ML14113A058: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Wed, Apr 23, 2014 08:45 1 | ||
Page No: | |||
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET LTR-14-0224 PAPER NUMBER: | |||
04/21/2014 LOGGING DATE: | |||
ACTION OFFICE: | |||
EDO AUTHOR: | |||
Markey E J AFFILIATION: | |||
US Congress ADDRESSEE: | |||
Macfarlane A M | |||
==SUBJECT:== | ==SUBJECT:== | ||
Senator Edward J. Markey and Senator Elizabeth Warren, Letter re: requests that the Commission immediately implement mitigating measures needed to protect Pilgrim Nuclear Power Station and the Seabrook Station against seismic vulnerability. | |||
immediately implement mitigating measures needed to protect Pilgrim Nuclear Power Station and the Seabrook Station against seismic vulnerability. | ACTION: | ||
ACTION: | Signature of Chairman DISTRIBUTION: | ||
LETTER DATE: | RF, Chrm, Comrs, OCA to Ack. | ||
LETTER DATE: | |||
04/18/2014 ACKNOWLEDGED: | |||
No SPECIAL HANDLING: | |||
Commission Correspondence. | |||
NOTES: | NOTES: | ||
FILE LOCATION: | FILE LOCATION: | ||
DUE DATE: | |||
ADAMS DATE SIGNED: | |||
05/01/2014}} | |||
Latest revision as of 21:30, 10 January 2025
| ML14113A058 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim, Seabrook |
| Issue date: | 04/18/2014 |
| From: | Markey E, Warren E US Congress, US SEN (Senate) |
| To: | Macfarlane A NRC/Chairman |
| Shared Package | |
| ML14113A057 | List: |
| References | |
| LTR-14-0224, FOIA | |
| Download: ML14113A058 (1) | |
Text
Wed, Apr 23, 2014 08:45 1
Page No:
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET LTR-14-0224 PAPER NUMBER:
04/21/2014 LOGGING DATE:
ACTION OFFICE:
EDO AUTHOR:
Markey E J AFFILIATION:
US Congress ADDRESSEE:
Macfarlane A M
SUBJECT:
Senator Edward J. Markey and Senator Elizabeth Warren, Letter re: requests that the Commission immediately implement mitigating measures needed to protect Pilgrim Nuclear Power Station and the Seabrook Station against seismic vulnerability.
ACTION:
Signature of Chairman DISTRIBUTION:
RF, Chrm, Comrs, OCA to Ack.
LETTER DATE:
04/18/2014 ACKNOWLEDGED:
No SPECIAL HANDLING:
Commission Correspondence.
NOTES:
FILE LOCATION:
DUE DATE:
ADAMS DATE SIGNED:
05/01/2014