|
|
| Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Malling Addr:sa Alabama Power Company 600 North 18th Street Post Office Box 2641 Darmingham. Alabama 35291 Telephone 205 783-6081 F. L. Cf myton, Jr. | | {{#Wiki_filter:}} |
| a l=''C*:"o*"' Alabamalbwer tre soutten electnc system September 21, 1982 Docket No. 50-348 Docket No. 50-364 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. S. A. Varga RE: Joseph M. Farley Nuclear Plant Units 1 and 2
| |
| | |
| ==Dear Sir:==
| |
| | |
| Enclosed are copies of Revision 4 and Revision 5 to the Joseph M.
| |
| Farley Nuclear Plant Security Plan. Revision 4 incorporates changes that reflect guidance given in Review Guideline No. 7, Revision 3, dated February 16, 1982. Revision 5 makes changes to the plan to delete sec-tions and text associated with the Unit 2 construction phase. Also in Revision 5 the screening measures applied to new employees has been in-corporated into Section 1.3.1.3. Enclosed with Revision 5 is a listing of all the changes made and the reason for the change. This list should be helpful in your review of these changes.
| |
| These changes have been made in accordance with 10CFR50.54(p) and this submittal constitutes the required report.
| |
| y very truly, ENCLOSURE CONTAU!3 SAFEGUARDS INFORMATION.
| |
| UPON SEPARATION THIS PAGE IS DECONTGOLLED. G''
| |
| F. Clayton, r, FLCJr/JGS:nac Enclosures xc: Mr. J. P. O'Reilly (w/ Enclosures)
| |
| Mr. N. M. Haller (w/ Enclosures)
| |
| Mr. G. F. Trowbridge {
| |
| Mr. R. A. Thomas Mr. W. H. Bradford g ,\\
| |
| File I t
| |
| 0210010195 820921 PDR ADOCK 05000348 F PDR}}
| |