ML092440685: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Page 1 of 2                                                                               Browns Ferry 09/01/2009     07:46:01                                                           Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit         Planned Dates                                                                                                                             No. of Staff Number        Start       End     Inspection Activity                                                               Title                                 on Site TFPI           - TRIENNIAL FIRE PROTECTION INSPECTION                                                                           6 1, 2, 3   09/21/2009   09/25/2009   IP 7111105T              Fire Protection [Triennial]
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 09/01/2009 07:46:01 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Browns Ferry TFPI
1, 2, 3    10/05/2009   10/09/2009   IP 7111105T              Fire Protection [Triennial]
- TRIENNIAL FIRE PROTECTION INSPECTION 6
ISFSI          - ISFSI OPERATIONAL INSPECTION                                                                                   2 1, 2, 3   09/01/2009  12/31/2009  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants CDBI-EB1       - COMPONENT DESIGN BASES INSPECTION                                                                             8 1, 2, 3   09/28/2009   10/02/2009   IP 7111121              Component Design Bases Inspection 1          09/28/2009   11/20/2009   IP 71004                Power Uprate 1, 2, 3   10/19/2009   10/23/2009   IP 7111121              Component Design Bases Inspection 1, 2, 3    11/02/2009   11/06/2009   IP 7111121              Component Design Bases Inspection 1, 2, 3    11/16/2009   11/20/2009   IP 7111121              Component Design Bases Inspection PSB1EP         - EMERGENCY PREPAREDNESS EXERCISE                                                                               3 1, 2, 3   11/02/2009  11/06/2009  IP 2515/175              Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 1, 2, 3    11/02/2009   11/06/2009   IP 7111401              Exercise Evaluation 1, 2, 3   11/02/2009   11/06/2009   IP 7111404              Emergency Action Level and Emergency Plan Changes 1, 2, 3   11/02/2009   11/06/2009   IP 71151                Performance Indicator Verification EB3ISI         - UNIT 3 INSERVICE INSPECTION                                                                                   1 3   03/08/2010   03/12/2010   IP 7111108G              Inservice Inspection Activities - BWR PSB1-RP       - RP ACCESS CONTROLS                                                                                             1 1, 2, 3   03/22/2010   03/26/2010   IP 7112101              Access Control to Radiologically Significant Areas 1, 2, 3   03/22/2010   03/26/2010   IP 71151                Performance Indicator Verification PSB1EP         - EMERGENCY PREPAREDNESS INSPECTION                                                                             1 1, 2, 3   03/22/2010  03/26/2010  IP 7111402              Alert and Notification System Testing 1, 2, 3    03/22/2010   03/26/2010   IP 7111403              Emergency Response Organization Augmentation Testing 1, 2, 3    03/22/2010   03/26/2010   IP 7111404              Emergency Action Level and Emergency Plan Changes 1, 2, 3    03/22/2010   03/26/2010   IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2, 3   03/22/2010   03/26/2010   IP 71151                Performance Indicator Verification OL EXAM       - INITIAL EXAM PREP                                                                                             7 1         05/17/2010   05/21/2010     V23304                BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES PSB1-RP       - RP GROUNDWATER PROTECTION                                                                                     1 1, 2, 3   05/31/2010  06/04/2010  IP 2515/173              Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative OL EXAM       - INITIAL EXAM - WEEK 1                                                                                         7 1         06/07/2010   06/11/2010     V23304                BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 2                                                                                         7 1         06/14/2010   06/18/2010     V23304                BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
1, 2, 3 IP Fire Protection [Triennial]
This report shows only on-site and announced inspection procedures.                                     Enclosure
7111105T 09/21/2009 09/25/2009 1, 2, 3 IP Fire Protection [Triennial]
7111105T 10/05/2009 10/09/2009 ISFSI
- ISFSI OPERATIONAL INSPECTION 2
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/01/2009 12/31/2009 CDBI-EB1
- COMPONENT DESIGN BASES INSPECTION 8
1, 2, 3 IP Component Design Bases Inspection 7111121 09/28/2009 10/02/2009 1
IP Power Uprate 71004 09/28/2009 11/20/2009 1, 2, 3 IP Component Design Bases Inspection 7111121 10/19/2009 10/23/2009 1, 2, 3 IP Component Design Bases Inspection 7111121 11/02/2009 11/06/2009 1, 2, 3 IP Component Design Bases Inspection 7111121 11/16/2009 11/20/2009 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
1, 2, 3 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 11/02/2009 11/06/2009 1, 2, 3 IP Exercise Evaluation 7111401 11/02/2009 11/06/2009 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 11/02/2009 11/06/2009 1, 2, 3 IP Performance Indicator Verification 71151 11/02/2009 11/06/2009 EB3ISI
- UNIT 3 INSERVICE INSPECTION 1
3 IP Inservice Inspection Activities - BWR 7111108G 03/08/2010 03/12/2010 PSB1-RP
- RP ACCESS CONTROLS 1
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 03/22/2010 03/26/2010 1, 2, 3 IP Performance Indicator Verification 71151 03/22/2010 03/26/2010 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1, 2, 3 IP Alert and Notification System Testing 7111402 03/22/2010 03/26/2010 1, 2, 3 IP Emergency Response Organization Augmentation Testing 7111403 03/22/2010 03/26/2010 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 03/22/2010 03/26/2010 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/22/2010 03/26/2010 1, 2, 3 IP Performance Indicator Verification 71151 03/22/2010 03/26/2010 OL EXAM
- INITIAL EXAM PREP 7
1 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES V23304 05/17/2010 05/21/2010 PSB1-RP
- RP GROUNDWATER PROTECTION 1
1, 2, 3 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/31/2010 06/04/2010 OL EXAM
- INITIAL EXAM - WEEK 1 7
1 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES V23304 06/07/2010 06/11/2010 OL EXAM
- INITIAL EXAM - WEEK 2 7
1 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES V23304 06/14/2010 06/18/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure


Page 2 of 2                                                                             Browns Ferry 09/01/2009     07:46:01                                                         Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit         Planned Dates                                                                                                                               No. of Staff Number        Start       End     Inspection Activity                                                               Title                                     on Site PSB1-RP       - RP PUBLIC RADIATION PROTECTION                                                                                     3 1, 2, 3   06/14/2010  06/18/2010  IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment 1, 2, 3    06/14/2010   06/18/2010   IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2, 3    06/14/2010   06/18/2010   IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2, 3   06/14/2010   06/18/2010   IP 71151                Performance Indicator Verification PI&R         - PROBLEM IDENTIFICATION AND RESOLUTION IN                                                                           5 1, 2, 3   08/30/2010   09/03/2010   IP 71152B              Identification and Resolution of Problems 1, 2, 3    09/20/2010   09/24/2010   IP 71152B              Identification and Resolution of Problems EB3ISI       - UNIT 1 INSERVICE INSPECTION                                                                                       1 1         11/01/2010   11/05/2010   IP 7111108G            Inservice Inspection Activities - BWR OL RQ         - REQUAL INSPECTION                                                                                                 2 1, 2       12/06/2010   12/10/2010   IP 7111111B            Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.
Inspection / Activity Plan Page 2 of 2 09/01/2009 07:46:01 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Browns Ferry PSB1-RP
This report shows only on-site and announced inspection procedures.                                         Enclosure}}
- RP PUBLIC RADIATION PROTECTION 3
1, 2, 3 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 06/14/2010 06/18/2010 1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 06/14/2010 06/18/2010 1, 2, 3 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 06/14/2010 06/18/2010 1, 2, 3 IP Performance Indicator Verification 71151 06/14/2010 06/18/2010 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION IN 5
1, 2, 3 IP Identification and Resolution of Problems 71152B 08/30/2010 09/03/2010 1, 2, 3 IP Identification and Resolution of Problems 71152B 09/20/2010 09/24/2010 EB3ISI
- UNIT 1 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - BWR 7111108G 11/01/2010 11/05/2010 OL RQ
- REQUAL INSPECTION 2
1, 2 IP Licensed Operator Requalification Program 7111111B 12/06/2010 12/10/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure}}

Latest revision as of 10:31, 14 January 2025

Inspection/Activity Plan 09/01/2009 - 12/31/2010
ML092440685
Person / Time
Site: Browns Ferry  
(DPR-033, DPR-052, DPR-068)
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
References
Download: ML092440685 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 07:46:01 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Browns Ferry TFPI

- TRIENNIAL FIRE PROTECTION INSPECTION 6

1, 2, 3 IP Fire Protection [Triennial]

7111105T 09/21/2009 09/25/2009 1, 2, 3 IP Fire Protection [Triennial]

7111105T 10/05/2009 10/09/2009 ISFSI

- ISFSI OPERATIONAL INSPECTION 2

1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/01/2009 12/31/2009 CDBI-EB1

- COMPONENT DESIGN BASES INSPECTION 8

1, 2, 3 IP Component Design Bases Inspection 7111121 09/28/2009 10/02/2009 1

IP Power Uprate 71004 09/28/2009 11/20/2009 1, 2, 3 IP Component Design Bases Inspection 7111121 10/19/2009 10/23/2009 1, 2, 3 IP Component Design Bases Inspection 7111121 11/02/2009 11/06/2009 1, 2, 3 IP Component Design Bases Inspection 7111121 11/16/2009 11/20/2009 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2, 3 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 11/02/2009 11/06/2009 1, 2, 3 IP Exercise Evaluation 7111401 11/02/2009 11/06/2009 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 11/02/2009 11/06/2009 1, 2, 3 IP Performance Indicator Verification 71151 11/02/2009 11/06/2009 EB3ISI

- UNIT 3 INSERVICE INSPECTION 1

3 IP Inservice Inspection Activities - BWR 7111108G 03/08/2010 03/12/2010 PSB1-RP

- RP ACCESS CONTROLS 1

1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 03/22/2010 03/26/2010 1, 2, 3 IP Performance Indicator Verification 71151 03/22/2010 03/26/2010 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1, 2, 3 IP Alert and Notification System Testing 7111402 03/22/2010 03/26/2010 1, 2, 3 IP Emergency Response Organization Augmentation Testing 7111403 03/22/2010 03/26/2010 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 03/22/2010 03/26/2010 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/22/2010 03/26/2010 1, 2, 3 IP Performance Indicator Verification 71151 03/22/2010 03/26/2010 OL EXAM

- INITIAL EXAM PREP 7

1 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES V23304 05/17/2010 05/21/2010 PSB1-RP

- RP GROUNDWATER PROTECTION 1

1, 2, 3 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/31/2010 06/04/2010 OL EXAM

- INITIAL EXAM - WEEK 1 7

1 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES V23304 06/07/2010 06/11/2010 OL EXAM

- INITIAL EXAM - WEEK 2 7

1 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES V23304 06/14/2010 06/18/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2009 07:46:01 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Browns Ferry PSB1-RP

- RP PUBLIC RADIATION PROTECTION 3

1, 2, 3 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 06/14/2010 06/18/2010 1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 06/14/2010 06/18/2010 1, 2, 3 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 06/14/2010 06/18/2010 1, 2, 3 IP Performance Indicator Verification 71151 06/14/2010 06/18/2010 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION IN 5

1, 2, 3 IP Identification and Resolution of Problems 71152B 08/30/2010 09/03/2010 1, 2, 3 IP Identification and Resolution of Problems 71152B 09/20/2010 09/24/2010 EB3ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - BWR 7111108G 11/01/2010 11/05/2010 OL RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 12/06/2010 12/10/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure