{{#Wiki_filter:}} | {{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 FEB j 0 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen: | ||
In the Matter of )) Docket No. 50-390 Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN) - JANUARY 2003 MONTHLY OPERATING REPORT Enclosed is the January 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4. If you have any questions concerning this matter, please call me at (423) 365-1824. | |||
Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc: See page 2 Prmted o, recycded paper | |||
U.S. Nuclear Regulatory Commission Page 2 FEB 1 0 2003 cc (Enclosure): | |||
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 | |||
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN) | |||
MONTHLY OPERATING REPORT JANUARY 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1 | |||
OPERATING DATA REPORT Doc ket No. 50-390 Unit Name: WBN Unit 1 Dat February 5, 2003 Con npleted By- P. P. Salkeld Tele phone. (423) 365-3635 Rep orting Period: January 2003 | |||
: 1. Design Electrical Rating (MWe-Net): 1155 2 Maximum Dependable Capacity (MWe-Net): 1125 Month Year-to-Date Cumulative | |||
: 3. Number of Hours Reactor was Critical 744 744 53909.5 | |||
: 4. Hours Generator On-Line 744 744 53644.2 | |||
: 5. Unit Reserve Shutdown Hours 00 0.0 0.0 | |||
: 6. Net Electrical Energy Generated (M'Wh) 874381 874381 59340449 E-2 | |||
UNIT SHUTDOWNS DOCKET NO: 50-390 UNIT NAME: WBN-1 DATE: February 5, 2003 COMPLETED BY: P. P. Salkeld TELEPHONE: (423) 365-3635 REPORT PERIOD: Januar 2003 Type' Duration Reason 2 Method Licensee System --,Component Cause and Corrective Action to*, | |||
No. Date Codeode 4 Prevent Recurrence | |||
,(Hour) ' .of . Event Shutting Report No. | |||
Down None N/A N/A N/A N/A N/A N/A N/A N/A The unit operated at or near 100% power for the entire month of January. | |||
2 Reason: 3Method 4 Instructions for Preparation of | |||
'F: Forced A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee S: Scheduled B-Maintenance or Test 2-Manual Trip/Scram Event Report (LER) | |||
C-Refueling 3-Automatic Trip/Scram (NUREG - 1022) | |||
D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Other (Explain) | |||
F-Administrative G-Operational Error (Explain) | |||
H- Other (Explain) | |||
Summary: The unit operated at or near 100% power for the entire month of January. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month. | |||
E-3}} | |||
Revision as of 02:14, 26 March 2020
| ML030440078 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 02/10/2003 |
| From: | Pace P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML030440078 (5) | |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 FEB j 0 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of )) Docket No. 50-390 Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN) - JANUARY 2003 MONTHLY OPERATING REPORT Enclosed is the January 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4. If you have any questions concerning this matter, please call me at (423) 365-1824.
Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc: See page 2 Prmted o, recycded paper
U.S. Nuclear Regulatory Commission Page 2 FEB 1 0 2003 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT JANUARY 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1
OPERATING DATA REPORT Doc ket No. 50-390 Unit Name: WBN Unit 1 Dat February 5, 2003 Con npleted By- P. P. Salkeld Tele phone. (423) 365-3635 Rep orting Period: January 2003
- 1. Design Electrical Rating (MWe-Net): 1155 2 Maximum Dependable Capacity (MWe-Net): 1125 Month Year-to-Date Cumulative
- 3. Number of Hours Reactor was Critical 744 744 53909.5
- 4. Hours Generator On-Line 744 744 53644.2
- 5. Unit Reserve Shutdown Hours 00 0.0 0.0
- 6. Net Electrical Energy Generated (M'Wh) 874381 874381 59340449 E-2
UNIT SHUTDOWNS DOCKET NO: 50-390 UNIT NAME: WBN-1 DATE: February 5, 2003 COMPLETED BY: P. P. Salkeld TELEPHONE: (423) 365-3635 REPORT PERIOD: Januar 2003 Type' Duration Reason 2 Method Licensee System --,Component Cause and Corrective Action to*,
No. Date Codeode 4 Prevent Recurrence
,(Hour) ' .of . Event Shutting Report No.
Down None N/A N/A N/A N/A N/A N/A N/A N/A The unit operated at or near 100% power for the entire month of January.
2 Reason: 3Method 4 Instructions for Preparation of
'F: Forced A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee S: Scheduled B-Maintenance or Test 2-Manual Trip/Scram Event Report (LER)
C-Refueling 3-Automatic Trip/Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H- Other (Explain)
Summary: The unit operated at or near 100% power for the entire month of January. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month.