ML12234A436: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 20, 2012 LICENSEE:       Exelon Generation Company, LLC FACILITY:       Braidwood Station, Units 1 and 2
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 20, 2012 LICENSEE:
Exelon Generation Company, LLC FACILITY:
Braidwood Station, Units 1 and 2  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE BRAIDWOOD STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 15, 2012, the Nuclear Regulatory Commission (NRC) held a public meeting at the Braidwood Station City Hall. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRC=s assessment of the safety performance of Braidwood Station, Units 1 and 2, for the period from January 1 through December 31, 2011. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML12205A304 and ML12227A533, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE BRAIDWOOD STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 15, 2012, the Nuclear Regulatory Commission (NRC) held a public meeting at the Braidwood Station City Hall. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRC=s assessment of the safety performance of Braidwood Station, Units 1 and 2, for the period from January 1 through December 31, 2011. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML12205A304 and ML12227A533, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Braidwood Station, Units 1 and 2, in calendar year 2011, which was documented in the March 5, 2012, end-of-cycle assessment letter, as ML12065A102. As part of this regulatory performance meeting, Exelon briefly responded to the NRC=s assessment. The licensee presentation can be found in ADAMS as ML12227A517. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.
The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Braidwood Station, Units 1 and 2, in calendar year 2011, which was documented in the March 5, 2012, end-of-cycle assessment letter, as ML12065A102. As part of this regulatory performance meeting, Exelon briefly responded to the NRC=s assessment. The licensee presentation can be found in ADAMS as ML12227A517. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.
Sincerely,
Sincerely,  
                                              /RA/
/RA/
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77  


==Enclosure:==
==Enclosure:==
As Stated cc w/encl:     Distribution via ListServ TM
As Stated cc w/encl:
Distribution via ListServ TM  


UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 20, 2012 LICENSEE:                 Exelon Generation Company, LLC FACILITY:                 Braidwood Station, Units 1 and 2
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 20, 2012 LICENSEE:
Exelon Generation Company, LLC FACILITY:
Braidwood Station, Units 1 and 2  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE BRAIDWOOD STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 15, 2012, the Nuclear Regulatory Commission (NRC) held a public meeting at the Braidwood Station City Hall. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRC=s assessment of the safety performance of Braidwood Station, Units 1 and 2, for the period from January 1 through December 31, 2011. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML12205A304 and ML12227A533, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE BRAIDWOOD STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 15, 2012, the Nuclear Regulatory Commission (NRC) held a public meeting at the Braidwood Station City Hall. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRC=s assessment of the safety performance of Braidwood Station, Units 1 and 2, for the period from January 1 through December 31, 2011. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML12205A304 and ML12227A533, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Braidwood Station, Units 1 and 2, in calendar year 2011, which was documented in the March 5, 2012, end-of-cycle assessment letter, as ML12065A102. As part of this regulatory performance meeting, Exelon briefly responded to the NRC=s assessment. The licensee presentation can be found in ADAMS as ML12227A517. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.
The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Braidwood Station, Units 1 and 2, in calendar year 2011, which was documented in the March 5, 2012, end-of-cycle assessment letter, as ML12065A102. As part of this regulatory performance meeting, Exelon briefly responded to the NRC=s assessment. The licensee presentation can be found in ADAMS as ML12227A517. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.
Sincerely,                         /RA/
Sincerely,  
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77
/RA/
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77  


==Enclosure:==
==Enclosure:==
As Stated cc w/encl:               Distribution via ListServ TM DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\EOC CY 2011 (Issued 2012)
As Stated cc w/encl:
Meeting Summary & Slides\Braidwood 2011 EOC Public Meeting Summary.docx Publicly Available                           Non-Publicly Available                   Sensitive                 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                                 RIII NAME               RNg:dtp                             EDuncan DATE               08/20/12                             08/20/12 OFFICIAL RECORD COPY
Distribution via ListServ TM DOCUMENT NAME: G:\\DRPIII\\1-Secy\\1-Work In Progress\\EOC CY 2011 (Issued 2012)
Meeting Summary & Slides\\Braidwood 2011 EOC Public Meeting Summary.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RNg:dtp EDuncan DATE 08/20/12 08/20/12 OFFICIAL RECORD COPY  


Meeting Participants NRC K. OBrien, Acting Deputy Director, Division of Reactor Projects, Region III E. Duncan, Chief, Branch 3, Division of Reactor Projects, Region III B. Dickson, Chief, Health Physics and Incident Response Branch, Division of Reactor Safety, Region III J. Wiebe, Senior Project Manager, Office of Nuclear Reactor Regulation J. Benjamin, Senior Resident Inspector, Braidwood Station A. Garmoe, Resident Inspector, Braidwood Station L. Rodriguez, Reactor Engineer, Division of Nuclear Materials Safety, Region III H. Logaras, Government Liaison Specialist, Region III P. Chandrathil, Public Affairs Officer, Region III H. Rowland, Reactor Engineer, Branch 3, Division of Reactor Projects, Region III Exelon Generation Company - Braidwood Station D. Enright, Site Vice President M. Kanavos, Plant Manager Other Attendees J. Zimmer, Member of the Public T. Zimmer, Member of the Public M. Mack, Member of the Public M. Simon, Member of the Public H. Zelhofer, Member of the Public S. Jansen, Office of Congressman Kinzinger C. Settles, Illinois Emergency Management Agency N. Miller, Braidwood Station J. Gerrity, Braidwood Station M. Abbas, Braidwood Station
Meeting Participants NRC K. OBrien, Acting Deputy Director, Division of Reactor Projects, Region III E. Duncan, Chief, Branch 3, Division of Reactor Projects, Region III B. Dickson, Chief, Health Physics and Incident Response Branch, Division of Reactor Safety, Region III J. Wiebe, Senior Project Manager, Office of Nuclear Reactor Regulation J. Benjamin, Senior Resident Inspector, Braidwood Station A. Garmoe, Resident Inspector, Braidwood Station L. Rodriguez, Reactor Engineer, Division of Nuclear Materials Safety, Region III H. Logaras, Government Liaison Specialist, Region III P. Chandrathil, Public Affairs Officer, Region III H. Rowland, Reactor Engineer, Branch 3, Division of Reactor Projects, Region III Exelon Generation Company - Braidwood Station D. Enright, Site Vice President M. Kanavos, Plant Manager Other Attendees J. Zimmer, Member of the Public T. Zimmer, Member of the Public M. Mack, Member of the Public M. Simon, Member of the Public H. Zelhofer, Member of the Public S. Jansen, Office of Congressman Kinzinger C. Settles, Illinois Emergency Management Agency N. Miller, Braidwood Station J. Gerrity, Braidwood Station M. Abbas, Braidwood Station  


Letter to Exelon Generation Company, LLC, from E. Duncan dated August 20, 2012.
Letter to Exelon Generation Company, LLC, from E. Duncan dated August 20, 2012.  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE BRAIDWOOD STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:
OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE BRAIDWOOD STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:
Silas Kennedy RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Christine Lipa Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov}}
Silas Kennedy RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Christine Lipa Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov}}

Latest revision as of 22:53, 11 January 2025

August 15, 2012 Public Meeting Summary to Discuss the Braidwood, Units 1 & 2, End-of-Cycle Plant Performance Assessment
ML12234A436
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/20/2012
From: Eric Duncan
Region 3 Branch 3
To:
References
Download: ML12234A436 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 20, 2012 LICENSEE:

Exelon Generation Company, LLC FACILITY:

Braidwood Station, Units 1 and 2

SUBJECT:

SUMMARY

OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE BRAIDWOOD STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 15, 2012, the Nuclear Regulatory Commission (NRC) held a public meeting at the Braidwood Station City Hall. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRC=s assessment of the safety performance of Braidwood Station, Units 1 and 2, for the period from January 1 through December 31, 2011. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML12205A304 and ML12227A533, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Braidwood Station, Units 1 and 2, in calendar year 2011, which was documented in the March 5, 2012, end-of-cycle assessment letter, as ML12065A102. As part of this regulatory performance meeting, Exelon briefly responded to the NRC=s assessment. The licensee presentation can be found in ADAMS as ML12227A517. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77

Enclosure:

As Stated cc w/encl:

Distribution via ListServ TM

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 20, 2012 LICENSEE:

Exelon Generation Company, LLC FACILITY:

Braidwood Station, Units 1 and 2

SUBJECT:

SUMMARY

OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE BRAIDWOOD STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 15, 2012, the Nuclear Regulatory Commission (NRC) held a public meeting at the Braidwood Station City Hall. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRC=s assessment of the safety performance of Braidwood Station, Units 1 and 2, for the period from January 1 through December 31, 2011. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML12205A304 and ML12227A533, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Braidwood Station, Units 1 and 2, in calendar year 2011, which was documented in the March 5, 2012, end-of-cycle assessment letter, as ML12065A102. As part of this regulatory performance meeting, Exelon briefly responded to the NRC=s assessment. The licensee presentation can be found in ADAMS as ML12227A517. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77

Enclosure:

As Stated cc w/encl:

Distribution via ListServ TM DOCUMENT NAME: G:\\DRPIII\\1-Secy\\1-Work In Progress\\EOC CY 2011 (Issued 2012)

Meeting Summary & Slides\\Braidwood 2011 EOC Public Meeting Summary.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RNg:dtp EDuncan DATE 08/20/12 08/20/12 OFFICIAL RECORD COPY

Meeting Participants NRC K. OBrien, Acting Deputy Director, Division of Reactor Projects, Region III E. Duncan, Chief, Branch 3, Division of Reactor Projects, Region III B. Dickson, Chief, Health Physics and Incident Response Branch, Division of Reactor Safety, Region III J. Wiebe, Senior Project Manager, Office of Nuclear Reactor Regulation J. Benjamin, Senior Resident Inspector, Braidwood Station A. Garmoe, Resident Inspector, Braidwood Station L. Rodriguez, Reactor Engineer, Division of Nuclear Materials Safety, Region III H. Logaras, Government Liaison Specialist, Region III P. Chandrathil, Public Affairs Officer, Region III H. Rowland, Reactor Engineer, Branch 3, Division of Reactor Projects, Region III Exelon Generation Company - Braidwood Station D. Enright, Site Vice President M. Kanavos, Plant Manager Other Attendees J. Zimmer, Member of the Public T. Zimmer, Member of the Public M. Mack, Member of the Public M. Simon, Member of the Public H. Zelhofer, Member of the Public S. Jansen, Office of Congressman Kinzinger C. Settles, Illinois Emergency Management Agency N. Miller, Braidwood Station J. Gerrity, Braidwood Station M. Abbas, Braidwood Station

Letter to Exelon Generation Company, LLC, from E. Duncan dated August 20, 2012.

SUBJECT:

SUMMARY

OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE BRAIDWOOD STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:

Silas Kennedy RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Christine Lipa Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov