{{#Wiki_filter:Sequoyah Nuclear Plant                                   Page    11 PER Workorder Needing MRC or Supervisor Review Printout                     PER256s 01/29/02 Recommend Levi Oper A Recommend Org  Repo S Pot   Pot Pot WorkOrder/Sta Entry Dt   Department       Identified By         Supervisor           Systems Units D Template:     FE   ME Oper Repo 91-18 the card replacement heard the adapter fail and took the necessary steps to locate the missing part. Due to its location, planning to remove additional cards was obtained.
{{#Wiki_filter:Sequoyah Nuclear Plant PER Workorder Needing MRC or Supervisor Review Printout Page 11 PER256s 01/29/02 Recommend Levi Recommend Org Oper A Repo S Pot Pot Pot WorkOrder/Sta Entry Dt Department Identified By Supervisor Systems Units D Template:
FE ME Oper Repo 91-18 the card replacement heard the adapter fail and took the necessary steps to locate the missing part. Due to its location, planning to remove additional cards was obtained.
***** IMMEDIATE ACTION TAKEN *****
***** IMMEDIATE ACTION TAKEN *****
02-000822-000 01/28/2002 OPS 1             17:11 N
02-000822-000 01/28/2002 OPS 1
17:11 N
***** DESCRIPTION OF CONDITION *****
***** DESCRIPTION OF CONDITION *****
The current Appendix - R program requires the Reactor Vessel Head Vent Valve fuses to be removed as a pre-emptive manual action for any declared Appendix-R fire. For fires in the 6.9 kv Shutdown Board Rooms, the accomplishment of this action may require the use of fire fighter 'turn-out' gear. Operations shift personnel are no longer qualified to utilize 'turn-out' gear nor does Operations maintain 'turn-out' gear for Operations shift personnel.
The current Appendix - R program requires the Reactor Vessel Head Vent Valve fuses to be removed as a pre-emptive manual action for any declared Appendix-R fire.
For fires in the 6.9 kv Shutdown Board Rooms, the accomplishment of this action may require the use of fire fighter 'turn-out' gear.
Operations shift personnel are no longer qualified to utilize 'turn-out' gear nor does Operations maintain 'turn-out' gear for Operations shift personnel.
***** IMMEDIATE ACTION TAKEN *****
***** IMMEDIATE ACTION TAKEN *****
        -r_}}
-r_}}

Latest revision as of 03:30, 16 January 2025

Per Workorder Needing MRC or Supervisor Review Printout
ML041100733
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/29/2002
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0358
Download: ML041100733 (1)


Text

Sequoyah Nuclear Plant PER Workorder Needing MRC or Supervisor Review Printout Page 11 PER256s 01/29/02 Recommend Levi Recommend Org Oper A Repo S Pot Pot Pot WorkOrder/Sta Entry Dt Department Identified By Supervisor Systems Units D Template:

FE ME Oper Repo 91-18 the card replacement heard the adapter fail and took the necessary steps to locate the missing part. Due to its location, planning to remove additional cards was obtained.

          • IMMEDIATE ACTION TAKEN *****

02-000822-000 01/28/2002 OPS 1

17:11 N

          • DESCRIPTION OF CONDITION *****

The current Appendix - R program requires the Reactor Vessel Head Vent Valve fuses to be removed as a pre-emptive manual action for any declared Appendix-R fire.

For fires in the 6.9 kv Shutdown Board Rooms, the accomplishment of this action may require the use of fire fighter 'turn-out' gear.

Operations shift personnel are no longer qualified to utilize 'turn-out' gear nor does Operations maintain 'turn-out' gear for Operations shift personnel.

          • IMMEDIATE ACTION TAKEN *****