{{#Wiki_filter:FENOC                            I _
Perry Nuclear Power Plant 10 Center Road FrstEnergy Nuclear Operating Company                                                                            Perry, Ohio 44081 Richard Anderson                                                                                                    440-280-5579 Vice President-Nuclear                                                                                          Fax: 440-280-8029 July 14, 2005 PY-CEI/NRR-2890L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the June 2005 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
 
OPERATING DATA REPORT UNIT:  EprrY DATE:  7/6/05
: 1. Docket: 50-440
: 2. Unit Name: Perry Nuclear Power Plant
: 3. Reporting Period June 2005
: 4. Utility
 
==Contact:==
T. Phelps
: 5. Telephone: 440-280-7660
: 6. Design Electrical Rating (Net MWe):          1260
: 7. Maximum Dependable Capacity (Net MWe):        1235 This Month  Yr-to-Date    Cumulative
: 8. Hours Reactor was Critical                  720.0      2.051.9    122.721.3
: 9. Hours Generator On-Line                      720.0      1.946.5    119.837.8
: 10. Unit Reserve Shutdown Hours                    0.0          0.0          0.0
: 11. Net Electrical Enerav (MWeH)            888.993.0 2.200.275.0  137.556.032.0 Page 1
 
I in UNIT SHUTDOWNS REPORT MONTH - June 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 716105 CONTACT: T. Phelps Il                                              TELEPHONE: (440) 280-7660 No.        Date    Type      Duration        Reason            Method                Cause and Corrective Action to Prevent Recurrence LHours                      2                3 k
 
==SUMMARY==
: The Perry Nuclear Power Plant was on line the entire month of June 2005.
: 1. TYPE:              2. REASON:                              3. METHOD:
F: Forced            A- Equipment Failure (explain)          I - Manual S: Scheduled          8 - Maintenance or Test                  2 - Manual Scram C - Refueling                            3 - Automatic Scram D - Regulatory                          4 - Continuation E - Operating Training &                5 - Other License Examination F - Administrative G - Operational Error (explain)
H -Other (explain)
Page 2 I}}

Revision as of 20:50, 22 December 2019

June 2005 Monthly Operating Report for Perry Unit 1
ML052030339
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/14/2005
From: Richard Anderson
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2890L
Download: ML052030339 (3)


Text

FENOC I _

Perry Nuclear Power Plant 10 Center Road FrstEnergy Nuclear Operating Company Perry, Ohio 44081 Richard Anderson 440-280-5579 Vice President-Nuclear Fax: 440-280-8029 July 14, 2005 PY-CEI/NRR-2890L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the June 2005 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT: EprrY DATE: 7/6/05

1. Docket: 50-440
2. Unit Name: Perry Nuclear Power Plant
3. Reporting Period June 2005
4. Utility

Contact:

T. Phelps

5. Telephone: 440-280-7660
6. Design Electrical Rating (Net MWe): 1260
7. Maximum Dependable Capacity (Net MWe): 1235 This Month Yr-to-Date Cumulative
8. Hours Reactor was Critical 720.0 2.051.9 122.721.3
9. Hours Generator On-Line 720.0 1.946.5 119.837.8
10. Unit Reserve Shutdown Hours 0.0 0.0 0.0
11. Net Electrical Enerav (MWeH) 888.993.0 2.200.275.0 137.556.032.0 Page 1

I in UNIT SHUTDOWNS REPORT MONTH - June 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 716105 CONTACT: T. Phelps Il TELEPHONE: (440) 280-7660 No. Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence LHours 2 3 k

SUMMARY

The Perry Nuclear Power Plant was on line the entire month of June 2005.
1. TYPE: 2. REASON: 3. METHOD:

F: Forced A- Equipment Failure (explain) I - Manual S: Scheduled 8 - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory 4 - Continuation E - Operating Training & 5 - Other License Examination F - Administrative G - Operational Error (explain)

H -Other (explain)

Page 2 I