ML17284A880: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 44: | Line 44: | ||
OPERATING STATUS REPORT for WNP-2 Date: September 1, 1999 Docket: 50-397 | OPERATING STATUS REPORT for WNP-2 Date: September 1, 1999 Docket: 50-397 | ||
: 2. Reporting Period: August 1999 | : 2. Reporting Period: August 1999 | ||
: 3. Utility Contact: Bernice Kasko (509) 377-4473 | : 3. Utility | ||
==Contact:== | |||
Bernice Kasko (509) 377-4473 | |||
: 4. Design Electrical Rating (Net MW,): 1153 | : 4. Design Electrical Rating (Net MW,): 1153 | ||
: 5. Maximum Dependable Capacity - summer (Net MW.): 1107 MONTH YEAR CUMULATIVE | : 5. Maximum Dependable Capacity - summer (Net MW.): 1107 MONTH YEAR CUMULATIVE | ||
Revision as of 03:11, 4 December 2019
| ML17284A880 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/31/1999 |
| From: | Kasko B, Galen Smith WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GO2-99-170, NUDOCS 9909170016 | |
| Download: ML17284A880 (6) | |
Text
REGULAT RY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 ASH.hggfE AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O~ Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Aug 1999 for 2.With 990910 j
WNP ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per. Tech Specs)
ENCL L SIZE:
NOTES: E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL CUSHING,J 1 1 0 INTERNAL: ACRS 1 1 ~ CENTER 01 1 1 OC/DBA/PAD 1 1 RES-/BE~ERA~ 1 1 RGN4 1 1 EXTERNAL: LMITCO MARSHALL 1 NOAC 1 1 NRC PDR' 1 1 D,
0
'E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE HASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF. COPIES REQUIRED: LTTR 9 ENCL 9
>lJ( ~l"'('
~
"P "~
NORTH NfEST PO. Box 968 a Richland, Washington 99352-0968 September 10, 1999 GO-99-170 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPI -21 MONTHLYOPERATING REPORT AUGUST 1999 Transmitted herewith is the Monthly Operating Report for the month of August 1999 as required by Technical Specification 5.6.4.
G. O. Smith Vice President, Generation Mail Drop 927M CC: EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N TC Poindexter - Winston Ec Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 1399 eioqa700<e 9e083i 05000397 PDR ADGCK R
,P t
OPERATING STATUS REPORT for WNP-2 Date: September 1, 1999 Docket: 50-397
- 2. Reporting Period: August 1999
- 3. Utility
Contact:
Bernice Kasko (509) 377-4473
- 4. Design Electrical Rating (Net MW,): 1153
- 5. Maximum Dependable Capacity - summer (Net MW.): 1107 MONTH YEAR CUMULATIVE
- 6. Hours Reactor Critical 744.0 4,036.5 92,877.8
- 7. Hours Generator On-Line 744.0 3,965.0 89,839.2
- 8. Unit Reserve Shutdown Hours 0.0 237.2 3,274.7
- 9. Net Electrical Energy (MWH) 699,997 3,952,130 87,282,061
- 10. Challenges to safety/relief valves: None
UNIT SHVIOWNS DOCKET NO.: 50-397 UNIT NAME: -'2 DATE: September 1, 1999 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: August, 1999 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence N/A
SUMMARY
~IREAEON 2 METHOD A - Equipment Failure E - Operator Training & 1 - Manua B - Mainteaance or Test License Examination 2- Manual Scram C Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -
G Operational Error 4 - Continued H - Olher 5 - Reduced Load 9 - Other