ML052710294: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[3F0905-05, Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations.]]
| number = ML052710294
| issue date = 09/21/2005
| title = Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations.
| author name = Davis R
| author affiliation = Progress Energy Florida, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000302
| license number = DPR-072
| contact person =
| case reference number = 3F0905-05, RIS-05-019
| document type = Letter, License-Operator License Exam, Draft
| page count = 3
}}
 
=Text=
{{#Wiki_filter:-                      .
Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating Ucense No. DPR-72 September 21, 2005 3F0905-05 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
 
==Subject:==
Crystal River Unit 3 - Response to NRC Regulatory Issue Summary 2005-19, "Preparation and Scheduling of Operator Licensing Examinations"
 
==Reference:==
NRC Regulatory Issue Summary 2005-19, "Preparation and Scheduling of Operator Licensing Examinations," dated August 24, 2005
 
==Dear Sir:==
 
As requested by the referenced NRC Regulatory Issue Summary, Florida Power Corporation, doing business as Progress Energy Florida, Inc. (PEE), is hereby providing the attached completed NRC Form 536 delineating the proposed specific operator licensing examination schedule for calendar years (CYs) 2006 through 2008 as well as adding an estimate for CY 2009.
The attached form provides an estimate of the number of applicants planning to take the operator licensing examinations and the NRC's generic fundamentals examinations (GFEs).
If you have any questions regarding this submittal, please contact Mr. David Jones, Superintendent, Operations Training at (352) 563-4948.
Sincerely, Re          ci..
Ron W. Davis Training Manager RWD/ff Attachment xc:        Regional Administrator, Region II James H. Moorman, III, Region II NRR Project Manager Senior Resident Inspector jO3 Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 WV. Powerline Street Crystal River, FL 34428
 
PROGRESS ENERGY FLORIDA, INC.
CRYSTAL RIVER UNIT - 3 DOCKET NUMBER 50-302/ LICENSE NUMBER DPR-72 ATTACHMENT RESPONSE TO NRC REGULATORY ISSUE
 
==SUMMARY==
2005-19
'PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS"
 
NRC FORM 536                  U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150-0131                          EXPIRES: 08131/2008 (8-2005)                                                            Estimated burden per response to comply with this voluntary Information collection request: 1 hour. This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden PE    AT      LICENSI                      aO        to the Records 1estimate and FOIAPrvacy Services Branch -5 F3), U.S.
Nuclear Regulatory Commission, Washington, DC 205551000 or by Internet e-mail to Infocollectsenrc.gov. and to the Desk Officer, Office of Information EXAMINATION DATA                            and Regulatory Affairs. NEOB-1O202, (3150-0131), Office of Management and Budget, Washington. DC 20503. If a means used to Impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.
FACILITY                                                                                                          NRC REGION Progress Energy Florida, Inc. - Crystal River Unit 3 15760 West Power Line Street Crystal River, FL 34428-6708 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                        CY2006 ESTIMATED NUMBER OF LICENSEE-PREPARED                          0                  1                                0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                            0                  0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS                                                                                                          I PROPOSED NUMBER                        CY2006            CY2007                          CY2008 NUMBER OF REACTOR                          0                  4                                0 OPERATORS NUMBER OF SENIOR REACTOR                          0                8                                0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR                          0                  0                                0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR                          0                  0                                0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE                        N/A        10/22/2007                              N/A ALTERNATE DATE                          N/A      10/29/2007                              N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2006                                                  CY 2007 PROPOSED          ____            ____      ______
NUMBER              MARCH        JUNE      SEPTEMBERDECEMBER            MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF              0              0            12    0                  0                0                0                0 CANDIDATES NRC FORM 536 (8-2005)                                                                                                PRINTED ON RECYCLED PAPER}}

Latest revision as of 14:55, 14 March 2020