i sosroN co:5CN CCMPANY GENanA4. orrtcts 800 SSTLaToes STmECT S G STO N. MASSacHu9CTTS oaI99 | |||
: 3. CAmb ANCOGN4NS g' | : 3. CAmb ANCOGN4NS g' | ||
.0ANAGER qucLEam omCmAttcNS CEPamTMENT e' | |||
~ | |||
:~ - | :~ - | ||
Zn, | Zn, February 14, 1978 Q'1 l | ||
--. i. | |||
BEco. Ler. #78-26 | BEco. Ler. #78-26 | ||
.C Ud 7 | |||
l Director of Nuclear Reactor Regulation | |||
.i | |||
l | ~ | ||
i U.S. Nuclear Regul'atory Com:21ssion d | |||
l Washington, D. C. | |||
20555 Docket No. 50-293 l | |||
License No. DPR-35 l | |||
l Reliability Study of Standby Diesel Generators | |||
==Dear Sir:== | ==Dear Sir:== | ||
In letters dated December 15, 1977 and January 3,1978, power reactor licensees i | |||
In letters dated December 15, 1977 and January 3,1978, power reactor licensees i | were requested to complete a questionnaire on standby diesel generators. The l | ||
ec=pleted and is hereby submitted. | attached questionnaire for the Pilgrim Nuclear Powe,I Station diesels has been ec=pleted and is hereby submitted. | ||
3osnn Edison Conpany regrets the delay in transmitting the survey results, however, due to some c: mission we were not aware of the request for such in-l for=ation until receipt of your {{letter dated|date=January 3, 1978|text=January 3, 1978 letter}}. | |||
At that time appropriate steps were taken to obtain a copy of the questionnaire and begin ec= piling the responses. | |||
We trust that this infor=ation will contribute to the reliability study. | |||
We trust that this infor=ation will contribute to the reliability study. If additional infor=ation is required concerning this subj ect please contact the | If additional infor=ation is required concerning this subj ect please contact the | ||
[ | [ | ||
individual identified on the cover sheet of the question = aire. | |||
l l | l l | ||
Very truly yours, l | |||
/ | |||
l :l; ['gh'u b ret u- | l :l; ['gh'u b ret u- | ||
.Yj' 7?C550015 l | |||
7?C550015 l | h IO, I | ||
D Attachments | |||
8107:.s10135 810720 PDR ADOCK 05000293 p | \\ | ||
\\ | |||
8107:.s10135 810720 PDR ADOCK 05000293 p | |||
PDR | |||
I s | I s | ||
20- | 20-Are any foreign cases sucn as pro;rane, freen, halon, carbon S. | ||
dioxide, etc. storec in the: | |||
Diesel Engine roem? | |||
Yes flo or adjacent buildings? Yes f!o If yes, (other than hand portacle fire extinguishers), then w.....,' | |||
Gases | identify gases and give approximate tar.k size. | ||
3 Volume (f t ) | |||
Gases Does control systect autenatically bypa:s, in cmergency starting, any engine tem;orarily out of service for T. | |||
maintenance? Yes __ | |||
fic _p <' | |||
If yes, then how many f ailures to bypass have occured? | If yes, then how many f ailures to bypass have occured? | ||
~ | |||
Does the control system aut:matically overritie the test | |||
Does the control system aut:matically overritie | *.._7,., | ||
~ | |||
U. | |||
Have repetitive mechanical f ailures occurred in any com:onent part. | raode under emergency conditiens? | ||
Yes j."' | |||
!!o Have repetitive mechanical f ailures occurred in any com:onent part. | |||
or subsystem of the engine, generator, or switen gear, eti.? | or subsystem of the engine, generator, or switen gear, eti.? | ||
V. | |||
if yes, then which part or sJbsys tem? 5'ri.A . - ,WA "T.: | n !!o Yes 10 r/c3 _, | ||
How many failures? '/ | if yes, then which part or sJbsys tem? 5'ri.A. -,WA "T.: | ||
How many failures? | |||
'/ | |||
Ka weie c,x-Give nature of failure. At*La d f- | |||
':ould periccic (yearly or other) ovaluation and/or testing by "outside experts" contribute significantly to the diesel-generator reliability? Yes g lio g,.. | |||
Pe:Je .w.sti is 6Asin . c e":,%c | 'NS Give brief reasons for the answer. Av.<ww/%).b Pe:Je.w.sti is 6Asin. c e":,%c cc < :+-c r, se n | ||
. ~.. | |||
..y | |||
~ | |||
1 j | |||
21 X. | |||
1. | |||
Give the accunulated tir.e-load ccera-ing recore f:r each diesel-generator unit from insta,1.lati:n to the cresent (Running Mcurs): | |||
: Serial No. : | ..-- h, r | ||
Preoperational test Date m /7c. | |||
Engine Surv. Testing & | |||
N. | inargency Total | ||
: Serial No. : | |||
liaintenance Hrs. : | |||
and Other Hcurs No load : Loaded Service Hrs. : | |||
- --!~ | |||
N. | |||
~ | |||
2. | |||
Surveillance test load (percent of cortinucus rating) | Surveillance test load (percent of cortinucus rating) | ||
/ ; 'c-3. | |||
Give the projected or clannec tice-1cid coeratica for eaca diesel-generator unit during tne text 12 cenths.' | |||
eaca diesel-generator unit during tne text 12 cenths.' | : Surveillance & | ||
Ecergency | |||
' ctal | |||
:flaintenance Hrs. : | :flaintenance Hrs. : | ||
and other : | |||
:cac m:: A_x | ?.cu rs Service Mrs. : | ||
:cac m:: A_x | |||
:* .m c < e c o | .[,, | ||
c< | |||
: e. t - | |||
Starting date of surveillance testing (OL date) | : 52.'.N L-S : | ||
e' re' W. | |||
:*.m c < e c o 4. | |||
Provide the follcuing succary of the iriccic surveillance testing experience: | |||
f aii re to accept load | 'D | ||
'' 'J 77-Starting date of surveillance testing (OL date) a. | |||
b. | |||
Periccic test interval | |||
/ '55% v Total number of surveillance tes 3 :erformed i | |||
c. | |||
d. | |||
Total nuceer of test f ailures m | |||
L;": | |||
failure to start f aii re to accept load i | |||
failure to carry icad f ail.res due to c:erator errc: | |||
'~ | |||
f ailure due to ecuir, rent not bein; perative curing cecrgency condi tions e. | |||
Supply a copy of tna surveillarce test peccecures with this - | |||
concleted questionnaire. | concleted questionnaire. | ||
e. | |||
e- | e-g | ||
--m, | |||
.,._-g | |||
-,, -}} | |||
Latest revision as of 08:22, 21 December 2024
| ML20009F427 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/14/1978 |
| From: | Andognini G BOSTON EDISON CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20009F426 | List: |
| References | |
| 78-26, NUDOCS 8107310135 | |
| Download: ML20009F427 (3) | |
Text
..
i sosroN co:5CN CCMPANY GENanA4. orrtcts 800 SSTLaToes STmECT S G STO N. MASSacHu9CTTS oaI99
- 3. CAmb ANCOGN4NS g'
.0ANAGER qucLEam omCmAttcNS CEPamTMENT e'
~
- ~ -
Zn, February 14, 1978 Q'1 l
--. i.
BEco. Ler. #78-26
.C Ud 7
l Director of Nuclear Reactor Regulation
.i
~
i U.S. Nuclear Regul'atory Com:21ssion d
l Washington, D. C.
20555 Docket No. 50-293 l
License No. DPR-35 l
l Reliability Study of Standby Diesel Generators
Dear Sir:
In letters dated December 15, 1977 and January 3,1978, power reactor licensees i
were requested to complete a questionnaire on standby diesel generators. The l
attached questionnaire for the Pilgrim Nuclear Powe,I Station diesels has been ec=pleted and is hereby submitted.
3osnn Edison Conpany regrets the delay in transmitting the survey results, however, due to some c: mission we were not aware of the request for such in-l for=ation until receipt of your January 3, 1978 letter.
At that time appropriate steps were taken to obtain a copy of the questionnaire and begin ec= piling the responses.
We trust that this infor=ation will contribute to the reliability study.
If additional infor=ation is required concerning this subj ect please contact the
[
individual identified on the cover sheet of the question = aire.
l l
Very truly yours, l
/
l :l; ['gh'u b ret u-
.Yj' 7?C550015 l
h IO, I
D Attachments
\\
\\
8107:.s10135 810720 PDR ADOCK 05000293 p
I s
20-Are any foreign cases sucn as pro;rane, freen, halon, carbon S.
dioxide, etc. storec in the:
Diesel Engine roem?
Yes flo or adjacent buildings? Yes f!o If yes, (other than hand portacle fire extinguishers), then w.....,'
identify gases and give approximate tar.k size.
3 Volume (f t )
Gases Does control systect autenatically bypa:s, in cmergency starting, any engine tem;orarily out of service for T.
maintenance? Yes __
fic _p <'
If yes, then how many f ailures to bypass have occured?
~
Does the control system aut:matically overritie the test
- .._7,.,
~
U.
raode under emergency conditiens?
Yes j."'
!!o Have repetitive mechanical f ailures occurred in any com:onent part.
or subsystem of the engine, generator, or switen gear, eti.?
V.
n !!o Yes 10 r/c3 _,
if yes, then which part or sJbsys tem? 5'ri.A. -,WA "T.:
How many failures?
'/
Ka weie c,x-Give nature of failure. At*La d f-
':ould periccic (yearly or other) ovaluation and/or testing by "outside experts" contribute significantly to the diesel-generator reliability? Yes g lio g,..
'NS Give brief reasons for the answer. Av.<ww/%).b Pe:Je.w.sti is 6Asin. c e":,%c cc < :+-c r, se n
. ~..
..y
~
1 j
21 X.
1.
Give the accunulated tir.e-load ccera-ing recore f:r each diesel-generator unit from insta,1.lati:n to the cresent (Running Mcurs):
..-- h, r
Preoperational test Date m /7c.
Engine Surv. Testing &
inargency Total
- Serial No. :
liaintenance Hrs. :
and Other Hcurs No load : Loaded Service Hrs. :
- --!~
N.
~
2.
Surveillance test load (percent of cortinucus rating)
/ ; 'c-3.
Give the projected or clannec tice-1cid coeratica for eaca diesel-generator unit during tne text 12 cenths.'
- Surveillance &
Ecergency
' ctal
- flaintenance Hrs. :
and other :
?.cu rs Service Mrs. :
- cac m:: A_x
.[,,
c<
- e. t -
- 52.'.N L-S :
e' re' W.
- .m c < e c o 4.
Provide the follcuing succary of the iriccic surveillance testing experience:
'D
'J 77-Starting date of surveillance testing (OL date) a.
b.
Periccic test interval
/ '55% v Total number of surveillance tes 3 :erformed i
c.
d.
Total nuceer of test f ailures m
L;":
failure to start f aii re to accept load i
failure to carry icad f ail.res due to c:erator errc:
'~
f ailure due to ecuir, rent not bein; perative curing cecrgency condi tions e.
Supply a copy of tna surveillarce test peccecures with this -
concleted questionnaire.
e.
e-g
--m,
.,._-g
-,, -