ML050660453: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
Line 20: Line 20:
Division Manager - Nuclear Operations
Division Manager - Nuclear Operations
Omaha Public Power District
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550
P.O. Box 550
Fort Calhoun, NE 68023-0550
Fort Calhoun, NE 68023-0550
SUBJECT:         FORT CALHOUN STATION - NOTIFICATION OF NRC INITIAL OPERATOR
SUBJECT:
                LICENSING EXAMINATION (EXAMINATION REPORT 05000285/2005-301)
FORT CALHOUN STATION - NOTIFICATION OF NRC INITIAL OPERATOR
LICENSING EXAMINATION (EXAMINATION REPORT 05000285/2005-301)
Dear Mr. Ridenoure:
Dear Mr. Ridenoure:
In a telephone conversation on February 22, 2005, between Messrs. David Weaver, Supervisor,
In a telephone conversation on February 22, 2005, between Messrs. David Weaver, Supervisor,
Line 35: Line 36:
week of June 20, 2005.
week of June 20, 2005.
To meet the above schedule, it will be necessary for your staff to submit the examination
To meet the above schedule, it will be necessary for your staff to submit the examination
outlines by April 1, 2005. The draft written examinations, operating tests, and the supporting
outlines by April 1, 2005. The draft written examinations, operating tests, and the supporting
reference materials identified in Attachment 2 of ES-201 and as specified by the chief examiner
reference materials identified in Attachment 2 of ES-201 and as specified by the chief examiner
will be due by May 27, 2005. Any delay in receiving the examination and reference materials, or
will be due by May 27, 2005.   Any delay in receiving the examination and reference materials, or
the submittal of inadequate or incomplete materials, may cause the examinations to be
the submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled.
rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
temperatures, and levels) generated during the dynamic operating tests until the examination
Line 49: Line 50:
effect while the written examinations and operating tests are being administered.
effect while the written examinations and operating tests are being administered.


Omaha Public Power District                     -2-
Omaha Public Power District
-2-
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0101, which expires on June 30, 2006.
Management and Budget, approval number 3150-0101, which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average 500 hours
The public reporting burden for this collection of information is estimated to average 500 hours
per response, including the time for reviewing instructions, gathering and maintaining the data
per response, including the time for reviewing instructions, gathering and maintaining the data
needed, writing the examinations, and completing and reviewing the collection of information.
needed, writing the examinations, and completing and reviewing the collection of information.  
Send comments on any aspect of this collection of information, including suggestions for
Send comments on any aspect of this collection of information, including suggestions for
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Line 73: Line 75:
enclosure(s), and your response will be made available electronically for public inspection in the
enclosure(s), and your response will be made available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at
NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Weaver has been advised of the policies
Thank you for your cooperation in this matter. Mr. Weaver has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. McKernon at 817-860-8153, or
examination procedures and guidelines, please contact Mr. McKernon at 817-860-8153, or  
myself 817-860-8159 .
myself 817-860-8159 .
                                              Sincerely,
Sincerely,
                                                      /RA/
/RA/
                                              Anthony T. Gody, Chief
Anthony T. Gody, Chief
                                              Operations Branch
Operations Branch
                                              Division of Reactor Safety
Division of Reactor Safety
Docket: 50-285
Docket:   50-285
License: DPR-40
License: DPR-40


Omaha Public Power District             -3-
Omaha Public Power District
-3-
cc:
cc:
John B. Herman, Manager
John B. Herman, Manager
Line 94: Line 97:
Fort Calhoun Station FC-2-4 Adm.
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550
P.O. Box 550
Fort Calhoun, NE 68023-0550
Fort Calhoun, NE 68023-0550
David J. Bannister
David J. Bannister
Manager - Fort Calhoun Station
Manager - Fort Calhoun Station
Line 100: Line 103:
Fort Calhoun Station FC-1-1 Plant
Fort Calhoun Station FC-1-1 Plant
P.O. Box 550
P.O. Box 550
Fort Calhoun, NE 68023-0550
Fort Calhoun, NE 68023-0550
James R. Curtiss
James R. Curtiss
Winston & Strawn
Winston & Strawn
1400 L. Street, N.W.
1400 L. Street, N.W.
Washington, DC 20005-3502
Washington, DC 20005-3502
Chairman
Chairman
Washington County Board of Supervisors
Washington County Board of Supervisors
P.O. Box 466
P.O. Box 466
Blair, NE 68008
Blair, NE 68008
Sue Semerena, Section Administrator
Sue Semerena, Section Administrator
Nebraska Health and Human Services System
Nebraska Health and Human Services System
Line 115: Line 118:
301 Centennial Mall, South
301 Centennial Mall, South
P.O. Box 95007
P.O. Box 95007
Lincoln, NE 68509-5007
Lincoln, NE 68509-5007
Daniel K. McGhee
Daniel K. McGhee
Bureau of Radiological Health
Bureau of Radiological Health
Iowa Department of Public Health
Iowa Department of Public Health
401 SW 7th Street, Suite D
401 SW 7th Street, Suite D
Des Moines, IA 50309
Des Moines, IA 50309


Omaha Public Power District                 -4-
Omaha Public Power District
-4-
Electronic distribution by RIV:
Electronic distribution by RIV:
Regional Administrator (BSM1)
Regional Administrator (BSM1)
Line 134: Line 138:
RITS Coordinator (KEG)
RITS Coordinator (KEG)
RidsNrrDipmIipb
RidsNrrDipmIipb
SISP Review Completed: _Y_____ ADAMS: XG Yes           G No     Initials: ______
SISP Review Completed: _Y_____ ADAMS: XG Yes
XG Publicly Available       G Non-Publicly Available G Sensitive G Non-Sensitive
G No           Initials: ______  
SOE:OB                 C:OB
XG   Publicly Available     G   Non-Publicly Available     G   Sensitive
TOMcKernon/lmb         ATGody
G   Non-Sensitive
/RA/                   /RA/
SOE:OB
02/23/2005             02/25/2005
C:OB
OFFICIAL RECORD COPY                                 T=Telephone       E=E-mail   F=Fax
TOMcKernon/lmb
ATGody
/RA/
/RA/
02/23/2005
02/25/2005
OFFICIAL RECORD COPY  
T=Telephone           E=E-mail       F=Fax
}}
}}

Latest revision as of 22:39, 15 January 2025

Notification of NRC Initial Operator Licensing Examination (Examination Report 05000285-05-301
ML050660453
Person / Time
Site: Fort Calhoun 
(DPR-040)
Issue date: 02/25/2005
From: Gody A
Operations Branch IV
To: Ridenoure R
Omaha Public Power District
References
Download: ML050660453 (4)


See also: IR 05000285/2005301

Text

February 25, 2005

R. T. Ridenoure

Division Manager - Nuclear Operations

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION (EXAMINATION REPORT 05000285/2005-301)

Dear Mr. Ridenoure:

In a telephone conversation on February 22, 2005, between Messrs. David Weaver, Supervisor,

Operations Training and Tom McKernon, Chief Examiner, arrangements were made for the

administration of licensing examinations at Fort Calhoun Station during the week of July 11,

2005.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for

Power Reactors." Your support for onsite validation of the examinations is required during the

week of June 20, 2005.

To meet the above schedule, it will be necessary for your staff to submit the examination

outlines by April 1, 2005. The draft written examinations, operating tests, and the supporting

reference materials identified in Attachment 2 of ES-201 and as specified by the chief examiner

will be due by May 27, 2005. Any delay in receiving the examination and reference materials, or

the submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

Omaha Public Power District

-2-

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0101, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />

per response, including the time for reviewing instructions, gathering and maintaining the data

needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for

reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail

at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,

NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of

information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s), and your response will be made available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Weaver has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. McKernon at 817-860-8153, or

myself 817-860-8159 .

Sincerely,

/RA/

Anthony T. Gody, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-285

License: DPR-40

Omaha Public Power District

-3-

cc:

John B. Herman, Manager

Nuclear Licensing

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550

Fort Calhoun, NE 68023-0550

David J. Bannister

Manager - Fort Calhoun Station

Omaha Public Power District

Fort Calhoun Station FC-1-1 Plant

P.O. Box 550

Fort Calhoun, NE 68023-0550

James R. Curtiss

Winston & Strawn

1400 L. Street, N.W.

Washington, DC 20005-3502

Chairman

Washington County Board of Supervisors

P.O. Box 466

Blair, NE 68008

Sue Semerena, Section Administrator

Nebraska Health and Human Services System

Division of Public Health Assurance

Consumer Services Section

301 Centennial Mall, South

P.O. Box 95007

Lincoln, NE 68509-5007

Daniel K. McGhee

Bureau of Radiological Health

Iowa Department of Public Health

401 SW 7th Street, Suite D

Des Moines, IA 50309

Omaha Public Power District

-4-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (MRS)

Senior Resident Inspector (JDH1)

Branch Chief, DRP/C (MCH2)

Senior Project Engineer, DRP/C (WCW)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

RidsNrrDipmIipb

SISP Review Completed: _Y_____ ADAMS: XG Yes

G No Initials: ______

XG Publicly Available G Non-Publicly Available G Sensitive

G Non-Sensitive

SOE:OB

C:OB

TOMcKernon/lmb

ATGody

/RA/

/RA/

02/23/2005

02/25/2005

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax