{{#Wiki_filter:[     -Salem/Hope               Creek Allegation Background/Chronology                                               I Issue/Event Date   Description Feb. 18', 2004   101t1 ARB Feb. 171", 2004 Feb. 11, 2004   I' ARB for "Spin-Off' Allegation (#20040010       ... Conduct of Maintenance Issues)
{{#Wiki_filter:[ -Salem/Hope Creek Allegation Background/Chronology I
Jan. 29', 2004 9"'ARB Jan. 28', 2004 Issued a "significant letter" to PSEG providing them with interim results of our ongoing SCWE review (they have until February 27"' to respond with an action plan).
Issue/Event Date Feb. 18', 2004 Feb. 171", 2004 Feb. 11, 2004 Description 101t1 ARB I' ARB for "Spin-Off' Allegation (#20040010... Conduct of Maintenance Issues)
Jan. 28', 2004 Jan. 27", 2004  Initial interview With "Nine Mile Spin-Off Alleger" Jan. .8',2004  8'h ARB Dec. 3 t12003                          A between Dec. 2 1d and Dec. 18'", 2003  7'h ARB Nov. 17', 2003  6"'ARB Nov. 13"', 2003  5'h ARB Nov. 12"', 2003 Nov. 71, 2003   4 'hARB m
Jan. 29', 2004 Jan. 28', 2004 Jan. 28', 2004 Jan. 27", 2004 Jan..8', 2004 Dec. 3 t1 2003 Dec. 18'", 2003 Nov. 17', 2003 Nov. 13"', 2003 Nov. 12"', 2003 9"'ARB Issued a "significant letter" to PSEG providing them with interim results of our ongoing SCWE review (they have until February 27"' to respond with an action plan).
Information in this record was deleted inaccordance With the. Freedom of 1nformation Act, exemptions       ''.
Initial interview With "Nine Mile Spin-Off Alleger" 8'h ARB A between Dec. 2 1d and 7'h ARB 6"' ARB 5'h ARB Nov. 71, 2003 4 'h ARB Information in this record was deleted in accordance With the. Freedom of 1nformation Act, exemptions F~ev.Date 211/04 age of m
R~ev. Date: 2/12/04                         F~ev.Date 211/04                                                      Page   of 4 age I of
R~ev. Date: 2/12/04 Page I of 4


Salem/Hope Creek Allegation Background/Chronology Issue/Event Date       Description Nov. 40, 2003       Interviews conducted between Nov. 4th and Nov. 7th
Salem/Hope Creek Allegation Background/Chronology Issue/Event Date Nov. 40, 2003 Description Deci pto Interviews conducted between Nov. 4th and Nov. 7th
                                        ,fo!low-up re union representation issue, developed additional information)
,fo!low-up re union representation issue, developed additional information)
Deci  pto (follow-up interview at l       s request)               7 (1 I
(follow-up interview at l
Oct. 28"* 2003     3 rd  ARB Oct. 240, 2003       Interviews conducted between Oct. 24"h and Oct. 291h Oct. 23d, 2003       Interviews conducted on Oct.     2 3k" One confidentialtsource Oct. 22  ,nd2003  Interviews conducted on Oct. 2 2nd Oct. 16"Y'2003      Certified acknowledgment letter sent.
s request) 7 (1 I
Oct. 14th, 2003    Interviews conducted bitween Oct. 14"h and Oct.         2 1st li'and Atty. Jeff Keenan re ECP and Gallup surveys)
Oct. 28"* 2003 Oct. 240, 2003 3 rd ARB Interviews conducted between Oct. 24"h and Oct. 291h Oct. 23d, 2003 Oct. 2 2
,nd 2003 Oct. 16"Y'2003 Oct. 14th, 2003 Oct. 110, 2003 Oct. 91h, 2003 Oct. 2w', 2003 Sept. 30', 2003 Sept. 29, 2003 Sept. 251, 2003 Interviews conducted on Oct. 2 3k" One confidentialtsource Interviews conducted on Oct. 2 2nd Certified acknowledgment letter sent.
Interviews conducted bitween Oct. 14"h and Oct. 2 1st li'and Atty. Jeff Keenan re ECP and Gallup surveys)
More email received from alleger.
More email received from alleger.
Oct. 110, 2003 More email received from alleger.
More email received from alleger.
Oct. 91h, 2003 Oct. 2w', 2003    2Dd   ARB Sept. 30', 2003    Alieger sends a letter via email to the NRC, Region I, Regional Administrator indicating thatthe UOMMM_                                   -M thought that issues at the site "aren't going to be brought up ... just like Davis-Besse."
2Dd ARB Alieger sends a letter via email to the NRC, Region I, Regional Administrator indicating thatthe UOMMM_  
Sept. 29, 2003      Alleger filed civil discrimination law suit against PSEG in Morris County, N.J.
-M thought that issues at the site "aren't going to be brought up... just like Davis-Besse."
Sept. 251, 2003    Interviews conducted between Sept.       2 5 th and Oct. 9 th FRev. Date: 2/12/04                                                                                              Page 2 of 4
Alleger filed civil discrimination law suit against PSEG in Morris County, N.J.
Interviews conducted between Sept. 25th and Oct. 9th Page 2 of 4 FRev. Date: 2/12/04


Salem/Hope Creek Allegation Background/Chronology Issue/Event Date         Description Sept./Oct. 2003       PSEG decision making process relative to #14 Steam Generator (SG) Feed Regulating Valve (FRV) believed to be stuck at .74%open. This concern related primarily to the timing of a decision to enter TS 3.0.3. An NEO and RO have asserted that it should not have taken 12 hours to enter 3.0.3. However, once the licensee's troubleshooting plan showed that FRV was stuck they immediately entered the LCO and followed the SD requirements. Although non-conservative decision making was a possible root cause, there was no TS violation.
Salem/Hope Creek Allegation Background/Chronology Issue/Event Date Sept./Oct. 2003 Sept. 9', 2003 Description PSEG decision making process relative to #14 Steam Generator (SG) Feed Regulating Valve (FRV) believed to be stuck at.74 % open. This concern related primarily to the timing of a decision to enter TS 3.0.3. An NEO and RO have asserted that it should not have taken 12 hours to enter 3.0.3. However, once the licensee's troubleshooting plan showed that FRV was stuck they immediately entered the LCO and followed the SD requirements. Although non-conservative decision making was a possible root cause, there was no TS violation.
Sept. 9', 2003        Initial recorded interview with alleger & 1"Allegation Review Board (ARE).
Initial recorded interview with alleger & 1" Allegation Review Board (ARE).
Sept. 5"', 2003     Alleger informed of right to file a discrimination complaint with the-Dept. of Labor (DOL).
Sept. 5"', 2003 Sept. 3rd& 4 "I, 2003 June 17"', 2003 March 17.', 2003 Mar. 28"', 2003 Mar. 26', 2003 Mar. 25"', 2003 Feb. 26"a, 2003 Nov. 2002 Alleger informed of right to file a discrimination complaint with the-Dept. of Labor (DOL).
Sept. 3 rd& 4 "I,2003  Initial allegation contact between RI-2003-A-01 10 alleger & Dave Vito.
Initial allegation contact between RI-2003-A-01 10 alleger & Dave Vito.
June 17"', 2003      Hope Creek - EDGleakage exceeds LCO time; pressure to avoid shutdown; directed operator'         0o not shutdown; shutdown commenced within acceptable time frame and met regulations. There was time pressure to delay the shutdown as long as possible to allow engineering time to come up with an adequate operability justification. Although non-conservative decision making was a possible root cause, there was no TS violation. The HC Ris were fully engaged with the issue as it unfolded.
Hope Creek - EDGleakage exceeds LCO time; pressure to avoid shutdown; directed operator' 0 o not shutdown; shutdown commenced within acceptable time frame and met regulations. There was time pressure to delay the shutdown as long as possible to allow engineering time to come up with an adequate operability justification. Although non-conservative decision making was a possible root cause, there was no TS violation. The HC Ris were fully engaged with the issue as it unfolded.
March 17.', 2003        1. Hope Creek Reactivity Event - Manipulation of Electro Hydraulic Control (EHG) system caused an unanticipated rise in reactor power 6 1/2/2 % to 13 % ... not discovered until Wednesday (3/19/03).
: 1. Hope Creek Reactivity Event - Manipulation of Electro Hydraulic Control (EHG) system caused an unanticipated rise in reactor power 6 1/2/2 % to 13 %... not discovered until Wednesday (3/19/03).
: 2. Entering a planned shutdown to repair 3 technical/mechanical failures (late Sunday / early Monday morning).
: 2. Entering a planned shutdown to repair 3 technical/mechanical failures (late Sunday / early Monday morning).
: 3. Monday morning (0800) Turbine pass Valye                 St,*       (47o%). TBV closed fully during subsequent testin                 rgued withb                       bout whether or not a shut down was required.. The concern here was btwhis                         department heads..
: 3. Monday morning (0800) Turbine pass Valye St,*
He apparently "harassed" (from interviews witl Uth                         ,them for 4 hours on why a shutdown to repair the TBV was necessary whenall of the department heads believed that shutting down was a "no brainer". Although non-conservative decision making is a possible root cause, there Was no TS violation.
(47o%). TBV closed fully during subsequent testin rgued withb bout whether or not a shut down was required.. The concern here was btwhis department heads..
He apparently "harassed" (from interviews witl Uth  
,them for 4 hours on why a shutdown to repair the TBV was necessary whenall of the department heads believed that shutting down was a "no brainer". Although non-conservative decision making is a possible root cause, there Was no TS violation.
: 4. Heated discussions about the duration of the forced outage.
: 4. Heated discussions about the duration of the forced outage.
Mar. 28"', 2003      Alleger's last day on site (employment officially terminated this date).
Alleger's last day on site (employment officially terminated this date).
Mar. 26', 2003        Alle er told (by th-           ,    -    --              that thn
Alle er told (by th-that thn wanted the alleger "out by Friday" (March 28"', 2003).
                        %        wanted the alleger "out by Friday" (March 28"', 2003).
Alleger submitted letter tjW reiterating work environment concerns and describing the alleged retaliatory actions.
Mar. 25"', 2003      Alleger submitted letter tjW reiterating work environment concerns and describing the alleged retaliatory actions.
Alleger met with former M to purportedly discuss [the] bonus. But, after discussing concerns about the work environment at Artificial Island, the alleger was informed of future terniination (originally planned for April 16"'). It was also alleged that the formeimthen directed that the termination be "accelerated."
Feb. 26"a, 2003      Alleger met with former M           to purportedly discuss [the] bonus. But, after discussing concerns about the work environment at Artificial Island, the alleger was informed of future terniination (originally planned for April 16"'). It was also alleged that the formeimthen directed that the termination be "accelerated."
Higher Tritium sample concentration in Spring 2003 - "a serious issue that had to be handled with kid gloves to keep us [PSEG] out of trouble'9 ju Rev. Date: 2/12/04 Page 3 of 4
Nov. 2002          Higher Tritium sample concentration in Spring 2003 - "a serious issue that had to be handled with kid gloves to keep us [PSEG] out of trouble'9         ju Rev. Date: 2/12/04                                                                                               Page 3 of 4


'I       " Salem/Hope Creek Allegation Background/Chronology                                                                                   Im Issue/Event Date         Description Fall 2002 to have an~~n fired but was unsuccess ul.
'I  
o NAee  anstartup checklist step.
" Salem/Hope Creek Allegation Background/Chronology I
ation received 7e2 MiEs alleged activity may Fave actually occurred whe                                 directed                 to "NA" a surveillance step for the Reactor Vessel Vent                             en a single valve indicated dual indication during this routine stroking evolution.                           was allegedly told by the Operation Crew that they would not "NA" the step. arlier information from interviews suggested that the concern involved "NA-ing".a second ver'ification containment walkdown to be done by a VP-OPS level person step. This steD*was added to the SU procedure as a lessons learned from the Davis, esse issue. According t                           this walkdown was actually done by himself and               and startup was delaye b' d because of leaks that they found from some SG wet layup level indication valves. So, the step was actually completed contrary to the alleger's assertion.
m Issue/Event Date Fall 2002 Description an~~n o NAee an startup checklist step. 7e2 to have fired but was unsuccess ul.
Sept. 2 4 ', 2002   Based on the size and location of a significant steam leak ()0'to                   j40lum r     e. bonnet of a Feed Water Pump steam admission valve), th                                                             agreed with the shift operators that the plant should be shut down taffect r                       s.airs.         Lto   1 spak wjith "upper mana ge nt and,, upon*biretur,,subsequentl
ation received MiEs alleged activity may Fave actually occurred whe directed to "NA" a surveillance step for the Reactor Vessel Vent en a single valve indicated dual indication during this routine stroking evolution.
                                                                          'rur               '.'.r,~..                                   -
was allegedly told by the Operation Crew that they would not "NA" the step.
                          \confidential report substantiates allegation, Th*dStep Grieevanw.                                                 I without regard to his own personal safety, without a Nuclear Equipment Operator (NEO),
arlier information from interviews suggested that the concern involved "NA-ing".a second ver'ification containment walkdown to be done by a VP-OPS level person step. This steD*was added to the SU procedure as a lessons learned from the Davis, esse issue. According t this walkdown was actually done by himself and and startup was delaye b' d
because of leaks that they found from some SG wet layup level indication valves. So, the step was actually completed contrary to the alleger's assertion.
Sept. 24 ', 2002 Based on the size and location of a significant steam leak ()0'to j40lum r
: e. bonnet of a Feed Water Pump steam admission valve), th agreed with the shift operators that the plant should be shut down taffect r s.airs.
Lto spak wjith "upper mana ge nt and,, upon*biretur,,subsequentl 1
'rur  
'.'.r,~..  
\\confidential report substantiates allegation, Th*dStep Grieevanw.
without regard to his own personal safety, without a Nuclear Equipment Operator (NEO),
and without the permission/knowledge of control room personnel).
and without the permission/knowledge of control room personnel).
Spring 2002         Salem grassing approach (i.e., heroic efforts) deviated from expected approach / lessons learned from 1994 grassing.                 This concern relates to a decision to keep one of the Salem unit's on during a period o heavy grassing. Interviews have suggested that this may have been done for one day, but when it occurred on a second day the unit was taken off-line.
I Spring 2002 Spring 2001 Not Specified Not Specified Not Specified Not Specified Salem grassing approach (i.e., heroic efforts) deviated from expected approach / lessons learned from 1994 grassing.
Spring 2001        In the Spring 2001 outage, a Salem Unit I reactor trip was causedby a main generator current transformer failure...Th .I             MI.--      told operations that they needed to get the reactor started u by a particular ate or their NRC performance indicator was going to "go white."
This concern relates to a decision to keep one of the Salem unit's on during a period o heavy grassing. Interviews have suggested that this may have been done for one day, but when it occurred on a second day the unit was taken off-line.
tgmallegedly harassed o erat'ns daily by asking day "when are you going to start the p ant". Operations then tol               hey would start up when the thought they were within a day of putting steam into the main turbine. Although                             insisted that operations should start up the reactor with the     MSIVs       shut, operations       re used   to doso because it was contrary to their safety analysis.
In the Spring 2001 outage, a Salem Unit I reactor trip was causedby a main generator current transformer failure...Th.I MI. told operations that they needed to get the reactor started u by a particular ate or their NRC performance indicator was going to "go white."
Not Specified        Excessive use of temporary tags Not Specified        Salem 2 In-service Inspection (ISI) relief request re: piping UT (coverup?)
tgmallegedly harassed o erat'ns daily by asking day "when are you going to start the p ant". Operations then tol hey would start up when the thought they were within a day of putting steam into the main turbine. Although insisted that operations should start up the reactor with the MSIVs shut, operations re used to doso because it was contrary to their safety analysis.
Not Specified        Hope Creek offgas issue afte                     ook over. Rad safety concerns expressed but not resolved Not Specified        Hope Creek employee allegedly asked to modify a Notification re: "in-leakage" GI)M\R'BRANCH3\A1Iegation 5wE\Salem-HC-Chronologymwpd Rlev. Date: 2/12/04                                                                                                               Page 4 of 4}}
Excessive use of temporary tags Salem 2 In-service Inspection (ISI) relief request re: piping UT (coverup?)
Hope Creek offgas issue afte ook over. Rad safety concerns expressed but not resolved Hope Creek employee allegedly asked to modify a Notification re: "in-leakage" GI)M\\R'BRANCH3\\A1Iegation 5wE\\Salem-HC-Chronologymwpd Rlev. Date: 2/12/04 Page 4 of 4}}

Latest revision as of 06:53, 15 January 2025

Allegation Background/Chronology
ML062510108
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 02/12/2004
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2005-0194
Download: ML062510108 (4)


Text

[ -Salem/Hope Creek Allegation Background/Chronology I

Issue/Event Date Feb. 18', 2004 Feb. 171", 2004 Feb. 11, 2004 Description 101t1 ARB I' ARB for "Spin-Off' Allegation (#20040010... Conduct of Maintenance Issues)

Jan. 29', 2004 Jan. 28', 2004 Jan. 28', 2004 Jan. 27", 2004 Jan..8', 2004 Dec. 3 t1 2003 Dec. 18'", 2003 Nov. 17', 2003 Nov. 13"', 2003 Nov. 12"', 2003 9"'ARB Issued a "significant letter" to PSEG providing them with interim results of our ongoing SCWE review (they have until February 27"' to respond with an action plan).

Initial interview With "Nine Mile Spin-Off Alleger" 8'h ARB A between Dec. 2 1d and 7'h ARB 6"' ARB 5'h ARB Nov. 71, 2003 4 'h ARB Information in this record was deleted in accordance With the. Freedom of 1nformation Act, exemptions F~ev.Date 211/04 age of m

R~ev. Date: 2/12/04 Page I of 4

Salem/Hope Creek Allegation Background/Chronology Issue/Event Date Nov. 40, 2003 Description Deci pto Interviews conducted between Nov. 4th and Nov. 7th

,fo!low-up re union representation issue, developed additional information)

(follow-up interview at l

s request) 7 (1 I

Oct. 28"* 2003 Oct. 240, 2003 3 rd ARB Interviews conducted between Oct. 24"h and Oct. 291h Oct. 23d, 2003 Oct. 2 2

,nd 2003 Oct. 16"Y'2003 Oct. 14th, 2003 Oct. 110, 2003 Oct. 91h, 2003 Oct. 2w', 2003 Sept. 30', 2003 Sept. 29, 2003 Sept. 251, 2003 Interviews conducted on Oct. 2 3k" One confidentialtsource Interviews conducted on Oct. 2 2nd Certified acknowledgment letter sent.

Interviews conducted bitween Oct. 14"h and Oct. 2 1st li'and Atty. Jeff Keenan re ECP and Gallup surveys)

More email received from alleger.

More email received from alleger.

2Dd ARB Alieger sends a letter via email to the NRC, Region I, Regional Administrator indicating thatthe UOMMM_

-M thought that issues at the site "aren't going to be brought up... just like Davis-Besse."

Alleger filed civil discrimination law suit against PSEG in Morris County, N.J.

Interviews conducted between Sept. 25th and Oct. 9th Page 2 of 4 FRev. Date: 2/12/04

Salem/Hope Creek Allegation Background/Chronology Issue/Event Date Sept./Oct. 2003 Sept. 9', 2003 Description PSEG decision making process relative to #14 Steam Generator (SG) Feed Regulating Valve (FRV) believed to be stuck at.74 % open. This concern related primarily to the timing of a decision to enter TS 3.0.3. An NEO and RO have asserted that it should not have taken 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to enter 3.0.3. However, once the licensee's troubleshooting plan showed that FRV was stuck they immediately entered the LCO and followed the SD requirements. Although non-conservative decision making was a possible root cause, there was no TS violation.

Initial recorded interview with alleger & 1" Allegation Review Board (ARE).

Sept. 5"', 2003 Sept. 3rd& 4 "I, 2003 June 17"', 2003 March 17.', 2003 Mar. 28"', 2003 Mar. 26', 2003 Mar. 25"', 2003 Feb. 26"a, 2003 Nov. 2002 Alleger informed of right to file a discrimination complaint with the-Dept. of Labor (DOL).

Initial allegation contact between RI-2003-A-01 10 alleger & Dave Vito.

Hope Creek - EDGleakage exceeds LCO time; pressure to avoid shutdown; directed operator' 0 o not shutdown; shutdown commenced within acceptable time frame and met regulations. There was time pressure to delay the shutdown as long as possible to allow engineering time to come up with an adequate operability justification. Although non-conservative decision making was a possible root cause, there was no TS violation. The HC Ris were fully engaged with the issue as it unfolded.

1. Hope Creek Reactivity Event - Manipulation of Electro Hydraulic Control (EHG) system caused an unanticipated rise in reactor power 6 1/2/2 % to 13 %... not discovered until Wednesday (3/19/03).
2. Entering a planned shutdown to repair 3 technical/mechanical failures (late Sunday / early Monday morning).
3. Monday morning (0800) Turbine pass Valye St,*

(47o%). TBV closed fully during subsequent testin rgued withb bout whether or not a shut down was required.. The concern here was btwhis department heads..

He apparently "harassed" (from interviews witl Uth

,them for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> on why a shutdown to repair the TBV was necessary whenall of the department heads believed that shutting down was a "no brainer". Although non-conservative decision making is a possible root cause, there Was no TS violation.

4. Heated discussions about the duration of the forced outage.

Alleger's last day on site (employment officially terminated this date).

Alle er told (by th-that thn wanted the alleger "out by Friday" (March 28"', 2003).

Alleger submitted letter tjW reiterating work environment concerns and describing the alleged retaliatory actions.

Alleger met with former M to purportedly discuss [the] bonus. But, after discussing concerns about the work environment at Artificial Island, the alleger was informed of future terniination (originally planned for April 16"'). It was also alleged that the formeimthen directed that the termination be "accelerated."

Higher Tritium sample concentration in Spring 2003 - "a serious issue that had to be handled with kid gloves to keep us [PSEG] out of trouble'9 ju Rev. Date: 2/12/04 Page 3 of 4

'I

" Salem/Hope Creek Allegation Background/Chronology I

m Issue/Event Date Fall 2002 Description an~~n o NAee an startup checklist step. 7e2 to have fired but was unsuccess ul.

ation received MiEs alleged activity may Fave actually occurred whe directed to "NA" a surveillance step for the Reactor Vessel Vent en a single valve indicated dual indication during this routine stroking evolution.

was allegedly told by the Operation Crew that they would not "NA" the step.

arlier information from interviews suggested that the concern involved "NA-ing".a second ver'ification containment walkdown to be done by a VP-OPS level person step. This steD*was added to the SU procedure as a lessons learned from the Davis, esse issue. According t this walkdown was actually done by himself and and startup was delaye b' d

because of leaks that they found from some SG wet layup level indication valves. So, the step was actually completed contrary to the alleger's assertion.

Sept. 24 ', 2002 Based on the size and location of a significant steam leak ()0'to j40lum r

e. bonnet of a Feed Water Pump steam admission valve), th agreed with the shift operators that the plant should be shut down taffect r s.airs.

Lto spak wjith "upper mana ge nt and,, upon*biretur,,subsequentl 1

'rur

'.'.r,~..

\\confidential report substantiates allegation, Th*dStep Grieevanw.

without regard to his own personal safety, without a Nuclear Equipment Operator (NEO),

and without the permission/knowledge of control room personnel).

I Spring 2002 Spring 2001 Not Specified Not Specified Not Specified Not Specified Salem grassing approach (i.e., heroic efforts) deviated from expected approach / lessons learned from 1994 grassing.

This concern relates to a decision to keep one of the Salem unit's on during a period o heavy grassing. Interviews have suggested that this may have been done for one day, but when it occurred on a second day the unit was taken off-line.

In the Spring 2001 outage, a Salem Unit I reactor trip was causedby a main generator current transformer failure...Th.I MI. told operations that they needed to get the reactor started u by a particular ate or their NRC performance indicator was going to "go white."

tgmallegedly harassed o erat'ns daily by asking day "when are you going to start the p ant". Operations then tol hey would start up when the thought they were within a day of putting steam into the main turbine. Although insisted that operations should start up the reactor with the MSIVs shut, operations re used to doso because it was contrary to their safety analysis.

Excessive use of temporary tags Salem 2 In-service Inspection (ISI) relief request re: piping UT (coverup?)

Hope Creek offgas issue afte ook over. Rad safety concerns expressed but not resolved Hope Creek employee allegedly asked to modify a Notification re: "in-leakage" GI)M\\R'BRANCH3\\A1Iegation 5wE\\Salem-HC-Chronologymwpd Rlev. Date: 2/12/04 Page 4 of 4