ML19262B992: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19262B996 | | number = ML19262B996 | ||
| issue date = 01/16/1980 | | issue date = 01/16/1980 | ||
| title = | | title = LER 79-066/03L-0:on 791220,while Performing Surveillance One Containment Pressure Channel Declared Inoperable Due to Faulty Connection in B Train Sodium Selection Panel Input Cabinet 1.Caused by Contact Film Build Up | ||
| author name = | | author name = | ||
| author affiliation = ALABAMA POWER CO. | | author affiliation = ALABAMA POWER CO. |
Latest revision as of 12:02, 23 January 2020
Date released: 10/03/2019 | Download: ML19262B992 |
---|---|
ML19262B996 | |
Person / Time | |
---|---|
Site: | Farley ![]() |
Issue date: | 01/16/1980 |
From: | ALABAMA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19262B996 (1) | |
ML19262B991 | |
Person / Time | |
---|---|
Site: | Farley ![]() |
Issue date: | 01/16/1980 |
From: | Clayton F ALABAMA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19262B991 (1) | |