ML17362A074: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 25: | Line 25: | ||
Accession No. ML17338A930), a Category 2 public meeting was held between the U. S. | Accession No. ML17338A930), a Category 2 public meeting was held between the U. S. | ||
Nuclear Regulatory Commission (NRC) staff and representatives from the Nuclear Energy Institute (NEI) to discuss their draft document that requests the Use of Flexible Scheduling Provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.155(h)(2) to establish an alternative date for compliance with reevaluated seismic hazard mitigation requirements of 10 CFR 50.155(b)(2) (ADAMS Accession No. ML17321B023). | Nuclear Regulatory Commission (NRC) staff and representatives from the Nuclear Energy Institute (NEI) to discuss their draft document that requests the Use of Flexible Scheduling Provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.155(h)(2) to establish an alternative date for compliance with reevaluated seismic hazard mitigation requirements of 10 CFR 50.155(b)(2) (ADAMS Accession No. ML17321B023). | ||
The NEI gave a presentation to discuss the details of its draft document (ADAMS Accession No. | The NEI gave a presentation to discuss the details of its draft document (ADAMS Accession No. ML17338A818) and addressed comments and questions from the NRC staff. | ||
ML17338A818) and addressed comments and questions from the NRC staff. | |||
Members of the public attended the meeting in person and through the bridge line. At designated points during the meeting, members of the public were invited to provide any comments on the presentations. | Members of the public attended the meeting in person and through the bridge line. At designated points during the meeting, members of the public were invited to provide any comments on the presentations. | ||
| Line 34: | Line 33: | ||
ML17362A074 *via e-mail OFFICE NRR/DLP/PBEB* NRR/DLP/LA NRR/DLP/PBEB/BC (A) NRR/DLP/PBEB* | ML17362A074 *via e-mail OFFICE NRR/DLP/PBEB* NRR/DLP/LA NRR/DLP/PBEB/BC (A) NRR/DLP/PBEB* | ||
NAME JQuinones SLent TBrown JQuinones DATE 12/28/2017 12/28/2017 1/2/2018 1/4/2018 | NAME JQuinones SLent TBrown JQuinones DATE 12/28/2017 12/28/2017 1/2/2018 1/4/2018 PUBLIC MEETING WITH NUCLEAR ENERGY INSTITUTE TO DISCUSS DRAFT DOCUMENT THAT REQUESTS THE USE OF FLEXIBLE SCHEDULING PROVISIONS OF 10 CFR50.155(h)(2) | ||
PUBLIC MEETING WITH NUCLEAR ENERGY INSTITUTE TO DISCUSS DRAFT DOCUMENT THAT REQUESTS THE USE OF FLEXIBLE SCHEDULING PROVISIONS OF 10 CFR50.155(h)(2) | |||
December 7, 2017 List of Attendees Name Organization Brenda Kovarik American Electric Power John Edgorf Nuclear Energy Institute Paul Guill Duke Energy Eric Bowman NRC (U.S. Nuclear Regulatory Commission) | December 7, 2017 List of Attendees Name Organization Brenda Kovarik American Electric Power John Edgorf Nuclear Energy Institute Paul Guill Duke Energy Eric Bowman NRC (U.S. Nuclear Regulatory Commission) | ||
Tony Brown NRC Joylynn Quinones NRC Brett Titus NRC Milton Valentin NRC Enclosure}} | Tony Brown NRC Joylynn Quinones NRC Brett Titus NRC Milton Valentin NRC Enclosure}} | ||
Revision as of 20:53, 3 February 2020
| ML17362A074 | |
| Person / Time | |
|---|---|
| Issue date: | 01/04/2018 |
| From: | Joylynn Quinones-Navarro Beyond-Design-Basis Engineering Branch |
| To: | Tony Brown Beyond-Design-Basis Engineering Branch |
| Quinones-Navarro J | |
| References | |
| Download: ML17362A074 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 4, 2018 MEMORANDUM TO: Tony Brown, Acting Chief Beyond Design Basis Project Engineering Branch Division of Licensing Projects Office of Nuclear Reactor Regulation FROM: Joylynn Quinones-Navarro, Reactor Engineer /RA/
Beyond Design Basis Project Engineering Branch Division of Licensing Projects Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF DECEMBER 7, 2017, PUBLIC MEETING WITH THE NUCLEAR ENERGY INSTITUTE (NEI) TO DISCUSS DRAFT DOCUMENT THAT REQUESTS THE USE OF FLEXIBLE SCHEDULING PROVISIONS OF 10 CFR 50.155(h)(2)
On December 7, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17338A930), a Category 2 public meeting was held between the U. S.
Nuclear Regulatory Commission (NRC) staff and representatives from the Nuclear Energy Institute (NEI) to discuss their draft document that requests the Use of Flexible Scheduling Provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.155(h)(2) to establish an alternative date for compliance with reevaluated seismic hazard mitigation requirements of 10 CFR 50.155(b)(2) (ADAMS Accession No. ML17321B023).
The NEI gave a presentation to discuss the details of its draft document (ADAMS Accession No. ML17338A818) and addressed comments and questions from the NRC staff.
Members of the public attended the meeting in person and through the bridge line. At designated points during the meeting, members of the public were invited to provide any comments on the presentations.
Enclosure:
Lists of Attendees CONTACT: Joylynn Quinones-Navarro, NRR/DLP/PBEB 404-997-4469
ML17362A074 *via e-mail OFFICE NRR/DLP/PBEB* NRR/DLP/LA NRR/DLP/PBEB/BC (A) NRR/DLP/PBEB*
NAME JQuinones SLent TBrown JQuinones DATE 12/28/2017 12/28/2017 1/2/2018 1/4/2018 PUBLIC MEETING WITH NUCLEAR ENERGY INSTITUTE TO DISCUSS DRAFT DOCUMENT THAT REQUESTS THE USE OF FLEXIBLE SCHEDULING PROVISIONS OF 10 CFR50.155(h)(2)
December 7, 2017 List of Attendees Name Organization Brenda Kovarik American Electric Power John Edgorf Nuclear Energy Institute Paul Guill Duke Energy Eric Bowman NRC (U.S. Nuclear Regulatory Commission)
Tony Brown NRC Joylynn Quinones NRC Brett Titus NRC Milton Valentin NRC Enclosure