ML11255A026: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:From: | {{#Wiki_filter:From: | ||
HOO Hoc To: | |||
HOO Hoc | |||
==Subject:== | ==Subject:== | ||
Logbook Entry: 9/9/2011 - Salem Sturgeon Date: | Logbook Entry: 9/9/2011 - Salem Sturgeon Date: | ||
Site | Friday, September 09, 2011 5:46:00 PM Ops Officer : PETE SNYDER Entry Date : 9/9/2011 - 17:06 Entry Type : 50.72 LOGGED ONLY Notify Date - Time : 9/9/2011 - 17:03 Event Date - Time : 9/9/2011 - 15:12 (EDT) | ||
Site : SALEM Emergency Class : | |||
"At 1512 hours on September 9, 2011, a dead shortnose sturgeon was identified at the Salem Generating Station Circulating Water intake structure. This report to the NRC is being made due to the fact that a report to the National Marine Fisheries Service was made at 1620 hours in accordance with the site Incidental Take Statement. Additionally, a report to New Jersey Department of Environmental Protection was also made at 1630 hours. The sturgeon was deceased prior to collection." | "At 1512 hours on September 9, 2011, a dead shortnose sturgeon was identified at the Salem Generating Station Circulating Water intake structure. This report to the NRC is being made due to the fact that a report to the National Marine Fisheries Service was made at 1620 hours in accordance with the site Incidental Take Statement. Additionally, a report to New Jersey Department of Environmental Protection was also made at 1630 hours. The sturgeon was deceased prior to collection." | ||
The unit was at 95% Power both before and after the event. | The unit was at 95% Power both before and after the event. | ||
Notified R1DO (Jackson) and the Endangered Species Group via email.}} | Notified R1DO (Jackson) and the Endangered Species Group via email.}} | ||
Latest revision as of 02:08, 13 January 2025
| ML11255A026 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 09/09/2011 |
| From: | NRC/NSIR/DPR |
| To: | NRC/NSIR/DPR |
| Balsam B | |
| References | |
| Download: ML11255A026 (1) | |
Text
From:
HOO Hoc To:
HOO Hoc
Subject:
Logbook Entry: 9/9/2011 - Salem Sturgeon Date:
Friday, September 09, 2011 5:46:00 PM Ops Officer : PETE SNYDER Entry Date : 9/9/2011 - 17:06 Entry Type : 50.72 LOGGED ONLY Notify Date - Time : 9/9/2011 - 17:03 Event Date - Time : 9/9/2011 - 15:12 (EDT)
Site : SALEM Emergency Class :
"At 1512 hours0.0175 days <br />0.42 hours <br />0.0025 weeks <br />5.75316e-4 months <br /> on September 9, 2011, a dead shortnose sturgeon was identified at the Salem Generating Station Circulating Water intake structure. This report to the NRC is being made due to the fact that a report to the National Marine Fisheries Service was made at 1620 hours0.0188 days <br />0.45 hours <br />0.00268 weeks <br />6.1641e-4 months <br /> in accordance with the site Incidental Take Statement. Additionally, a report to New Jersey Department of Environmental Protection was also made at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br />. The sturgeon was deceased prior to collection."
The unit was at 95% Power both before and after the event.
Notified R1DO (Jackson) and the Endangered Species Group via email.