1997 Annapolis Exchange Parkway Annapolis, Maryland 21401 Constellation Energye Generation Group February 2, 2005 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: | 1997 Annapolis Exchange Parkway Annapolis, Maryland 21401 Constellation Energye Generation Group February 2, 2005 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: | ||
==SUBJECT:== | ==SUBJECT:== | ||
Calvert Cliffs Nuclear Power Plant; Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation; Docket No. 72-8 Fitness for Duty: Proaram Performance Data. July 1 - December 31. 2004 The Semi-Annual Fitness for Duty Program Performance Data (Attachment 1) is submitted for the period of July 1 - December 31, 2004 in accordance with 10 CFR 26.71 (d). | Document Control Desk Calvert Cliffs Nuclear Power Plant; Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation; Docket No. 72-8 Fitness for Duty: Proaram Performance Data. July 1 - December 31. 2004 The Semi-Annual Fitness for Duty Program Performance Data (Attachment 1) is submitted for the period of July 1 - December 31, 2004 in accordance with 10 CFR 26.71 (d). | ||
Should you have questions regarding this matter, we will be pleased to discuss them with you. | Should you have questions regarding this matter, we will be pleased to discuss them with you. | ||
Very truly yours, Peter T. Crinigan Director-Security and Emergency Preparedness Program PTC/CAN/bjd | Very truly yours, Peter T. Crinigan Director-Security and Emergency Preparedness Program PTC/CAN/bjd | ||
==Attachment:== | ==Attachment:== | ||
(1) | (1) | ||
S. L. Miller, Esquire | Fitness for Duty Program Performance Data Personnel Subject to 10 CFR Part 26 cc: | ||
(Without Attachment) | |||
S. L. Miller, Esquire J. E. Silberg, Esquire R. V. Guzman, NRC S. J. Collins, NRC Resident Inspector, NRC R. I. McLean, DNR | |||
ATTACHMENT (1) | ATTACHMENT (1) | ||
| Line 32: | Line 34: | ||
February 2,2005 | February 2,2005 | ||
Fitness for Duty Program Performance Data Personnel Subject to 10 CFR Part 26 | Fitness for Duty Program Performance Data Personnel Subject to 10 CFR Part 26 CCNPP does not differentiate between long-term and short-term contractors. All contractors that have obtained unescorted access are considered short-term. | ||
Primarily refers to tests conducted for samples that were hydrated (diluted). A second (observed) sample is conducted following results indicating low specific gravity and/or creatinine. | |||
Page I of 3 | Page I of 3 | ||
I BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine | I BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal Total tamines lidinetoesTta Licensee Employees 0 | ||
0 0 | |||
0 0 | |||
0 0 | |||
0 Long-Term Contractors 0 | |||
0 0 | |||
0 0 | |||
0 0 | |||
0 Short-Term Contractors 0 | |||
0 0 | |||
0 0 | |||
0 0 | |||
0 | |||
?_;TP1AE1V1 | |||
.Wfia.. | |||
4- | |||
.;.1;g21.X v | |||
A V | |||
For details see next page. | |||
NOTE: THC positives are reported at 50 ng/ml and 100 ng/ml | NOTE: THC positives are reported at 50 ng/ml and 100 ng/ml | ||
(*) Three (3) of Five (5) specimens tested positive for THC at both 50 ng/ml and 100 ng/ml. | (*) Three (3) of Five (5) specimens tested positive for THC at both 50 ng/ml and 100 ng/ml. | ||
I FITNESS FOR DUTY (FFD) PROGRAM PERFORMANCE DATA REPORT Situation Descriptions, Management Actions, and NRC Reportable Events July 1 - December 31, 2004 A. Situation Descriptions | I FITNESS FOR DUTY (FFD) PROGRAM PERFORMANCE DATA REPORT Situation Descriptions, Management Actions, and NRC Reportable Events July 1 - December 31, 2004 A. | ||
: 1. N/A B. Management Actions (in Response to Situation Descriptions) | Situation Descriptions | ||
: 1. N/A B. | |||
Management Actions (in Response to Situation Descriptions) | |||
The following actions were taken by management as a result of the above situation descriptions: | The following actions were taken by management as a result of the above situation descriptions: | ||
: 1. N/A C. NRC Reportable | : 1. | ||
N/A C. | |||
NRC Reportable E vents (Per 10CFR Part 26.73) | |||
There were no reportable events during this performance data period. | There were no reportable events during this performance data period. | ||
Page 3 of 3}} | Page 3 of 3}} | ||
Latest revision as of 22:32, 15 January 2025
| ML050380013 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 02/02/2005 |
| From: | Crinigan P Constellation Energy Group |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| +KBR1SISP20050504 | |
| Download: ML050380013 (5) | |
Text
-
1997 Annapolis Exchange Parkway Annapolis, Maryland 21401 Constellation Energye Generation Group February 2, 2005 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant; Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation; Docket No. 72-8 Fitness for Duty: Proaram Performance Data. July 1 - December 31. 2004 The Semi-Annual Fitness for Duty Program Performance Data (Attachment 1) is submitted for the period of July 1 - December 31, 2004 in accordance with 10 CFR 26.71 (d).
Should you have questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours, Peter T. Crinigan Director-Security and Emergency Preparedness Program PTC/CAN/bjd
Attachment:
(1)
Fitness for Duty Program Performance Data Personnel Subject to 10 CFR Part 26 cc:
(Without Attachment)
S. L. Miller, Esquire J. E. Silberg, Esquire R. V. Guzman, NRC S. J. Collins, NRC Resident Inspector, NRC R. I. McLean, DNR
ATTACHMENT (1)
FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR PART 26 Calvert Cliffs Nuclear Power Plant, Inc.
February 2,2005
Fitness for Duty Program Performance Data Personnel Subject to 10 CFR Part 26 CCNPP does not differentiate between long-term and short-term contractors. All contractors that have obtained unescorted access are considered short-term.
Primarily refers to tests conducted for samples that were hydrated (diluted). A second (observed) sample is conducted following results indicating low specific gravity and/or creatinine.
Page I of 3
I BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal Total tamines lidinetoesTta Licensee Employees 0
0 0
0 0
0 0
0 Long-Term Contractors 0
0 0
0 0
0 0
0 Short-Term Contractors 0
0 0
0 0
0 0
0
?_;TP1AE1V1
.Wfia..
4-
.;.1;g21.X v
A V
For details see next page.
NOTE: THC positives are reported at 50 ng/ml and 100 ng/ml
(*) Three (3) of Five (5) specimens tested positive for THC at both 50 ng/ml and 100 ng/ml.
I FITNESS FOR DUTY (FFD) PROGRAM PERFORMANCE DATA REPORT Situation Descriptions, Management Actions, and NRC Reportable Events July 1 - December 31, 2004 A.
Situation Descriptions
- 1. N/A B.
Management Actions (in Response to Situation Descriptions)
The following actions were taken by management as a result of the above situation descriptions:
- 1.
N/A C.
NRC Reportable E vents (Per 10CFR Part 26.73)
There were no reportable events during this performance data period.