ML19350B513: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19350B514 | | number = ML19350B514 | ||
| issue date = 03/10/1981 | | issue date = 03/10/1981 | ||
| title = | | title = LER 81-004/01T-0:on 810225,review Indicated That If Backup Scram Solenoids Failed,Actuation of ATWS Sys Would Prevent Closure of Scram Discharge Vol Vent & Drain Valves,Violating Primary Containment.Cause Due to Oversight in Design | ||
| author name = Mcloughlin M | | author name = Mcloughlin M | ||
| author affiliation = BOSTON EDISON CO. | | author affiliation = BOSTON EDISON CO. |
Latest revision as of 20:14, 16 January 2020
Date released: 12/30/2019 | Download: ML19350B513 |
---|---|
ML19350B514 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 03/10/1981 |
From: | Mcloughlin M BOSTON EDISON CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
Download: ML19350B514 (2) | |
ML19350B512 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 03/10/1981 |
From: | Machon R BOSTON EDISON CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
Download: ML19350B512 (1) | |