ML19345C955: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:From:                           Gleaves, Billy Sent:                           Wednesday, December 11, 2019 7:29 AM To:                             Vogtle PEmails Cc:                             Rankin, Jennivine
{{#Wiki_filter:From:
Gleaves, Billy Sent:
Wednesday, December 11, 2019 7:29 AM To:
Vogtle PEmails Cc:
Rankin, Jennivine  


==Subject:==
==Subject:==
Public Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019)
Public Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019)
Attachments:                     Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019).pdf These are the first 2 pages from the draft submittal for Vogtle LAR-19-020 on Cyber Security Plan Changes. These will be discussed at a meeting with SNC on 12/12/19.
Attachments:
Billy William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy and are not binding on the Commission.
Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019).pdf These are the first 2 pages from the draft submittal for Vogtle LAR-19-020 on Cyber Security Plan Changes. These will be discussed at a meeting with SNC on 12/12/19.
Billy William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy and are not binding on the Commission.  


Hearing Identifier:   Vogtle_COL_Docs_Public Email Number:         508 Mail Envelope Properties     (BL0PR0901MB4387E7B0F55BAEA0E19D63699F5A0)
Hearing Identifier:
Vogtle_COL_Docs_Public Email Number:
508 Mail Envelope Properties (BL0PR0901MB4387E7B0F55BAEA0E19D63699F5A0)  


==Subject:==
==Subject:==
Public Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019)
Public Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019)
Sent Date:             12/11/2019 7:29:13 AM Received Date:         12/11/2019 7:29:17 AM From:                 Gleaves, Billy Created By:           Bill.Gleaves@nrc.gov Recipients:
Sent Date:
12/11/2019 7:29:13 AM Received Date:
12/11/2019 7:29:17 AM From:
Gleaves, Billy Created By:
Bill.Gleaves@nrc.gov Recipients:  
"Rankin, Jennivine" <Jennivine.Rankin@nrc.gov>
"Rankin, Jennivine" <Jennivine.Rankin@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office:           BL0PR0901MB4387.namprd09.prod.outlook.com Files                           Size               Date & Time MESSAGE                         707                 12/11/2019 7:29:17 AM Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019).pdf                       659378 Options Priority:                       Normal Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Tracking Status: None Post Office:
BL0PR0901MB4387.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 707 12/11/2019 7:29:17 AM Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019).pdf 659378 Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:  


Michael J. Yox               7825 River Road Regulatory Affairs Director   Waynesboro, GA 30830 Vogtle 3 & 4                 706-848-6459 December XX, 2019 Docket Nos.: 52-025                                                                     ND-19-0000 52-026                                                                   10 CFR 50.90 10 CFR 73.54 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 mpany Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Ladies and Gentlemen:
Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 December XX, 2019 Docket Nos.:
AF Cyber Security Plan Changes In accordance with 10 CFR 50.90, Southern amendment to the combined licenses (COLs) endme endment:
52-025 ND-19-0000 52-026 10 CFR 50.90 10 CFR 73.54 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Request for License Amendment:
Request for License Amendment:
Cyber Security Plan Changes (LAR-19-020)
es ((LAR-19-020)
Ladies and Gentlemen:
LA 020)
In accordance with 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requests an amendment to the combined licenses (COLs) for Vogtle Electric Generating Plant (VEGP) Units 3 and 4 (License Numbers NPF-91 and NPF-92, respectively). The requested amendment proposes changes to the VEGP Units 3 & 4 Cyber Security Plan (CSP).
LAR Operatin Company (SNC) requests an ern Nuclear Operating OLs) for Vogtle Electric Generating Ge        Plant (VEGP) Units 3 Units 1 through 4, to align enhance certain controls the changes proposed osed in T
The license amendment request (LAR) proposes changes to the VEGP Units 3 & 4 CSP to identify the VEGP 1&2 CSP for cyber security protection of digital assets in systems common to VEGP Units 1 through 4, to align language in the VEGP Units 3&4 CSP with the corresponding elements of the NRC-endorsed CSP template in NEI 08-09, Revision 6, including Addendum 1, and to enhance certain controls for the protection and safety monitoring system (PMS). SNC has reviewed the changes proposed in this LAR in accordance with the provisions of 10 CFR 50.54(p)(2) and has determined that a request for prior NRC approval constitutes the most prudent path forward. provides the description, technical evaluation, regulatory evaluation (including the Significant Hazards Consideration Determination) and environmental considerations for the proposed changes. Enclosure 2 identifies the requested changes and provides markups depicting the requested changes to the VEGP Units 3 and 4 current licensing basis documents. The information in Enclosures 1 and 2 contains Security-Related Information and, therefore, cannot be disclosed to the public in accordance with 10 CFR 2.390.
and 4 (License Numbers NPF-91 and NPF-92, proposes changes to the VEGP Units The license amendment request the VEGP 1&2 CSP for cyber st (LAR)
This letter contains no regulatory commitments.
NPF--92, respectively).
NPF (LA proposes respectively). The ts 3 & 4 Cyber Security Plan (CS n language in the VEGP Units of the NRC-endorsed CSP template in NEI 08-n this LAR iin U
08-09, 08 n accordance with Re T
(CSP).
requested amendment changes to the VEGP Units 3 & 4 CSP to identify oses chan ber security protection oof digital a assets in systems common to VEGP 3&4 CSP with the corresponding elements
                                                    -09, Revision   6, including Addendum 1, and to ols for the protection and safety monitoring system (PMS). SNC has reviewed trols wi the provisions of 10 CFR 50.54(p)(2) and has proposed R
determined thatt a request for prior NRC approval provides the description, Significant sed changes.
ch the requested Enclosure sure 2 identifies uested changes to the VEGP VE approva constitutes the most prudent path forward.
description technical tech ant Hazards Consideration Determination)
Dete De evaluation, regulatory evaluation (including the and environmental considerations for the ntif the requested changes and provides markups depicting identif Units 3 and 4 current licensing basis documents. The D
information n in Enclosures 1 and This letter containss no reg an 2 contains Security-Related Information and, therefore, cannot be disclosed to the public in accordance a
ac          with 10 CFR 2.390.
regulatory commitments.
SNC requests NRC staff review and approval of this license amendment request (LAR) no later than May 1, 2020 to support receipt of nuclear fuel for VEGP Unit 3. Delay approval of this license amendment could result in a delay in establishing the VEGP Unit 3 protected area boundary, and a subsequent delay in fuel receipt onsite. SNC expects to implement the proposed amendment within 30 days of approval of the LAR.
SNC requests NRC staff review and approval of this license amendment request (LAR) no later than May 1, 2020 to support receipt of nuclear fuel for VEGP Unit 3. Delay approval of this license amendment could result in a delay in establishing the VEGP Unit 3 protected area boundary, and a subsequent delay in fuel receipt onsite. SNC expects to implement the proposed amendment within 30 days of approval of the LAR.
In accordance with 10 CFR 50.91, SNC is notifying the State of Georgia by transmitting a copy of this letter and its enclosures to the designated State Official.
In accordance with 10 CFR 50.91, SNC is notifying the State of Georgia by transmitting a copy of this letter and its enclosures to the designated State Official.
Should you have any questions, please contact Ms. Kelli A. Roberts at (706) 848-6991.
Should you have any questions, please contact Ms. Kelli A. Roberts at (706) 848-6991.
12/12/2019 Pre-Submittal Meeting
DRAFT mpany mpany Units 3 and 4 Units endment:
endme es es (LAR LA 020)
FT ern Nuclear Operating Company Operatin OLs) for Vogtle Electric Generating OLs) for Vogtle Electric Ge and NPF NPF-92, respectively) 92, respectively). The T
ts 3 & 4 Cyber Security Plan (CS 4 Cyber Security Plan (CS st (LAR) st (LA proposes changes to oses chan the the ber security protection of digital a ber security protection o n language in the VEGP Units 3&4 n language in the VEGP U CSP template in NEI 08 CSP template in NEI 08-09, Re 09, trols for the protection and safety ols for the protection and safety osed in this LAR n this LAR in accordance wi n accordance wi t a request for prior NRC approva request for prior 1 provides the 1 provides the description, tech description ant Hazards Consideration Dete ant Hazards Consideration De sed changes.
sed ch Enclosure sure 2 identif ntif uested changes to the VE uested changes to the n in Enclosures 1 and n in Enclosures 1 an to the public in ac to the public in a s no reg s no reg 12/12/2019 Pre-Submittal Meeting


U.S. Nuclear Regulatory Commission ND-19-0000 Page 2 of 4 I declare under penalty of perjury that the foregoing is true and correct. Executed on the XXth of December 2019.
U.S. Nuclear Regulatory Commission ND-19-0000 Page 2 of 4 I declare under penalty of perjury that the foregoing is true and correct. Executed on the XXth of December 2019.
Respectfully submitted, Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 Southern Nuclear Operating Company T
Respectfully submitted, Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 Southern Nuclear Operating Company Enclosures
Enclosures AF SECURITY-RELATED to Licensing RELATED ng Plant (VEGP) Units
: 1) Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - Request for License Amendment: Cyber Security Plan Changes (LAR-19-020)
: 1) Vogtle Electric Generating Amendment: Cyber Security Plan Changes ED INFORMATION Unit 3 and 4 - Request for License hanges (LAR-19-020)
(CONTAINS SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390)
INFORMATIO - WITHHOLD THHO g Basis Documents ((LAR-19-020)
: 2) Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - Proposed Changes to Licensing Basis Documents (LAR-19-020)
D INFORMATION INFORMA        - WIT LAR-19 WITHHOLD U 9
(CONTAINS SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390)
(LAR        (CONTAINS UNDER 10 CFR 2.390) g Plant (VEGP) Units 3 and 4 - Proposed Changes
DRAFT ng Plant (VEGP) Units 3 and 4 ng Plant (VEGP) Unit Security Plan Security Changes (
: 2) Vogtle Electric Generating (CONTAINS SECURITY-UNDER 10 CFR 2.390)
hanges LAR ED INFORMATION INFORMATIO
R D
- WITHHOLD THHO Generating Plant (VEGP) Units g Plant (VEGP) Units g Basis Documents (
12/12/2019 Pre-Submittal Meeting}}
g Basis Documents LAR-199 D INFORMATION D INFORMA
- WITHHOLD U WIT 12/12/2019 Pre-Submittal Meeting}}

Latest revision as of 09:54, 24 December 2024

COL Docs - Public Pages from Draft SNC_LAR-19-020 (Rf) Pre-Sub Mtg (12-12-2019)
ML19345C955
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/11/2019
From:
NRC
To:
NRC/NRR/DNRL
References
Download: ML19345C955 (4)


Text

From:

Gleaves, Billy Sent:

Wednesday, December 11, 2019 7:29 AM To:

Vogtle PEmails Cc:

Rankin, Jennivine

Subject:

Public Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019)

Attachments:

Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019).pdf These are the first 2 pages from the draft submittal for Vogtle LAR-19-020 on Cyber Security Plan Changes. These will be discussed at a meeting with SNC on 12/12/19.

Billy William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy and are not binding on the Commission.

Hearing Identifier:

Vogtle_COL_Docs_Public Email Number:

508 Mail Envelope Properties (BL0PR0901MB4387E7B0F55BAEA0E19D63699F5A0)

Subject:

Public Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019)

Sent Date:

12/11/2019 7:29:13 AM Received Date:

12/11/2019 7:29:17 AM From:

Gleaves, Billy Created By:

Bill.Gleaves@nrc.gov Recipients:

"Rankin, Jennivine" <Jennivine.Rankin@nrc.gov>

Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office:

BL0PR0901MB4387.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 707 12/11/2019 7:29:17 AM Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019).pdf 659378 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 December XX, 2019 Docket Nos.:

52-025 ND-19-0000 52-026 10 CFR 50.90 10 CFR 73.54 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Request for License Amendment:

Cyber Security Plan Changes (LAR-19-020)

Ladies and Gentlemen:

In accordance with 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requests an amendment to the combined licenses (COLs) for Vogtle Electric Generating Plant (VEGP) Units 3 and 4 (License Numbers NPF-91 and NPF-92, respectively). The requested amendment proposes changes to the VEGP Units 3 & 4 Cyber Security Plan (CSP).

The license amendment request (LAR) proposes changes to the VEGP Units 3 & 4 CSP to identify the VEGP 1&2 CSP for cyber security protection of digital assets in systems common to VEGP Units 1 through 4, to align language in the VEGP Units 3&4 CSP with the corresponding elements of the NRC-endorsed CSP template in NEI 08-09, Revision 6, including Addendum 1, and to enhance certain controls for the protection and safety monitoring system (PMS). SNC has reviewed the changes proposed in this LAR in accordance with the provisions of 10 CFR 50.54(p)(2) and has determined that a request for prior NRC approval constitutes the most prudent path forward. provides the description, technical evaluation, regulatory evaluation (including the Significant Hazards Consideration Determination) and environmental considerations for the proposed changes. Enclosure 2 identifies the requested changes and provides markups depicting the requested changes to the VEGP Units 3 and 4 current licensing basis documents. The information in Enclosures 1 and 2 contains Security-Related Information and, therefore, cannot be disclosed to the public in accordance with 10 CFR 2.390.

This letter contains no regulatory commitments.

SNC requests NRC staff review and approval of this license amendment request (LAR) no later than May 1, 2020 to support receipt of nuclear fuel for VEGP Unit 3. Delay approval of this license amendment could result in a delay in establishing the VEGP Unit 3 protected area boundary, and a subsequent delay in fuel receipt onsite. SNC expects to implement the proposed amendment within 30 days of approval of the LAR.

In accordance with 10 CFR 50.91, SNC is notifying the State of Georgia by transmitting a copy of this letter and its enclosures to the designated State Official.

Should you have any questions, please contact Ms. Kelli A. Roberts at (706) 848-6991.

DRAFT mpany mpany Units 3 and 4 Units endment:

endme es es (LAR LA 020)

FT ern Nuclear Operating Company Operatin OLs) for Vogtle Electric Generating OLs) for Vogtle Electric Ge and NPF NPF-92, respectively) 92, respectively). The T

ts 3 & 4 Cyber Security Plan (CS 4 Cyber Security Plan (CS st (LAR) st (LA proposes changes to oses chan the the ber security protection of digital a ber security protection o n language in the VEGP Units 3&4 n language in the VEGP U CSP template in NEI 08 CSP template in NEI 08-09, Re 09, trols for the protection and safety ols for the protection and safety osed in this LAR n this LAR in accordance wi n accordance wi t a request for prior NRC approva request for prior 1 provides the 1 provides the description, tech description ant Hazards Consideration Dete ant Hazards Consideration De sed changes.

sed ch Enclosure sure 2 identif ntif uested changes to the VE uested changes to the n in Enclosures 1 and n in Enclosures 1 an to the public in ac to the public in a s no reg s no reg 12/12/2019 Pre-Submittal Meeting

U.S. Nuclear Regulatory Commission ND-19-0000 Page 2 of 4 I declare under penalty of perjury that the foregoing is true and correct. Executed on the XXth of December 2019.

Respectfully submitted, Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 Southern Nuclear Operating Company Enclosures

1) Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - Request for License Amendment: Cyber Security Plan Changes (LAR-19-020)

(CONTAINS SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390)

2) Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - Proposed Changes to Licensing Basis Documents (LAR-19-020)

(CONTAINS SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390)

DRAFT ng Plant (VEGP) Units 3 and 4 ng Plant (VEGP) Unit Security Plan Security Changes (

hanges LAR ED INFORMATION INFORMATIO

- WITHHOLD THHO Generating Plant (VEGP) Units g Plant (VEGP) Units g Basis Documents (

g Basis Documents LAR-199 D INFORMATION D INFORMA

- WITHHOLD U WIT 12/12/2019 Pre-Submittal Meeting