ENS 54382: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 10: | Line 10: | ||
| utype = GE-4, GE-4, GE-4 | | utype = GE-4, GE-4, GE-4 | ||
| cfr = 10 CFR 50.72(b)(3)(xiii) | | cfr = 10 CFR 50.72(b)(3)(xiii) | ||
| emergency class = Non Emergency | | emergency class = Non Emergency | ||
| notification date = 11/12/2019 10:32 | | notification date = 11/12/2019 10:32 | ||
| notification by = Angel Yarbrough | | notification by = Angel Yarbrough | ||
| NRC officer = Thomas Kendzia | | NRC officer = Thomas Kendzia</Td> | ||
| event date = 11/12/2019 06:00 CST | | event date = 11/12/2019 06:00 CST | ||
| last update date = 01/31/2020 | | last update date = 01/31/2020 | ||
| title = Emergency Operations Facility Out of Service | | title = Emergency Operations Facility Out of Service | ||
| event text = On November 12, 2019, the Central Emergency Control Center (CECC) was removed from service for a planned facility upgrade project. | | event text = "On November 12, 2019, the Central Emergency Control Center (CECC) was removed from service for a planned facility upgrade project. The CECC is a common Emergency Operations Facility (EOF) for the TVA Nuclear sites (Browns Ferry / Sequoyah / Watts Bar). The duration of the upgrade project is approximately 75 days. | ||
If an emergency is declared requiring CECC activation during this period, an alternate CECC will be used. | |||
This is an eight-hour, non-emergency notification for a Loss of Emergency Assessment Capability. | "If an emergency is declared requiring CECC activation during this period, an alternate CECC will be used. During this period, the alternate CECC will be staffed and activated using existing emergency procedures. | ||
The Emergency Response Organization has been notified that the CECC will be unavailable during the upgrade project and to report to the alternate CECC in the event of an emergency. | |||
"This is an eight-hour, non-emergency notification for a Loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the CECC will be unavailable for more than 72 hours. | |||
"The Emergency Response Organization has been notified that the CECC will be unavailable during the upgrade project and to report to the alternate CECC in the event of an emergency. There is no impact on the health and safety of the public or plant employees. | |||
"The NRC Resident Inspector has been notified." | |||
* * * UPDATE AT 1316 EST ON 11/14/19 FROM BARUCH CALKIN TO JEFF HERRERA * * * | |||
The event information was updated to indicate that the event occurred at 0700 EST. | |||
The NRC Resident Inspector has been notified. | The NRC Resident Inspector has been notified. | ||
Notified the R2DO(Musser). | Notified the R2DO(Musser). | ||
* * * UPDATE FROM ALAN PRUCHA TO KERBY SCALES AT 1526 EST ON 1/31/2020 * * * | * * * UPDATE FROM ALAN PRUCHA TO KERBY SCALES AT 1526 EST ON 1/31/2020 * * * | ||
The CECC facility upgrade project is sufficiently complete such that the CECC was returned to a functional status at 1350 CST on January 31, 2020. | |||
The NRC Resident Inspector has been notified. | "The CECC facility upgrade project is sufficiently complete such that the CECC was returned to a functional status at 1350 CST on January 31, 2020. | ||
Notified R2DO (Baptist). | |||
"The NRC Resident Inspector has been notified." | |||
Notified R2DO (Baptist).</td> | |||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200203en.html#en54382 | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200203en.html#en54382 | ||
}}{{unit info | }}{{unit info | ||
| Unit = | | Unit = 1 | ||
| type = | | type = GE-4 | ||
| Scram code = | | Scram code = N | ||
| Reactor critical = | | Reactor critical = Y | ||
| Initial power = | | Initial power = 100 | ||
| Initial reactor mode = | | Initial reactor mode = Power Operation | ||
| Current power = | | Current power = 100 | ||
| Current reactor mode = | | Current reactor mode = Power Operation | ||
}}{{unit info | }}{{unit info | ||
| Unit = | | Unit = 2 | ||
| type = | | type = GE-4 | ||
| Scram code = | | Scram code = N | ||
| Reactor critical = | | Reactor critical = Y | ||
| Initial power = | | Initial power = 100 | ||
| Initial reactor mode = | | Initial reactor mode = Power Operation | ||
| Current power = | | Current power = 100 | ||
| Current reactor mode = | | Current reactor mode = Power Operation | ||
}}{{unit info | }}{{unit info | ||
| Unit = | | Unit = 3 | ||
| type = | | type = GE-4 | ||
| Scram code = | | Scram code = N | ||
| Reactor critical = | | Reactor critical = Y | ||
| Initial power = | | Initial power = 100 | ||
| Initial reactor mode = | | Initial reactor mode = Power Operation | ||
| Current power = | | Current power = 100 | ||
| Current reactor mode = | | Current reactor mode = Power Operation | ||
}} | }} | ||
{{ENS-Nav}}[[Category:Power Reactor]] | {{ENS-Nav}}[[Category:Power Reactor]] |
Revision as of 23:35, 14 January 2021
Where | |
---|---|
Browns Ferry Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-1.47 h-0.0613 days <br />-0.00875 weeks <br />-0.00201 months <br />) | |
Opened: | Angel Yarbrough 10:32 Nov 12, 2019 |
NRC Officer: | Thomas Kendzia |
Last Updated: | Jan 31, 2020 |
54382 - NRC Website
| |