{{#Wiki_filter:VARIOUS CHECKLISTS FOR THE FERMI RETAKE EXAMINATION JULY 7,2003
{{#Wiki_filter:VARIOUS CHECKLISTS FOR THE FERMI RETAKE EXAMINATION - JULY 7,2003  


ES-201                                 Examination Preparation Checklist                     Form ES-201-1 Date of Examination: 7 03 Target Date*
ES-201 Examination Preparation Checklist Form ES-201-1 Target Date*
Mpid~q &+cjTask Description ke K Y Q ~
Mpid~q &+cj ke K Y Q ~
                                                              / Reference Chief Examiner's Initials
Task Description / Reference  
: 1)    -1 80    I  1. Examination administration date confirmed (C.l .a; C.2.a & b) 1      -120    I 2. NRC examiners and facility contact assigned (C.1 .d; C.2.e)
-1 20
                                ~~                 ~     ~                   ~
-1 20
5e
[-go]
      -1 20      3. Facility contact briefed on security & other requirements (C.2.c)           6P
~~  
      -1 20      4. Corporate notification letter sent (C.2.d)
~  
[-go]      [5. Reference material due (C.1 .e; C.3.c)l 1       -75     I 6. Integrated examination outline(s) due (C.1 .e & f; C.3.d)
~  
        -70       7. Examination outline@) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)
~
        -45      8. Proposed examinations, supporting documentation, and reference materials due ((3.1 .e, f, g & h; C.3.d)
: 3. Facility contact briefed on security & other requirements (C.2.c)
        -30      9. Preliminary license applications due (C.1 .I; C.2.g; ES-202)               PP
: 4. Corporate notification letter sent (C.2.d)
        -14      10. Final license applications due and assignment sheet prepared (C.l .I; C.2.g; ES-202)                                                 64 1 1. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.9
[5. Reference material due (C.1.e; C.3.c)l Date of Examination: 7-7- 03 Chief Examiner's Initials
: 12. Examinations reviewed with facility licensee (C.l .j; C.2.f & h; C.3.g)
: 1)
I        -7
-1 80 I 1. Examination administration date confirmed (C.l.a; C.2.a & b) 11
: 13. Written examinations     +
-1 20 I 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) 5e 6P 11
NRC supervisor (C.2.i; C.3.h)
-75 I 6. Integrated examination outline(s) due (C.1.e & f; C.3.d)  
                                                                                    ,c//t of il      -7
-70
: 7. Examination outline@) reviewed by NRC and feedback provided
: 8. Proposed examinations, supporting documentation, and
: 9. Preliminary license applications due (C.1.I; C.2.g; ES-202)
: 10. Final license applications due and assignment sheet prepared to facility licensee (C.2.h; C.3.e) reference materials due ((3.1.e, f, g & h; C.3.d)
(C.l.I; C.2.g; ES-202)  
-45
-30 P P
-1 4 64 1 1. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.9
: 12. Examinations reviewed with facility licensee (C.l.j; C.2.f & h; C.3.g)
II
-7
: 13. Written examinations +  
,c//t NRC supervisor (C.2.i; C.3.h) o f il
-7
: 14. Final applications reviewed; assignment sheet updated; waiver letters sent (C.2.g, ES-204)
: 14. Final applications reviewed; assignment sheet updated; waiver letters sent (C.2.g, ES-204)
: 15. Proctoring/written exam administration guidelines reviewed with
: 15. Proctoring/written exam administration guidelines reviewed with facility licensee and authorization granted to give written exams (if applicable) (C.3.k)
        -7            facility licensee and authorization granted to give written exams (if applicable) (C.3.k)                                                   OP
OP  
        -7     I 16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)
-7
: 16. Approved scenarios, job performance measures, and questions  
-7 I distributed to NRC examiners (C.3.i)
Target dates are keyed to the examination date identified in the corporate notification letter.
Target dates are keyed to the examination date identified in the corporate notification letter.
They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
[ ]      Applies only to examinations prepared by the NRC.
Applies only to examinations prepared by the NRC.
NUREG-1021, Revision 8, Supplement 1                   22 of 24
[ ]
NUREG-1021, Revision 8, Supplement 1 22 of 24  


Detroit Edison July 17,2003 NANT-03-0 110                                080 1.26 Mr. B. Palagi Region III U.S . Nuclear Regulatory Commission 80 1 Warrenville Road Lisle, IL 60532-4351
Detroit Edison July 17,2003 NANT-03 -0 1 10 080 1.26 Mr. B. Palagi Region III U. S. Nuclear Regulatory Commission 80 1 Warrenville Road Lisle, IL 60532-4351  


==Dear Mr. Palagi:==
==Dear Mr. Palagi:==
Fermi 2 administered an initial written retake license exam on July 7, 2003. Enclosed please find the remaining material required in accordance with NUREG-102 1, ES-50 1.
Original Form ES-201-3, "Examination Security Agreement," with a pre and post-examination signature for each individual who had detailed knowledge of the written examination 0
If you have any questions or comments regarding the contents of these materials please contact Mr. AI Mann at 734-586-4067.
Sincerely, Larry'D. d&ders Manager, Nuclear Training Fermi 2 Enclosure


Fermi 2 administered an initial written retake license exam on July 7, 2003. Enclosed please find the remaining material required in accordance with NUREG- 1021, ES-50 1.
x Examination Security Agreement Form ES-201-3 ES-201
0  Original Form ES-201-3, "Examination Security Agreement," with a pre and post-examination signature for each individual who had detailed knowledge of the written examination If you have any questions or comments regarding the contents of these materials please contact Mr. AI Mann at 734-586-4067.
: 1.
Sincerely, Larry'D. d&ders Manager, Nuclear Training Fermi 2 Enclosure
Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 717 /AS as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC. Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
: 2.
Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 7/7/03. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
PRINTED NAME JOB TiTLE I RESPONSIBILITY SIGNATURE (I)
DATE SIGNATURE (2) DATE NOTE NOTES:
25 of 25 NUREG-I 021, Draft Revision 9


-.                                                                                x                                                                --
SECURITY AGREEMENT CLARIFICATION SIMULATOR DYNAMIC EXAMINATION PRINT NAME PHE-EXAMINATION CERTIFICATION DATE~TIME SUPERVISOR POST-EXAMINATION CERTIFICATION DATE~TIME SIGNATURE INITIALS SIGNATURE JPM EXAMINATION PRINT NAME PRE-EXAMINATION CERTIFICATION DATE~TIME SuPERvrson POST-EXAMINATION CERTIFICATION DATE~TIME SIGNATURE INITIALS SIGNATURE I
ES-201                                                      Examination Security Agreement                                                Form ES-201-3
I I
: 1.      Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 717 /AS            as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC. Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
I I
: 2.      Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 7/7/03 . From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
DTC: TPMMNT DSN: MNT04008 Rev. 1 P2/2 File: 1703.22  
PRINTED NAME              JOB TiTLE I RESPONSIBILITY                  SIGNATURE (I)            DATE      SIGNATURE (2) DATE                NOTE NOTES:
\\  
25 of 25                                          NUREG-I 021, Draft Revision 9
 
SECURITY AGREEMENT CLARIFICATION SIMULATOR DYNAMIC EXAMINATION PRINT NAME       PHE-EXAMINATION CERTIFICATION       DATE~TIME SUPERVISOR           POST-EXAMINATION CERTIFICATION   DATE~TIME SIGNATURE                               INITIALS                     SIGNATURE JPM EXAMINATION PRINT NAME       PRE-EXAMINATION CERTIFICATION       DATE~TIME S u P E R v r s o n  POST-EXAMINATION CERTIFICATION   DATE~TIME SIGNATURE                               INITIALS                     SIGNATURE I                                   I           I                   I                               I DTC: TPMMNT DSN: MNT04008 Rev. 1 P2/2 File: 1703.22
\


c SECURITY AGREEMENT CLARIFICATION c
c SECURITY AGREEMENT CLARIFICATION c
PRINT NAME   1   PRE-EXAMINATION CERTIFICATION WKITTEN EXAMINATION I DATERIME 1 SUPERVISOR I POST-EXAMINATION CERTIFICATION I DATERIME I DTC. "DMMNT DSN: MNT04008 Rev. 1 P2/2 File: 1703.22
WKITTEN EXAMINATION PRINT NAME 1
PRE-EXAMINATION CERTIFICATION I DATERIME 1
SUPERVISOR I POST-EXAMINATION CERTIFICATION I DATERIME I DTC. "DMMNT DSN: MNT04008 Rev. 1 P2/2 File: 1703.22  


6' SECURITY ACREEhENT CLARIFICATION 1                                                     WRITTEN EXAMINATION PRINT NAME       PRE-EXAMINATION CERTIFICATION     DATE/TIME SUPERVISOR       POST-EXAMINATION CERTIFICATION     DATE/TIME SIGNATURE                           INITIALS               SIGNATURE
6' SECURITY ACREEhENT CLARIFICATION 1
WRITTEN EXAMINATION DATE/TIME PRINT NAME PRE-EXAMINATION CERTIFICATION DATE/TIME SUPERVISOR POST-EXAMINATION CERTIFICATION SIGNATURE INITIALS SIGNATURE KE O b k
/2W&
on\\o 7f-l 0.3 1 025
: b. zc-CS /
: b. zc-CS /
KE O b k              /2W&                                on\o                                                  7f-l 0.3    1025 J?AA                                           6~I1103~;rdkb                                            7/8/03  flsr SIMULATOR DYNAMIC EXAMINATION PRINT NAME       PRE-EXAMINATION CERTIFICATION     DATE/TIME SUPERVISOR       POST-EXAMINATION CERTIFICATION     DATE/TIME SIGNATURE                           INITIALS               SIGNATURE I
J?AA SIMULATOR DYNAMIC EXAMINATION DATE/TIME PRINT NAME PRE-EXAMINATION CERTIFICATION DATE/TIME SUPERVISOR POST-EXAMINATION CERTIFICATION SIGNATURE INITIALS SIGNATURE I
A IN I                                                                                   I PUE-EXAMINATION CERTIFICATION     DATE/TIME   SUPERVISOR     POST-EXAMINATION CERTIFICATION     DATE~IME SIGNATURE                            INITIAIS             SIGNATURE
A IN 6~I1103~;rdkb 7/8/03 flsr I
                    .                                              1 I
I PUE-EXAMINATION CERTIFICATION DATE/TIME SIGNATURE 1
I ' '
I I
1 DTC: TPMMNT DSN: MNT04008 Rev. 1 P2/2 File: 1703.22
1 SUPERVISOR POST-EXAMINATION CERTIFICATION DATE~IME INITIAIS SIGNATURE DTC: TPMMNT DSN: MNT04008 Rev. 1 P2/2 File: 1703.22  


SECURITY AGREEMENT ROSTER W
W W
EXAMINATIONPERIOD--         7/7/05         to   7h3' W
SECURITY AGREEMENT ROSTER EXAMINATION PERIOD --
DTC: TPMMNT DSN: MNT04009 Rev. 1 P1/1 File: 1703.22Date: 101195 DTC: VSNTDP DSN:                   File: 0210.06.04 IP: I
7/7/05 to 7h3 '
DTC: TPMMNT DSN: MNT04009 Rev. 1 P1/1 File: 1703.22Date: 101195 DTC: VSNTDP DSN:
File: 0210.06.04 IP: I  


ES-401                                           Written Examination                              Form ES-40 1-6 Qualitv Checklist Facility: Fermi 2                                  Date of Exam: 07107l03 Exam Level: RO/SRO Initial
ES-401
: 6.       Bank use meets limits (no more than 75                 Bank      Modified    New percent from the bank at least 10 percent new, and the rest modified); enter the actual RO /
: 6.
SRO-only question distribution at right 35           9           3/           P
Bank use meets limits (no more than 75 percent from the bank at least 10 percent new, SRO-only question distribution at right and the rest modified); enter the actual RO /
: 7.       Between 50 and 60 percent of the questions on           Memoty              CIA the RO exam are written at the                                       I comprehension/analysis level; the SRO Exam may exceed 60 percent if the randomly selected WAS support the higher cognitive 33              +L levels; enter the actual question distribution at       ( 44%)             ( 56 %)
Written Examination Qualitv Checklist Bank Modified New 35 9
right Printed Name I Sianature                           Date
3/
Form ES-40 1-6
: 7.
Between 50 and 60 percent of the questions on the RO exam are written at the Facility: Fermi 2 Date of Exam: 07107l03 Exam Level: RO/SRO Memoty CIA I
comprehension/analysis level; the SRO Exam may exceed 60 percent if the randomly selected WAS support the higher cognitive levels; enter the actual question distribution at right 33
+L
( 44%)
( 56 %)
Printed Name I Sianature Initial
* P
: a. Author
: a. Author
: b. Facility Reviewer (*)
: b. Facility Reviewer (*)
: c. NRC Chief Examiner (#)
: c. NRC Chief Examiner (#)
: d. NRC Regional Supervisor Note:
: d. NRC Regional Supervisor Date Note:
* The facility reviewers initials/signature are not applicable for NRC-developed examinations.
* The facility reviewers initials/signature are not applicable for NRC-developed examinations.  
          # Independent NRC reviewer initial items in Column c; chief examiner concurrence required.
# Independent NRC reviewer initial items in Column c; chief examiner concurrence required.  


ES-403                               Written Examination Grading                 Form ES-403-1 Quality Checklist Facility: Fermi 2                       Date of Exam: 07/07/03             Exam Level: 80 Initials Item Description                                a     b     c
ES-403 Written Examination Grading Form ES-403-1 Quality Checklist Item Description Facility: Fermi 2 Date of Exam: 07/07/03 Exam Level: 80 Initials a
: 1.       Clean answer sheets copied before grading I
b c
: 2.       Answer key changes and question deletions justified and documented                                        AloAlJ&  of
: 2.
: 3.      Applicants' scores checked for addition errors (reviewers spot check 25% of examinations)                         p .
: 3.
: 3.       Grading for all borderline cases (80% +/- 2% overall and 70 +/- 4% on the SRO-only) reviewed in detail           92%@       i$4     $v oe
Answer key changes and question deletions justified and Applicants' scores checked for addition errors documented AloAlJ& o f (reviewers spot check 25% of examinations)
: 4.       All other failing examinations checked to ensure that grades are justified                               A I O M G ~ ~ (./A
: 1.
                                                                              ~           6P
Clean answer sheets copied before grading I
: 5.        Performance on missed questions checked for training w P oe deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants
p.
: a. Grader                     > R I                                               7-7-03
: 3.
Grading for all borderline cases (80% +/- 2% overall and 70 +/- 4% on the SRO-only) reviewed in detail 92%@ i$4  
$v oe
: 4.
: 5.
All other failing examinations checked to ensure that grades are justified A I O M G ~ ~ ~
Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants
: a. Grader >
R I 7-7-03
: b. Facility Reviewer(*)
: b. Facility Reviewer(*)
: c. NRC Chief Examiner (*)
: c. NRC Chief Examiner (*)
(*)     The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.
(./A 6P w P oe
5 of 5           NUREG-1021, Draft Revision 9
(*)
The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.
5 of 5 NUREG-1021, Draft Revision 9  


f CY ES-401                                                                           Written Examination                                                     Form ES-401-9 (R8, S i )
f
: 1.
: 2.
: 3. Psychometric Flaws
: 4. Job Content Flaws
: 5. Other s1#
LOK LOD (F/H)
(1-5) Stem Cues T/F Cred. Partial Job-Minutia
#/
Back-Q= SRO Focus Dist.
Link units ward WA Only 1
H 3
X 2
F 2
3 F
3 4
F 2
5 H
3 X
6 F
2 7
F 2
8 H
4 X
9 H
4 10 H
3 X
CY
: 6.
: 7.
U/E/S Explanation E/S
# Distractor D. not credible RESOLUTION: Distractor changed s
s E
S U
S s
S U
S s
S Question is Fundamental not Higher cognitive level. Also editorial comment on stem. RESOLUTION: stem changed Does not ask question for WA called for in outline RESOLUTION: In stem trip point exceeded with no scram = KA Can we expect the candidate to know the limit for Stator cooling water out let temperature? RESOLUTION: Stem changed ES-401 Written Examination Form ES-401-9 (R8, Si)
Review Worksheet
Review Worksheet
: 1. 2.          3. Psychometric Flaws              4. Job Content Flaws          5. Other      6.                                      7.
s1# LOK    LOD (F/H)  (1-5)  Stem Cues        T/F  Cred. Partial Job- Minutia #/ Back- Q= SRO                  U/E/S                                  Explanation Focus                    Dist.          Link            units ward WA Only 1    H      3                              X                                                          E/S    # Distractor D. not credible RESOLUTION: Distractor changed 2    F      2                                                                                            s    *#
3    F      3                                                                                            s    *#
4    F      2                                                                                            E  Question is Fundamental not Higher cognitive level. Also editorial S  comment on stem. RESOLUTION: stem changed 5    H      3                                                                              X            U    Does not ask question for WA called for in outline RESOLUTION: In S  stem trip point exceeded with no scram = KA 6    F      2                                                                                            s    #
7    F      2                                                                                            S 8    H      4                                                    X                                      U  Can we expect the candidate to know the limit for Stator cooling water S  out let temperature? RESOLUTION: Stem changed 9    H      4                                                                                            s  *#
10    H      3                              X                                                            S
[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
: 1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
: 1.
: 2. Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
: 3. Check the appropriate box if a psychometric flaw is identified:
: 2.
Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
: 3.
Check the appropriate box if a psychometric flaw is identified:
The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
The stem or dist,ractors contain cues (!.e., clues, specific determiners, phrasing, length, etc).
The stem or dist,ractors contain cues (!.e., clues, specific determiners, phrasing, length, etc).
Line 121: Line 203:
More than one distractor is not credible.
More than one distractor is not credible.
One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
: 4. Check the appropriate box if a job content error is identified:
: 4.
Check the appropriate box if a job content error is identified:
The question is not linked to the job requirements (Le., the question has a valid WA but, as written, is not operational in content).
The question is not linked to the job requirements (Le., the question has a valid WA but, as written, is not operational in content).
The question requires the recall of knowledge that is too specific for the closed reference test mode (Le., it is not required to be known from memory).
The question requires the recall of knowledge that is too specific for the closed reference test mode (Le., it is not required to be known from memory).
The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
The question requires reverse logic or application compared to the job requirements.
The question requires reverse logic or application compared to the job requirements.
: 5. Check questions that are sampled for conformance with the approved WA and those that are desiqnated SRO-only (WA and license level mismatches are unacceptable).
: 5.
: 6. Based on the reviewers judgment, is the question as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
Check questions that are sampled for conformance with the approved WA and those that are desiqnated SRO-only (WA and license level mismatches are unacceptable).
: 7. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
: 6.
* Question reviewed for 30 question WA match
Based on the reviewers judgment, is the question as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
      # Question reviewed for 30 question psychometric quality review
: 7.
At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
* Question reviewed for 30 question WA match  
# Question reviewed for 30 question psychometric quality review  


I' ES-401                                                             2                                             Form ES-401-9 (R8, S1)
I' ES-401 2
: 1. I 2. I 3. Psychometric Flaws I 4. Job Content Flaws I 5. Other I 6. 7.
Form ES-401-9 (R8, S1)
Explanation
: 1. I 2.
                                                                                  *# A. IS NOT CREDIBLE, D. ALSO A CORRECT ANSWER RESOLUTION: Distractors A and D changed
I
                                                                                  *# C&D NOT CREDIBLE RESOLUTION: Distractors C and D changed Edit to add procedure names. RESOLUTION: done
: 3. Psychometric Flaws I
* Question reviewed for 30 question WA match
: 4. Job Content Flaws I 5. Other I
  # Question reviewed for 30 question psychometric quality review
: 6.
: 7.
Explanation  
*# A. IS NOT CREDIBLE, D. ALSO A CORRECT ANSWER RESOLUTION: Distractors A and D changed  
*# C&D NOT CREDIBLE RESOLUTION: Distractors C and D changed Edit to add procedure names. RESOLUTION: done
* Question reviewed for 30 question WA match  
# Question reviewed for 30 question psychometric quality review  


ES-401                                                                 2                                                 Form ES-401-9 (R8, S1)
ES-401 2
: 1. 2       3. Psychometric Flaws     4 Job Content Flaws 5 Other  6.                                  7 Q# LOK   LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO U/E/S                                Explanation Focus             Dist     Link         units ward WA Only 31   F     2                                                                 s  '#
Form ES-401-9 (R8, S1)
32   H     2                                                                 S 33   F     2                       X                                         U  *# C IS THE ONLY CREDIBLE ANSWER RESOLUTION: Distractors S  changed 34   H     2                                                                 S 35   H     2                                                                 S 36   H     2                       X                                       U/S * # A & C NOT CREDIBLE RESOLUTION: Distractors changed 37  H    3                                                                E/s  Edit stem for clarity RESOLUTION: done 38  F    2                                                                S 39  F    2                      X                                        E/S *# A. NOT CREDIBLE RESOLUTION: Distractor changed 40    F    3                                                                S 41  F    4                            X        X                        U   C & B require candidate to remember alarm set points A also S correct. RESOLUTION: Distractors changed 42  H    3                                                                S 43  H    3
: 1.
                                                                -  --  -  -S                                                               -
2
44  H    3                                                                s   '#
: 3. Psychometric Flaws 4 Job Content Flaws Q#
45  F    3                                                                S 46  H    4                                                                s   *#
LOK LOD (F/H)
47  H    2                                                                S 48  H    3                                                                S 49  H    3                                                                S 50  H    4                                                                S
(1-5) Stem Cues T/F Cred. Partial Job-Minutia  
* Question reviewed for 30 question WA match
#/
# Question reviewed for 30 question psychometric quality review
Back-Focus Dist Link units ward 31 F
2 32 H
2 33 F
2 X
34 H
2 35 H
2 36 H
2 X
37 H
3 38 F
2 39 F
2 X
40 F
3 41 F
4 X
X 42 H
3 43 H
3 44 H
3 45 F
3 46 H
4 47 H
2 48 H
3 49 H
3 50 H
4 5 Other
: 6.
7 Q= SRO U/E/S Explanation WA Only s
S U
S changed S
S U/S E/s S
*# C IS THE ONLY CREDIBLE ANSWER RESOLUTION: Distractors
* # A & C NOT CREDIBLE RESOLUTION: Distractors changed Edit stem for clarity RESOLUTION: done E/S  
*# A. NOT CREDIBLE RESOLUTION: Distractor changed S
U S
correct. RESOLUTION: Distractors changed S
S s
S s
S S
S S
C & B require candidate to remember alarm set points A also
* Question reviewed for 30 question WA match  
# Question reviewed for 30 question psychometric quality review  


I ES-401                                                         2 Form ES-401-9 (R8, Sly
I ES-401 2
* Question reviewed for 30 question WA match
Form ES-401-9 (R8, Sly
  # Question reviewed for 30 question psychometric quality review
* Question reviewed for 30 question WA match  
# Question reviewed for 30 question psychometric quality review  


ES-401                                                         2 Form ES-401-9 (R8,S I )
ES-401 2
* Question reviewed for 30 question WA match
Form ES-401-9 (R8, SI)
* Question reviewed for 30 question WA match  
# Question reviewed for 30 question psychometric quality review}}
# Question reviewed for 30 question psychometric quality review}}

Latest revision as of 08:54, 16 January 2025

Various Checklists for the Retake Examination - July 7, 2003
ML032480901
Person / Time
Site: Fermi 
Issue date: 07/07/2003
From: Lanksbury R
NRC/RGN-III/DRS/OLB
To:
Detroit Edison
References
50-341/03-302
Download: ML032480901 (15)


Text

VARIOUS CHECKLISTS FOR THE FERMI RETAKE EXAMINATION - JULY 7,2003

ES-201 Examination Preparation Checklist Form ES-201-1 Target Date*

Mpid~q &+cj ke K Y Q ~

Task Description / Reference

-1 20

-1 20

[-go]

~~

~

~

~

3. Facility contact briefed on security & other requirements (C.2.c)
4. Corporate notification letter sent (C.2.d)

[5. Reference material due (C.1.e; C.3.c)l Date of Examination: 7-7- 03 Chief Examiner's Initials

1)

-1 80 I 1. Examination administration date confirmed (C.l.a; C.2.a & b) 11

-1 20 I 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) 5e 6P 11

-75 I 6. Integrated examination outline(s) due (C.1.e & f; C.3.d)

-70

7. Examination outline@) reviewed by NRC and feedback provided
8. Proposed examinations, supporting documentation, and
9. Preliminary license applications due (C.1.I; C.2.g; ES-202)
10. Final license applications due and assignment sheet prepared to facility licensee (C.2.h; C.3.e) reference materials due ((3.1.e, f, g & h; C.3.d)

(C.l.I; C.2.g; ES-202)

-45

-30 P P

-1 4 64 1 1. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.9

12. Examinations reviewed with facility licensee (C.l.j; C.2.f & h; C.3.g)

II

-7

13. Written examinations +

,c//t NRC supervisor (C.2.i; C.3.h) o f il

-7

14. Final applications reviewed; assignment sheet updated; waiver letters sent (C.2.g, ES-204)
15. Proctoring/written exam administration guidelines reviewed with facility licensee and authorization granted to give written exams (if applicable) (C.3.k)

OP

-7

16. Approved scenarios, job performance measures, and questions

-7 I distributed to NRC examiners (C.3.i)

Target dates are keyed to the examination date identified in the corporate notification letter.

They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

Applies only to examinations prepared by the NRC.

[ ]

NUREG-1021, Revision 8, Supplement 1 22 of 24

Detroit Edison July 17,2003 NANT-03 -0 1 10 080 1.26 Mr. B. Palagi Region III U. S. Nuclear Regulatory Commission 80 1 Warrenville Road Lisle, IL 60532-4351

Dear Mr. Palagi:

Fermi 2 administered an initial written retake license exam on July 7, 2003. Enclosed please find the remaining material required in accordance with NUREG-102 1, ES-50 1.

Original Form ES-201-3, "Examination Security Agreement," with a pre and post-examination signature for each individual who had detailed knowledge of the written examination 0

If you have any questions or comments regarding the contents of these materials please contact Mr. AI Mann at 734-586-4067.

Sincerely, Larry'D. d&ders Manager, Nuclear Training Fermi 2 Enclosure

x Examination Security Agreement Form ES-201-3 ES-201

1.

Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 717 /AS as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC. Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.

2.

Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 7/7/03. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TiTLE I RESPONSIBILITY SIGNATURE (I)

DATE SIGNATURE (2) DATE NOTE NOTES:

25 of 25 NUREG-I 021, Draft Revision 9

SECURITY AGREEMENT CLARIFICATION SIMULATOR DYNAMIC EXAMINATION PRINT NAME PHE-EXAMINATION CERTIFICATION DATE~TIME SUPERVISOR POST-EXAMINATION CERTIFICATION DATE~TIME SIGNATURE INITIALS SIGNATURE JPM EXAMINATION PRINT NAME PRE-EXAMINATION CERTIFICATION DATE~TIME SuPERvrson POST-EXAMINATION CERTIFICATION DATE~TIME SIGNATURE INITIALS SIGNATURE I

I I

I I

DTC: TPMMNT DSN: MNT04008 Rev. 1 P2/2 File: 1703.22

\\

c SECURITY AGREEMENT CLARIFICATION c

WKITTEN EXAMINATION PRINT NAME 1

PRE-EXAMINATION CERTIFICATION I DATERIME 1

SUPERVISOR I POST-EXAMINATION CERTIFICATION I DATERIME I DTC. "DMMNT DSN: MNT04008 Rev. 1 P2/2 File: 1703.22

6' SECURITY ACREEhENT CLARIFICATION 1

WRITTEN EXAMINATION DATE/TIME PRINT NAME PRE-EXAMINATION CERTIFICATION DATE/TIME SUPERVISOR POST-EXAMINATION CERTIFICATION SIGNATURE INITIALS SIGNATURE KE O b k

/2W&

on\\o 7f-l 0.3 1 025

b. zc-CS /

J?AA SIMULATOR DYNAMIC EXAMINATION DATE/TIME PRINT NAME PRE-EXAMINATION CERTIFICATION DATE/TIME SUPERVISOR POST-EXAMINATION CERTIFICATION SIGNATURE INITIALS SIGNATURE I

A IN 6~I1103~;rdkb 7/8/03 flsr I

I PUE-EXAMINATION CERTIFICATION DATE/TIME SIGNATURE 1

I I

1 SUPERVISOR POST-EXAMINATION CERTIFICATION DATE~IME INITIAIS SIGNATURE DTC: TPMMNT DSN: MNT04008 Rev. 1 P2/2 File: 1703.22

W W

SECURITY AGREEMENT ROSTER EXAMINATION PERIOD --

7/7/05 to 7h3 '

DTC: TPMMNT DSN: MNT04009 Rev. 1 P1/1 File: 1703.22Date: 101195 DTC: VSNTDP DSN:

File: 0210.06.04 IP: I

ES-401

6.

Bank use meets limits (no more than 75 percent from the bank at least 10 percent new, SRO-only question distribution at right and the rest modified); enter the actual RO /

Written Examination Qualitv Checklist Bank Modified New 35 9

3/

Form ES-40 1-6

7.

Between 50 and 60 percent of the questions on the RO exam are written at the Facility: Fermi 2 Date of Exam: 07107l03 Exam Level: RO/SRO Memoty CIA I

comprehension/analysis level; the SRO Exam may exceed 60 percent if the randomly selected WAS support the higher cognitive levels; enter the actual question distribution at right 33

+L

( 44%)

( 56 %)

Printed Name I Sianature Initial

  • P
a. Author
b. Facility Reviewer (*)
c. NRC Chief Examiner (#)
d. NRC Regional Supervisor Date Note:
  • The facility reviewers initials/signature are not applicable for NRC-developed examinations.
  1. Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

ES-403 Written Examination Grading Form ES-403-1 Quality Checklist Item Description Facility: Fermi 2 Date of Exam: 07/07/03 Exam Level: 80 Initials a

b c

2.
3.

Answer key changes and question deletions justified and Applicants' scores checked for addition errors documented AloAlJ& o f (reviewers spot check 25% of examinations)

1.

Clean answer sheets copied before grading I

p.

3.

Grading for all borderline cases (80% +/- 2% overall and 70 +/- 4% on the SRO-only) reviewed in detail 92%@ i$4

$v oe

4.
5.

All other failing examinations checked to ensure that grades are justified A I O M G ~ ~ ~

Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants

a. Grader >

R I 7-7-03

b. Facility Reviewer(*)
c. NRC Chief Examiner (*)

(./A 6P w P oe

(*)

The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.

5 of 5 NUREG-1021, Draft Revision 9

f

1.
2.
3. Psychometric Flaws
4. Job Content Flaws
5. Other s1#

LOK LOD (F/H)

(1-5) Stem Cues T/F Cred. Partial Job-Minutia

  1. /

Back-Q= SRO Focus Dist.

Link units ward WA Only 1

H 3

X 2

F 2

3 F

3 4

F 2

5 H

3 X

6 F

2 7

F 2

8 H

4 X

9 H

4 10 H

3 X

CY

6.
7.

U/E/S Explanation E/S

  1. Distractor D. not credible RESOLUTION: Distractor changed s

s E

S U

S s

S U

S s

S Question is Fundamental not Higher cognitive level. Also editorial comment on stem. RESOLUTION: stem changed Does not ask question for WA called for in outline RESOLUTION: In stem trip point exceeded with no scram = KA Can we expect the candidate to know the limit for Stator cooling water out let temperature? RESOLUTION: Stem changed ES-401 Written Examination Form ES-401-9 (R8, Si)

Review Worksheet

[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1.

Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.

2.

Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).

3.

Check the appropriate box if a psychometric flaw is identified:

The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).

The stem or dist,ractors contain cues (!.e., clues, specific determiners, phrasing, length, etc).

The answer choices are a collection of unrelated true/false statements.

More than one distractor is not credible.

One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).

4.

Check the appropriate box if a job content error is identified:

The question is not linked to the job requirements (Le., the question has a valid WA but, as written, is not operational in content).

The question requires the recall of knowledge that is too specific for the closed reference test mode (Le., it is not required to be known from memory).

The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).

The question requires reverse logic or application compared to the job requirements.

5.

Check questions that are sampled for conformance with the approved WA and those that are desiqnated SRO-only (WA and license level mismatches are unacceptable).

6.

Based on the reviewers judgment, is the question as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?

7.

At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).

  • Question reviewed for 30 question WA match
  1. Question reviewed for 30 question psychometric quality review

I' ES-401 2

Form ES-401-9 (R8, S1)

1. I 2.

I

3. Psychometric Flaws I
4. Job Content Flaws I 5. Other I
6.
7.

Explanation

    1. A. IS NOT CREDIBLE, D. ALSO A CORRECT ANSWER RESOLUTION: Distractors A and D changed
    1. C&D NOT CREDIBLE RESOLUTION: Distractors C and D changed Edit to add procedure names. RESOLUTION: done
  • Question reviewed for 30 question WA match
  1. Question reviewed for 30 question psychometric quality review

ES-401 2

Form ES-401-9 (R8, S1)

1.

2

3. Psychometric Flaws 4 Job Content Flaws Q#

LOK LOD (F/H)

(1-5) Stem Cues T/F Cred. Partial Job-Minutia

  1. /

Back-Focus Dist Link units ward 31 F

2 32 H

2 33 F

2 X

34 H

2 35 H

2 36 H

2 X

37 H

3 38 F

2 39 F

2 X

40 F

3 41 F

4 X

X 42 H

3 43 H

3 44 H

3 45 F

3 46 H

4 47 H

2 48 H

3 49 H

3 50 H

4 5 Other

6.

7 Q= SRO U/E/S Explanation WA Only s

S U

S changed S

S U/S E/s S

    1. C IS THE ONLY CREDIBLE ANSWER RESOLUTION: Distractors
  • # A & C NOT CREDIBLE RESOLUTION: Distractors changed Edit stem for clarity RESOLUTION: done E/S
    1. A. NOT CREDIBLE RESOLUTION: Distractor changed S

U S

correct. RESOLUTION: Distractors changed S

S s

S s

S S

S S

C & B require candidate to remember alarm set points A also

  • Question reviewed for 30 question WA match
  1. Question reviewed for 30 question psychometric quality review

I ES-401 2

Form ES-401-9 (R8, Sly

  • Question reviewed for 30 question WA match
  1. Question reviewed for 30 question psychometric quality review

ES-401 2

Form ES-401-9 (R8, SI)

  • Question reviewed for 30 question WA match
  1. Question reviewed for 30 question psychometric quality review