ML12046A837: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | |||
Safety System / JPM Title Type Code* | Safety System / JPM Title Type Code* | ||
Function | Function | ||
| Line 29: | Line 27: | ||
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6 | : f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6 | ||
: g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No. D,L,S 7 4100.01 | : g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No. D,L,S 7 4100.01 | ||
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors | : h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | |||
: i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER | : i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER | ||
: j. 295016 AA1.07 4.2 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7 | : j. 295016 AA1.07 4.2 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7 | ||
| Line 39: | Line 35: | ||
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27 | (R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27 | ||
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 | ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | |||
Safety System / JPM Title Type Code* | Safety System / JPM Title Type Code* | ||
Function | Function | ||
| Line 50: | Line 44: | ||
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5 | : e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5 | ||
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6 g. | : f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6 g. | ||
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors | : h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | |||
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER | : i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER | ||
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7 | : j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7 | ||
| Line 60: | Line 52: | ||
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27 | (R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27 | ||
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 | ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | |||
Safety System / JPM Title Type Code* | Safety System / JPM Title Type Code* | ||
Function a. | Function a. | ||
| Line 70: | Line 60: | ||
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5 f. | : e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5 f. | ||
g. | g. | ||
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors | : h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | |||
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER | : i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER | ||
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7 k. | : j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7 k. | ||
Revision as of 18:04, 6 February 2020
| ML12046A837 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 08/29/2011 |
| From: | Bielby M Operations Branch III |
| To: | Exelon Nuclear |
| Shared Package | |
| ML11354A098 | List: |
| References | |
| ES-301, ES-301-2 | |
| Download: ML12046A837 (3) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- e. 223002 A4.01 3.6 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
- f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
- h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
- f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6 g.
- h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function a.
b.
c.
- e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5 f.
g.
- h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27