| notification by = Angel Yarbrough
| notification by = Angel Yarbrough
| NRC officer = Thomas Kendzia
| NRC officer = Thomas Kendzia
| event date = 11/12/2019 00:00 CST
| event date = 11/12/2019 06:00 CST
| last update date = 11/12/2019
| last update date = 11/14/2019
| title = Emergency Operations Facility Out of Service
| title = En Revision Imported Date  11/15/2019
| event text = On November 12, 2019, the Central Emergency Control Center (CECC) was removed from service for a planned facility upgrade project.  The CECC is a common Emergency Operations Facility (EOF) for the TVA Nuclear sites (Browns Ferry / Sequoyah / Watts Bar).  The duration of the upgrade project is approximately 75 days.
| event text = EN Revision Text: EMERGENCY OPERATIONS FACILITY OUT OF SERVICE
On November 12, 2019, the Central Emergency Control Center (CECC) was removed from service for a planned facility upgrade project.  The CECC is a common Emergency Operations Facility (EOF) for the TVA Nuclear sites (Browns Ferry / Sequoyah / Watts Bar).  The duration of the upgrade project is approximately 75 days.
If an emergency is declared requiring CECC activation during this period, an alternate CECC will be used.  During this period, the alternate CECC will be staffed and activated using existing emergency procedures.
If an emergency is declared requiring CECC activation during this period, an alternate CECC will be used.  During this period, the alternate CECC will be staffed and activated using existing emergency procedures.
This is an eight-hour, non-emergency notification for a Loss of Emergency Assessment Capability.  This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the CECC will be unavailable for more than 72 hours.
This is an eight-hour, non-emergency notification for a Loss of Emergency Assessment Capability.  This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the CECC will be unavailable for more than 72 hours.
The Emergency Response Organization has been notified that the CECC will be unavailable during the upgrade project and to report to the alternate CECC in the event of an emergency.  There is no impact on the health and safety of the public or plant employees.
The Emergency Response Organization has been notified that the CECC will be unavailable during the upgrade project and to report to the alternate CECC in the event of an emergency.  There is no impact on the health and safety of the public or plant employees.
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20191113en.html#en54382
* * * UPDATE AT 1316 EST ON 11/14/19 FROM BARUCH CALKIN TO JEFF HERRERA * * *
The event information was updated to indicate that the event occurred at 0700 EST.
The NRC Resident Inspector has been notified. 
Notified the R2DO(Musser).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20191115en.html#en54382
}}{{unit info
}}{{unit info
| Unit =  1  
| Unit =  1  

Revision as of 08:01, 15 November 2019

ENS 54382 +/-
Where
Browns Ferry Tennessee Valley Authority icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-1.47 h-0.0613 days <br />-0.00875 weeks <br />-0.00201 months <br />)
Opened: Angel Yarbrough
10:32 Nov 12, 2019
NRC Officer: Thomas Kendzia
Last Updated: Nov 14, 2019
54382 - NRC Website
Loading map...