ENS 54382: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
| NRC officer = Thomas Kendzia | | NRC officer = Thomas Kendzia | ||
| event date = 11/12/2019 06:00 CST | | event date = 11/12/2019 06:00 CST | ||
| last update date = | | last update date = 01/31/2020 | ||
| title = | | title = Emergency Operations Facility Out of Service | ||
| event text = | | event text = On November 12, 2019, the Central Emergency Control Center (CECC) was removed from service for a planned facility upgrade project. The CECC is a common Emergency Operations Facility (EOF) for the TVA Nuclear sites (Browns Ferry / Sequoyah / Watts Bar). The duration of the upgrade project is approximately 75 days. | ||
On November 12, 2019, the Central Emergency Control Center (CECC) was removed from service for a planned facility upgrade project. The CECC is a common Emergency Operations Facility (EOF) for the TVA Nuclear sites (Browns Ferry / Sequoyah / Watts Bar). The duration of the upgrade project is approximately 75 days. | |||
If an emergency is declared requiring CECC activation during this period, an alternate CECC will be used. During this period, the alternate CECC will be staffed and activated using existing emergency procedures. | If an emergency is declared requiring CECC activation during this period, an alternate CECC will be used. During this period, the alternate CECC will be staffed and activated using existing emergency procedures. | ||
This is an eight-hour, non-emergency notification for a Loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the CECC will be unavailable for more than 72 hours. | This is an eight-hour, non-emergency notification for a Loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the CECC will be unavailable for more than 72 hours. | ||
Line 27: | Line 26: | ||
The NRC Resident Inspector has been notified. | The NRC Resident Inspector has been notified. | ||
Notified the R2DO(Musser). | Notified the R2DO(Musser). | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/ | * * * UPDATE FROM ALAN PRUCHA TO KERBY SCALES AT 1526 EST ON 1/31/2020 * * * | ||
The CECC facility upgrade project is sufficiently complete such that the CECC was returned to a functional status at 1350 CST on January 31, 2020. | |||
The NRC Resident Inspector has been notified. | |||
Notified R2DO (Baptist). | |||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200203en.html#en54382 | |||
}}{{unit info | }}{{unit info | ||
| Unit = 1 | | Unit = 1 |
Revision as of 09:01, 3 February 2020
Where | |
---|---|
Browns Ferry Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-1.47 h-0.0613 days <br />-0.00875 weeks <br />-0.00201 months <br />) | |
Opened: | Angel Yarbrough 10:32 Nov 12, 2019 |
NRC Officer: | Thomas Kendzia |
Last Updated: | Jan 31, 2020 |
54382 - NRC Website
| |