ML20005B127: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000296/LER-1981-030-01, /01T-0:on 810616,turbine First Stage Permissive Switches PS-1-81A & B & PS-1-91A & B Were Found Above Tech Spec Limit.Caused by Barksdale Model B2T-A12SS Setpoint Drift.Switches Reset]]
| number = ML20005B127
| issue date = 06/29/1981
| title = LER 81-030/01T-0:on 810616,turbine First Stage Permissive Switches PS-1-81A & B & PS-1-91A & B Were Found Above Tech Spec Limit.Caused by Barksdale Model B2T-A12SS Setpoint Drift.Switches Reset
| author name =
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000296
| license number =
| contact person =
| document report number = LER-81-030-01T-01, LER-81-30-1T-1, NUDOCS 8107060342
| package number = ML20005B126
| document type = LICENSEE EVENT REPORT (SEE ALSO AO,RO), TEXT-SAFETY REPORT
| page count = 2
}}
 
=Text=
{{#Wiki_filter:,
                                                                                                                                                                                                                                        ) 4. Nie , , ap nWUl ATORY COMMISSION N HC i OllM .' inh _ ,
{f lit                                ,
LICENSEE EVENT ItL:                                                T CtdtpfHtti(w'k                                  ,, l,, { { { ]                                                                  O't.[ ASL PRINT On T YPE At t. REouinED INFonMATIoN) l      [g
([ [ [ A[ Ll Bl Rl Fl 3]@l!$ 0 l 0l -l 0 l 0 l 0 l 0 ] O l - l 0 l 0 l@[ 4 l 1 l 1 $7l (1A l l'd)1 l@l
  #                            at 4                                      g H.t tai,6 ( c oj el                  14                                        4 pCE NLt; Null 49t H                                        25      '.%      LILENSE j yPE        .60 enN s
[.'ll_L}"                                                        $,[,$N I Lhl 0l 5l 0] O[ 0l 2] 9 ] 6 @l                                                                6tl 069l 6 lEVENT1l6  DATE l 8 l 1 @l 0 l 6REPORT 14        15 l 2 l DATE 9 l 8 l H01 l@
IA8                  G1                DOCKE T NUM9EH t vr.Ni r,f;SCillPflON AND PROB AFILE CONSEQUENCES h l
DiT~] {__Dtiring, normal operation, while performing turbine first stage pressure permissive (SI 4.1. A-14) turbine first stage permissive switches PS-1-81A and B and PS-1-91Al E E [ test                                                _
1
  ~ EJ4] Land B were found an average of 10.7 percent above the limits of T.S. table 3.1. A.
There were no redundant                    ;
E LThere was no danger to the health or safety of the public.
BFRO-50-259/78016, 79008, 80053; 260/79016,                                                                      g
[j_@ l systems. Previous similar events:
l
  ^[n l il l 79017, 79024, 80020, 80057; 296/ 79007, 79012, 30022, 80030, 80045, 81017, 81023.
l IOlHl {                                                                                                                                                                                                                                                                              80 1                                  8 3                                                                                                                                                                                                  COMP.            VALVE
                                                                                                ..i '. ! E M              CAUSE                    CAUSE SUBCODE                            COMPONENT CODE                                      SU& CODE          SU8 CODE CODE                      CODE lol9l                                                                                  1 Il Al @ [Ej @ lE l@ [I l N l S l T l R l Uj@ ]@ ] @      11                  30                                                  sta            1.i              20 1                                  8                                                  9                  f0            it R E VISION SE QUE N11 At                                  oCCun 4t NCE                          REFORT COI'E                  TYPE                        NO f VI NI YE AH                                                HF POH ? NO.
                                                  . O llgl, g",pn-a,,            ,',        18111                          L-j                      1013101                            [gj 27 l 01 11 28                  29 i Tl 30 L-J 31 LJ 32 27                J2          11                      24                  76 HOURS                  SUB ITT 0                        FOR1      S.      SUPPLI A            MAN FACTURER TAKIN A Tl                                      ON 4          I        MET LEJ@ly._J@                                      l zl@                l zJ@                      l0IoIOIoI                            LY_j@
41
[42Y[@            l43Ll@          lB l0 l6 l9 l(
44            4;
_14                            J's                .s6                        37                              40
                                                              '8 J CAUSE DESCHIPTION AND COHHECTIVE ACTIONS
[ i I o ' [_The Barksdale bourdon tube pressure switch model B2T-A12SS setpoints had drif ted.
i i l The switches were reset to the proper values and SI 4.1.A-14 was satisfactorily
      ;,;.,jI completed. Design change request 1398 has been initiated to replace these switches g
j
[g l with an analog transmitter with a trip switch.
l li 14nI nl                                                                                                                                                                                                                                                                        80 1
OTHER $f A TUS                                    is OV HY                                                DISCOVERY DESCRIPTION
                                                                                          't. POWE R ST            5 lB[gl                              Surveillance test                                                ]
l i j '> ] [_E_jh l 0] 9l 8l@l                                                                                              NA                                        l
                                          " AC UVITY                            CO%ENT                                                                                                                                                    LOCATION OF RELE ASE nELE ASEn oF HI L F ASE                                                  AMOUNT OF AC11VITY NA                                        1 NA                                                  l 1 6                                            [.Zj h [Z_] @ l                                                                                              44 l
45 80 1                                  H 1                                      to                  31 PE f t%4fgNE l. I kPtr.UHLS Nt i' 'ilf it                  TYPE            L r SCniP TION --
NA                                                                                                            l t i                                            1010 I OJGLzJ@l                        '              "
      '                                    " '                      ,mOmN A',,uU,'it s
                                                                      ~,,,,,,,,                        m,:,,,P,,0N8                                                                                                                                                                          j NA E, E,] L, at.oloJ,,8l                      ,                                                    ,,
                                                              $ f i' .;. (10 (H t I nA14 Af .1          Iti f As'tl t i V      -
f Yt f          l H ',f'.p us' T i( sPJ NA                                                                                                          }
ITTT1                                  M 9 W @lIn                                                                                                                                                                                                                  80 J
fli f.,1tiP flON 2 o                                          1%tig l_gj hi                                                                                                          NA                                                                        l    ?Illlllll1ll1E G107060342 8f0629 P                                      05000296                                                        ,,n on e .                                            {
nam or Pnt PAnen_ . SDR ADGCK                                                                Q DR                                                                                                            ,
 
7
  .. . ?    ._                                      ,
rennessee Valley Aathority                                                    Form IIF 17.
Browns Ferry Nuclear Plant                                                          BF 15.2 6/04/81 l F.R SUPPI.F. MENTAL, INFORMATION Technical Specification inv<>!ved . Table _3 A A BFitO40~.._290 /._81030.
lleported Under Technical Specification _6 7 2 AO)                *Date due NRC:__6/30/81_
Unit    3 Date of Occurrence ._ hL1h/6L_ Time of Occurrence __0830 Identification and Description of Occurrence: During performance of SI 4.1.A-14 PS-1-81A and B and PS-1-91A and B f ailed to operate within T.S. limits. The as found was: .PS-1-81A,187 psi; PS-1-81B,185 psi; PS-1-91A,183.5 psi, PS-1-91B, 184 psi. The above values include a 12.6 psig water leg. T.S. table 3.1.A setpoint is 1154 psig.
_ Conditions Prior to Occurrence:
            . Unit 1 refueling outage Unit 2 maintenance outage Unit 3 at 98%
Action specified in the Technical Specification Surveillance Requirements met due to inoperable equipment. Describe.                _
None Apparent Cause of Occurrence:
Drift of the setpoint. This drift historically seems to occur during times of the year when there are seasonal weather changes. Application of these switches are marginal.
An:3_ lysis of Occurrence.
There was no danger to the health or safety of the public, no release of activity, no damage to the plant or equipment, and no resulting significant chain of events.
Corrective Action:
The switches were reset to the proper values and SI 4.1.A-14 was satisfactorily completed. Design change request 1398 has been initiated to replace these switches with an analog transmitter with a trip switch. Setpoint has been made more conservative. As interim correction action we are investigating another more applicable switch.
Failure Data: BFRO-50-259/78016, 79008, 80053; 260/79016, 79017, 79024, 80020, 296/79007, 79012, 80022, 80030, 80045, 81017, 81023.
80057;    i_o_n_:Per >d - I.if : time; llesponsibility - Document Control Supervisor R e_t en_t_
tllevision: _      _  __
_ _ _}}

Latest revision as of 09:18, 23 December 2024