ML072420543: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 16: Line 16:
=Text=
=Text=
{{#Wiki_filter:Enlergy Nuclear Operations, inc.
{{#Wiki_filter:Enlergy Nuclear Operations, inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043 August 23,2007                                                         10 CFR 26.71 (d)
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043 August 23,2007 10 CFR 26.71 (d)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Dutv P r o ~ r a mPerformance Report
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Dutv Pro~ram Performance Report  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
 
In accordance with 10 CFR 26.71 (d), Entergy Nuclear Operations, Inc, is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, 2007, through June 30, 2007.
In accordance with 10 CFR 26.71(d), Entergy Nuclear Operations, Inc, is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, 2007, through June 30, 2007.
Enclosures 1 and 2 summarize the test results at the PNP.
Enclosures 1 and 2 summarize the test results at the PNP.
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
Site Vice President Palisades Nuclear Plant Enclosures (2)
Site Vice President Palisades Nuclear Plant Enclosures (2)
CC     Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC  


ENCLOSURE 1 PALBSADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE  
ENCLOSURE 1 PALBSADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE  


==SUMMARY==
==SUMMARY==
 
January "1thougk June 30,2007
January "1thougk J u n e 30,2007
: 1. MANAGEMENT  
: 1. MANAGEMENT  


==SUMMARY==
==SUMMARY==
A. RANDOM TESTING During this reporting period, a total of 244 random tests were conducted with the following results:
A. RANDOM TESTING During this reporting period, a total of 244 random tests were conducted with the following results:
Donor Group                 Random Tests                 Results Employees                       153           Random testing identified no positive drug/alcohol results.
Donor Group Random Tests Results Employees Contractors 153 Random testing identified no positive drug/alcohol results.
Contractors                      91            Random testing identified no positive drug/alcohol results.
9 1 Random testing identified no positive drug/alcohol results.
The percentage of random tests conducted during this period was 55%.
The percentage of random tests conducted during this period was 55%.
The positive drug/alcohol rate for 2007 indicates a stable trend for employees and contractors:
The positive drug/alcohol rate for 2007 indicates a stable trend for employees and contractors:
Random Tests           Positive Rate       Leading Substance Emplovees C/V1s       Emplovees C/V1s       Cocaine THC B. PRE-ACCESS TESTING A total of 283 pre-access tests were conducted during this reporting period. One individual was denied access based on positive test results.
Random Tests Positive Rate Leading Substance Emplovees C/V1s Emplovees C/V1s Cocaine THC B. PRE-ACCESS TESTING A total of 283 pre-access tests were conducted during this reporting period. One individual was denied access based on positive test results.
Page 1 of 2
Page 1 of 2  


C. FOR CAUSEIPOST-ACCIDENT TESTING One for-cause test was required during the reporting period. The test was given because of observed behavior. The results of the test were negative.
C. FOR CAUSEIPOST-ACCIDENT TESTING One for-cause test was required during the reporting period. The test was given because of observed behavior. The results of the test were negative.
Line 48: Line 45:
E. APPEALS The appeals process was not initiated during this reporting period
E. APPEALS The appeals process was not initiated during this reporting period
: 2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered no Fitness for Duty events that required reporting in accordance with 10 CFR 26.73.
: 2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered no Fitness for Duty events that required reporting in accordance with 10 CFR 26.73.
Page 2 of 2
Page 2 of 2  


ENCLOSURE 2 PALlSABESNUCLEARPLANT SEMI-ANNUAL. FITNESS FOR DUTY PROGRAM PERFORMANCE D N A January "1tkrough June 30,2007 Entergy Nuclear Operations, Inc.                                                       June 30.2007 Company                                                                    6 Months Ending Palisades Nuclear Plant Location 269-764-2575 Phone (include Areacode)
ENCLOSURE 2 PALlSABESNUCLEARPLANT SEMI-ANNUAL. FITNESS FOR DUTY PROGRAM PERFORMANCE D N A January "1tkrough June 30,2007 Entergy Nuclear Operations, Inc.
Brian Rabideau Contact Name Cutoffs: Screen/Confirmation (nglml) : Appendix A to 10 CFR 26 Marijuana       100 / 15               Amphetamines         1000 / 500                               1 Cocaine         300 / 150               Phencyclidine           25 / 25                               1 Opiates         300 / 300               Alcohol (% BAC)*       0.04 / 0.04                             1 "Anv detectable amount for situations other than random.
Company Palisades Nuclear Plant Location Brian Rabideau Contact Name June 30.2007 6 Months Ending 269-764-2575 Phone (include Areacode)
Long-Term              Short-Term Testing Results                               Licensee              Contractor      Contractor Personnel Employees                Personnel Average Number With Unescorted Access                                 541                    N/A                  348
Cutoffs: Screen/Confirmation (nglml) : Appendix A to 10 CFR 26 Marijuana 100 / 15 Amphetamines 1000 / 500 1
                                            #Tested    #Positive  #Tested    #Positive  #Tested    #Positive Categories Pre-Access                                                           ---          ---
Cocaine 300 / 150 Phencyclidine 25 / 25 1
36         0                                 247        1 FOR                      Post-              0       0         ---          ---      0         0 CAUSE                    Accident Observed            1        0         ---          ---      0         0 Behavior Random                                        153        0         ---          ---      91        0 Follow-UP                                      20        0         ---          ---      14         0 Other                                            0       0         ---          ---      0         0 TOTAL                                        210        0         ---          ---      352        1 Page 1 of 2
Opiates 300 / 300 Alcohol (% BAC)*
0.04 / 0.04 1  
"Anv detectable amount for situations other than random.
Page 1 of 2 Testing Results Average Number With Unescorted Access Categories Pre-Access FOR CAUSE Licensee Employees 541 Post-Accident Observed Behavior
#Tested 36 0
1 153 20 0
21 0 Random Follow-UP Other TOTAL
#Positive 0
0 0
0 0
0 0
Long-Term Contractor Personnel N/A
#Tested Short-Term Contractor Personnel 348
#Positive
#Tested 247 0
0 9 1 14 0
352
#Positive 1
0 0
0 0
0 1  


Breakdown of Confirmed Positive Tests for Specific Substances Amphe-   Phency-         Refusal Marijuana Cocaine   Opiates   tamines   clidine Alcohol to Test 1 2 3 4 5 Licensee Employees Long-Term Contractors 1
Breakdown of Confirmed Positive Tests for Specific Substances Page 2 of 2 Licensee Employees Long-Term Contractors Short-Term Contractors Total Marijuana Cocaine 1
Short-Term Contractors Total                                1 I I Page 2 of 2}}
1 Opiates Amphe-tamines Phency-clidine Alcohol Refusal to Test 1
2 I I 3
4 5}}

Latest revision as of 22:12, 14 January 2025

Fitness for Duty Program Performance Report for Period of January 1, 2007 Through June 30, 2007
ML072420543
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/23/2007
From: Schwarz C
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML072420543 (5)


Text

Enlergy Nuclear Operations, inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043 August 23,2007 10 CFR 26.71 (d)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Dutv Pro~ram Performance Report

Dear Sir or Madam:

In accordance with 10 CFR 26.71 (d), Entergy Nuclear Operations, Inc, is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, 2007, through June 30, 2007.

Enclosures 1 and 2 summarize the test results at the PNP.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Site Vice President Palisades Nuclear Plant Enclosures (2)

CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

ENCLOSURE 1 PALBSADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

January "1thougk June 30,2007

1. MANAGEMENT

SUMMARY

A. RANDOM TESTING During this reporting period, a total of 244 random tests were conducted with the following results:

Donor Group Random Tests Results Employees Contractors 153 Random testing identified no positive drug/alcohol results.

9 1 Random testing identified no positive drug/alcohol results.

The percentage of random tests conducted during this period was 55%.

The positive drug/alcohol rate for 2007 indicates a stable trend for employees and contractors:

Random Tests Positive Rate Leading Substance Emplovees C/V1s Emplovees C/V1s Cocaine THC B. PRE-ACCESS TESTING A total of 283 pre-access tests were conducted during this reporting period. One individual was denied access based on positive test results.

Page 1 of 2

C. FOR CAUSEIPOST-ACCIDENT TESTING One for-cause test was required during the reporting period. The test was given because of observed behavior. The results of the test were negative.

D. FOLLOW-UP TESTING No individuals tested positive during "follow-up" testing.

E. APPEALS The appeals process was not initiated during this reporting period

2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered no Fitness for Duty events that required reporting in accordance with 10 CFR 26.73.

Page 2 of 2

ENCLOSURE 2 PALlSABESNUCLEARPLANT SEMI-ANNUAL. FITNESS FOR DUTY PROGRAM PERFORMANCE D N A January "1tkrough June 30,2007 Entergy Nuclear Operations, Inc.

Company Palisades Nuclear Plant Location Brian Rabideau Contact Name June 30.2007 6 Months Ending 269-764-2575 Phone (include Areacode)

Cutoffs: Screen/Confirmation (nglml) : Appendix A to 10 CFR 26 Marijuana 100 / 15 Amphetamines 1000 / 500 1

Cocaine 300 / 150 Phencyclidine 25 / 25 1

Opiates 300 / 300 Alcohol (% BAC)*

0.04 / 0.04 1

"Anv detectable amount for situations other than random.

Page 1 of 2 Testing Results Average Number With Unescorted Access Categories Pre-Access FOR CAUSE Licensee Employees 541 Post-Accident Observed Behavior

  1. Tested 36 0

1 153 20 0

21 0 Random Follow-UP Other TOTAL

  1. Positive 0

0 0

0 0

0 0

Long-Term Contractor Personnel N/A

  1. Tested Short-Term Contractor Personnel 348
  1. Positive
  1. Tested 247 0

0 9 1 14 0

352

  1. Positive 1

0 0

0 0

0 1

Breakdown of Confirmed Positive Tests for Specific Substances Page 2 of 2 Licensee Employees Long-Term Contractors Short-Term Contractors Total Marijuana Cocaine 1

1 Opiates Amphe-tamines Phency-clidine Alcohol Refusal to Test 1

2 I I 3

4 5