ]

1.11 If a release is in progress, have a dose calculation performed per Procedure 5.7.17 to determine if a higher classification is warranted.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 11 OF 37

[I

[]

ATTACHMENT 2 ACTIONS FOR AN ALERT I

[ ] 1.12 Ensure Emergency Response Data Systems (ERDS) is activated using PMIS START/STOP Menu. This shall be done as soon as possible but not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after time of declaration of an ALERT or higher classification.

[ ]

1.12.1 Record time ERDS activated.

[]

1.13 Time:

Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies, and not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after declaration of emergency.

[1 1.13.1 Record Time NRC duty officer is contacted.

[]

1.14 Time:

Ensure initial accountability of Operations personnel is completed.

[1 ]1.15 If any of following conditions exist, concurrently enter Procedure 5.7.14 for Stable Iodine Thyroid Blocking:

[ ]

1.15.1 Fuel cladding has been determined to be lost, or

[I 1.15.2 Calculated dose of >_ 25 rem (CDE) to thyroid is likely to be received, or

[ ]

1.15.3 Life saving operation is to be undertaken in areas where high levels of radio-iodine are suspected and no current air analysis is available.

[1]

1.16 Ensure initial accountability completed by:

[ ]

1.16.1 Within 30 minutes, ensure Security Coordinator reports when initial accountability is complete.

[ ]

1.16.2 If accountability was not initiated due to personnel safety concerns, monitor plant/site conditions and when personnel safety concern has passed, initiate personnel assembly and accountability.

[1 1.16.3 Record time initial accountability completed.

Time:

[1 ]1.17 Consider dismissal of all non-ERO personnel from station at ALERT classification per Procedure 5.7.11.

[1 1.18 During an ALERT or higher class emergency, perform follow-up notifications to state and local agencies at least every 60 minutes or sooner if there is a significant change in status of emergency per Procedure 5.7.6.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 12 OF 37

ATTACHMENT 2 ACTIONS FOR AN ALERT I

[1I I

PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 13 OF 37 1.19 If reclassifying to another emergency classification, perform following:

[ ]

1.19.1 Announce following to Control Room Staff.

[ ]

1.19.1.1 Time of classification.

Time:

[ ]

1.19.1.2 Level of emergency classification.

Class:

1 ]

1.19.1.3 EAL on which classification is based.

EAL:

[ ]

1.19.1.4 Description of condition causing classification.

[ ]

1.19.2 Exit this Attachment and enter Attachment for applicable Classification level.

1.20 Turnover Emergency Director duties when relieved by another qualified Emergency Director.

[ ]

1.20.1 Use Attachment 7 to turnover to oncoming Emergency Director.

[ ]

1.20.2 Announce to Control Room Staff who Emergency Director is.

[1 1.20.3 Exit this Attachment and enter Attachment 5.

[]

ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY ACTIONS FOR SITE AREA EMERGENCY SI CAUTION - Do not re-activate Automated Notification System if Emergency Response Facilities are already being activated.

[1 1.1 If not previously performed, initiate ERO Activation by:

[ ]

1.1.1 Determine if ERO personnel will report to on-site Facilities or to AEOF.

[ ]

1.1.2 On telephone with ANS Activation Module, activate ANS by:

[ ]

1.1.2.1 Picking up telephone.

[ ]

NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.

[1 1.1.2.2 When Dial Tone received, depress ACTIVATE DIALOGICS pushbutton.

[ ]

1.1.2.3 When voice asks for Scenario Password, depress one of following:

[ ]

a.

"222 SCENARIO" pushbutton to activate on-site ERFs.

[]

b.

"333 SCENARIO" pushbutton to Activate AEOF.

[ ]

1.1.2.4 When ANS tells you goodby, hang up.

[ ]

1.1.3 If ANS or telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per.

[ ]

NOTE - Accountability will be performed if not previously performed and performing accountability will not additionally THREATEN PERSONNEL SAFETY©.

[ ]1.2 Determine if personnel assembly and accountability will be performed.

[ ]

1.2.1 If accountability will be performed, go to Step 1.3.

[1 1.2.2 If accountability will not be performed, go to Step 1.4.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 14 OF 37

ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY

[1 1.3 Notify personnel and initiate personnel assembly and accountability by:

[1 1.3.1 If desired, fill in blanks below for Step 1.3.3.

[ ]

1.3.1.1 In (1), give a brief description of emergency event and if applicable, location.

[1 1.3.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.

Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.

Any precautions needed for security events/severe weather conditions.

[ ]

1.3.2 Activating Emergency Alarm for 10 seconds.

[ ]

1.3.3 Announce following over station Gaitronics:

Attention All Station Personnel, At Emergency Director

[time]

declared a SITE AREA EMERGENCY.

There is (1)

All personnel report to your Designated Assembly Areas for initial accountability.

All personnel stay clear of (2)

Activate Emergency Alarm for 10 seconds and repeat announcement.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 15 OF 37

I ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY

[]

1.4

[]

[1

[1]

Notify station personnel WITHOUT personnel assembly and accountability by:

1.4.1 If desired, fill in blanks below for Step 1.4.3.

[ ]

1.4.1.1 In (1), give a brief description of emergency event and if applicable, location.

[1 1.4.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.

Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.

Any precautions needed for security events/severe weather conditions.

1.4.2 Activate Emergency Alarm for 10 seconds.

1.4.3 Announce following over station Gaitronics:

Attention All Station Personnel, at Emergency Director

[time]

declared a SITE AREA EMERGENCY.

There is (1)

All personnel stay clear of (2)

Activate Emergency Alarm for 10 seconds and repeat announcement.

[ ] 1.5 Record time announcement completed.

Time:

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 16 OF 37 j

I ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY

[ J 1.6 Make a Protective Action Recommendation (PAR) as part of initial notifications to responsible state and local governmental agencies.

[ ]

1.6.1 If no release in progress, PAR is "None".

[ ]

1.6.2 If release in progress, perform following as needed:

[ ]

1.6.2.1 If dose calculation cannot be completed in time to meet 15 minute notification time limits, perform initial notifications with PAR of "None" and update when dose information needed for a PAR is available.

[ ]

1.6.2.2 Have dose calculation performed per Procedure 5.7.17.

[ ]

1.6.2.3 Use projected doses and Procedure 5.7.20 to make PARs.

[ ]

1.7 Direct on watch individual to complete CNS Notification form per Procedure 5.7.6.

[ ]

1.7.1 Review and sign completed Notification form to authorize transmitt*

1.8

[I

[l 1.9

[

[

]

1 al to state and local authorities.

Ensure initial notification to responsible state and local governmental agencies is completed within 15 minutes of each declaration of an emergency class per Procedure 5.7.6.

1.8.1 Record time state and local authorities contacted.

Time:

If not previously performed, ensure ERO pager activation has occurred by one of the following methods:

1.9.1 Activation of Control Room or Shift Manager's pager, or 1.9.2 ANS activation by calling Ext. 5560 and verifying ANS indicates an active scenario.

If ANS fails to activate pagers, have an individual concurrently activate backup notification methods per Attachment 6.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 17 OF 37 1

[]

[]

1.10

ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY

[ ] 1.11 During performance of subsequent steps in this Attachment, monitor plant conditions and re-evaluate emergency classification as conditions change per Procedure 5.7.1. Escalate to higher classification if conditions warrant.

[1]

1.11.1 If reclassification is performed, ensure NRC and ERDS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time limits are completed and tracked.

[ ]

1.11.2 If reclassification is performed, proceed to Step 1.21.

1.12 If not previously performed, ensure Emergency Response Data Systems (ERDS) is activated using PMIS START/STOP Menu. This shall be done as soon as possible but not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after declaration of an ALERT or higher classification.

[1 1.12.1 Record time ERDS activated.

Time:

[ ] 1.13 If release in progress or suspected, have additional dose calculations performed per Procedure 5.7.17 to determine projected off-site doses for use in determining classification and PAR.

[]

1.14 Monitor plant conditions and meteorological conditions for changes in PAR.

[1 1.14.1 If a change in PAR occurs, complete notifications to responsible state and local governmental agencies within 15 minutes of declaration of the change per Procedure 5.7.6.

[ ]

1.14.2 If a change in PAR occurs, complete notification to NRC immediately after notification of responsible state and local governmental agencies, and not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after declaration of the change per Procedure 5.7.6.

[ ]

1.15 Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies, and not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after declaration of each emergency classification.

[ ]

1.15.1 Record Time NRC duty officer is contacted.

[1 1.16 Time:

If not previously performed, ensure initial accountability of Operations personnel is completed.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 18 OF 37 J

[]

S ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY

[1

[1 I

PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 19 OF 37 1.17 If any of following conditions exist, concurrently enter Procedure 5.7.14 for Stable Iodine Thyroid Blocking:

[ ]

1.17.1 Fuel cladding has been determined to be lost, or

[ ]

1.17.2 A calculated dose of > 25 rem (CDE) to thyroid is likely to be received, or

[ ]

1.17.3 Life saving operation is to be undertaken in areas where high levels of radio-iodine are suspected and no current air analysis is available.

1.18 If not previously performed, ensure initial accountability completed by:

[ ]

1.18.1 Within 30 minutes, ensure Security Coordinator reports when initial accountability is complete.

[ ]

1.18.2 If accountability was not initiated due to personnel safety concerns, monitor plant/site conditions and when personnel safety concern has passed, initiate personnel assembly and accountability.

[ ]

1.18.3 Record time initial accountability completed.

Time:

1.19 Evacuate all non-ERO personnel per Procedure 5.7.11.

1.20 Perform follow-up notifications to state and local agencies at least every 60 minutes or sooner if there is a significant change in status of emergency per Procedure 5.7.6.

1.21 If escalating to another emergency classification, perform following:

[1 ]

1.21.1 Announce following to Control Room Staff:

[1 1.21.1.1 Time of classification.

Time:

[1 1.21.1.2 Level of emergency classification.

Class:

[ ]

1.21.1.3 EAL on which classification is based.

EAL #:

[1 1.21.1.4 Description of condition causing classification.

[1 1.21.2 Exit this Attachment and enter Attachment for applicable Classification level.

[

[

]

]

[I

I ATTACHMENT 3 ACTIONS FOR SITE AREA EMERGENCY I

Turnover Emergency Director duties when relieved by another qualified Emergency Director.

1.22.1 Use Attachment 7 to turnover to oncoming Emergency Director.

1.22.2 Announce to Control Room Staff who Emergency Director is.

1.22.3 Exit this Attachment and enter Attachment 5.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 20 OF 37 1.22

[]

[]

[I

ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY ACTIONS FOR GENERAL EMERGENCY

[ ]I CAUTION - Do not re-activate Automated Notification System if Emergency Response Facilities are already being activated.

[ ]

1.1 If not previously performed, initiate ERO activation by:

[ ]

1.1.1 Determine if ERO personnel will report to on-site Facilities or to AEOF.

[ ]

1.1.2 On telephone with ANS Activation Module, activate ANS by:

[ ]

1.1.2.1 Picking up telephone.

[ ]

NOTE - Hanging up phone while ANS is activating may cause ANS to lockup.

[ ]

1.1.2.2 When dial tone received, depress ACTIVATE DIALOGICS pushbutton.

[ ]

1.1.2.3 When voice asks for Scenario Password, depress one of following:

[ ]

a.

"222 SCENARIO" pushbutton to activate on-site ERFs.

[ ]

b.

"333 SCENARIO" pushbutton to activate AEOF.

[ ]

1.1.2.4 When ANS tells you goodby, hang up.

[ ]

1.1.3 If ANS telephone with ANS Activation Module is unavailable, have an individual concurrently activate backup notification methods per.

[ ] NOTE - Accountability will be performed if not previously performed and performing accountability will not additionally THREATEN PERSONNEL SAFETY.©

[ ]

1.2 Determine if personnel assembly and accountability will be performed.

[ ]

1.2.1 If accountability will be performed, go to Step 1.3.

[ ]

1.2.2 If accountability will not be performed, go to Step 1.4.

I PROCEDURE 5.7.2 REVISION 17 1

PAGE 21 OF 37 1

ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY

[ ]

1.3 Notify personnel and initiate personnel assembly and accountability by:

[1 1.3.1 If desired, fill in blanks below for Step 1.3.3.

[ ]

1.3.1.1 In (1), give a brief description of emergency event and if applicable, location.

[ ]

1.3.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.

Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.

Any precautions needed for security events/severe weather conditions.

]

1.3.2 Activate Emergency Alarm for 10 seconds.

[ ]

1.3.3 Announce following over station Gaitronics:

Attention All Station Personnel, at Emergency Director

[time]

declared a GENERAL EMERGENCY.

There is (1)

All personnel report to your Designated Assembly Areas for initial accountability.

All personnel stay clear of (2)

Activate Emergency Alarm for 10 seconds and repeat announcement.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 22 OF 37

I ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY I

[]

1.4

[1

[I

[I Notify station personnel WITHOUT personnel assembly and accountability by:

1.4.1 If desired, fill in blanks below for Step 1.4.3.

[ ]

1.4.1.1 In (1), give a brief description of emergency event and if applicable, location.

[1 1.4.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.

Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.

Any precautions needed for security events/severe weather conditions.

1.4.2 Activate Emergency Alarm for 10 seconds.

1.4.3 Announce following over station Gaitronics:

Attention All Station Personnel, at Emergency Director

[time]

declared a GENERAL EMERGENCY.

There is (1)

All personnel stay clear of (2)

Activate Emergency Alarm for 10 seconds and repeat announcement.

[ ] 1.5 Record time announcement completed.

Time:

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 23 OF 37

ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY

]

1.6 Make a Protective Action Recommendation (PAR) as part of initial notifications to responsible state and local governmental agencies.

[1 1.6.1 If no release in progress, automatic minimum PARs for a GENERAL EMERGENCY are:

Evacuation of 2 mile radius, Evacuation of 5 miles downwind of site and, Go indoors and monitor EAS/EBS for remainder of 10 mile Emergency Planning Zone (EPZ).

[ J 1.6.2 If release in progress, perform following as needed:

[ ]

1.6.2.1 If dose calculation cannot be completed in time to meet 15 minute notification time limits, perform initial notifications with Automatic minimum PARs and update if dose information indicates need to expand PAR.

[ J 1.6.2.2 Have dose calculation performed per Procedure 5.7.17.

[1 1.6.2.3 Use projected doses and Procedure 5.7.20 to make PARs.

[ ]

1.6.2.4 If dose based PAR is greater than current PAR, perform notifications to responsible state and local governmental agencies to update them of expanded PAR.

[ ] 1.7 Direct on watch individual to complete CNS Notification form per Procedure 5.7.6.

[ ]

1.7.1 Review and sign completed Notification form to authorize transmittal to state and local authorities.

[ ] 1.8 Ensure initial notification to responsible state and local governmental agencies is completed within 15 minutes of each declaration of an emergency class per Procedure 5.7.6.

[ ]

1.8.1 Record time state and local authorities contacted.

Time:

[ ]

1.9 If not previously performed, ensure ERO pager activation has occurred by one of the following methods:

[ ]

1.9.1 Activation of Control Room or Shift Manager's pager, or I

PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 24 OF 37

ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY

[ ]

1.9.2 ANS activation by calling Ext. 5560 and verifying ANS indicates an active scenario.

[ ]1.10 If ANS fails to activate pagers, have an individual concurrently activate backup notification methods per Attachment 6.

[ ]

1.11 If not previously performed, ensure Emergency Response Data Systems (ERDS) is activated using PMIS START/STOP Menu. This shall be done as soon as possible but not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after time of declaration of an ALERT or higher classification.

[ ]

1.11.1 Record time ERDS activated.

Time:

[ ] 1.12 If release in progress, have additional dose calculations performed per Procedure 5.7.17 to determine projected off-site doses for use in determining PAR.

[ 1 1.13 Monitor plant conditions and meteorological conditions for changes in PAR.

[ ]

1.13.1 If a change in PAR occurs, complete notifications to responsible state and local governmental agencies within 15 minutes of declaration of the change per Procedure 5.7.6.

[1 1.13.2 If a change in PAR occurs, complete notification to NRC immediately after notification of responsible state and local governmental agencies, and not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after declaration of the change per Procedure 5.7.6.

[ ]

1.14 Ensure NRC is notified via Emergency Notification System (ENS) immediately after notification of responsible state and local governmental agencies, and not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after declaration of each emergency classification.

[ ]

1.14.1 Record Time NRC duty officer is contacted.

Time:

[ ]1.15 If not previously performed, ensure initial accountability of Operations personnel is completed.

[ ]1.16 If any of following conditions exist, concurrently enter Procedure 5.7.14 for Stable Iodine Thyroid Blocking:

[1 1.16.1 Fuel cladding has been determined to be lost, or

[ ]

1.16.2 Calculated dose of Ž! 25 rem (CDE) to thyroid is likely to be received, or PROCEDURE 5.7.2 REVISION 17 PAGE 25 OF 37

I ATTACHMENT 4 ACTIONS FOR GENERAL EMERGENCY I

[ ]

1.16.3 Life saving operation is to be undertaken in areas where high levels of radio iodine are suspected and no current air analysis is available.

[

1.17 If not previously performed, ensure initial accountability completed by:

[ ]

1.17.1 Within 30 minutes, ensure Security Coordinator reports when initial accountability is complete.

[ ]

1.17.2 If accountability was not initiated due to personnel safety concerns, monitor plant/site conditions and when personnel safety concern has passed, initiate personnel assembly and accountability.

[1 1.17.3 Record time initial accountability completed.

Time:

[ ]

1.18 Ensure evacuation of all non-ERO personnel has been initiated per Procedure 5.7.11.

[ J 1.19 Perform follow-up notifications to state and local agencies at least every 60 minutes or sooner if there is a significant change in status of emergency per Procedure 5.7.6.

[ ]1.20 Turn-over ED duties when relieved by another qualified Emergency Director.

[ ]

1.20.1 Use Attachment 7 to turnover to oncoming Emergency Director.

[ ]

1.20.2 Announce to Control Room who Emergency Director is.

[ ]

1.20.3 Exit this Attachment and enter Attachment 5.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 26 OF 37

ATTACHMENT 5 SHIFT SUPERVISOR ACTIONS WHEN ANOTHER INDIVIDUAL IS EMERGENCY DIRECTOR

1.

SHIFT SUPERVISOR ACTIONS WHEN ANOTHER INDIVIDUAL IS EMERGENCY DIRECTOR

[ ] NOTE - Perform following steps concurrently, as needed.

[ ] 1.1 Notify Emergency Director when changes in plant conditions are discovered that warrant reclassifying to a higher classification.

[ J 1.2 If requested, have emergency announcements made per Attachment 8 when changes in emergency classifications are made.

[ ] 1.3 Notify Emergency Director of any significant changes in plant conditions.

[ ] 1.4 Notify Emergency Director of any emergent equipment repairs needed.

[ ] 1.5 Notify Emergency Director when changes in plant conditions warrant changes in TSC and OSC priorities.

[ ]1.6 Notify Operations Coordinator in TSC of additional support needed from TSC or OSC that is not being obtained through the ED.

[ ] 1.7 Coordinate dispatch of Station Operators from Control Room with Chem/RP Coordinator.

[ ]1.8 If SAMG entry is required, implement Procedure 5.9SAMG.

[ ]

1.8.1 Record time Decision Making Authority is transferred to Operations Coordinator.

Time:

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 27 OF 37

ATTACHMENT 6 ALTERNATE NOTIFICATION METHODS

[ ]

1.1 If CNS ANS is unavailable, activate backup pagers by performing following:

[1 1.1.1 If desired, script an addition to voice mail message per Step 1.4.

[1 1.1.2 On telephone with ANS Activation Module, pick up telephone.

[1 1.1.3 Press ACTIVATE BACKUP pushbutton.

[ ]

1.1.4 When prompted for password, press PASSWORD pushbutton.

[1 1.1.5 When prompted for scenario and after tone, press" SCENARIO" pushbutton.

Scenario Description Scenario Number Notification of Unusual Event Declared 100 ERF Activation - Respond to Plant 222 ERF Activation - Respond to AEOF 333

[ ]

1.1.6 After hearing message, "Thank you for using ATS", HANG UP.

[ ]

1.2 If telephone with ANS Activation Module is not available and CNS ANS is available, perform following:

[ ]

1.2.1 Complete CNS ANS code below by performing following:

[ ]

1.2.1.1 Obtain Emergency Directors Password and write it in blocks.

[ ]

1.2.1.2 Determine and enter appropriate scenario code.

Scenario Description Scenario Number Notification of Unusual Event Declared 100 ERF Activation - Respond to Plant 222 ERF Activation - Respond to AEOF 333

[ ]

NOTE - Hanging up phone while ANS is activating may cause ANS to lock up.

[ 3 1.2.2 Activate CNS ANS by dialing and providing following information when requested:

Extension 8579 ED PASSWORD PROCEDURE 5.7.2 REVISION 17 PAGE 28 OF 37

I ATTACHMENT 6 ALTERNATE NOTIFICATION METHODS I

Scenario Number Confirm Event Code 2

If you do not wish to record a "Current Scenario Message", press 3#.

If desired to record a "Current Scenario Message":

When ask about "Current Scenario Message", press 2.

After the tone speak your message.

When finished recording, press #.

Listen to message and follow voice mail instructions to modify or accept as desired.

To activate chosen scenario and message, press 3#.

[ ]

1.2.3 Record Time of Completion:

[ ]1.3 If telephone with ANS Activation Module is not available, AND CNS ANS is not available, activate all ERO pagers by:

f ]

1.3.1 If desired, script an addition to voice mail message per Step 1.4.

[ ]

1.3.2 Obtain password from Shift Supervisor cubicle sealed envelope.

[ ]

1.3.3 Determine and enter appropriate scenario code below:

Scenario Description Scenario Number Notification of Unusual Event Declared 100 ERF Activation - Respond to Plant 222 ERF Activation - Respond to AEOF 333

[ ]

1.3.4 Dial below number and providing following information when requested:

Dial 402 633 0469 on any telephone.

When prompted, ENTER password When prompted, ENTER "numeric message" 8_28255 522.

After hearing the message "Thank you for using ATS", HANG UP.

PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 29 OF 37 j

ATTACHMENT 6 ALTERNATE NOTIFICATION METHODS

[ ]

1.3.5 Record Time of Completion:

[ J NOTE - Step 1.4 is not necessary if CNS Automated Notification System is operational.

[ 1 1.4 If needed to provide Emergency responders more specific information prior to arrival at CNS, record a voice mail message by:

[1 1.4.1 Dial 5200 (voice mail).

[ ]

1.4.2 Enter mailbox number, 5522, and #.

[ ]

1.4.3 Enter password, 5522 and #.

[ ]

1.4.4 Enter 8, 2 (mailbox greeting).

[ ]

1.4.5 Enter 1 (external greeting).

[ ]

1.4.6 Enter 2; wait until end of greeting.

[ ]

1.4.7 Enter 5 (record command).

[ ]

1.4.8 Provide desired information as an addition to the external greeting.

[ ]

1.4.9 Enter # when completed.

[ ]

1.4.10 Enter 8, 3 (exits voice mail).

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 30 OF 37 1

ATTACHMENT 7 EMERGENCY DIRECTOR TURNOVER

[1 1.1 Emergency Classification Status, circle applicable Classification:

Unusual Event Alert Site Area Emergency General Emergency

[ ]1.2 EAL Classification is based upon EAL #:

[ ]

1.3 Initiating Events:

[ ] 1.4 Previous EAL #s Entered:

[]

1.5

[I

[I Status 1.5.1 1.5.2 of emergency procedure implementation and mitigating actions.

Off-Site Notification Form IS / IS NOT Completed Off-Site Notifications - Last Notification #:

Local & States NOT NOTIFIED IN PROGRESS NOTIFIED Time Completed:

NRC Duty Officer NOT NOTIFIED IN PROGRESS NOTIFIED Time Completed:

[ ]

1.5.3 Protective Action Recommendations made.

NONE YES (Complete Table Below)

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 31 OF 37 1

I, Go indoors and I

I I monitor EAS/EBS None --

Evacuate Sectors.

in Sectors

  • -- Miles--

f-------------44---------------------

4-----

0-2 M iles ',

les ------- 4-------------------

4------------

l 2-5 Miles 1 5-10 Miles

ATTACHMENT 7 EMERGENCY DIRECTOR TURNOVER

[

1.5.4 Status of Personnel Assembly and Accountability per Procedure 5.7.10.

[I 1.5.5 Status of Stable Iodine Thyroid Blocking per Procedure 5.7.14.

Not Implemented Implemented and Status is:

[ ]

1.5.6 Status of dismissal and or evacuation of non-ERO personnel per Procedure 5.7.11.

Not Started Started and Status is:

[ ]

1.5.7 Radiological conditions release above ODAM limits in progress (circle):

YES NO

[ ]

1.5.8 Status of Release Rate Determinations per Procedure 5.7.16.

Not Started Started and Status is:

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 32 OF 37 j

SATTACHMENT 7 EMERGENCY DIRECTOR TURNOVER

[ ]

1.5.9 Status of Dose Calculations per Procedure 5.7.17.

Not Started Started and Status is:

[1 1.6 Reactor Status (circle):

OPERATING SHUTDOWN

[ ] 1.7 Fission Product Barrier and Safety System Status (circle):

Fuel Cladding:

Intact Potential Loss Lost Primary Coolant:

Intact Potential Loss Lost Primary Containment:

Intact Potential Loss Lost Secondary Containment:

Intact Potential Loss Lost

[ ] 1.8 Evolutions in Progress:

]

1.9 Off-Site Assistance Requests:

[ ]

1.10 Site Priorities:

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 33 OF 37

ATTACHMENT 8 ANNOUNCEMENTS WITH ERFS ACTIVATED I

[]

1.1

[1I

[]

[1 There is (1)

All personnel stay clear of (2)

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 34 OF 37 Notify station personnel of Emergency Classification changes by:

1.1.1 If desired, fill in blanks below for Step 1.1.3.

[1 1.1.1.1 In (1), give a brief description of emergency event and if applicable, location.

[ ]

1.1.1.2 In (2), provide following as needed:© Locations that should be avoided due to emergency conditions.

Include specific evacuation routes to ensure personnel are directed around areas involving significant personnel safety hazards.

Any precautions needed for security events/severe weather conditions.

1.1.2 Activate Emergency Alarm for 10 seconds.

1.1.3 Announce following over station Gaitronics:

Attention All Station Personnel, at Emergency Director

[time]

declared a (an)

[emergency classification]

Activate Emergency Alarm for 10 seconds and repeat announcement.

ATTACHMENT 9 INFORMATION SHEET DISCUSSION 1.1 The responsibility and authority to classify events and make emergency declarations rests with the Emergency Director. The Shift Supervisor shall initially assume the role of the Emergency Director and remain so until relieved by another qualified Emergency Director. Certain actions may still need to be performed by the Shift Supervisor, as requested by the Emergency Director, after command and control of the emergency response has been transferred to the EOF.

1.2 Four standardized emergency classifications have been established; they are:

1.2.1 NOTIFICATION OF UNUSUAL EVENT (NOUE).

1.2.2 ALERT.

1.2.3 SITE AREA EMERGENCY (SAE).

1.2.4 GENERAL EMERGENCY (GE).

1.3 The rationale for the NOUE and ALERT classes is to provide early and prompt recognition and notification of minor events which could lead to more serious consequences or which might be indicative of more serious conditions which are not yet fully realized.

1.4 The SAE and GE classes reflect conditions where significant radiological releases are likely or are occurring or there is actual or imminent substantial core degradation or melting with potential for loss of containment. These classifications warrant full mobilization of Emergency Response Organizations and the alerting of the public.

1.5 Upon the declaration of any emergency classification, prompt notification is made to the responsible state and local governmental agencies to ensure sufficient emergency response personnel are mobilized and respond to the event in accordance with their respective radiological emergency response plans.

1.6 All on-site Emergency Response Facilities are activated following the declaration of an ALERT or higher classification. Activation of Facilities and/or assembly and accountability activities may be delayed if determined by the Emergency Director that personnel safety would be threatened. Facility activation and/or assembly and accountability shall be accomplished as soon as practical after safety concerns pass.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 35 OF 37

ATTACHMENT 9 INFORMATION SHEET 1.7 Representatives from federal and state agencies may dispatch personnel to the EOF. The decision to make prompt notification of the general public will be made at a SAE or GE by the appropriate governmental agencies.

1.8 Assessment of meteorological data, radiological dose projections, and other parameters will be made to determine the type of Protective Action Recommendations (PARs) necessary for the protection of the general public.

Off-site authorities will implement appropriate protective actions for affected populations based on those PARs, as well as other data they have assembled.

The general public will be kept informed of events by media facilities with periodic releases of updated information.

1.9 Contracted service companies, sponsor utilities, and other industry resources may be alerted and requested to render assistance, as appropriate. In addition, federal resources may be called upon for assistance.

1.10 The Emergency Director shall escalate, terminate, or reduce the emergency classification as conditions warrant.

2.

REFERENCES 2.1 CODES AND STANDARDS 2.1.1 NPPD Emergency Plan for CNS.

2.1.2 NUREG 0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

2.1.3 NUREG BR-0150, Volume 1, Revision 1.

2.2 PROCEDURES 2.2.1 Emergency Plan Implementing Procedure 5.7.1, Emergency Classification.

2.2.2 Emergency Plan Implementing Procedure 5.7.6, Notification.

2.2.3 Emergency Plan Implementing Procedure 5.7.10, Personnel Assembly and Accountability.

2.2.4 Emergency Plan Implementing Procedure 5.7.11, Evacuation of Non-Designated Site Personnel.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 36 OF 37 1

ATTACHMENT 9 INFORMATION SHEET 2.2.5 Emergency Plan Implementing Procedure 5.7.14, Stable Iodine Thyroid Blocking (KI).

2.2.6 Emergency Plan Implementing Procedure 5.7.16, Release Rate Determination.

2.2.7 Emergency Plan Implementing Procedure 5.7.17, Dose Assessment.

2.2.8 Emergency Plan Implementing Procedure 5.7.20, Protective Action Recommendations.

2.2.9 Severe Accident Procedure 5.9SAMG, Severe Accident Management Guidance.

2.3 MISCELLANEOUS 2.3.1 CNS Emergency Telephone Directory.

2.3.2 NRC Information Notice 83-28.

2.3.3 NRC Inspection Report 94-11.

2.3.4

© NRC Inspection Report 98-12. Affects NOTES prior to Steps 1.2 and 1.4 on Attachment 1, Steps 1.3.1.2 and 1.4.1.2 on Attachment 1, NOTE prior to Step 1.2 on Attachment 2, Steps 1.3.1.2, and 1.4.1.2 on, NOTE prior to Step 1.2 on Attachment 3, Steps 1.3.1.2 and 1.4.1.2 on Attachment 3, NOTE prior to Step 1.2 on, Steps 1.3.1.2 and 1.4.1.2 on Attachment 4, and Step 1.1.1.2 on Attachment 8.

2.3.5 RCR 2001-0354, Action 13.

I PROCEDURE 5.7.2 1

REVISION 17 1

PAGE 37 OF 37 1

USE: REFERENCE CNS OPERATIONS MANUAL EFEC E:

/80 EPIP PROCEDURE 5.7.6 APPROVA: S/RC APPROVAL: SORC NOTIFICATION OWNER: R. J. FISCHER DEPARTMENT: EP

1.

P U R P O SE............................................................

1

2.

PRECAUTIONS AND LIMITATIONS 1

3.

ENTRY CONDITIONS..................................................

2

4.

CONTROL ROOM ACTIONS.............................................

2

5.

E O F A CTIO N S........................................................

3

6.

RECORDS............................................

3 ATTACHMENT 1 COMPLETING NOTIFICATION FORM WITH CNS-DOSE AVAILABLE........................................

4 ATTACHMENT 2 COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE....................................

5 ATTACHMENT 3 COOPER NUCLEAR STATION NOTIFICATION REPORT.. 8 ATTACHMENT 4 SHIFT COMMUNICATOR.............................

9 ATTACHMENT 5 OFF-SITE COMMUNICATOR.........................

11 ATTACHMENT 6 INFORMATION SHEET.............................

13

1.

PURPOSE Provide instructions for initial, follow-up, and termination notifications to responsible State and Local governmental agencies, NRC notifications, initial generation of press releases to the Media, and notifications to other off-site support agencies.

2.

PRECAUTIONS AND LIMITATIONS

[1 2.1 Initial notifications to State/Local agencies shall be performed within 15 minutes of each declaration of an Emergency and/or change in Protective Action Recommendations (PARs).©

[ ]2.2 NRC notification shall be performed immediately following notification of responsible State and Local governmental agencies, and not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after the time of declaration of one of the emergency classes.

[ ] 2.3 At an ALERT or higher classification, follow-up notifications to responsible State and Local governmental agencies shall be performed approximately every 60 minutes, or sooner if there is a significant change in the status of the emergency.© PROCEDURE 5.7.6 REVISION 35 PAGE 1 OF 15

[1 2.4 Section 8, "Release Information" of the Notification Report, is completed only when both of the following conditions exist:

[ ]

2.4.1 Follow-up notification.

[ ]

2.4.2 A release of Airborne Radioactive material greater than ODAM limits is occurring or occurred during the event.

[ J 2.5 Notification of termination to off-site agencies shall be performed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after the termination of the emergency.

]

2.6 If the Control Room must be evacuated and off-site notification responsibilities have not been transferred to the EOF, the Shift Communicator shall perform off-site notifications over the State Notification Telephone from the TSC or EOF.

[ ] 2.7 If making a notification for an Emergency that occurred but was not reported (e.g., the condition occurred yesterday but was not caught at that time), make the notification to State/Local agencies by performing an initial notification with the Event Declared and Terminated as the same time.

II]

2.8 The Emergency Director shall be immediately notified of any difficulties or delays in completing this procedure.

3.

ENTRY CONDITIONS

[ ]

3.1 An Emergency has been declared per Procedure 5.7.1.

4.

CONTROL ROOM ACTIONS

[]

4.1 NOTIFICATIONS FROM CONTROL ROOM.

[ ]

4.1.1 Emergency Director (ED) direct Operator or Shift Technical Engineer to complete Notification Report per Attachment 1.

[ ]

4.1.2 ED review form for accuracy.

[ ]

4.1.3 ED add remarks to the remarks section as appropriate.

[1 4.1.4 ED sign form including date/time.

[ ]

4.1.5 If FAX available, ED authorize notification to be faxed to State/Local agencies, NRC Operations Center, TSC, and EOF by providing password to Operator or Shift Technical Engineer.

[ ]

4.1.6 ED direct Shift Communicator to make notifications per.

PROCEDURE 5.7.6 REVISION 35 PAGE 2 OF 15

5.

EOF ACTIONS

[]

5.1 NOTIFICATIONS FROM EOF

[ ]

5.1.1 Emergency Director (ED) direct Rad Assessment Supervisor or OPS/EOP Advisor to complete Notification Report per Attachment 1.

[ ]

5.1.2 ED review form for accuracy.

[ J 5.1.3 ED add remarks to the remarks section as appropriate.

[ ]

5.1.4 ED sign form including date/time.

[ ]

5.1.5 If FAX available, ED authorize notification to be faxed to State/Local agencies, NRC Operations Center, TSC, and EOF by providing password to Rad Assessment Supervisor or OPS/EOP Advisor.

[ ]

5.1.6 ED direct Off-Site Communicator to make notifications per.

6.

RECORDS

] 6.1 Attachments 3, 4, and 5 from actual events shall be forwarded to the EP Manager within 5 working days of their completion (Quality Record upon completion).

I PROCEDURE 5.7.6 1

REVISION 35 1

PAGE 3 OF 15

ATTACHMENT 1 COMPLETING NOTIFICATION FORM WITH CNS-DOSE AVAILABLE

[ ] ]CAUTION - If CNS-DOSE is not available, notify ED and complete Notification Form using Attachment 2.

1.

COMPUTER DOSE PROJECTION/AUTOMATED NOTIFICATION REPORT

[ ]

1.1 On a PMIS terminal, enter turn-on code "DOSE".

[ ]

1.2 Complete Notification Report using on-line instructions.

]

1.3 Deliver printed Notification Report to the ED to complete the remarks section and approve the notification.

[

1.4 Verify ED signature, date, and time are on the Notification Report and fax using the on-line instructions.

[ ]

1.5 Provide completed Notification Report to the Communicator.

I PROCEDURE 5.7.6 1

REVISION 35 1

PAGE 4 OF 15 j

ATTACHMENT 2 COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE

1.

COMPLETE NOTIFICATION FORM

[ ]

1.1 Obtain copy of Attachment 3, Notification Report.

[ ] NOTE 1 - Initial Notifications: Steps 1.2 through 1.19 and 1.28 are required.

[1 ]NOTE 2 - Follow-Up Notifications: Steps 1.2 through 1.28 are required.

[ ] NOTE 3 - Termination Notifications: Steps 1.2 through 1.9 are required.

]

1.2 Notification Report Number: Enter 1 or the next sequential number if more than one has been generated during the event.

[ ]

1.3 Time of Transmittal: Leave blank.

[ ]

1.4 Initial or Follow-Up Report:

[ ]

1.4.1 Check Initial Report for EAL classifications or change in PAR.

[ ]

1.4.2 Check Follow-Up Report for all others including termination.

[ ]

1.5 Name of CNS Communicator: Leave blank.

[ ]

1.6 Classification

Check the Emergency Classification.

[ ]

1.7 EAL Number: Enter the EAL number (e.g., 1.1.2).

[ ]

1.8 Event Declared (Date/Time): Enter time and date of the Emergency Declaration in military format (e.g., 14:18).

[ ]

1.9 Event Terminated (Date/Time): Enter time and date of the termination in military format (e.g., 14:18).

RELEASE DEFAULT POINT PRIMARY BACKUP VALUES 13 mph and D ERP CNS DOSE or 100 M MET 60 M MET abi C

Stability Class All Others CNS DOSE or 10 M MET 60 M MET 8 mph and D Points I

I Stability Class

[ ]

1.10 Wind Speed: Enter wind speed in MPH.

I PROCEDURE 5.7.6 1

REVISION 35 1

PAGE 5 OF 15

ATTACHMENT 2 COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE

[ ] 1.11 Wind From: Enter the direction (e.g., if the wind is coming from the east, enter 90.

[ ] NOTE - If it is currently raining, SPDS MET will have message "It is raining".

[ ] 1.12 Precipitation (Yes/No): Check Yes if there is precipitation. Check No if it is not.

[ ]

1.13 Stability Classification (A-G): Check Stability Class (A-G).

[1 1.14 Release Status (Is/Was/Will-Be):

[ ]

1.14.1 Is: Enter Is if release is currently in excess of ODAM limits or no release in progress/expected.

[1 1.14.2 Was: Enter Was if release is now less than ODAM limits.

[1 1.14.3 Will-Be: Enter Will-Be if release in excess of ODAM limits is expected.

[

1.15 Release Type (None/Airborne/Liquid):

]

1.15.1 None: Check None if releases are currently below ODAM limits.

[ ]

1.15.2 Airborne: Check Airborne if release is, was, or will-be in excess of ODAM limits for airborne activity.

[1 1.15.3 Liquid: Check Liquid if release is, was, or will-be in excess of ODAM limits for liquid activity.

[1 1.16 Protective Action Recommendations: Enter PARs. Verify PAR includes previous PARs if they have changed.

[ ]1.17 Prognosis (Stable/Unstable):

[ ]

1.17.1 Check Stable if the event is not likely to degrade.

[1 1.17.2 Check Unstable if the event is degrading (e.g., RPV level is lowering or Containment Rad Monitors are trending upward).

[1 1.18 Plant Status (at Power/Shutdown): Check appropriate box.

PROCEDURE 5.7.6 REVISION 35 PAGE 6 OF 15

ATTACHMENT 2 COMPLETING NOTIFICATION FORM WITH CNS-DOSE NOT AVAILABLE

[ ]

1.19 Remarks: Enter information that will be useful to the off-site agencies in understanding the event, pla onditions, or release information. If dose projections at 10 miles are g r-tha*o rqetua!;l1 REM TEDE or 5 REM CDE, verify that this in the remarks section.

[ ]

1.20 Section 8, "Release Information" of the Notification Report is completed only when both of the following conditions exist:

[ ]

1.20.1 Follow-up notification.

[ ]

1.20.2 A release of airborne radioactive material greater than ODAM limits is occurring or occurred during the event.

[ ] 1.21 Release From: Check the location that was or is exceeding ODAM limits.

[ ] 1.22 Release Height: 100 M for ERP and 10 M for any building release. Other is checked if the release is not from a building.

]

1.23 Release Duration: If duration is unknown, use the default of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

[ ]1.24 Start Time: Enter release start time (e.g., 14:18)

[ ]

1.25 Stop Time: Enter release stop time if known; otherwise, enter "UNK".

[ ]

1.26 Release Rate (pCi/sec): Enter release rate in jCi/sec.

[ ]

1.27 Projected Integrated Dose (Rem) and Projected Dose Rate (Rem/hr):

Are obtained from CNS DOSE or by hand calculations per Procedure 5.7.17.

[ ]

1.28 Deliver to ED to add remarks, signature, date, and time.

I PROCEDURE 5.7.6 1

REVISION 35 1

PAGE 7 OF 15

ATTACHMENT 3 COOPER NUCLEAR STATION NOTIFICATION REPORT Notification Report Number:

Time of Transmittal:

[

Initial Report (Complete Sections 1-7 only)

[ ] Follow-Up Report

1) Name of CNS Communicator:

Call Back Number: 402-825

2) Classification: [ ] NOUE; [ ]-Alert; [1 Site Area; [

General.

EAL Number:

Event Declared (DaterTime):

i Event Terminated (Date/Time):

3) Meteorological Wind Speed:

MPH Wind From:

Degrees I Precipitation: [ ] Yes [ ] No Conditions I

Stability Class: [ ]A; [ ]B; [ ]C;

]D;[ ]E;

]F;[ ]G

4) ODAM Airborne Release Values:

There [ ]is

[ ] no Release of Radioactive Material Greater ERP = 7.28E5 pCi/sec than ODAM Limits.

TG Bldg = 3.6E4 pCi/sec RX Bldg = 3.3E4 pCilsec ARW Bldg = 3.6E4 pCi/sec will be a liquid

5) Protective Action Recommendations (PARS): General Emergency Automatic PAR - Evacuate 2 mi radius/5 mi downwind, go indoors, and monitor EAS/EBS remainder 10 mi EPZ.

S

-None Evacuate Sectors I Go indoors and monitor EAS/EBS in Sectors 4---------

4 0-2 Miles ----------

4-------------------- 4------------------------------------------

2-5 Miles,,

2-Ms4 4-5-10 Miles

6) Prognosis: [] Stable; [ ] Unstable I Plant Status: []at Power; []Shutdown
7) Remarks:
8) Release Information (required on follow-up Notification with airborne release >ODAM limits):

Release From: [_] ERP; [ ] Reactor Building; [_Turbine Building; [1 Aug Radwaste Building;[ ]Other:

r-----------------------

Release Height: []100 M (ERP); [ ] 10 M (RB, TB, ARWB); [ ] Other: _

ft 1 Release Rate (pCilsec)

J Estimated Duration:

(Hours)

Noble gas:

pCi/sec Start Time:

Iodides:

N/A Stop Time:

Particulate:

N/A I-----------------------------------------------------------------

Distance Projected Integrated Dose (Rem) i Projected Dose Rate (Rem/hr) 4 -----

x--------------- -------

From Plant TEDE CDE (Thyroid)

TEDE CDE (Thyroid)

.......4............

4--

Site-Boundar---------------------------

4 Site Boundar~y 4

I -

2 Miles 2-Miles-------------- --------------------- 4------------------- 4-------------------

5Miles tt+

--- Mie

+----------------+---------------+-----------------------------

10 Miles I

Emergency Director Signature:

Date:

Time:

PROCEDURE 5.7.6 REVISION 35 PAGE 8 OF 15

ATTACHMENT 4 SHIFT COMMUNICATOR Notification Report Number:

] 1.1 When directed to perform notification to State and Local Government agencies, perform the following:

[ ]

1.1.1 Verify ED signature/date/time and remarks section (optional) on Notification Report.

[ ]

1.1.2 Print your name and call back number on Notification Report, Block 1.

[ 1 1.1.3 Contact State/Local Agencies using State Notification Telephone System by pressing the "Group Call" button or 7450 from any phone.

NOTIFY FOLLOWING

SPEED:

TIME II AGENCIES PHONE DIAL #: ON LINE:

NAME OF CONTACT II NEMA via Nebraska State 04 Patrol ------------

I ------------- -

Nemaha County EOC via State 20 Nemaha County Sheriff Notification--------I------I Atchison County EOC via Telephone Atchison County Sheriff System 19 Missouri SEMA via 22 Missouri Highway Patrol

[ ]

NOTE - If communication is lost with one or more agencies, continue to make notifications to on-line parties. When notifications are complete, call back agencies missing and make report.

[ ]

1.1.4 Record time last party on line as "Time of Transmittal" on Notification Report.

[ ]

1.1.5 When all parties are on line, verify that they have received the faxed notification. Only information on the form is allowed to be communicated unless authorized by the ED.

[1 1.1.5.1 If FAX not received, read the Notification Report line by line.

[ ]

1.1.6 Notify ED notification to State/Local agencies is complete and time follow-up notification is required.

PROCEDURE 5.7.6 1

REVISION 35 PAGE 9 OF 15

ATTACHMENT 4 SHIFT COMMUNICATOR

[ ] 1.2 Contact NRC Headquarters via ENS immediately after Step 1.1.6 and not later than 60 minutes after declaration of an emergency.

NRC CNS TELEPHONE ALTERNATE PERSON CONTACTED TIME Dial # on Phone ETD or Speed Sticker Dial - 10

] 1.3.

When contacted by ENS Communicator in TSC, transfer NRC notification responsibilities and notify ED. ENS communications from the TSC are performed in accordance with Procedure 5.7ENS.

NAME OF ENS COMMUNICATOR PERFORMED BY TIME

[ ] 1.4.

When contacted by Off-Site Communicator in EOF, transfer off-site notification responsibilities and notify ED.

NAME OF OFF-SITE COMMUNICATOR PERFORMED BY TIME Communicator Signature:

Date:

PROCEDURE 5.7.6 REVISION 35 PAGE 10 OF 15

ATTACHMENT 5 OFF-SITE COMMUNICATOR Notification Report Number:

[ ] 1.1 When directed to perform notification to State and Local Government agencies, perform the following:

[1 1.1.1 Verify ED signature/date/time and remarks section on Notification Report.

[ ]

1.1.2 Print your name and call back number on Notification Report, Block 1.

[ ]

1.1.3 Contact State/Local agencies using State Notification Telephone System by pressing the "Group Call" button or 7450 from any phone.

NOTIFY FOLLOWING TIME AGENCIES PHONE ON LINE NAME OF CONTACT NEMA via Nebraska State Patrol -

L...................-----------------------

State Nemaha County EOC via S

I Nemaha County Sheriff Notification Telephone L------

Atchison County EOC via System Atchison County Sheriff L

I Missouri SEMA via Missouri Highway Patrol

[ ]

NOTE - If communication is lost with one or more agencies, continue to make notifications to on-line parties. When notifications are complete, call back agencies missing and make report.

[ ]

1.1.4 Record time last party on line as "Time of Transmittal" on Notification Report.

[1 1.1.5 When all parties are on line, verify that they have received the faxed notification. Only information on the form is allowed to be communicated unless authorized by the ED.

[ ]

1.1.5.1 If FAX not received, read the Notification Report line by line.

[ ]

1.1.6 Notify ED that notification to State/Local agencies is complete and time follow-up notification is required.

PROCEDURE 5.7.6 1

REVISION 35 PAGE 11 OF 15 j

ATTACHMENT 5 OFF-SITE COMMUNICATOR

[ ] 1.2 Perform notifications to the following support agencies, as soon as possible, after the declaration of an ALERT or higher emergency classification, but not until after all notifications are completed as required in Section 1.

AGENCY PHONE PERSON CONTACTED TIME INPO (800) 321-0614 American Nuclear (860) 561-3433 Insurers (ANI)

Communicator Signature:

Date:

I PROCEDURE 5.7.6 1

REVISION 35 1

PAGE 12 OF 15

]

ATTACHMENT 6 INFORMATION SHEET

1. DISCUSSION 1.1 All notifications and communications will be handled from the Control Room (CR) until the Technical Support Center (TSC) and Emergency Operations Facility (EOF) are activated. The responsibility of generating press releases to the media may be transferred to NPPD Corporate Communications Department personnel prior to activation of the Joint Information Center (JIC).

1.2 During a declared Emergency at CNS, Emergency notifications to the State of Nebraska; State of Missouri; Atchison County, Missouri; and Nemaha County, Nebraska are accomplished through the State Notification Telephone System.

The CNS State Notification Telephone System is a conference-calling system.

When the handset to this hotline is picked up, and the "Group Call" button is pushed, dedicated telephones will automatically ring at Nebraska State Patrol, Missouri Highway Patrol, Atchison County Sheriffs Department, and Nemaha County Sheriffs Department. The utilization of law enforcement agencies as initial points of contact provides for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coverage. The dedicated lines listed also have extension lines which ring at the following facilities respectively: Nebraska Emergency Management Agency EOC, Missouri State Emergency Management Agency EOC, Atchison County EOC, and Nemaha County EOC. Once the EOCs become operational, notifications may be made using the extension lines at the EOCs with concurrence between the respective EOC and law enforcement agency.

1.3 Notifications to the NRC are normally accomplished through the Emergency Notification System (ENS). The Emergency Notification System is a dedicated telephone system which is manned 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by the Duty Officer at the NRC Headquarters Operations Center.

1.4 During any notification activity, if the primary communications system fails, communication methods shall be attempted such as alternate telephones, National Warning System (NAWAS), base station radio, or relay through a third party. Alternate telephone numbers are listed in the Emergency Telephone Directory.

1.5 At an ALERT or higher emergency classification, to receive continuous and detailed information, the NRC will likely request an open line of communication with the Control Room (CNS) until the TSC is operational.

I PROCEDURE 5.7.6 1

REVISION 35 1

PAGE 13 OF 15

ATTACHMENT 6 INFORMATION SHEET 1.6 The Public Affairs Duty Officer (PADO) shall be notified by pager by the CNS ANS and instructed to contact the Shift Communicator in the Control Room.

Upon being contacted by the PADO, the Shift Communicator will ensure all information from the Initial CNS Notification Report is relayed to the PADO.

In such cases, that it is not feasible to relay the information via telephone in a timely manner, the Notification Report may be faxed to the PADO. PADO functions shall be superseded by the activation of the Joint Information Center (JIC). The JIC shall receive follow-up information from the Technical Information Coordinator in the EOF.

1.7 The On-Call Emergency Preparedness Coordinator should assume the responsibility of coordinating press releases after being notified and responding to a Notification of Unusual Event (NOUE).

1.7.1 Assist the Shift Communicator in ensuring communications are established with the PADO and information from the CNS Notification Reports is relayed to the PADO per Procedure 5.7.23.

1.7.2 This responsibility shall be for the period immediately after the declaration of the NOUE and continue until the responsibility is transferred to appropriate NPPD Corporate Communications Department personnel.

1.7.3 Any press release that is generated during this period should be reviewed and approved by the Emergency Director.

1.8 Authorized Representatives of the Governors of Nebraska and Missouri may be represented in the EOF and set up Forward Command Posts at some other location.

2.

REFERENCES 2.1 CODES AND STANDARDS 2.1.1 10CFR50.

2.1.2 NPPD Emergency Plan for CNS.

2.2 PROCEDURES 2.2.1 Emergency Plan Implementing Procedure 5.7.1, Emergency Classification.

PROCEDURE 5.7.6 REVISION 35 PAGE 14 OF 15

ATTACHMENT 6 INFORMATION SHEET 2.3 MISCELLANEOUS 2.3.1 CNS Emergency Telephone Directory.

2.3.2 NRC Inspection Report 89-35, Item 1.

2.3.3 NCR 93-52.

2.3.4 NRC Inspection Report 94-11.

2.3.5 NRC Inspection Report 94-29, Item 1.

2.3.6 QA Observation 93-05A.

2.3.7 QA Report 86-06.

2.3.8 RCR 2001-0181, Action #2, Require State/Local Notification within 15 minutes of a PAR or change in PAR.

2.4 NRC COMMITMENTS 2.4.1

© NRC Inspection Report 92-14. Commitment affects Steps 2.1 and 2.3.

2.4.2

© NRC Inspection Report 98-12 (NLS980074-05 and NLS980074-06).

Commitment affects Steps 2.1 and 2.3.

I PROCEDURE 5.7.6 1

REVISION 35 1

PAGE 15 OF 15

ý

CNS OPERATIONS MANUAL USE: INFORMATION EPIP PROCEDURE 5.7.21 EFFECTIVE: 7/15/02 APPROVAL: SORC MAINTAINING EMERGENCY PREPAREDNESS -

OWNE:S. C EMERGENCY EXERCISES, DRILLS, DEPARTMENT: EP TESTS, AND EVALUATIONS DEPARTMENT:_EP

1.

PU R P O SE............................................................

1

2.

SENIOR MANAGER OF SITE SUPPORT INSTRUCTIONS...................

1

3.

EMERGENCY PREPAREDNESS MANAGER INSTRUCTIONS................

2

4.

R E C O R D S............................................................

4 ATTACHMENT 1 EP PROGRAM MAINTENANCE CHECKLIST............

5 ATTACHMENT 2 QUARTERLY EP MAINTENANCE CHECKLIST..........

7 ATTACHMENT 3 EMERGENCY PLAN 6 YEAR ELEMENT DEMONSTRATION

...............................................o

... 1 0 ATTACHMENT 4 EPIP ANNUAL REVIEW.............................

11 ATTACHMENT 5 EP EXERCISE CHECKLIST..........................

13 ATTACHMENT 6 INSTRUCTIONS FOR EQUIPMENT INVENTORIES (ATTACHMENTS 7 THOUGH 14).....................

14 ATTACHMENT 7 EMERGENCY EQUIPMENT MAINTAINED AT CONTROL R O O M............................................

16 ATTACHMENT 8 EMERGENCY EQUIPMENT AT OSC..................

17 ATTACHMENT 9 EMERGENCY RESCUE EQUIPMENT LOCKER.........

18 ATTACHMENT 10 EMERGENCY EQUIPMENT MAINTAINED AT AOSC....

19 ATTACHMENT 11 EMERGENCY EQUIPMENT MAINTAINED AT EOF.....

20 ATTACHMENT 12 EMERGENCY EQUIPMENT MAINTAINED AT AEOF....

24 ATTACHMENT 13 EMERGENCY EQUIPMENT MAINTAINED FOR AM BULANCE......................................

26 ATTACHMENT 14 EMERGENCY EQUIPMENT MAINTAINED AT HOSPITAL

......................................... 2 7 ATTACHMENT 15 INFORMATION SHEET.............................

28

1.

PURPOSE This procedure provides instructions for documenting the completion of periodic surveillances, tests, drills, and training. Periodic test and reviews of components of the Emergency Planning Program (e.g., facilities, equipment, Emergency Plan, and Emergency Plan Implementing Procedures, etc.) are conducted to ensure availability, operability, and reliability.

2.

SENIOR MANAGER OF SITE SUPPORT INSTRUCTIONS 2.1 Review completed documentation of Attachment 1, EP Program Maintenance Checklist, on an annual basis.

PROCEDURE 5.7.21 1

REVISION 25 PAGE 1 OF 32

2.2 Ensure State and County Emergency Management officials are made aware of non-emergency events that have a potential for media interest.

2.2.1 Inform Emergency Preparedness (EP) of event.

2.2.2 Verify EP has informed appropriate Emergency Management officials.

2.3 Ensure State and County Emergency Management officials are made aware of the following on an annual basis:

2.3.1 Significant changes to the Emergency Plan/EPIPs.

2.3.2 Emergency Action Levels (EALs).

2.4 Ensure that biennial exercises are performed with state and county Emergency Response Agencies.

3.

EMERGENCY PREPAREDNESS MANAGER INSTRUCTIONS 3.1 At the beginning of each calendar year:

3.1.1 Review the items on Attachment 1, EP Program Maintenance Checklist, and establish a working schedule.

3.2 Maintain awareness of status of completion of Attachment 1, EP Program Maintenance Checklist.

3.2.1 Response actions performed as part of actual plant emergencies may be credited towards the following drills or tests:

3.2.1.1 Integrated facility activation drill.

3.2.1.2 Call out phone test/drill.

3.2.1.3 RP drill.

3.2.1.4 Off-Site agency communications drill.

3.2.1.5 Medical drill.

3.2.2 For actual plant emergencies, a post-event critique should be performed utilizing the format in EPDG #2, H-1, CNS Drill and Exercise Manual, Attachment 10 - Critique Process.

I PROCEDURE 5.7.21 REVISION 25 PAGE 2 OF 32

3.2.3 Evolutions incorporated within a multiple scope drill/exercise may count as drill or test completion, as example:

3.2.3.1 RP drill, medical drill, or off-site communications drill as part of quarterly integrated facility activated drill or annual exercise.

3.2.4 Notification of ERO and Governmental Agencies including:

3.2.4.1 Weekly tests of Automated Notification system.

3.2.4.2 Quarterly off-hours ERO call-in test (at least one per year should be manual).

3.2.4.3 Quarterly verification and update of Emergency Telephone Directory.

3.2.5 NRC Performance Indicators:

3.2.5.1 Prepare and submit in accordance with Administrative Procedure 0-PI-01.

3.3 Ensure completion of the items on Attachment 2, Quarterly EP Maintenance Checklist.

3.4 Ensure the completion of the items on Attachment 3, Emergency Plan 6 Year Element Demonstration.

3.5 Ensure the completion of the items on Attachment 4, EPIP Annual Review.

3.6 Ensure the completion of the items on Attachment 5, EP Exercise Checklist.

3.7 Maintain awareness of the status of the Alert and Notification System (ANS) operability.

3.8 Ensure the following is performed for Biennial Exercises:

3.8.1 Schedule a date for the exercise in coordination with the primary State and County emergency response agencies.

3.8.2 Provide the opportunity for State and County response agencies to participate in an exercise.

I PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 3 OF 32 j

3.8.3 Coordinate NPPD efforts with other participating personnel, organizations, and agencies.

3.8.3.1 If the Federal Emergency Management Agency (FEMA) is evaluating State and County emergency response, ensure the exercise scenario is developed within the time frames specified by the regulations, as defined in Attachment 5, EP Exercise Checklist.

3.8.4 Discuss and evaluate annual exercise performance with plant management, NPPD controller/evaluators, and principal participants.

4.

RECORDS 4.1 Attachments 1 through 5 are sent to CNS Records (quality record upon final review).

I PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 4 OF 32

]

I ATTACHMENT 1 EP PROGRAM MAINTENANCE CHECKLIST I

Year:

SEMI-ANNUAL/ANNUAL/BIENNIAL EP MAINTENANCE ITEMS 1.1 Radiological Protection Drill (Semi-Annual).

1.1.1 (January - June).

D 1.1.2 (July - December).

D 1.2 Radiological Monitoring Drill (Annual).

D 1.3 Biennial Exercise (include Attachment 5, EP Exercise Checklist).

1.3.1 FEMA Evaluated (even years only).

1.4 Annual Off-Site Agencies Communications Drill.

D 1.5 Annual Unannounced Communications Drill.

D 1.6 Annual Medical Drill.

D 1.7 Emergency Plan Review.

1.7.1 Emergency Plan Review (Annual).

D 1.7.2 Letters of Agreement Certification (Annual D

Confirmation).

1.7.3 EPIP Review (Annual).

D 1.8 Media Day (Annual).

D 1.9 Public Information Brochure (Annual).

D 1.10 Review and update 6 Year Plan (Annual) (include, Emergency Plan 6 Year Element D

Demonstration).

1.11 Significant Emergency Plan/EPIP Changes, Emergency Action Levels (EALs) Meeting with State/County D

Emergency Management (Annual).

1.12 Hospital Training (Annual).

D ate:

ate:

ate:

ate:

[ ]Yes;[ ]No ate:

ate:

ate:

ate:

ate:

ate:

ate:

ate:

ate:

ate:

)ate:

PROCEDURE 5.7.21 REVISION 25 PAGE 5 OF 32

I ATTACHMENT 1 EP PROGRAM MAINTENANCE CHECKLIST Year:

1.13 Off-Site Agency Training (Annual).

1.13.1 Nebraska.

1.13.2 Missouri.

1.13.3 Iowa.

1.13.4 Kansas.

1.13.5 Local Agencies.

1.14 Annual Training Review of ERO.

1.14.1 Solicit verification of annual ERO training completion from the Training Department.

1.14.2 Review training completion feedback and remove any ERO members not qualified.

1.15 EP Department Training Review (Annual).

Completed By:

Emergency Preparedness Coordinator Reviewed By:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Emergency Preparedness Manager I

PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 6 OF 32 j

I ATTACHMENT 2 QUARTERLY EP MAINTENANCE CHECKLIST Quarter:

EMERGENCY RESPONSE FACILITY SURVEILLANCE 1.1 Quarterly Emergency Equipment Inventory.

1.1.1 Control Room (Attachment 7).

1.1.2 OSC (Attachment 8).

1.1.3 Emergency Rescue (Attachment 9).

1.1.4 AOSC (Attachment 10).

1.1.5 EOF (Attachment 11).

1.1.6 AEOF (Attachment 12).

1.1.7 Ambulance (Attachment 13).

1.1.8 Hospital (Attachment 14).

1.2 TSC.

1.2.1 Monthly Facility Survey (Per EPDG #2).

1.3 OSC.

1.3.1 1.4 EOF.

1.4.1 1.2.1.1 Month 1.

1.2.1.2 Month 2.

1.2.1.3 Month 3.

Monthly Facility Survey (Per EPDG #2).

1.3.1.1 Month 1.

1.3.1.2 Month 2.

1.3.1.3 Month 3.

Monthly 1.4.1.1 1.4.1.2 1.4.1.3 Facility Survey (Per EPDG #2).

Month 1.

Month 2.

Month 3.

Year:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

I PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 7 OF 32

I ATTACHMENT 2 QUARTERLY EP MAINTENANCE CHECKLIST Quarter:

2.

STAFF AUGMENTATION METHODOLOGIES 2.1 Weekly Test of Automated Emergency Notification System (Autodialer).

2.1.1 Week 1.

2.1.2 Week 2.

2.1.3 Week 3.

2.1.4 Week 4.

2.1.5 Week 5.

2.1.6 Week 6.

2.1.7 Week 7.

2.1.8 Week 8.

2.1.9 Week 9.

2.1.10 Week 10.

2.1.11 Week 11.

2.1.12 Week 12.

2.1.13 Week 13.

2.2 Quarterly Review and Update of Emergency Telephone Directory.

2.3 Quarterly Performance Indicator (PI) Drill and Critique Report.

2.3.1 Quarterlv Trend Report (Drill Critique and Issue Year:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Review per EPDG # 2, Section H-i, Drill and Date:

Exercise Manual).© 2.4 Quarterly Off-Hours ERO Call-in Phone Test or Staff Date:

Augmentation Drill.

2.5 Quarterly Self-Assessment.

Date:

3.

QUARTERLY SUBMITTAL OF EP PERFORMANCE INDICATORS 3.1 Participation.

Date:

3.2 Drill and Exercise Performance.

Date:

3.3 Alert and Notification System.

Date:

I PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 8 OF 32

]

I ATTACHMENT 2 QUARTERLY EP MAINTENANCE CHECKLIST Quarter:

Year:

NOTES:

i PROCEDURE 5.7.21 1

REVISION 25 PAGE 9 OF 32

ATTACHMENT 3 EMERGENCY PLAN 6 YEAR ELEMENT DEMONSTRATION YEAR LAST YEAR NEXT COMPLETION ELEMENT PERFORMED SCHEDULED DATE Two off hours staffing Exercises (6 p.m. - 4 a.m.) one must be unannounced Activation of Joint Information Center Use of fire control teams Use of medical support personnel Use of Security personnel for prompt access to emergency equipment or support Use of one or more portions of backup communications for notification Field monitoring Capability for determining the magnitude and impact of the particular components of a release Capability of post-accident coolant sampling and analysis Assembly and accountability Initial recovery planning activities Unannounced off hours drill including Staff Augmentation I

PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 10 OF 32 j

ATTACHMENT 4 EPIP ANNUAL REVIEW Emergency Plan Implementing Procedures (Annual)

Revision Date PCR Year:

Number Reviewed Y N 5.7.1 Emergency Classification 5.7.2 Shift Supervisor EPIP 5.7.6 Notification 5.7.7 Activation of TSC 5.7.8 Activation of OSC 5.7.8.1 Activation of Alternate OSC 5.7.9 Activation of EOF 5.7.9.1 Activation of Alternate EOF 5.7.10 Personnel Assembly and Accountability 5.7.11 Early Dismissal/Evacuation of Site Personnel 5.7.12 Emergency Radiation Exposure Control 5.7.13 Personnel Monitoring and Decontamination 5.7.14 Stable Iodine Thyroid Blocking (KI) 5.7.15 OSC Team Dispatch 5.7.16 Release Rate Determination 5.7.17 Dose Assessment 5.7.18 Off-Site and Site Boundary Monitoring 5.7.19 On-Site Radiological Monitoring 5.7.20 Protective Action Recommendations Maintaining Emergency Preparedness 5.7.21 Emergency Exercises, Drills, Tests, and Evaluations 5.7.22 Communications 5.7.23 Activation of the JIC 5.7.24 Medical Emergency PROCEDURE 5.7.21 REVISION 25 PAGE 11 OF 32 j

ATTACHMENT 4 EPIP ANNUAL REVIEW Emergency Plan Implementing Procedures (Annual)

Revision Date PCR Year:

Number Reviewed YI N 5.7.25 Recovery Operations 5.7.26 Long-Term Environmental Monitoring 5.7.27 Alert and Notification System 5.7.27.1 EAS Tone-Activated Radio Malfunction 2.7.27.2 False Activation of Alert and Notification System Sirens Administration of Positional Instruction Manuals (PIMS)

I PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 12 OF 32

ATTACHMENT 5 EP EXERCISE CHECKLIST Year:

1.

Exercise Date Selection.

Date:

2.

ERO Participant Notification.

Date:

3.

Scenario Development Personnel Assigned.

Date:

4.

Controllers[Evaluators Assigned.

Date:

5.

Exercise Objectives.

5.1 Emergency Preparedness Manager Approval.

Date:

5.2 Submitted to Licensing (75 Day NRC Submittal, even years Date:

only).

6.

Exercise Scenario.

6.1 Provided to Nebraska Emergency Management Agency Date:

(EMA).

6.2 Provided to Missouri EMA.

Date:

6.3 Sixty Day (Prior to Exercise) FEMA Submittal, even years Date:

only).

6.4 Provided to Licensing (45 Day NRC Submittal, even years Date:

only).

7.

Post Exercise Critique Date:

Date:

8.

Site Oversight Review Committee (SORC) Critique Report Date:

Review.

I PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 13 OF 32 J

ATTACHMENT 6 INSTRUCTIONS FOR EQUIPMENT INVENTORIES (ATTACHMENTS 7 THOUGH 14)

INSTRUCTIONS 1.1 PM cards, from the CNS Maintenance Planning Office, shall be issued to those departments responsible for emergency equipment inventory once per quarter.

Emergency equipment inventory shall also be performed after each use.

1.1.1 The Radiological Protection Department is responsible for the inventory of emergency equipment listed on Attachments 7, 8, 10, 11, 12, 13, and 14.

1.1.2 The Maintenance Department is responsible for the inventory of emergency rescue equipment listed on Attachment 9.

1.2 Personnel responsible for emergency equipment inventory shall obtain an emergency locker seal prior to opening an Emergency Locker. A supply of locker seals shall be maintained by the Emergency Preparedness Department.

1.3 The inventory shall be performed utilizing the appropriate attachment of this procedure.

NOTE - An operability check need not be performed on communication equipment listed in this procedure that is located in the TSC, OSC, or EOF. Testing of these communication devices is conducted by the Emergency Preparedness Staff on a periodic basis.

1.4 Emergency equipment shall be inventoried, inspected, equipment calibration stickers checked, and an operability check shall be performed on all emergency equipment/instruments.

1.5 Operability, calibration, and equipment maintenance shall be conducted per normal station procedures.

1.6 During inspection, any equipment found inoperative or out of calibration shall be replaced in a timely manner.

1.7 During inspection, if any deficiency of inventory is discovered, contact the Emergency Preparedness Department.

I PROCEDURE 5.7.21 1

REVISION 25 PAGE 14 OF 32 j

ATTACHMENT 6 INSTRUCTIONS FOR EQUIPMENT INVENTORIES (ATTACHMENTS 7 THOUGH 14) 1.8 Instruments or equipment may be routinely removed from inventory for purposes of calibration or repair. Instruments and equipment being removed for calibration or repair should be immediately replaced with similar reserve instruments or equipment, where such reserves exist. Instruments or equipment for which there are not reserves should be returned to inventory immediately upon completion of calibration or repair activities.

1.9 During the inventory process, the expiration date of the supply of Potassium Iodide (KI) located within the emergency response facilities shall be checked.

If the expiration date is within 3 months from the date of the inventory currently being performed, contact the Emergency Preparedness Department and advise them of the expiration date. Emergency Preparedness Department personnel shall order a new supply of KI or receive an extension of the expiration date from the manufacturer.

1.10 Upon completion of the emergency equipment inventory, the PM card shall be signed off, indicating inventory is complete, and sent to the Emergency Preparedness Department for review. Emergency Preparedness Department will return the PM card to CNS Maintenance Planning Office. Documentation of emergency equipment inventories shall be kept on file at CNS Maintenance Planning Office.

I PROCEDURE 5.7.21 REVISION 25 1

PAGE 15 OF 32 j

ATTACHMENT 7 EMERGENCY EQUIPMENT MAINTAINED AT CONTROL ROOM NOTE - The air breathing equipment is not within the Emergency Locker, but the cases are located near the Emergency Locker for convenience, inspection, and maintenance.

ITEM QUANTITY

1.

Coveralls, Paper 25 Pairs

2.

Shoe Covers, Disposable 14" 24 Pairs

3.

Gloves, Disposable 2 Boxes

4.

Geiger-Mueller Survey Meter (Range 0-50 mrem/hr) 1 Each

5.

Ion-Chamber Survey Instrument (Range 0-50 rem/hr) 3 Each

6.

Dosimeter, Direct Reading Electronic 6 Each

7.

Spare Batteries ("AA" Cell) 12 Each

8.

Thyroid Blocking Tablets (KI) Check Expiration Date Per Step 1.9 20 Bottles

9.

Radiation Warning Sign And Appropriate Inserts 4 Each

10.

Radiation Barrier Rope, 200' 1 Coil

11.

Radiation Warning Tape 1 Roll

12.

First Aid Kit 1 Each

13.

Plastic Bag, Large 6 Each

14.

Duct Tape, 2" 3 Rolls

15.

Self-Contained Breathing Apparatus (With Voice Communicators) 6 Each

16.

Full Face Respirators With Single Particulate Canisters 6 Each

17.

Full Face Respirators With Single Particulate Canisters And Voice 6 Each Communicators

18.

Spare Air Cylinders 6 Each

19.

Spare Respirator Canister 12 Each

20.

Hand Lantern, With 6 Volt Battery 2 Each

21.

Flashlight, With Two "D" Cell Batteries 8 Each

22.

Spare Battery For Hand Lantern (6 Volt) 2 Each

23.

Spare Batteries ("D" Cell, 12 Per Box) 1 Box

24.

Spare Battery (9 Volt) 24 Each

25. General Arrangement Drawing 1 Set
26. Step-Off Pad 1 Each
27. Radiation Monitor (Frisker) 1 Each
28.

Spare Batteries ("C" Cell) 15 Each

29.

Spare Batteries (30 Volt) 2 Each

30.

Meals-Ready-To-Eat (MREs

> 20 Each

31.

Smear Book (10 Smears Per Book) 10 Each PROCEDURE 5.7.21 REVISION 25 PAGE 16 OF 32

ATTACHMENT 8 EMERGENCY EQUIPMENT AT OSC ITEM QUANTITY

1.

Flashlight, With Two "D" Cell Batteries 25 Each

2.

Masking Tape 6 Rolls

3.

Particulate Filter, 2" 1 Box

4.

Charcoal And Silver Zeolite Cartridge 10 Each

5.

Air Sample Plastic Bag And Label 20 Each

6.

Smear Book (10 Smears Per Book) 10 Each

7.

Spare Batteries ("D" Cell, 12 Per Box) 2 Boxes

8.

Spare Batteries ("AA" Cell) 4 Each

9.

Step-Off Pad 4 Each

10.

Protective Clothing (Full Set) 6 Each

11.

Self-Contained Breathing Apparatus 8 Each

12.

Spare Bottle For SCBA 12 Each

13.

Thyroid Blocking Tablets (KI) Check Expiration Date Per Step 1.9 100 Bottles

14.

Survey Instrument Ion-Chamber (Range 0 to 50 rem/hr) 2 Each

15.

I&C/Electrical Tool Kit 4 Each

16.

Volt Ohmmeter 2 Each

17.

Coveralls, Paper 25 Pairs

18.

Shoe Covers, Disposable 14" 25 Pairs

19.

Gloves, Disposable 1 Box

20.

Radiation Barrier Rope, 200' 1 Roll

21.

Radiation Monitor (Frisker) 2 Each

22.

Radiation Warning Sign With Appropriate Inserts 12 Each

23.

Mechanical Maintenance Tool Kit 2 Each

24.

Continuous Air Monitor 1 Each

25.

PD-1 Area Radiation Monitor 3 Each

26.

Personnel Radiation Monitor 1 Each

27.

Gloves, Electrical, Low Voltage 1 Pair

28.

Continuous Air Monitor Particulate Filter (CNSNO 35881) 10 Each

29. Hard Hat 10 Each
30.

Safety Glasses 10 Each

31.

Ear Plugs 1 Box

32.

Portable Air Sampler 1 Each

33.

Spare Battery (9 Volt) 12 Each

34.

Spare Battery ("C" Cell) 12 Each

35.

Geiger-Mueller Survey Instrument (Range 0-50 mrem/hr) 1 Each PROCEDURE 5.7.21 REVISION 25 PAGE 17 OF 32

ATTACHMENT 9 EMERGENCY RESCUE EQUIPMENT LOCKER ITEM DESCRIPTION UNIT QUANTITY

1.

Wrecking Bars Each 2

2.

Bolt Cutters Each 2

3.

Hacksaw and Blades Each 2

4.

Come-Along Each 1

5.

Cable Sling, 1/2" x 3' Each 2

6.

Cable Sling, 1/2" x 6' Each 2

7.

Hydraulic Jack, 3 Ton Each 1

8.

Hydraulic Jack, 5 Ton Each 1

9.

Sledge Hammer, Various Sizes Each 4

10.

Porta Power Each 1

11.

Web Slings (2" - 20' Long, 2" - 10' Long)

Each 4

12.

Sound Powered Phones Each 1

13.

Safety Belt and Line Each 1

14.

Fire Axe Each 1

15.

Crow Bar Each 1

16.

200' - 3 Part Block and Tackle Each 1

17.

Battery Lanterns Each 2

18.

Spare Batteries for Battery Lanterns Each 2

I PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 18 OF 32 1

I ATTACHMENT 10 EMERGENCY EQUIPMENT MAINTAINED AT AOSC

1.

GENERAL SUPPLIES AND PROTECTION EQUIPMENT ITEMS QUANTITY

1.

Coveralls, Paper 25 Pair

2.

Shoe Covers 25 Pair

3.

Gloves, Disposable 1 Box

4.

PD-1 Area Radiation Monitor 3 Each

5.

Continuous Air Monitor 1 Each

6.

Radiation Monitor (Frisker) 1 Each

7.

Flashlight, With 2 "D" Cell Batteries 8 Each

8.

Spare Batteries ("D" Cell, 12 Per Box) 1 Box

9.

Book Of Team-Dispatch Forms (Procedure 5.7.15, 1 Each )

10.

Thyroid Blocking Tablets (KI) Check Expiration Date 20 Bottles Per Step 1.9

11.

Step-Off Pad 2 Each

12.

Continuous Air Monitor Particulate Filter (CNSNO 35881) 10 Each

13.

Spare Batteries ("AA" Cell, 4 Per Box) 1 Box PROCEDURE 5.7.21 REVISION 25 PAGE 19 OF 32

ATTACHMENT 11 EMERGENCY EQUIPMENT MAINTAINED AT EOF PROTECTION EQUIPMENT NOTE - The air breathing equipment is not within the Emergency Locker, but the cases are near the Emergency Locker for convenience, inspection, and maintenance.

ITEM QUANTITY

1.

Coveralls, Paper 25 Each

2.

Shoe Covers, Disposable 14" 25 Pairs

3.

Gloves, Disposable 1 Box

4.

Extendable Probe Survey Instrument (Range 0-1,000 remlhr) 1 Each

5.

Ion-Chamber Survey Instrument (Range 0-50 rem/hr) 1 Each

6.

Geiger-Mueller Survey Instrument (Range 0-50 mrem/hr) 1 Each

7.

Sample Holder With Pancake Type Detector 1 Each

8.

Scaler Electronic Package (MS-2) 1 Each

9.

Dosimeter, Direct Reading, Electronic 1 Each

10.

Spare Batteries ("AA" Cell) 8 Each

11.

Filters For Air Sampler; 2" 1 Box

12.

Charcoal Cartridge For Air Sampler 10 Each

13.

Silver Zeolite Cartridge For Air Sampler 10 Each

14.

Extension Cord, Electric (50')

2 Each

15.

PD-1 Area Radiation Monitor 3 Each

16.

Continuous Air Monitor 1 Each

17.

Self-Contained Breathing Apparatus 4 Each

18.

Spare 45 Air Cylinder 4 Each

19.

Tape, Duct, 2" 3 Rolls

20.

Plastic Sheeting, 20' x 20' 2 Sheets

21.

Plastic Bag, Small 1 Box

22.

Plastic Bag, Large 6 Each

23.

Radiation Warning Sign with Appropriate Inserts 12 Each

24.

Smear Book (10 Smears Per Book) 20 Each

25.

Radiation Barrier Rope, 200' 1 Coil

26.

Radiation Warning Tape 1 Roll

27.

Hand Lantern With 6 Volt Battery 1 Each

28.

Flashlight, With Two "D" Cell Batteries 8 Each

29.

Spare Battery For Hand Lantern (6 Volt) 1 Each

30.

Spare Batteries ("D" Cell, 12 Per Box) 1 Box PROCEDURE 5.7.21 REVISION 25 PAGE 20 OF 32

ATTACHMENT 11 EMERGENCY EQUIPMENT MAINTAINED AT EOF ITEM QUANTITY

31.

Pocket Knife 1 Each

32.

Small Hand Tool Kit With Straight Slot Screwdriver, Phillips I Each Screwdriver, Small Pliers, And Small Vise Grip

33.

Step-Off Pads 2 Each

34.

Procedure 9.INST.58, Portable Beta-Gamma Counting 1 Each Instruments

35.

Thyroid Blocking Tablets (KI) Check Expiration Date 200 Bottles Per Step 1.9

36.

Radiation Monitor (Frisker) 2 Each

37.

Continuous Air Monitor Particulate Filter (CNSNO 35881) 10 Each

38.

Spare Batteries (9 Volt) 12 Each

39.

Spare Batteries ("C" Cell) 6 Each

40.

Portable Air Sampler 1 Each

2.

EMERGENCY DOWNWIND SURVEY KIT SUPPLIES (two complete kits are required).

NOTE - The Downwind Survey Team Supplies (Items 1 through 13) are located in the EOF. Items 14 through 47 may be stored in the Downwind Survey Vehicles.

ITEM QUANTITY

1.

Full Face Respirator 2 Each

2.

Hand Lantern 1 Each

3.

Spare Battery For Hand Lantern 1 Each

4.

Calculator 1 Each

5.

Dosimeter, Direct Reading Electronic 2 Each

6.

Spare Batteries ("AA")

4 Each

7.

Hand Held Radio 1 Each

8.

Gieger-Mueller Survey Instrument (Range 0-50 mrem/hr) 1 Each

9.

Ion Chamber Survey Instrument (Range 0-50 rem/hr) 1 Each

10.

Spare Battery ("D" Cell) 4 Each

11.

Spare Battery (30 Volt) 1 Each

12.

Spare Battery (9 Volt) 4 Each

13.

Thyroid Blocking Tablets (KI) Check Expiration Date 2 Bottles Per Step 1.9 2_Bottles

14.

Low Cut Rubber Shoes 4 Each PROCEDURE 5.7.21 REVISION 25 PAGE 21 OF 32 j

ATTACHMENT11 EMERGENCY EQUIPMENT MAINTAINED AT EOF ITEM QUANTITY

15.

250 ml Square Bottle 6 Each

16.

One Liter Bottle 4 Each

17.

Masslin Cloths 1 Package

18.

One-Piece Plastic Coveralls 2 Each

19.

Shovel 1 Each

20.

Combination Cartridge For Respirator 8 Each

21.

Masking Tape 2 Rolls

22.

Emergency Action Log 1 Pad

23.

Procedure 9.EPIN.1, Emergency Air Samplers 1 Each

24. Plastic Sheeting 1 Roll
25.

Complete Set Of EPIPs 1 Each

26.

Bolt Cutters 1 Each

27.

Small Plastic Bag 50 Each

28.

Grass Shears 1 Each

29.

Paper Coveralls 4 Each

30.

2" Air Sample Filters 1 Box

31.

Silver Zeolite Cartridge 6 Each

32.

Charcoal Cartridge 6 Each

33.

2" Millipore Air Sample Filters 1 Box

34.

Air Sampler With Head 1 Each

35.

Smear Book (10 Smears Per Book) 10 Each 36 Radioactive Material Sticker 50 Each

37.

Sample Label 25 Each

38.

2 cc Vial 10 Each

39.

Plastic Pipet 10 Each

40.

Lined Paper Pad 1 Pad

41.

Clipboard 2 Each

42.

10-Mile Radius Map 2 Each

43.

Site Map 1 Each

44.

Large Plastic Bags 25 Each

45.

Disposable Gloves 1 Box

46.

Ink Pens 3 Each

47.

Tweezers 1 Each I

PROCEDURE 5.7.21 1

REVISION 25 F

PAGE 22 OF 32

I ATTACHMENT 11 EMERGENCY EQUIPMENT MAINTAINED AT EOF

3.

DECONTAMINATION SUPPLIES NOTE - Following supplies are available in or near the EOF Decon Room.

ITEM QUANTITY

1.

Towels 10 Each

2.

Soap 3 Bars

3.

Septisol (Germicide) 1 Can

4.

Lanolin 1 Tube

5.

Swabs, Cotton Tipped, 100s 3 Packages

6.

Compresses, Gauze, 3" x 3", 100s 2 Packages

7.

Towels, Paper 1 Roll

8.

Beaker, Plastic, 150 ml 3 Each

9.

Hand Brush, Soft Bristle 2 Each

10.

Soap, Pumice 2 Bars FIRST AID AND RESCUE EQUIPMENT ITEM QUANTITY

1.

First Aid Kit 1 Each

2.

Stretcher 1 Each

3.

Rope, 1/2" - 50' 1 Coil I

PROCEDURE 5.7.21 REVISION 25 PAGE 23 OF 32 4.

ATTACHMENT 12 EMERGENCY EQUIPMENT MAINTAINED AT AEOF PROTECTION EQUIPMENT AND ADMINISTRATIVE SUPPLIES ITEM QUANTITY

1.

Coveralls, Paper 50 Each

2.

Shoe Covers, Disposable 14" 50 Pairs

3.

Gloves, Disposable 2 Boxes

4.

Gieger-Mueller Survey Instrument (Range 0-50 mrem/hr) 1 Each

5.

Ion-Chamber Survey Instrument (Range 0-50 rem/hr) 1 Each

6.

Sample Holder With Pancake Type Detector 1 Each

7.

Scaler Electronic Package (MS-2) 1 Each

8.

Dosimeter, Direct Reading Electronic 1 Each

9.

Spare Batteries ("AA" cell) 4 Each

10.

Portable Air Sampler w/Head (High Volume) (60 Hz, 120 VAC) 1 Each

11.

Inverter (12 VDC To 120 VAC) 1 Each

12.

Filter For Air Sampler; 2" 1 Box

13.

Charcoal Cartridge For Air Sampler 5 Each

14.

Silver Zeolite Cartridge For Air Sampler 5 Each

15.

Extension Cord, Electric (50')

1 Each

16. Tape, Duct, 2" 3 Rolls
17.

Plastic Sheeting, 20' x 20' 2 Sheets

18.

Plastic Bag, Small 1 Box

19.

Plastic Bag, Large 6 Each

20.

Radiation Warning Sign With Appropriate Inserts 12 Each

21.

Smear Book 20 Each

22.

Radiation Barrier Rope, 200 1 Coil

23.

Radiation Warning Tape 1 Roll

24.

Hand Lantern With 6 Volt Battery 3 Each

25.

Flashlight, With Two "D" Cell Batteries 8 Each

26. Spare Battery For Hand Lantern (6 Volt) 3 Each
27.

Spare Batteries ("D" Cell) 1 Box

28. Pocket Knife 1 Each
29.

Small Hand Tool Kit With Straight Slot Screwdriver, Phillips 1 Each Screwdriver, Small Pliers, And Small Vise Grip

30.

Shovel 1 Each

31.

Liter Bottle 6 Each

32.

Step-Off Pad 2 Each I

PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 24 OF 32

ATTACHMENT 12 EMERGENCY EQUIPMENT MAINTAINED AT AEOF ITEM QUANTITY

33.

Thyroid Blocking Tablets (KI) Check Expiration Date 60 Bottles Per Step 1.9

34. Radiation Monitor (Frisker) 1 Each
35.

Spare Batteries (9 Volt) 6 Each

36.

Spare Batteries ("C" Cell) 1 Box DECONTAMINATION SUPPLIES ITEM QUANTITY

1.

55 Gallon Radwaste Barrel With Lid 3 Each

2.

Disposable Coveralls 50 Each

3.

Disposable Gloves, 25 Pair/Box 2 Boxes

4.

2" Masking Tape 3 Rolls

5.

Small Poly Bag 12 Each

6.

Large Poly Bag 36 Each

7.

Plastic Bucket 4 Each

8.

Bar Soap 24 Each

9.

Bath Towel

-50.

10.

Poly Sheeting 1 Roll

11.

Procedure 9.RADOP.7, Personnel Decontamination 6 Copies

12.

Pumice Soap 2 Bars

13.

Septisol (Germicide) 1 Can

14.

Lanolin 1 Tube

15.

Procedure 9.INST.58, Portable Beta-Gamma Counting 1 Each Instruments

16.

Swabs, Cotton Tipped, 100s 3 Packages

17.

Compresses, Gauze, 3" x 3", 100s 2 Packages

18.

Towels, Paper 1 Roll

19. Breaker, Plastic 150 ml 3 Each
20. Hand Brush, Soft Bristle 10 Each
3.

FIRST AID AND RESCUE EQUIPMENT ITEM QUANTITY

1.

First Aid Kit 1 Each

2.

Stretcher 1 Each PROCEDURE 5.7.21 REVISION 25 PAGE 25 OF 32 2.

ATTACHMENT 13 EMERGENCY EQUIPMENT MAINTAINED FOR AMBULANCE ITEM QUANTITY

1.

Dosimeter, Direct Reading Electronic 5 Each

2.

TLD Badge 5 Each

3.

Geiger-Mueller Survey Instrument (CPM) 1 Each

4.

Ion-Chamber Survey Instrument (0-5 rem/hr) 1 Each

5.

Radiation Tag 10 Each

6.

Spare Batteries ("AA" Cell) 8 Each

7.

Smear Book 5 Each

8.

Form CNS RP-25, TLD Badging Record 1 Each

9.

Spare Batteries (9 Volt) 6 Each

10. Spare Batteries ("C" Cell) 1 Box I

PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 26 OF 32 1

ATTACHMENT 14 EMERGENCY EQUIPMENT MAINTAINED AT HOSPITAL ITEM QUANTITY

1.

Radiation Barrier Rope 1 Roll

2.

Masking Tape 10 Rolls

3.

Brown Paper 1 Roll

4.

Plastic Sheeting 1 Roll

5.

Applicable Radiation Warning Signs With Inserts, As Appropriate 5 Each

6.

Shoe Covers 15 Pairs

7.

Bags, Plastic (Large) 10 Each

8.

Bags, Plastic (Small) 20 Each

9.

Radiation Marking Tape 1 Roll

10.

Coveralls, Paper 25 Pairs

11.

Gloves, Rubber Disposable 2 Boxes

12.

Cardboard Boxes, - 2'x 3' 6 Each

13.

Masslin Cloths 1 Bundle

14.

Step-Off Pad 1 Each I

PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 27 OF 32 1

ATTACHMENT 15 INFORMATION SHEET DISCUSSION 1.1 Annual - Once per calendar year (January 1 through December 31).

1.2 Biennial - Once per two calendar years.

1.3 DRILLS 1.3.1 Communications Tests and Drills - Communications tests involve the use of emergency communications equipment to verify operability.

Communications drills involve use of emergency communications equipment to notify and transfer simulated emergency information to off-site governmental agencies.

1.3.2 Performance Indicator (PI) (ERF) Drill - An ERF drill demonstrated various emergency response capabilities including management and coordination of emergency response, accident assessment, protective action decision-making, and plant system repair and corrective action involving all or certain Emergency Response Facilities (Control Room, Technical Support Center (TSC), Operational Support Center (OSC),

and Emergency Operations Facility (EOF). These drills are conducted at least four times per calendar year and should be conducted approximately once each calendar quarter. One of these drills is designed to satisfy the requirements of an exercise as defined below.

Non-exercise drills provide opportunity to consider accident management strategies. Supervised instruction can be permitted for these drills, with operating staff having the opportunity to resolve problems (success paths) rather than have controllers intervene.

Additionally, non-exercise drills may focus on on-site training objectives.

1.3.3 Medical Emergency Drill - A medical emergency drill involves a simulated contaminated individual, with provisions for activation of the plant First Aid/Personnel Decontamination Team. Participation by local support services (i.e., ambulance and off-site medical treatment facility) is tested separately once per year or as part of the annual medical drill. Medical Emergency Drills are conducted at least once every calendar year.

1.3.4 Radiological Monitoring Drill - Radiological monitoring drills include collection and analysis of air samples, testing of communications, and understanding of messages between Radiological Protection supervision and the off-site monitoring teams. A radiological monitoring drill will be conducted at least once every calendar year.

PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 28 OF 32

ATTACHMENT 15 INFORMATION SHEET 1.3.5 Radiological Protection Drills - Radiological Protection drills test various tasks employed by that department during an emergency condition. Radiological Protection drills are conducted semi-annually and one of the semi-annual drills may be incorporated into the radiological monitoring drill.

1.4 Exercise - An exercise is an event that tests the integrated capability of a major portion of the basic elements existing within the CNS Radiological Emergency Plan. An exercise is required biennially per 10CFR50. Off-site agency participation is required biennially. Exercises are developed, scheduled, and conducted in a manner consistent with the regulations and guidance of 10CFR50, Appendix E, NUREG 0654, and other appropriate regulatory documents. Biennial exercises involving off-site agencies shall be conducted as a Site Area Emergency and should escalate to General Emergency. The exercise scenarios are varied such that all major elements of the Plan are tested at least every 6 years.

1.5 Letter of Agreement (LOA) - Support or assistance from outside agencies is established and maintained through Letters of Agreement or, in some instances, purchase orders/contracts. Letters of Agreement are confirmed annually through correspondence, direct contact, or by telephone. Purchase orders/contracts are renewed as required.

1.6 Monthly - At least once each calendar month, being the first day of each month until the last unless otherwise specified.

1.7 Quarterly - Once per calendar quarter, with the quarters being January through March, April through June, July through September, and October through December.

1.8 Semi-Annual - Twice per calendar year, with one time from January 1 to June 30 and one from July 1 to December 31.

2.

RESPONSIBILITIES 2.1 The Emergency Preparedness Manager is responsible for:

2.1.1 Planning, scheduling, and coordinating emergency exercises involving off-site agencies.

2.1.2 Reviewing Attachment 1, EP Program Maintenance Checklist, upon completion.

2.1.3 Reviewing results of exercises and major drills.

PROCEDURE 5.7.21 1

REVISION 25 PAGE 29 OF 32

ATTACHMENT 15 INFORMATION SHEET 2.2 The Senior Manager of Site Support, with plant management, is responsible for ensuring adequate resources are made available to support and conduct emergency preparedness activities including:

2.2.1 Exercises and drill scenario development and control.

2.2.2 Exercise and drill participation.

2.2.3 Support for maintenance of emergency facilities and equipment.

2.3 The Site Oversight Review Committee (SORC) is responsible to review the following:

2.3.1 Revisions to the CNS Radiological Emergency Plan.

2.3.2 Revisions to Emergency Plan Implementing Procedures (EPIPs).

2.3.3 Quarterly PI Drill Critique Report.

2.4 The Emergency Preparedness (EP) Manager is responsible for:

2.4.1 Maintaining awareness of EP activities.

2.4.2 Ensuring coordination of EP drills and exercises in accordance with this procedure.

2.4.3 Ensuring documentation of EP Program maintenance in, EP Program Maintenance Checklist.

2.4.4 Ensuring documentation of major element demonstration as indicated on Attachment 3, Emergency Plan 6 Year Element Demonstration.

2.4.5 Ensuring critiques of exercises, drills, and actual events are conducted, documented, and that deficiencies are addressed in accordance with plant corrective action practices.

2.4.6 Ensuring that EPIPs are reviewed through feedback from the following sources:

2.4.6.1 Daily use.

2.4.6.2 Drills and exercises.

2.4.6.3 Actual events.

PROCEDURE 5.7.21 REVISION 25 PAGE 30 OF 32

ATTACHMENT 15 INFORMATION SHEET 2.4.6.4 Training.

2.4.6.5 Annual EPIP review as indicated on Attachment 4, EPIP Annual Review.

3.

REFERENCES 3.1 CODES AND STANDARDS 3.1.1 NPPD Emergency Plan for CNS.

3.1.2 NUREG 0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

3.1.3 10CFR50, Domestic Licensing of Production and Utilization Facilities.

3.1.4 Generic Letter #GL 93-01, Emergency Response Data System Test Program.

3.2 PROCEDURES 3.2.1 Administrative Procedure 0-EP-02, Configuration Control of The Automated Notification System (ANS).

3.2.2 Administrative Procedure 0-PI-01, Performance Indicator Program.

3.2.3 Radiological Protection Procedure 9.EPIN.1, Emergency Air Samplers.

3.2.4 Radiological Protection Procedure 9.INST.58, Portable Beta-Gamma Counting Instruments.

3.2.5 Radiological Protection Procedure 9.RADOP.7, Personnel Contamination.

3.3 MISCELLANEOUS 3.3.1 QA Finding 92-1900-24.

3.3.2 RCR 2002-0014.

3.3.3 EPDG #2, Emergency Preparedness Department Guide #2.

I PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 31 OF 32

ATTACHMENT 15 INFORMATION SHEET 3.3.4 RCR 2001-0075 (QA Audit 01-01).

3.3.5 RCR 2002-0520 (QA Audit 02-03).

3.3.6 RCR 2002-0606.

3.4 NRC COMMITMENTS 3.4.1

© NUREG-0737, Item III.D.3.4, Section 5.2, Emergency Provisions (LQA 8000581-11). Commitment affects Step 30 on Attachment 7.

3.4.2

© NRC Inspection Report 01-04 (NLS2001081). Commitment affects Step 2.3.1 on Attachment 2.

I PROCEDURE 5.7.21 1

REVISION 25 1

PAGE 32 OF 32

USE: REFERENCE

(

CNS OPERATIONS MANUAL S:E RNC CPE ION

5.7. EFFECTIVE

6/28/02 EPIP 5.7.23 APPROVAL: SORC OWNER: T. S. HAYNES ACTIVATION OF THE JIC DER EP DEPARTMENT: EP

1.

P U R P O SE............................................................

1

2.

PRECAUTIONS AND LIMITATIONS 1

3.

REQUIREMENTS......................................................

2

4.

INITIAL NOTIFICATION OF THE PADO..................................

2

5.

PUBLIC AFFAIRS DIRECTOR...........................................

3

6.

FACILITY M ANAGER..................................................

5

7.

TECHNICAL BRIEFER.................................................

6

8.

M EDIA M O NITOR.....................................................

7

9.

DESIGNATED SPOKESPERSON.........................................

7

10. PUBLIC INFORMATION OFFICER.......................................

7

11.

RUMOR CONTROL ACTIVITIES.........................................

8

12. PREPARATION AND APPROVAL OF WRITTEN INFORMATION (PRESS)

R E L E A SE S...........................................................

8

13. NEW S CONFERENCES.................................................

9

14. EMPLOYEE INFORMATION ACTIVITIES................................

10

15.

R E C O V E R Y..........................................................

10

16. DEACTIVATION OF THE JIC..........................................

12 ATTACHMENT 1 PAGER CARRIER INSTRUCTIONS....................

13 ATTACHMENT 2 JIC FLOOR PLAN..................................

14 ATTACHMENT 3 INFORMATION SHEET.............................

15

1.

PURPOSE This procedure provides notification and activation instructions in the event of a declared emergency at Cooper Nuclear Station (CNS). It provides instructions for the Public Affairs Duty Officer (PADO) to notify Corporate Communications and NPPD management. It also describes the functions of the Joint Information Center (JIC) and the responsibilities of the JIC staff in the event an emergency is declared at CNS.

2.

PRECAUTIONS AND LIMITATIONS

[ ]

2.1 The Emergency Director approves all written information releases prior to their release.

[ ] 2.2 Accuracy in receiving information regarding an emergency at CNS is extremely important. Be sure the receiver of each message understands its content. Ensure the information is recorded concisely and the reporting official repeats the information and gives his name.

PROCEDURE 5.7.23 1

REVISION 4 PAGE 1 OF 16

2.3 Accuracy in releasing information regarding an emergency at CNS is also extremely important. Always coordinate with other information gatherers before any information is released to the media or the public.

[ ] 2.4 It is imperative that all media releases/briefings be documented.

3.

REQUIREMENTS

[ 1 3.1 An emergency has been declared at CNS per Procedure 5.7.1.

4.

INITIAL NOTIFICATION OF THE PADO

[ ]4.1 The PADO shall be notified by pager of any emergency situation at CNS. The pager will display a return telephone number at CNS.

[I 4.2 I [1 4.3 The PADO shall immediately return a call to the telephone number provided and follow instructions given by the Automated Notification System (ANS).

This will also provide the PADO with information on how to contact the CNS Communicator.

Obtain Procedure 5.7.6, Attachment 3, Cooper Nuclear Station Notification Report. Upon establishing contact with the CNS Communicator, identify yourself as the PADO and request all information from the Initial Cooper Nuclear Station Notification Report. In certain cases, the CNS Communicator may not be available to provide you the information via telephone in a timely manner. In such cases, a fax of the Initial Notification Report is acceptable.

] 4.4 Repeat the emergency information on Procedure 5.7.6, Attachment 3, back to the CNS Communicator, if received via telephone. Forward the Initial Notification Report to the Public Affairs Director.

[I 4.4.1 Request the CNS Communicator to fax all Notification Reports to you.

[ ]

4.4.2 Notify the Vice President - Nuclear of an emergency situation at CNS and relay the information from Procedure 5.7.6, Attachment 3, Cooper Nuclear Station Notification Report.

[ ]

4.4.3 Notify the Chief Executive Officer (CEO) or designee of an emergency situation at CNS and relay the information from Procedure 5.7.6, Attachment 3, Cooper Nuclear Station Notification Report.

I PROCEDURE 5.7.23 1

REVISION 4 1

PAGE 2 OF 16

[I

]

4.5 Advise the CNS Communicator how to provide you further information. Give him a telephone number where you may be reached or tell him to continue to use the pager system.

[]

4.5.1 IN THE EVENT THAT THE JIC NEEDS TO BE ACTIVATED DURING NORMAL OFFICE HOURS (JIC ACTIVATION IS REQUIRED AT A SITE AREA EMERGENCY OR HIGHER CLASSIFICATION. HOWEVER, THE PUBLIC AFFAIRS DIRECTOR AND/OR EMERGENCY DIRECTOR CAN CHOSE TO ACTIVATE AT A LOWER CLASSIFICATION) - Request the NPPD General Office Receptionist to use the building paging system to announce the activation of the JIC. The Public Affairs Director has the responsibility to ensure the JIC is staffed and activated.

[ ]

NOTE - A print-out of qualified JIC personnel can be found in the Corporate Communications office, Public Affairs Director PIM, and the Facility Manager PIM.

[ ]

4.5.2 In the event that the JIC needs to be activated during non-business hours, the Public Affairs Director has the responsibility to ensure members of the JIC staff are contacted and the JIC is activated.

5.

PUBLIC AFFAIRS DIRECTOR

[1 5.1 The Public Affairs Director (PAD) is responsible for the following:

[ ]

5.1.1 Ensuring appropriate JIC staff members have been notified that the JIC is activating.

[ ]

5.1.2 Conducting a roll call to verify JIC Emergency Response positions have been staffed.

[ ]

5.1.3 Obtaining a current plant status report from the Emergency Director.

[ ]

5.1.4 Conducting an initial meeting with key JIC personnel to ensure they are ready to assume their emergency response functions.

[ ]

5.1.5 Declaring the JIC operational.

[ ]

5.1.6 Contacting the EOF Director to inform him that the JIC is operational.

[ ]

5.1.7 Conducting initial and follow-up meetings with the JIC staff and other agencies to ensure everyone has the latest emergency status information.

PROCEDURE 5.7.23 REVISION 4 PAGE 3 OF 16

[1 5.1.8 Coordinating JIC public relations activities by ensuring following activities are performed:

[ ]

5.1.8.1 News conferences.

]

5.1.8.2 Media monitoring.

[ ]

5.1.8.3 Rumor control.

[ ]

5.1.8.4 Employee information.

[ ]

5.1.9 Contacting the CEO and update him on the emergency status.

[ ]

5.1.10 Ensuring appropriate media representatives (AP, Omaha World Herald, etc.) are contacted and informed the JIC is functioning.

[1 5.1.11 Providing the Governmental Affairs office with information concerning the emergency status at CNS.

[ ]

5.1.12 Coordinating activities of the JIC with Media Representatives and moderate the news conferences (who speaks, when, where, etc.).

[ ]

5.1.13 Taking notes in news conferences and assisting the designated Spokesperson, as necessary.

[

5.1.14 Ensuring "press releases" by NPPD are faxed to NRC Region IV Public Information Officer and NRC Operations Center. Fax numbers are located in the Emergency Telephone Directory.

[1 5.1.15 Ensuring following are notified and provided with CNS status:

[ ]

5.1.15.1 LES Public Information.

[ ]

5.1.15.2 Mid American Energy Corporate Communications.

[ ]

5.1.16 Providing status of JIC support efforts to EOF.

[ ]

5.1.17 Providing follow-up contact with the EOF Director, Vice President - Nuclear, and CEO as needed.

[ ]

5.1.18 The PAD will review the written information releases to ensure following items are included:

[1 5.1.18.1 Time of events and declaration.

[ ]

5.1.18.2 Points of contact and/or telephone numbers for news media.

PROCEDURE 5.7.23 1

REVISION 4 PAGE 4 OF 16

[1 ]

5.1.19 The PAD will send the written information release to the Emergency Director for approval.

[ 1 5.1.19.1 The PAD will issue the information release for final processing after receiving the Emergency Directors approval.

6.

FACILITY MANAGER

[ ]6.1 The Facility Manager is responsible for following:

[ ]

6.1.1 Assuming responsibility for all office machines, supplies, and their environment throughout the course of the emergency.

[ ]

6.1.2 Ensuring tables and chairs are set up.

[ ]

NOTE - Emergency Planning Implementing Procedures and Emergency Telephone Directories are located in JIC Cabinet #1. Equipment and supplies can be found in JIC Cabinet #2. Two fax machines for the JIC and two fax machines for the States are located in JIC Cabinet #3.

]

6.1.3 Setting up and verifying operability of all communications equipment.

If any equipment is found to be defective, make arrangements to replace or augment it.

[

6.1.4 Ensuring equipment and supplies are available in the media briefing area (microphones, PA system, literature display, etc.).

]

6.1.5 Establishing and maintaining security by stationing one person at the Board Room Entrance near the General Office Lobby to perform following:

[ ]

6.1.5.1 Register NPPD, State, Federal agency personnel, and media representatives names and affiliations. Ensure media representatives have Media Press Credentials.

[ ]

6.1.5.2 Direct media representatives to briefing area.

[ ]

6.1.5.3 If necessary, acquire additional Security personnel (i.e.,

Columbus Police Department and/or professional security contractor. Guard-Rite Security Services L.L.C. can be contacted at 402-644-8000 or 402-644-7054 (emergencies).

[ ]

6.1.6 Developing a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> schedule for JIC personnel.

I PROCEDURE 5.7.23 1

REVISION 4 PAGE 5 OF 16

[1 6.1.7 Obtaining clerical and administrative support for the JIC staff as necessary.

[ ]

6.1.8 The Facility Manager will post a notice for the scheduled news conference near the briefing area.

[1 6.1.9 Ensuring the JIC is cleaned up and the appropriate equipment is returned to the General Office when the facility is deactivated.

7.

TECHNICAL BRIEFER 1 7.1 The Technical Briefer is responsible for following:

[ ]

7.1.1 Establishing contact with the EOF TIC.

[ ]

7.1.2 Receiving technical information for use by the designated Spokesperson in news conferences.

[ ]

7.1.3 Providing technical information to the Public Affairs Director (PAD).

[ ]

7.1.4 Assisting in the review of statements to the media by providing clarification of the technical data.

]

7.1.4.1 The type, severity, and extent of the emergency at CNS.

]

7.1.4.2 The plant's current status (i.e., stable, improving, or deteriorating).

]

7.1.4.3 Any changes in the emergency classification.

[ ]

7.1.4.4 A description of the latest developments regarding the emergency situation.

[ 1 7.1.4.5 The prognosis for, or magnitude of, any radiological releases from the plant and the associated meteorological conditions.

[1 7.1.4.6 A description of those actions taken or currently being undertaken to mitigate the emergency and place the plant in a safe and stable condition.

[1 7.1.4.7 Forward the information release to the PAD.

[ ]

7.1.5 Organizing the appropriate technical information for use in development of news conferences and communiques.

I PROCEDURE 5.7.23 1

REVISION 4 1

PAGE 6 OF 16

[1 7.1.6 Responding to technical questions that were asked by the media during news conferences and organize the appropriate responses for use in development of the upcoming news release, if necessary.

8.

MEDIA MONITOR

[ 8.1 The Media Monitor is responsible for following:

[ ]

8.1.1 Assisting in assembling equipment necessary for operation of the public information effort.

[ 1 8.1.2 Monitoring and recording radio and television network newscasts, particularly the EAS stations associated with CNS. Inform Public Affairs Director (PAD) of any misinformation being generated by or through the media.

[ ]

8.1.3 Remaining available to PAD for media monitoring assignments relative to emergency response by the District.

9.

DESIGNATED SPOKESPERSON

[ ] 9.1 The designated Spokesperson is responsible for following:

[ ]

9.1.1 The designated Spokesperson will represent NPPD during news conferences and present prepared statements to the media.

10. PUBLIC INFORMATION OFFICER

[1 ]10.1 The Public Information Officer (PIO) is responsible for:

[ ]

10.1.1 Making arrangements for two laptops and one printer to be brought to the JIC facility.

[ ]

10.1.2 Coordinating activities with Public Information Officers from other agencies (state and federal).

[ ]

10.1.3 The PIO will prepare written information releases for the news media and the public as needed.

[ ]

10.1.4 Assisting with the rumor control function in the JIC.

[ ]

10.1.5 Assisting with response to public inquiries, if necessary.

[1 10.1.6 Responding to public inquiry calls directed to NPPD at the JIC in cooperation with State and Federal personnel.

[ ]

10.1.7 Provide support to the District's designated Spokesperson.

PROCEDURE 5.7.23 REVISION 4 PAGE 7 OF 16

11.

RUMOR CONTROL ACTIVITIES

[] 11.1 Rumor control personnel shall relay rumors or misinformation and trends in information to the Public Affairs Director (PAD).

[ ]

11.1.1 PAD will ensure rumors and misinformation are addressed in a timely manner in either a news conference or a telephone call.

]

11.1.2 As appropriate, rumors or misinformation regarding state or county activities will referred to the state or county Public Information Officer located in the JIC.

12. PREPARATION AND APPROVAL OF WRITTEN INFORMATION (PRESS)

RELEASES

[ ]

12.1 At a minimum, written information releases should be prepared following activation of the JIC and cancellation of the emergency (i.e., resumption of normal plant operations); however, written information releases should be prepared as events related to the emergency dictate to ensure the news media and the public are kept informed, and to preclude the dissemination of misinformation. Such information releases should also be prepared when a change in emergency classification occurs.

[ ] 12.2 The Public Information Officer will prepare written information releases for the news media and the public as needed.

[ ] 12.3 The Technical Briefer will ensure the information release is accurate with regard to following:

[ ]

12.3.1 The type, severity, and extent of the emergency at CNS.

[ ]

12.3.2 The plant's current status (i.e., stable, improving, or deteriorating).

[1 12.3.3 Any changes in the emergency classification.

[1 12.3.4 A description of the latest developments regarding the emergency situation.

[ 1 12.3.5 The prognosis for, or magnitude of, any radiological releases from the plant and the associated meteorological conditions.

[]

12.3.6 A description of those actions taken or currently being undertaken to mitigate the emergency and place the plant in a safe, stable condition.

[

12.3.7 Forward the information release to the Public Affairs Director (PAD).

I PROCEDURE 5.7.23 1

REVISION 4 PAGE 8 OF 16

]

12.4 The PAD will review the written information releases to ensure following items are included:

[ ]

12.4.1 Time of events and declaration.

[ ]

12.4.2 Points of contact and/or telephone numbers for news media.

[ ]12.5 The PAD will send the written information release to the Emergency Director for approval.

[ ]

12.5.1 The PAD will generate the information release for final processing after receiving the Emergency Directors approval.

[]

12.6 DISTRIBUTION OF WRITTEN INFORMATION RELEASES

[ ]

12.6.1 The PAD's Secretary will distribute copies of the written information releases to following:

[ 1 12.6.1.1 Facility Manager for inclusion on the media materials desk.

]

12.6.1.2 Federal and State Public Information Officers in the JIC.

[ ]

12.6.1.3 Fax copies to the Governmental Affairs Office, NRC Region IV Public Information Officer, NRC Operations Center, LES Public Information, and Mid American Energy Corporate Communications. Fax numbers are located in the Emergency Telephone Directory.

13. NEWS CONFERENCES

[ ] 13.1 News conferences should be conducted as events related to the emergency dictate; however, it is recommended, at a minimum, news conferences be conducted at least once each day, until such time that the plant has been placed in a safe and stable condition.

[ ] 13.2 The Public Affairs Director (PAD) should schedule news conferences held in the JIC and announce the time to the media representatives, if possible.

[ 1 13.3 The Facility Manager will post a notice for the scheduled news conference near the briefing area.

[ ]13.4 Prior to the news conference the designated Spokesperson, PAD, Public Information Officer, and the appropriate State and Federal personnel shall meet to discuss the content and organization of the news conference.

[ ]

13.5 The PAD should serve as the moderator for all news conferences.

PROCEDURE 5.7.23 1

REVISION 4 1

PAGE 9 OF 16

[ ]

13.6 The designated Spokesperson will present prepared statements to the media during news conferences.

[ ]

13.7 The Technical Briefer should respond to technical questions that were asked by the media during news conferences and organize the appropriate responses for use in development of the upcoming news release, if necessary.

14. EMPLOYEE INFORMATION ACTIVITIES

]

14.1 Contact NPPD Regional System Control (Norfolk and Kearney), Transmission Control Center (Doniphan), Gerald Gentleman Station, and Sheldon Station and:

[1 14.1.1 Inform the area Managers of the emergency status at CNS. Updates need to be sent out as appropriate.

[ J 14.2 Contact the Customer Care Call Center in Norfolk and have them update the Customer Care Manager or designee of the emergency status at CNS.

[ ]

14.3 Notify PAD immediately upon completion of these tasks.

[

14.4 Update the area Managers, as appropriate.

]

14.5 Respond to telephone requests for information, as necessary.

15. RECOVERY

]

15.1 The Emergency Director at CNS evaluates the effectiveness of corrective actions taken at the Station and determines if the emergency is under control as discussed in Section 9 of the NPPD Emergency Plan for CNS. When the emergency is determined to be under control and at the direction of the Emergency Director, a Recovery Panel is activated. The Panel may consist of following personnel:

[ ]

15.1.1 Emergency Director.

[ ]

15.1.2 Emergency Operations Facility Director (EOF).

[ ]

15.1.3 Technical Support Center Director (TSC).

[ ]

15.1.4 Public Affairs Director (JIC).

[ ]

15.1.5 Radiological Control Manager (EOF).

I PROCEDURE 5.7.23 1

REVISION 4

-]

PAGE 10 OF 16 1

]

15.2 Accuracy in releasing information regarding an emergency at CNS is extremely important. Always coordinate and verify information before a statement is made to the media or the public.

]

15.3 All actions necessary during recovery operations cannot be anticipated. Most actions necessary during recovery from an accident at CNS will be dependent upon the conditions of the event. Personnel need to be alert, anticipate and identify problem situations, and communicate effectively.

[ ] 15.4 When the Recovery Panel is activated by the Emergency Director at CNS, JIC activities will be as follows:

[ ]

15.4.1 The Public Affairs Director will represent the JIC on the Recovery Panel by conference call.

[1 15.4.2 Notifying JIC personnel of Recovery Panel activation.

[ ]

15.4.3 Providing input to the Recovery Panel, as appropriate.

[ ]

15.4.4 Providing Legislative Affairs office with current emergency information.

[ ] 15.5 When Recovery Panel activities are terminated, JIC activities will be as follows:

J 15.5.1 The Public Affairs Director will:

[ J 15.5.1.1 Brief JIC personnel of any Recovery Panel decisions and information, as appropriate.

[ ]

15.5.1.2 Ensure the Facility Manager is informed of the CNS emergency status and expected time frame for future actions.

[ ]

15.5.1.3 Instruct JIC personnel to continue with facility activities.

[ ] 15.6 When the decision has been made to initiate the Recovery Organization, JIC activities will be as follows:

[ ]

15.6.1 The Public Affairs Director

[ ]

15.6.1.1 Notify JIC personnel of the decision to activate the Recovery Organization.

[1 15.6.1.2 Contact the Vice President - Nuclear to discuss the expected time frame for maintaining JIC activities.

I PROCEDURE 5.7.23 1

REVISION 4 1

PAGE 11 OF 16 j

[ ]

15.6.1.3 Deactivate the JIC, as necessary.

[ ]

15.6.1.4 Provide Legislative Affairs office with emergency and recovery operation information.

15.7 Overall activities of the JIC after activation of the Recovery Organization are as follows:

[ ]

15.7.1 Support the CEO and his interface with District Board members as well as other governmental officials.

[lI 15.7.2 Ensure all NPPD information provided to state and federal organizations and media sources is current and correct.

]

15.7.3 Ensure all NPPD information is relayed to the public in a timely manner and without distortion.

S]

15.7.4 Ensure sources of misinformation are located and erroneous information is corrected.

16. DEACTIVATION OF THE JIC

[

16.1 The Facility Manager shall supervise the deactivation of the JIC.

[

16.2 All personnel shall restore their work stations to the pre-emergency configurations.

]

16.3 All personnel shall surrender their logs and other records to the Facility Manager.

]

16.4 The Facility Manager shall forward all logs and other records to the Emergency Preparedness Office at CNS.

I PROCEDURE 5.7.23 1

REVISION 4 1

PAGE 12 OF 16

I ATTACHMENT 1 PAGER CARRIER INSTRUCTIONS The person carrying the pager is responsible for the following:

1.

Keep the pager "ON" at all times when scheduled to carry the pager.

2.

Familiarity with the operation of the digital display pager, how it operates, what the codes mean, how to reset the pager, etc. If you have questions about the pager use or need an additional copy of the pager operating instructions, contact the CNS Emergency Preparedness Department.

3.

Report to the JIC, as appropriate, when the pager is activated for an emergency as indicated by the display on the pager. The following codes will be displayed on the pager.

I PROCEDURE 5.7.23 1

REVISION 4 1

PAGE 13 OF 16 PAGER CODES AND INFORMATION/ACTIONS

SUMMARY

CODE RESPONSE TO CODE 100 NOUE: EP AND PADO RESPONSE ONLY 222 RESPONSE TO CNS IF FIT FOR DUTY 333 RESPOND TO THE ALTERNATE EOF IF FIT FOR DUTY 600 DRILL ERO CALL IN TEST 622 DRILL - RESPOND TO CNS IF FIT FOR DUTY 633 DRILL - RESPOND TO THE ALTERNATE EOF IF FIT FOR DUTY I

I ATTACHMENT 2 JIC FLOOR PLAN 5-7-23A Figure 1 I

PROCEDURE 5.7.23 1

REVISION 4 1

PAGE 14 OF 16

ATTACHMENT 3 INFORMATION SHEET DISCUSSION 1.1 The CNS Control Room makes the initial notification to General Office Emergency Response personnel upon declaration of an emergency classification. The JIC may be placed on standby during an ALERT and will be manned and activated upon the declaration of a SITE AREA EMERGENCY or GENERAL EMERGENCY.

1.2 As discussed in the NPPD Emergency Plan for CNS, the JIC is a media briefing area. At this site, NPPD coordinates press briefings with state and federal emergency response personnel. During an emergency response, the major function of the JIC is:

1.2.1 Coordinate the development and dissemination of information to the news media.

1.2.2 Conduct media monitoring.

1.2.3 Maintain rumor control.

1.2.4 Provide NPPD employees with information concerning the emergency.

1.3 The JIC is located in the third floor Conference Rooms of the Columbus General Office Building. Attachment 2 shows the floor plan of the JIC.

1.3.1 At a minimum during emergency response activities, the JIC should be staffed with following personnel:

1.3.1.1 Public Affairs Director.

1.3.1.2 Technical Briefer.

1.3.1.3 Public Information Officer.

1.4 POSITION INSTRUCTION MANUALS (PIMs) 1.4.1 Positional Instruction Manuals (PIMs) contain positional checklists for the activation and operation of the JIC and are to be utilized by all JIC positions. PIMs are numbered and controlled by the Emergency Preparedness Department, labeled by ERO position, and are located in JIC Cabinet #1.

1.4.1.1 Public Affairs Director - PIM #1.

1.4.1.2 Public Affairs Director Secretary - PIM #2.

PROCEDURE 5.7.23 1

REVISION 4 1

PAGE 15 OF 16

I ATTACHMENT 3 INFORMATION SHEET I

1.4.1.3 1.4.1.4 1.4.1.5 1.4.1.6 1.4.1.7 1.4.1.8 1.4.1.9 Designated Spokesperson - PIM #3.

Facility Manager - PIM #4.

Technical Briefer - PIM #5.

Media Monitor - PIM #6.

Public Information Officer - PIM #7.

Rumor Control - PIM #8.

Employee Information - PIM #9.

2.

REFERENCE 2.1 Emergency Plan Implementing Procedure 5.7.1, Emergency Classification.

2.2 Emergency Plan Implementing Procedure 5.7.6, Notification.

I PROCEDURE 5.7.23 1

REVISION 4 1

PAGE 16 OF 16 j

USE: REFERENCE CNS OPERATIONS MANUAL EFEC E:

/60 EPIP PROCEDURE 5.7.25 APPROVA: SOR0 APPROVAL: SORC OWNER: J. G. KELSAY RECOVERY OPERATIONS DERTMENT: EP DEPARTMENT: EP

1.

PU R P O SE............................................................

1

2.

PRECAUTIONS AND LIMITATIONS 1

3.

REQUIREM ENTS......................................................

1

4.

DETERMINATION OF STATION DAMAGE AND CONTAMINATION..........

2

5.

REPAIR, MODIFICATION, AND DECONTAMINATION......................

3

6.

NRC RESPONSE......................................................

3 ATTACHMENT 1 INFORMATION SHEET..............................

5

1.

PURPOSE This procedure describes the general guidelines used to determine whether or not an emergency is under control, the damage and radiological surveys necessary prior to recovery operations, and the organizational control of recovery operations.

2.

PRECAUTIONS AND LIMITATIONS

[ ] 2.1 Following any emergency involving radiological hazards, exposure to personnel should be kept as low as reasonably achievable consistent with the nature of the recovery operation required.

[ ] 2.2 Recovery operations commence with the station in a controlled, stable condition. No action is to be taken which might jeopardize this condition without the approval of the Site Vice President.

[ ] 2.3 Continually monitor station conditions. Be prepared to re-escalate the Emergency Class should conditions degrade.

3.

REQUIREMENTS

[ ] 3.1 Ensure the following equipment and materials are available, as needed:

[ ]

3.1.1 Recovery operations will be performed using existing station equipment to the maximum extent possible. Special and/or additional equipment will be obtained when required to complete the recovery operation in a safe and efficient manner.

[ 1 3.2 Radiation levels are stable or decreasing with time.

[ ] 3.3 Releases of radioactive materials to the environment have ceased or are controlled within permissible license limits.

PROCEDURE 5.7.25 REVISION 16 PAGE 1 OF 5

[ ] 3.4 Fire, flooding, or other similar emergency conditions no longer constitute a hazard to the station or station personnel.

[ 3.5 Measures have been successfully instituted to correct or compensate for malfunctioning equipment or barriers designed to contain radioactive materials.

4.

DETERMINATION OF STATION DAMAGE AND CONTAMINATION

[]

4.1 INITIAL STATION SURVEY

[ ]

4.1.1 For known or significant station damage, and at the discretion of the Plant Manager, survey teams will be formed consisting of Operations, Engineering, Maintenance, and Radiological Protection personnel.

[ ]

4.1.2 These teams, following pertinent guidance contained in Procedure 5.7.15, will perform an organized survey of the station to ascertain the extent of physical damage and areas of contamination/high radiation. The results of these initial surveys will be used by the Plant Manager and Radiological Manager in planning the detailed surveys described below.

[]

4.2 DETAILED STATION SURVEYS

[ ]

4.2.1 Using the information obtained above, the Radiological Manager will dispatch properly equipped Radiological Protection Technicians to perform detailed surveys of any areas known to contain radiological hazards.

[ ]

4.2.1.1 Each area shall be posted and access controlled per Radiological Protection procedures.

[1 4.2.1.2 Station Radiological Survey Maps will be used to record the boundaries of these areas.

[ 3 4.2.1.3 Station Chemistry Technicians may be dispatched to take and analyze a reactor coolant sample if conditions dictate.

[ ]

4.2.1.4 Provisions have been made to take and analyze coolant and containment samples within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> of the time a decision is made that samples are required.

I PROCEDURE 5.7.25 1

REVISION 16 1

PAGE 2 OF 5

5.

REPAIR, MODIFICATION, AND DECONTAMINATION

[]

5.1 PLANNING

[ ]

5.1.1 Activities such as modification, decontamination, installation, repair, and maintenance of existing station system components and determining the need for additional manpower, portable shielding, special procedures, environmental concerns, etc., will be discussed, prioritized, and planned.

[ ]

5.1.2 Scheduling Manager and Maintenance Manager will develop an overall schedule to guide, track, and expedite the recovery effort.

[]

5.2 TRAINING

[ ]

5.2.1 CNS Training Manager will coordinate the development and conduct of specific training for personnel needed to assist in recovery operations. Special training materials will be developed and training conducted as needed for special work tasks.

[ ]5.3 RECOVERY IMPLEMENTATION

[ ]

5.3.1 Normal station practices will be followed concerning maintenance, repair, modification, decontamination, and personnel exposure control wherever practical.

[ ]

5.3.2 Radiological Manager, in coordination with state and federal officials, will periodically estimate total population exposure.

[ J 5.3.3 As recovery operations proceed, any unforeseen problems encountered will be evaluated and factored into the recovery plan. The schedule will be adjusted accordingly.

[ ]

5.3.4 Technical Specification, Technical Requirements Manual, and Off-Site Dose Assessment Manual compliance will be verified prior to resuming normal station operations.

6.

NRC RESPONSE

[ J 6.1 During an accident, NRC response may be expected for all severe events resulting in the declaration of an Emergency Classification. Provisions have been made to accommodate these co-located, advisory personnel.

I PROCEDURE 5.7.25 1

REVISION 16 1

PAGE 3 OF 5 1

[] 6.2 POST-ACCIDENT

]

6.2.1 Depending upon the severity of the event or equipment involved, the NRC may decide to form an Incident Investigation Team for dispatch to the site. Every effort will be made to accommodate and cooperate with this team in their investigation. The primary contact for this team will be the Site Vice President.

I PROCEDURE 5.7.25 1

REVISION 16 1

PAGE 4 OF 5 1

ATTACHMENT 1 INFORMATION SHEET DISCUSSION 1.1 Recovery operations allow for the smooth transition from Emergency Response Organization operations to normal operations with the safety of the public and station personnel being of the utmost priority.

1.2 Based on the consideration of general guidelines, the Emergency Director shall determine the emergency to be under control and activate the Recovery Panel as per Section 9.0 of the Emergency Plan.

1.3 The purpose of the Recovery Panel is to evaluate emergency termination considerations, plant status parameters, and plan for and implement recovery operations. Based upon Recovery Panel discussions, the Site Vice President or designee may initiate the Recovery Organization.

1.4 The Recovery Organization as defined in Section 9.0 of the Emergency Plan is made up of the normal Nuclear Power Group organization as Recovery operations will be handled much the same as outage operations, under the control of the Site Vice President or designee.

2.

REFERENCES 2.1 CODES AND STANDARDS 2.1.1 NPPD Emergency Plan for CNS.

2.1.2 NUREG 0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

2.1.3 NUREG 0737, Clarification of TMI Action Plan Requirements, November 1980.

2.2 PROCEDURES 2.2.1 Emergency Plan Implementing Procedure 5.7.15, OSC Team Dispatch.

2.2.2 Emergency Plan Implementing Procedure 5.7.23, Activation of the JIC.

I PROCEDURE 5.7.25 1

REVISION 16 1

PAGE 5 OF 5