ML20050F777: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:% | {{#Wiki_filter:% | ||
OP! KAllNG DAT A REi ORT DocnEl NO. | OP! KAllNG DAT A REi ORT DocnEl NO. | ||
50-336 DATE 10-2-81 CO'.!PI LTED liY G.H. Howlett | |||
CO'.!PI LTED liY G.H. Howlett 1fI EPilONE (203)447 TT9T X4431 OPE R t ilNG hl A I US | ~ | ||
1fI EPilONE (203)447 TT9T X4431 OPE R t ilNG hl A I US Millstone 2 Notes | |||
: t.. '...we - | |||
I n.i.. | |||
Items 21 & 22 | |||
:. R. p..rija; Po;,.d: . .._ September 1981 | :. R. p..rija; Po;,.d:..._ September 1981 | ||
: 3. Lice ns.:d Thomal Power i31% ): | : 3. Lice ns.:d Thomal Power i31% ): | ||
: 4. N..n..phte Ratin;(Gross 31We): | 2700 Cumulative are computed | ||
: 5. D.>t | : 4. N..n..phte Ratin;(Gross 31We): | ||
: 6. .'!.nimum Dependahie Cepacity (Cross SIWE): | 909 | ||
: 7. at:0imum Dependele C:.pacity (Net 51We): | : 5. D.>t n Electrical R.Mir.; (Ne 51We). | ||
8.70 using a weighted average 3 | |||
895 | |||
: 6..'!.nimum Dependahie Cepacity (Cross SIWE): | |||
: 7. at:0imum Dependele C:.pacity (Net 51We): | |||
86.4 | |||
: b. If C!.:.ags Occur in Capadt> Rat n;s (Items Nurnber 3 Through 7) Since Imt Riport.Ghc Reasons: | : b. If C!.:.ags Occur in Capadt> Rat n;s (Items Nurnber 3 Through 7) Since Imt Riport.Ghc Reasons: | ||
i None | i None None | ||
: 9. Power Lesci To which Restricted,1f Any (Net S!We). | : 9. Power Lesci To which Restricted,1f Any (Net S!We). | ||
: 10. Reasons For Rntrktions. If any. | None | ||
l1. Ilours In Reporting Period | : 10. Reasons For Rntrktions. If any. | ||
: 12. Number Of flour > Reactor Was Critical | Tl:isS!onth Yr.-t o-Dat e Cumniatis e ' | ||
: 13. Reactor Resene Shutdown flours | l1. Ilours In Reporting Period 720 6,551 50,543 | ||
: 14. Ilours Gener. tor On Line | : 12. Number Of flour > Reactor Was Critical 720 5,779.5 37,028.8 | ||
: 15. Unit Ressne Shutdown Uours | : 13. Reactor Resene Shutdown flours 0 | ||
0 | 0 2.076.9 | ||
: 16. Cross Thennal Energy Generated (51Wil) | : 14. Ilours Gener. tor On Line 72_0 5.700 6 35J6L6 t | ||
: | : 15. Unit Ressne Shutdown Uours 0 | ||
4,999,680 | 0 468.2 | ||
: | : 16. Cross Thennal Energy Generated (51Wil) 1.92_3 108 15.100_,712 | ||
: 19. Unit Senice Factor | '88,336.033_ | ||
: 20. Unit Asai!4bi!;ty Factor | 2 | ||
: 21. Unit Capacity racior (U3;ng 31DC Net) | : 18. Net Electrical Energy Generated (StWil) 6 Q9_,5_9_0 ' | ||
: 22. Unit Capnity raetor (U>in; DER Net) | 4,999,680 28,672,597_ | ||
: 23. Unit Forud Outa;e Rate | : 17. Gross Ekctrical Energy Gena.ited (5;Wil) 631,910 4.814.297 | ||
: 24. Shutdowns Scheduled Oser Nest 6 Stonths ( | __27.476.34_3_ | ||
Re fuel ing.,_ _ December 5, 1981, 8 weeks. | : 19. Unit Senice Factor 100 - | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | 8L 0. | ||
: 26. Units In Test Status (Prior io Commercial Operation): | 70.2_ | ||
CO\lN!ERCI A L OPER ATION | : 20. Unit Asai!4bi!;ty Factor | ||
_100 8L Q_ | |||
71.1 | |||
: 21. Unit Capacity racior (U3;ng 31DC Net) 98.0 85.1 66.4 97.3 84.5 65.2 | |||
: 22. Unit Capnity raetor (U>in; DER Net) 0 13.0 21.3 | |||
: 23. Unit Forud Outa;e Rate | |||
: 24. Shutdowns Scheduled Oser Nest 6 Stonths (T pe. Date.and Duration of Each): | |||
3 Re fuel ing.,_ _ December 5, 1981, 8 weeks. | |||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | |||
N/A | |||
: 26. Units In Test Status (Prior io Commercial Operation): | |||
Forecast Achiesed INirliL CRI flCA LITY N/A N/A INiflAL ELECIRICirY | |||
_N/A___ | |||
_N/_A _ | |||
CO\\lN!ERCI A L OPER ATION N/A N/A-ohhh6 MO PDR | |||
("OI) | |||
\\ | |||
Av! r. ;cE r> ;itY UNr11 ow r R LI.Vrt i% e.L i No. | Av! r. ;cE r> ;itY UNr11 ow r R LI.Vrt i% e.L i No. | ||
50-336 Millstone 2 UNir | |||
-81 DAIE (o'.1Pl.E I E D liY _G._H._ _H. owl e t t _ | |||
X4431 l | 1 rt.EI' HONE (203) 447-1791___ | ||
i X4431 l | |||
'10N 111.____SeP.teger,_1981 l | |||
('.i W .'ict) | DAY AVER AGE DAILY POh ER I.EVFL DAY AVER AGE dally I OWER 1.LVFL 4 | ||
('.i W.'ict) | |||
858 | (;!We Nct) 856 858 17 t | ||
2 | |||
3 | __.. ___.B 5 8_. _ _ __. __ | ||
18 | |||
.855_._____ | |||
858 856 3 | |||
39 4 | |||
._859 20 | |||
___._-.856._ _ _ | |||
860 856 s | |||
,3 6 | |||
857 | _________.860_____ __ _ _ _ | ||
69,6 | 22 | ||
.___.____ _ __856 l | |||
7 33 856 859 858 | |||
,4 858 8 | |||
15 855 l | 9 25 767 858 858 | ||
t IN51 RUCTIONS | ,6 836 10 857 855 si 27 854 12-69,6 28 826 | ||
,9 | |||
.856 13 14 | |||
., _ _ 854 30 | |||
___ _ __ B 5 Z._ | |||
c__ | |||
854 33 15 855 l | |||
16 l | |||
t' IN51 RUCTIONS | |||
.Or. this immn.!!st the ve:qe daily ::r.it row c: Inc1 ir..'.;We Net fo; cath da) in the itportin; ;..mth. Compute to l | |||
0,e r.euest whole :r,epwatt.. | |||
+ | |||
(9i)71 f | (9i)71 f | ||
4 UNIT SilDTDOWNS AND POWER REDUCTIONS DOCKE7NO. | |||
l | 50-336 UNIT NA31E Millstone 2 DATE 10-6-81 HEPORTa!0NTil Septernber 1981 CON:i't.1:TED 1;y G_H_ Howlett TEl.EPliONE (203) 447-1791 X4431 I | ||
t t | |||
'i I | |||
i he t. | |||
DJfc d | |||
4 j | |||
r | l l g-g2 | ||
*C"' | |||
-5 g % | |||
f l | 1: | ||
92 Adani, to yO Prevent Recinrence y | |||
3 Di - | |||
Report a mV | |||
=0 x | |||
l r | |||
I t | |||
l I | |||
I f | |||
l i | |||
i i | i i | ||
4 I | |||
;e | ;e i | ||
i I | |||
i | i e | ||
i I | |||
Summary: | i I | ||
i Summary: | |||
The unit operated 'at or near 100% of rated thermal power throughout the month. | The unit operated 'at or near 100% of rated thermal power throughout the month. | ||
n's/77 ) | n's/77 ) | ||
O | O | ||
t ,, | t,,_ | ||
V. | V. | ||
Docket No. | |||
50-336 Date: | |||
L':tBber 6,1981 Completed by: G.H. Howlett III Telephone: | |||
23}/447-1971X364 I | 23}/447-1971X364 I | ||
REFUELING INFrgRMAT:0N REQUEST i: | REFUELING INFrgRMAT:0N REQUEST i: | ||
t 1. | |||
Name of facility: | |||
Millstone 2 | |||
\\ | |||
2. | |||
Scheduled date for next refueling shutdown- | |||
/ | |||
Commenced refuel outage December,5,1981. | |||
4 7 | |||
j 3. | |||
Schedule date for restart following refueling: Februaty '1, 1982 's 4. | |||
Will refueling or resumption of, operation thereafter require a technical specification change or other license amendment? | |||
It is anticipated that Cycle 5 operationd will require q | |||
Technical Specification changes or othe9 Licenseamendmentsf ll>' | |||
/ | |||
j-5. | |||
Scheduled date(s) for submitting licehsing action and 1 | |||
supporting information: | |||
Licensing documentation will be, provided a minimum of 90 days | |||
, ~ I prior to start-up of Cycle 5 or as documented in the R.A. Clark | |||
/' | |||
[s letter to W.G. Counsil, dated 10/6/80, authorizing. Cycle 4 i | |||
operation. | |||
J t | |||
> q. | |||
/ | |||
6. | |||
Important licensing considerations assochated Nth srefueling, e.g.', new or differentfueldesignorsupplier,unreviewedJesightarperformancel analysis methods, significant changes in fuel design, new operating procedures: | |||
3 | |||
! r N/A | |||
\\ | |||
t 7. | |||
The number of fuel assemblies (a) in the core and.(h)'in the spent fuel storage pool: | |||
(a) | |||
In Core: | |||
217 (b) 216 | |||
\\ | |||
8. | |||
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | |||
667 9. | |||
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the.present licensed capacity: | |||
i 1 | |||
1 1985, Spent Fuel Pool, full core off load capability is reached. | |||
1987, Core Full, Spent Fuel Pool contains 648 bundles. | |||
l l | |||
t | t | ||
? | |||
~ | |||
Dockct N1.. 50-336 | Dockct N1.. | ||
Page 1 of 1 | 50-336 Page 1 of 1 | ||
Date 10-6-81 | |||
~ | |||
CORRECTIVE MAINTENANCE SUNdARY FOR SAFETY RELATED EQUIPMENT Report Month | Unit Name tiillstone 2 | ||
8/31/81 | ' Completed By G.H. Howlett Telephone (203) 447-1791 X4_43]_ | ||
~ | |||
CORRECTIVE MAINTENANCE SUNdARY FOR SAFETY RELATED EQUIPMENT Report Month Auoust 1981 DATE SYSTEM COMPONENT MAINTENANCE ACTION I | |||
l B/4/81 Chemical c 3 ilume Charging Pump P C Replaced pump Control 8/4/81 Enclosure Building 2-EB-40, Supply from Enclosure Replaced damper motor Filtration Bldg. to EBF3. | |||
8/31/81 Chemical & Volume Charging Pump P C Repacked pump Control e | |||
%}} | |||
Latest revision as of 09:14, 18 December 2024
| ML20050F777 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/02/1981 |
| From: | Howlett G NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20050F767 | List: |
| References | |
| NUDOCS 8204130380 | |
| Download: ML20050F777 (5) | |
Text
%
OP! KAllNG DAT A REi ORT DocnEl NO.
50-336 DATE 10-2-81 CO'.!PI LTED liY G.H. Howlett
~
1fI EPilONE (203)447 TT9T X4431 OPE R t ilNG hl A I US Millstone 2 Notes
- t.. '...we -
I n.i..
Items 21 & 22
- . R. p..rija; Po;,.d:..._ September 1981
- 3. Lice ns.:d Thomal Power i31% ):
2700 Cumulative are computed
- 4. N..n..phte Ratin;(Gross 31We):
909
- 5. D.>t n Electrical R.Mir.; (Ne 51We).
8.70 using a weighted average 3
895
- 6..'!.nimum Dependahie Cepacity (Cross SIWE):
- 7. at:0imum Dependele C:.pacity (Net 51We):
86.4
- b. If C!.:.ags Occur in Capadt> Rat n;s (Items Nurnber 3 Through 7) Since Imt Riport.Ghc Reasons:
- 9. Power Lesci To which Restricted,1f Any (Net S!We).
None
- 10. Reasons For Rntrktions. If any.
Tl:isS!onth Yr.-t o-Dat e Cumniatis e '
l1. Ilours In Reporting Period 720 6,551 50,543
- 12. Number Of flour > Reactor Was Critical 720 5,779.5 37,028.8
- 13. Reactor Resene Shutdown flours 0
0 2.076.9
- 14. Ilours Gener. tor On Line 72_0 5.700 6 35J6L6 t
- 15. Unit Ressne Shutdown Uours 0
0 468.2
- 16. Cross Thennal Energy Generated (51Wil) 1.92_3 108 15.100_,712
'88,336.033_
2
- 18. Net Electrical Energy Generated (StWil) 6 Q9_,5_9_0 '
4,999,680 28,672,597_
- 17. Gross Ekctrical Energy Gena.ited (5;Wil) 631,910 4.814.297
__27.476.34_3_
- 19. Unit Senice Factor 100 -
8L 0.
70.2_
- 20. Unit Asai!4bi!;ty Factor
_100 8L Q_
71.1
- 21. Unit Capacity racior (U3;ng 31DC Net) 98.0 85.1 66.4 97.3 84.5 65.2
- 22. Unit Capnity raetor (U>in; DER Net) 0 13.0 21.3
- 23. Unit Forud Outa;e Rate
- 24. Shutdowns Scheduled Oser Nest 6 Stonths (T pe. Date.and Duration of Each):
3 Re fuel ing.,_ _ December 5, 1981, 8 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior io Commercial Operation):
Forecast Achiesed INirliL CRI flCA LITY N/A N/A INiflAL ELECIRICirY
_N/A___
_N/_A _
CO\\lN!ERCI A L OPER ATION N/A N/A-ohhh6 MO PDR
("OI)
\\
Av! r. ;cE r> ;itY UNr11 ow r R LI.Vrt i% e.L i No.
50-336 Millstone 2 UNir
-81 DAIE (o'.1Pl.E I E D liY _G._H._ _H. owl e t t _
1 rt.EI' HONE (203) 447-1791___
i X4431 l
'10N 111.____SeP.teger,_1981 l
DAY AVER AGE DAILY POh ER I.EVFL DAY AVER AGE dally I OWER 1.LVFL 4
('.i W.'ict)
(;!We Nct) 856 858 17 t
2
__.. ___.B 5 8_. _ _ __. __
18
.855_._____
858 856 3
39 4
._859 20
___._-.856._ _ _
860 856 s
,3 6
_________.860_____ __ _ _ _
22
.___.____ _ __856 l
7 33 856 859 858
,4 858 8
9 25 767 858 858
,6 836 10 857 855 si 27 854 12-69,6 28 826
,9
.856 13 14
., _ _ 854 30
___ _ __ B 5 Z._
c__
854 33 15 855 l
16 l
t' IN51 RUCTIONS
.Or. this immn.!!st the ve:qe daily ::r.it row c: Inc1 ir..'.;We Net fo; cath da) in the itportin; ;..mth. Compute to l
0,e r.euest whole :r,epwatt..
+
(9i)71 f
4 UNIT SilDTDOWNS AND POWER REDUCTIONS DOCKE7NO.
50-336 UNIT NA31E Millstone 2 DATE 10-6-81 HEPORTa!0NTil Septernber 1981 CON:i't.1:TED 1;y G_H_ Howlett TEl.EPliONE (203) 447-1791 X4431 I
t t
'i I
i he t.
DJfc d
4 j
l l g-g2
- C"'
-5 g %
1:
92 Adani, to yO Prevent Recinrence y
3 Di -
Report a mV
=0 x
l r
I t
l I
I f
l i
i i
4 I
- e i
i I
i e
i I
i I
i Summary:
The unit operated 'at or near 100% of rated thermal power throughout the month.
n's/77 )
O
t,,_
V.
Docket No.
50-336 Date:
L':tBber 6,1981 Completed by: G.H. Howlett III Telephone:
23}/447-1971X364 I
REFUELING INFrgRMAT:0N REQUEST i:
t 1.
Name of facility:
Millstone 2
\\
2.
Scheduled date for next refueling shutdown-
/
Commenced refuel outage December,5,1981.
4 7
j 3.
Schedule date for restart following refueling: Februaty '1, 1982 's 4.
Will refueling or resumption of, operation thereafter require a technical specification change or other license amendment?
It is anticipated that Cycle 5 operationd will require q
Technical Specification changes or othe9 Licenseamendmentsf ll>'
/
j-5.
Scheduled date(s) for submitting licehsing action and 1
supporting information:
Licensing documentation will be, provided a minimum of 90 days
, ~ I prior to start-up of Cycle 5 or as documented in the R.A. Clark
/'
[s letter to W.G. Counsil, dated 10/6/80, authorizing. Cycle 4 i
operation.
J t
> q.
/
6.
Important licensing considerations assochated Nth srefueling, e.g.', new or differentfueldesignorsupplier,unreviewedJesightarperformancel analysis methods, significant changes in fuel design, new operating procedures:
3
! r N/A
\\
t 7.
The number of fuel assemblies (a) in the core and.(h)'in the spent fuel storage pool:
(a)
In Core:
217 (b) 216
\\
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
667 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the.present licensed capacity:
i 1
1 1985, Spent Fuel Pool, full core off load capability is reached.
1987, Core Full, Spent Fuel Pool contains 648 bundles.
l l
t
?
~
Dockct N1..
50-336 Page 1 of 1
Date 10-6-81
~
Unit Name tiillstone 2
' Completed By G.H. Howlett Telephone (203) 447-1791 X4_43]_
~
CORRECTIVE MAINTENANCE SUNdARY FOR SAFETY RELATED EQUIPMENT Report Month Auoust 1981 DATE SYSTEM COMPONENT MAINTENANCE ACTION I
l B/4/81 Chemical c 3 ilume Charging Pump P C Replaced pump Control 8/4/81 Enclosure Building 2-EB-40, Supply from Enclosure Replaced damper motor Filtration Bldg. to EBF3.
8/31/81 Chemical & Volume Charging Pump P C Repacked pump Control e
%