{{#Wiki_filter:Thomas Alexion - A!loy 600/RV Head Inspection Status for April 24, 2004 | {{#Wiki_filter:Thomas Alexion - A!loy 600/RV Head Inspection Status for April 24, 2004 Page 1 From: | ||
To: | "BENNETT, STEVE A" <SBENNE2@entergy.com> | ||
To: | |||
Tom Alexion <twa~nrc.gov>, "Jeff Clark jac~nrc.gov)" <jac~nrc.gov>, "SWAIN, RONALD VANCE" <RSWAIN1 @entergy.com>, "BICE, DAVID B" <DBICE@entergy.com>, "BURFORD, FRANCIS G" <FBURFOR entergy.com>, CAMPBELL, BILL - NUCLEAR" <WCAMPB3@entergy.com>, | |||
"COMPTON, LESLIE" <LCOMPTO~entergy.com>, "DAIBER, BRYAN J" <BDAIBER~entergy.com>, | |||
"DAVANT, GUY H" <GDAVANT~entergy.com>, NDEESE, RICHARD W" <rdees9Oentergy.com>, | |||
"EATON, WILLIAM A" <WEATONientergy.com>, "EDGELL, DOUGLAS W" | |||
<DEDGELL~entergy.com>, "EHREN, TERRY G" <TEHREN~entergy.com>, "EUBANKS, CLIFFORD" | |||
<CEUBANK~entergy.com>, "FORBES, JEFFREY" <JFORBE1 ©entergy.com>, "FORREST, FREDDIE" | |||
<FFORRES~entergy.com>, *GOBELL, JAMIE N" <JGOBELL~entergy.com>, "GORDON, ROBERT A" | |||
<RGORDON@entergy.com>, "HOUGHTALING, JOHN B" <JHOUGHT entergy.com>, "JAMES, DALE E" <DJAMES~entergy.com>, "JAMES, WILLIAM" <WJAMES1 @entergy.com>, "KOWALEWSKI, JOSEPH A" <JKOWALE@entergy.com>, "LEWIS, RAYMOND S" <RLEWIS1 @entergy.com>, "MEANS, BRACY E" <BMEANS©entergy.com>, "MITCHELL, TIMOTHY Go <TMITCH1 ©entergy.com>, | |||
"PANTHER, KENNETH C" <KPANTHE@entergy.com>, "PARKS, GLENN A" <GPARKSQentergy.com>, | |||
Date: | "PAYNE, GARY - WF3" <GPAYNE~entergy.com>, "SIMS, WILLIAM D" <WSIMS~entergy.com>, | ||
"SMITH, JAMES A" <JSMITH@entergy.com> | |||
Date: | |||
4/24/04 9:45AM | |||
==Subject:== | ==Subject:== | ||
Alloy 600/RV Head Inspection Status for April 24, 2004 Attached is the | Alloy 600/RV Head Inspection Status for April 24, 2004 Attached is the 1 R1 8 Alloy 600 Inspection status for April 24, 2004 Steve Bennett NSA - Licensing 479-858-4626 Pager: 479-890-3323 | ||
C:\WINDOWS\TEMP\GWIOOOO1.TMP | C:\\WINDOWS\\TEMP\\GWIOOOO1.TMP Page 11 Mail Envelope Properties (408A6F61.593: 9: 50579) | ||
==Subject:== | ==Subject:== | ||
Alloy 600JRV Head Inspection Status for April 24, 2004 Creation Date: | Alloy 600JRV Head Inspection Status for April 24, 2004 Creation Date: | ||
Created By: | 4/24/04 9:41AM From: | ||
"BENNEITT, STEVE A" <SBENNE2@entergy.com> | |||
Created By: | |||
SBENNE2@entergy.com Recipients nrc.gov owf4_po.OWFNDO TWA (Thomas Alexion) nrc.gov ARLPO.ARLDO JAC (Jeffrey Clark) entergy.com JSMITH (SMITH, JAMES A) | |||
WSIMS (SIMS, WILLIAM D) | WSIMS (SIMS, WILLIAM D) | ||
GPAYNE (PAYNE, GARY - WF3) | GPAYNE (PAYNE, GARY - WF3) | ||
| Line 63: | Line 69: | ||
DBICE (BICE, DAVID B) | DBICE (BICE, DAVID B) | ||
I C:\\W1ND0WS\\TEMP\\GW)00001.TMP Page 2 Is I C:\\WINDOWS\\TEMP\\GWIOOQO1.TMP Page 211 RSWAINI (SWAIN, RONALD VANCE) | |||
Post Office | Post Office owf4_po.OWFNDO ARLPO.ARLDO Files Size MESSAGE 137 Part.001 776 IR18 RVH Inspection Results 4-24.doc Mime.822 63714 Route nrc.gov nrc.gov entergy.com Date & Time 04/24/04 09:41AM 43520 Options Expiration Date: | ||
Priority: | |||
Reply Requested: | |||
Return Notification: | |||
Concealed | |||
==Subject:== | ==Subject:== | ||
Security: | |||
None Standard No None No Standard | |||
April 24, 2004 - 8:30 AM 1R18 Alloy 600 Status Inspection | April 24, 2004 - 8:30 AM 1R18 Alloy 600 Status Inspection Inspection Method Extent of Inspection IR18 Status/ Findings BMV of RV BMV exam inside Service 100% of the RPV head surface (including 3600 69 of 69 CRDM nozzles visually inspected on 4/24/04 Head Structure around each head penetration). (OP 2311.009) | ||
(pending final documentation) | |||
No leaking nozzles identified CR being written to document boric acid staining from 1R17 RadCal seal leak CRDM/ | |||
Nozzles UT of six FTI repaired | UT of 60 CRDM nozzles UT of the RPV nozzle from 2" above the highest Scheduled to begin UT exams dayshift Monday RADCAL (no known defects) point of the root of the J-weld to the blind zone. | ||
(4/26/04). | |||
Nozzles UT of six FTI repaired UT the weld and at least 1-inch above the weld in CRDM nozzles (Nozzles the nozzle base material. | |||
3, 6, 15, 17, 33, & 56) | 3, 6, 15, 17, 33, & 56) | ||
UTMWS of two W repaired | UTMWS of two W repaired UT of the RPV nozzle from 2" above the highest CRDM nozzles (Nozzles point of the root of the J-weld to the blind zone 54 & 68) and wetted surface exam of weld overlay. | ||
UT of RADCAL Nozzle | UT of RADCAL Nozzle UT of the RPV nozzle from 2" above the highest (Nozzle 1) point of the root of the J-weld to the blind zone. | ||
UT of nozzle Annulus | UT of nozzle Annulus Interrogate interference fit in all 69 nozzle annuli | ||
[Leak Path Assessment] | [Leak Path Assessment] | ||
above J-weld for leakage path ICI Nozzles Visual Inspection of 52 Inspect 100% of the circumference of each 52 of 52 BMIs inspected on night shift 4/22/04 BMI nozzles penetration as it enters the RPV lower head. | |||
(Complete) | |||
(OP 2311.009) | (OP 2311.009) | ||
No leaking nozzles CR-ANO-1-2004-0735 written on rust/staining RCS Visually Inspect RCS for Visually Inspect above the RPV head for potential No leaking A600 nozzles identified (ongoing) | |||
Walkdowns RCS leaks boric acid leaks from pressure-retaining 5 of 9 pressurizer nozzles inspected components as well as other A600 RCS small 7 hot leg nozzles inspected bore locations. (OP 2311.009) 4 CFT nozzles inspected}} | |||
Walkdowns | |||
Latest revision as of 02:56, 16 January 2025
| ML041410152 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/24/2004 |
| From: | Sharon Bennett Entergy Operations |
| To: | Alexion T, David Bice, Burford F, Campbell B, Clark J, Compton L, Davant G, Rick Deese, Eaton W, Edgell D, Ehren T, Eubanks C, Forbes J, Forrest F, Gobell J, Gordon R, Houghtaling J, James D, James W, Kowalewski J, Robert Lewis, Means B, Mitchell T, Panther K, Parks G, Payne G, Sims W, James Smith, Swain R Entergy Operations, NRC/NRR/DLPM/LPD4 |
| Alexion T W, NRR/DLPM, 415-1326 | |
| References | |
| Download: ML041410152 (4) | |
Text
Thomas Alexion - A!loy 600/RV Head Inspection Status for April 24, 2004 Page 1 From:
"BENNETT, STEVE A" <SBENNE2@entergy.com>
To:
Tom Alexion <twa~nrc.gov>, "Jeff Clark jac~nrc.gov)" <jac~nrc.gov>, "SWAIN, RONALD VANCE" <RSWAIN1 @entergy.com>, "BICE, DAVID B" <DBICE@entergy.com>, "BURFORD, FRANCIS G" <FBURFOR entergy.com>, CAMPBELL, BILL - NUCLEAR" <WCAMPB3@entergy.com>,
"COMPTON, LESLIE" <LCOMPTO~entergy.com>, "DAIBER, BRYAN J" <BDAIBER~entergy.com>,
"DAVANT, GUY H" <GDAVANT~entergy.com>, NDEESE, RICHARD W" <rdees9Oentergy.com>,
"EATON, WILLIAM A" <WEATONientergy.com>, "EDGELL, DOUGLAS W"
<DEDGELL~entergy.com>, "EHREN, TERRY G" <TEHREN~entergy.com>, "EUBANKS, CLIFFORD"
<CEUBANK~entergy.com>, "FORBES, JEFFREY" <JFORBE1 ©entergy.com>, "FORREST, FREDDIE"
<FFORRES~entergy.com>, *GOBELL, JAMIE N" <JGOBELL~entergy.com>, "GORDON, ROBERT A"
<RGORDON@entergy.com>, "HOUGHTALING, JOHN B" <JHOUGHT entergy.com>, "JAMES, DALE E" <DJAMES~entergy.com>, "JAMES, WILLIAM" <WJAMES1 @entergy.com>, "KOWALEWSKI, JOSEPH A" <JKOWALE@entergy.com>, "LEWIS, RAYMOND S" <RLEWIS1 @entergy.com>, "MEANS, BRACY E" <BMEANS©entergy.com>, "MITCHELL, TIMOTHY Go <TMITCH1 ©entergy.com>,
"PANTHER, KENNETH C" <KPANTHE@entergy.com>, "PARKS, GLENN A" <GPARKSQentergy.com>,
"PAYNE, GARY - WF3" <GPAYNE~entergy.com>, "SIMS, WILLIAM D" <WSIMS~entergy.com>,
"SMITH, JAMES A" <JSMITH@entergy.com>
Date:
4/24/04 9:45AM
Subject:
Alloy 600/RV Head Inspection Status for April 24, 2004 Attached is the 1 R1 8 Alloy 600 Inspection status for April 24, 2004 Steve Bennett NSA - Licensing 479-858-4626 Pager: 479-890-3323
C:\\WINDOWS\\TEMP\\GWIOOOO1.TMP Page 11 Mail Envelope Properties (408A6F61.593: 9: 50579)
Subject:
Alloy 600JRV Head Inspection Status for April 24, 2004 Creation Date:
4/24/04 9:41AM From:
"BENNEITT, STEVE A" <SBENNE2@entergy.com>
Created By:
SBENNE2@entergy.com Recipients nrc.gov owf4_po.OWFNDO TWA (Thomas Alexion) nrc.gov ARLPO.ARLDO JAC (Jeffrey Clark) entergy.com JSMITH (SMITH, JAMES A)
WSIMS (SIMS, WILLIAM D)
GPAYNE (PAYNE, GARY - WF3)
GPARKS (PARKS, GLENN A)
KPANTHE (PANTHER, KENNETH C)
TMITCH1 (MITCHELL, TIMOTHY G)
BMEANS (MEANS, BRACY E)
RLEWIS1 (LEWIS, RAYMOND S)
JKOWALE (KOWALEWSKI, JOSEPH A)
WJAMES 1 (JAMES, WILLIAM)
DJAMES (JAMES, DALE E)
JHOUGHT (HOUGHTALING, JOHN B)
RGORDON (GORDON, ROBERT A)
JGOBELL (GOBELL, JAMIE N)
FFORRES (FORREST, FREDDIE)
JFORBE1 (FORBES, JEFFREY)
CEUBANK (EUBANKS, CLIFFORD)
TEHREN (EHREN, TERRY G)
DEDGELL (EDGELL, DOUGLAS W)
WEATON (EATON, WILLIAM A) rdees90 (DEESE, RICHARD W)
GDAVANT (DAVANT, GUY H)
BDAIBER (DAIBER, BRYAN J)
LCOMPTO (COMPTON, LESLIE)
WCAMPB3 (CAMPBELL, BILL - NUCLEAR)
FBURFOR (BURFORD, FRANCIS G)
DBICE (BICE, DAVID B)
I C:\\W1ND0WS\\TEMP\\GW)00001.TMP Page 2 Is I C:\\WINDOWS\\TEMP\\GWIOOQO1.TMP Page 211 RSWAINI (SWAIN, RONALD VANCE)
Post Office owf4_po.OWFNDO ARLPO.ARLDO Files Size MESSAGE 137 Part.001 776 IR18 RVH Inspection Results 4-24.doc Mime.822 63714 Route nrc.gov nrc.gov entergy.com Date & Time 04/24/04 09:41AM 43520 Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
None Standard No None No Standard
April 24, 2004 - 8:30 AM 1R18 Alloy 600 Status Inspection Inspection Method Extent of Inspection IR18 Status/ Findings BMV of RV BMV exam inside Service 100% of the RPV head surface (including 3600 69 of 69 CRDM nozzles visually inspected on 4/24/04 Head Structure around each head penetration). (OP 2311.009)
(pending final documentation)
No leaking nozzles identified CR being written to document boric acid staining from 1R17 RadCal seal leak CRDM/
UT of 60 CRDM nozzles UT of the RPV nozzle from 2" above the highest Scheduled to begin UT exams dayshift Monday RADCAL (no known defects) point of the root of the J-weld to the blind zone.
(4/26/04).
Nozzles UT of six FTI repaired UT the weld and at least 1-inch above the weld in CRDM nozzles (Nozzles the nozzle base material.
3, 6, 15, 17, 33, & 56)
UTMWS of two W repaired UT of the RPV nozzle from 2" above the highest CRDM nozzles (Nozzles point of the root of the J-weld to the blind zone 54 & 68) and wetted surface exam of weld overlay.
UT of RADCAL Nozzle UT of the RPV nozzle from 2" above the highest (Nozzle 1) point of the root of the J-weld to the blind zone.
UT of nozzle Annulus Interrogate interference fit in all 69 nozzle annuli
[Leak Path Assessment]
above J-weld for leakage path ICI Nozzles Visual Inspection of 52 Inspect 100% of the circumference of each 52 of 52 BMIs inspected on night shift 4/22/04 BMI nozzles penetration as it enters the RPV lower head.
(Complete)
(OP 2311.009)
No leaking nozzles CR-ANO-1-2004-0735 written on rust/staining RCS Visually Inspect RCS for Visually Inspect above the RPV head for potential No leaking A600 nozzles identified (ongoing)
Walkdowns RCS leaks boric acid leaks from pressure-retaining 5 of 9 pressurizer nozzles inspected components as well as other A600 RCS small 7 hot leg nozzles inspected bore locations. (OP 2311.009) 4 CFT nozzles inspected