ML19337B577: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
Metropolitan. Edison Company gg                                                                                  Post Office Box 480 Middletown, Pennsylvania 17057 717 9444041 Writer's Direct Dial Number October 2, 1980 TE 496 Office of Nuclear Reactor Regulation Attn:   R. W. Reid, Chief Operating Reactors, Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Metropolitan. Edison Company Post Office Box 480 gg Middletown, Pennsylvania 17057 717 9444041 Writer's Direct Dial Number October 2, 1980 TE 496 Office of Nuclear Reactor Regulation Attn:
R. W. Reid, Chief Operating Reactors, Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.
20555


==Dear Sir:==
==Dear Sir:==
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Reactor Building Spray System Our letter of April 2, 1980, TLL 154, in response to your letter of March 7, 1980, described our plans concerning the modification of the Reactor Building Spray System. Additionally, we anticipated a technical specification change would be submitted by September 1, 1980, based upon the results of our studies.
Operating License No. DPR-50 Docket No. 50-289 Reactor Building Spray System Our letter of April 2, 1980, TLL 154, in response to your letter of March 7, 1980, described our plans concerning the modification of the Reactor Building Spray System. Additionally, we anticipated a technical specification change would be submitted by September 1, 1980, based upon the results of our studies.
We have not completed the studies on the spray system and have, therefore, revised our anticipated submittal date for a technical specification change to January 1, 1981.
We have not completed the studies on the spray system and have, therefore, revised our anticipated submittal date for a technical specification change to January 1, 1981.
Sincerely,
Sincerely,
                                                                    . D. ukill Director-TMI-l HDH:DCM:1ma cc:   J. T. Collins B. J. Snyder B. H. Grier D. Dilanni H. Silver
. D.
                                                                                                                                        \
ukill Director-TMI-l HDH:DCM:1ma cc:
8 0100703o1.3     wtrecontan ec sen ccmoan, s a vemter et tre cenera! Putsc u:+t es system i}}
J. T. Collins B. J. Snyder B. H. Grier D. Dilanni H. Silver
\\
8 0100703o1.3 wtrecontan ec sen ccmoan, s a vemter et tre cenera! Putsc u:+t es system i}}

Latest revision as of 17:39, 25 December 2024

Informs That Study of Reactor Bldg Spray Sys Not Complete. Revised Submittal Date for Tech Specs Changed to 810101
ML19337B577
Person / Time
Site: Crane 
Issue date: 10/02/1980
From: Hukill H
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
TLL-496, NUDOCS 8010070323
Download: ML19337B577 (1)


Text

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

Metropolitan. Edison Company Post Office Box 480 gg Middletown, Pennsylvania 17057 717 9444041 Writer's Direct Dial Number October 2, 1980 TE 496 Office of Nuclear Reactor Regulation Attn:

R. W. Reid, Chief Operating Reactors, Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Reactor Building Spray System Our letter of April 2, 1980, TLL 154, in response to your letter of March 7, 1980, described our plans concerning the modification of the Reactor Building Spray System. Additionally, we anticipated a technical specification change would be submitted by September 1, 1980, based upon the results of our studies.

We have not completed the studies on the spray system and have, therefore, revised our anticipated submittal date for a technical specification change to January 1, 1981.

Sincerely,

. D.

ukill Director-TMI-l HDH:DCM:1ma cc:

J. T. Collins B. J. Snyder B. H. Grier D. Dilanni H. Silver

\\

8 0100703o1.3 wtrecontan ec sen ccmoan, s a vemter et tre cenera! Putsc u:+t es system i