ML050660453: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 20: | Line 20: | ||
Division Manager - Nuclear Operations | Division Manager - Nuclear Operations | ||
Omaha Public Power District | Omaha Public Power District | ||
Fort Calhoun Station FC-2-4 Adm. | Fort Calhoun Station FC-2-4 Adm. | ||
P.O. Box 550 | P.O. Box 550 | ||
Fort Calhoun, NE 68023-0550 | Fort Calhoun, NE 68023-0550 | ||
SUBJECT: | SUBJECT: | ||
FORT CALHOUN STATION - NOTIFICATION OF NRC INITIAL OPERATOR | |||
LICENSING EXAMINATION (EXAMINATION REPORT 05000285/2005-301) | |||
Dear Mr. Ridenoure: | Dear Mr. Ridenoure: | ||
In a telephone conversation on February 22, 2005, between Messrs. David Weaver, Supervisor, | In a telephone conversation on February 22, 2005, between Messrs. David Weaver, Supervisor, | ||
| Line 35: | Line 36: | ||
week of June 20, 2005. | week of June 20, 2005. | ||
To meet the above schedule, it will be necessary for your staff to submit the examination | To meet the above schedule, it will be necessary for your staff to submit the examination | ||
outlines by April 1, 2005. The draft written examinations, operating tests, and the supporting | outlines by April 1, 2005. The draft written examinations, operating tests, and the supporting | ||
reference materials identified in Attachment 2 of ES-201 and as specified by the chief examiner | reference materials identified in Attachment 2 of ES-201 and as specified by the chief examiner | ||
will be due by May 27, 2005. Any delay in receiving the examination and reference materials, or | will be due by May 27, 2005. Any delay in receiving the examination and reference materials, or | ||
the submittal of inadequate or incomplete materials, may cause the examinations to be | the submittal of inadequate or incomplete materials, may cause the examinations to be | ||
rescheduled. | rescheduled. | ||
In order to conduct the requested written examinations and operating tests, it will be necessary | In order to conduct the requested written examinations and operating tests, it will be necessary | ||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | for your staff to provide adequate space and accommodations in accordance with ES-402, and | ||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | to make the simulation facility available on the dates noted above. In accordance with ES-302, | ||
your staff should retain the original simulator performance data (e.g., system pressures, | your staff should retain the original simulator performance data (e.g., system pressures, | ||
temperatures, and levels) generated during the dynamic operating tests until the examination | temperatures, and levels) generated during the dynamic operating tests until the examination | ||
| Line 49: | Line 50: | ||
effect while the written examinations and operating tests are being administered. | effect while the written examinations and operating tests are being administered. | ||
Omaha Public Power District | Omaha Public Power District | ||
-2- | |||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor | To permit timely NRC review and evaluation, your staff should submit preliminary reactor | ||
operator and senior reactor operator license applications (Office of Management and Budget | operator and senior reactor operator license applications (Office of Management and Budget | ||
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | ||
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first | and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first | ||
examination date. If the applications are not received at least 30 days before the examination | examination date. If the applications are not received at least 30 days before the examination | ||
date, a postponement may be necessary. Signed applications certifying that all training has | date, a postponement may be necessary. Signed applications certifying that all training has | ||
been completed should be submitted at least 14 days before the first examination date. | been completed should be submitted at least 14 days before the first examination date. | ||
This letter contains information collections that are subject to the Paperwork Reduction Act of | This letter contains information collections that are subject to the Paperwork Reduction Act of | ||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | ||
Management and Budget, approval number 3150-0101, which expires on June 30, 2006. | Management and Budget, approval number 3150-0101, which expires on June 30, 2006. | ||
The public reporting burden for this collection of information is estimated to average 500 hours | The public reporting burden for this collection of information is estimated to average 500 hours | ||
per response, including the time for reviewing instructions, gathering and maintaining the data | per response, including the time for reviewing instructions, gathering and maintaining the data | ||
needed, writing the examinations, and completing and reviewing the collection of information. | needed, writing the examinations, and completing and reviewing the collection of information. | ||
Send comments on any aspect of this collection of information, including suggestions for | Send comments on any aspect of this collection of information, including suggestions for | ||
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. | reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. | ||
| Line 73: | Line 75: | ||
enclosure(s), and your response will be made available electronically for public inspection in the | enclosure(s), and your response will be made available electronically for public inspection in the | ||
NRC Public Document Room or from the Publicly Available Records (PARS) component of | NRC Public Document Room or from the Publicly Available Records (PARS) component of | ||
NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at | NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at | ||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Thank you for your cooperation in this matter. Mr. Weaver has been advised of the policies | Thank you for your cooperation in this matter. Mr. Weaver has been advised of the policies | ||
and guidelines referenced in this letter. If you have any questions regarding the NRC's | and guidelines referenced in this letter. If you have any questions regarding the NRC's | ||
examination procedures and guidelines, please contact Mr. McKernon at 817-860-8153, or | examination procedures and guidelines, please contact Mr. McKernon at 817-860-8153, or | ||
myself 817-860-8159 . | myself 817-860-8159 . | ||
Sincerely, | |||
/RA/ | |||
Anthony T. Gody, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket: 50-285 | Docket: 50-285 | ||
License: DPR-40 | License: DPR-40 | ||
Omaha Public Power District | Omaha Public Power District | ||
-3- | |||
cc: | cc: | ||
John B. Herman, Manager | John B. Herman, Manager | ||
| Line 94: | Line 97: | ||
Fort Calhoun Station FC-2-4 Adm. | Fort Calhoun Station FC-2-4 Adm. | ||
P.O. Box 550 | P.O. Box 550 | ||
Fort Calhoun, NE 68023-0550 | Fort Calhoun, NE 68023-0550 | ||
David J. Bannister | David J. Bannister | ||
Manager - Fort Calhoun Station | Manager - Fort Calhoun Station | ||
| Line 100: | Line 103: | ||
Fort Calhoun Station FC-1-1 Plant | Fort Calhoun Station FC-1-1 Plant | ||
P.O. Box 550 | P.O. Box 550 | ||
Fort Calhoun, NE 68023-0550 | Fort Calhoun, NE 68023-0550 | ||
James R. Curtiss | James R. Curtiss | ||
Winston & Strawn | Winston & Strawn | ||
1400 L. Street, N.W. | 1400 L. Street, N.W. | ||
Washington, DC 20005-3502 | Washington, DC 20005-3502 | ||
Chairman | Chairman | ||
Washington County Board of Supervisors | Washington County Board of Supervisors | ||
P.O. Box 466 | P.O. Box 466 | ||
Blair, NE 68008 | Blair, NE 68008 | ||
Sue Semerena, Section Administrator | Sue Semerena, Section Administrator | ||
Nebraska Health and Human Services System | Nebraska Health and Human Services System | ||
| Line 115: | Line 118: | ||
301 Centennial Mall, South | 301 Centennial Mall, South | ||
P.O. Box 95007 | P.O. Box 95007 | ||
Lincoln, NE 68509-5007 | Lincoln, NE 68509-5007 | ||
Daniel K. McGhee | Daniel K. McGhee | ||
Bureau of Radiological Health | Bureau of Radiological Health | ||
Iowa Department of Public Health | Iowa Department of Public Health | ||
401 SW 7th Street, Suite D | 401 SW 7th Street, Suite D | ||
Des Moines, IA 50309 | Des Moines, IA 50309 | ||
Omaha Public Power District | Omaha Public Power District | ||
-4- | |||
Electronic distribution by RIV: | Electronic distribution by RIV: | ||
Regional Administrator (BSM1) | Regional Administrator (BSM1) | ||
| Line 134: | Line 138: | ||
RITS Coordinator (KEG) | RITS Coordinator (KEG) | ||
RidsNrrDipmIipb | RidsNrrDipmIipb | ||
SISP Review Completed: _Y_____ ADAMS: XG Yes | SISP Review Completed: _Y_____ ADAMS: XG Yes | ||
XG Publicly Available | G No Initials: ______ | ||
XG Publicly Available G Non-Publicly Available G Sensitive | |||
G Non-Sensitive | |||
SOE:OB | |||
C:OB | |||
OFFICIAL RECORD COPY | TOMcKernon/lmb | ||
ATGody | |||
/RA/ | |||
/RA/ | |||
02/23/2005 | |||
02/25/2005 | |||
OFFICIAL RECORD COPY | |||
T=Telephone E=E-mail F=Fax | |||
}} | }} | ||
Latest revision as of 22:39, 15 January 2025
| ML050660453 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun (DPR-040) |
| Issue date: | 02/25/2005 |
| From: | Gody A Operations Branch IV |
| To: | Ridenoure R Omaha Public Power District |
| References | |
| Download: ML050660453 (4) | |
See also: IR 05000285/2005301
Text
February 25, 2005
R. T. Ridenoure
Division Manager - Nuclear Operations
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION - NOTIFICATION OF NRC INITIAL OPERATOR
LICENSING EXAMINATION (EXAMINATION REPORT 05000285/2005-301)
Dear Mr. Ridenoure:
In a telephone conversation on February 22, 2005, between Messrs. David Weaver, Supervisor,
Operations Training and Tom McKernon, Chief Examiner, arrangements were made for the
administration of licensing examinations at Fort Calhoun Station during the week of July 11,
2005.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for
Power Reactors." Your support for onsite validation of the examinations is required during the
week of June 20, 2005.
To meet the above schedule, it will be necessary for your staff to submit the examination
outlines by April 1, 2005. The draft written examinations, operating tests, and the supporting
reference materials identified in Attachment 2 of ES-201 and as specified by the chief examiner
will be due by May 27, 2005. Any delay in receiving the examination and reference materials, or
the submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
Omaha Public Power District
-2-
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0101, which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />
per response, including the time for reviewing instructions, gathering and maintaining the data
needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail
at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,
NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of
information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosure(s), and your response will be made available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Weaver has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. McKernon at 817-860-8153, or
myself 817-860-8159 .
Sincerely,
/RA/
Anthony T. Gody, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-285
License: DPR-40
Omaha Public Power District
-3-
cc:
John B. Herman, Manager
Nuclear Licensing
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550
Fort Calhoun, NE 68023-0550
David J. Bannister
Manager - Fort Calhoun Station
Omaha Public Power District
Fort Calhoun Station FC-1-1 Plant
P.O. Box 550
Fort Calhoun, NE 68023-0550
James R. Curtiss
Winston & Strawn
1400 L. Street, N.W.
Washington, DC 20005-3502
Chairman
Washington County Board of Supervisors
P.O. Box 466
Blair, NE 68008
Sue Semerena, Section Administrator
Nebraska Health and Human Services System
Division of Public Health Assurance
Consumer Services Section
301 Centennial Mall, South
P.O. Box 95007
Lincoln, NE 68509-5007
Daniel K. McGhee
Bureau of Radiological Health
Iowa Department of Public Health
401 SW 7th Street, Suite D
Des Moines, IA 50309
Omaha Public Power District
-4-
Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (JDH1)
Branch Chief, DRP/C (MCH2)
Senior Project Engineer, DRP/C (WCW)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
RidsNrrDipmIipb
SISP Review Completed: _Y_____ ADAMS: XG Yes
G No Initials: ______
XG Publicly Available G Non-Publicly Available G Sensitive
G Non-Sensitive
SOE:OB
C:OB
TOMcKernon/lmb
ATGody
/RA/
/RA/
02/23/2005
02/25/2005
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax