ML19269D549: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19269D551
| number = ML19269D551
| issue date = 05/29/1979
| issue date = 05/29/1979
| title = Forwards LER 79-056/03L-0
| title = LER 79-056/03L-0 on 790501:excesssive Leakage Found Through Containment Isolation Valve NN236.Caused by Either Dirt on Valve Seating Surface or Slipped Actuator Linkage.Valve Cleaned & Recalibr
| author name = Rohrer E
| author name = Rohrer E
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 10:00, 23 January 2020

Forwards LER 79-056/03L-0
Date released: 10/10/2019 Download: ML19269D549


LER 79-056/03L-0 on 790501:excesssive Leakage Found Through Containment Isolation Valve NN236.Caused by Either Dirt on Valve Seating Surface or Slipped Actuator Linkage.Valve Cleaned & Recalibr
ML19269D551
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/29/1979
From: Rohrer E
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19269D551 (2)
Forwards LER 79-056/03L-0
ML19269D548
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/29/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19269D548 (1)