. r~ PDR:HQ A h h MSIC ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 [501)371 4)O0 May 3, 1979 l-059-4 2-059-3 Mr. K. V. Seyfrit, Director Office of Inspection & Enforcement ' | . r~ PDR:HQ A h h MSIC ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 [501)371 4)O0 May 3, 1979 l-059-4 2-059-3 Mr. K. V. Seyfrit, Director Office of Inspection & Enforcement ' | ||
U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Urive, Suite 1000 Arlington, Texas 76011 | U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Urive, Suite 1000 Arlington, Texas 76011 | ||
| Line 28: | Line 27: | ||
We have reassessed our schedule for responding to 79-01 and now find that it will probably not be possible to respond by Juae 14, 1979, as required. Every effort will be made to respond as soon as possible, however, a revised schedule indicates July 14, 1979, is a realistic date for submittal of our response. | We have reassessed our schedule for responding to 79-01 and now find that it will probably not be possible to respond by Juae 14, 1979, as required. Every effort will be made to respond as soon as possible, however, a revised schedule indicates July 14, 1979, is a realistic date for submittal of our response. | ||
We believe you are sympathetic with our situation and have our com-plete assurance that work is progressing on Bulletin 79-01 on a top priority basis and our response will be submitted as soon as possible. | We believe you are sympathetic with our situation and have our com-plete assurance that work is progressing on Bulletin 79-01 on a top priority basis and our response will be submitted as soon as possible. | ||
Very truly yours, | Very truly yours, h | ||
David C. Trimble Manager, Licensing DCT:JTE:lg - | |||
T 'S q 9070 R C907 lo ME MOER M'OOLE SOUTH UTILITIES SYS TEM | T 'S q 9070 R C907 lo ME MOER M'OOLE SOUTH UTILITIES SYS TEM | ||
~ | ~ | ||
Mr. K. V. Seyfrit, Director Page 2 May 3, 1979 cc: Mr. Ll. D. Johnson U. S. Nuclear Regulatory Comission P. O. Box 2090 Russellville, AR 72801 l}} | |||
Mr. K. V. Seyfrit, Director Page 2 May 3, 1979 | |||
cc: Mr. Ll. D. Johnson U. S. Nuclear Regulatory Comission P. O. Box 2090 Russellville, AR 72801 | |||
l}} | |||
Revision as of 20:40, 1 February 2020
| ML19261E401 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/03/1979 |
| From: | Trimble D ARKANSAS POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 1-059-4, 1-59-4, NUDOCS 7907060407 | |
| Download: ML19261E401 (1) | |
Text
CENTRAL FILES
. r~ PDR:HQ A h h MSIC ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 [501)371 4)O0 May 3, 1979 l-059-4 2-059-3 Mr. K. V. Seyfrit, Director Office of Inspection & Enforcement '
U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Urive, Suite 1000 Arlington, Texas 76011
Subject:
Arkansas Nuclear One - Units 1 and 2 Docket Nos.50-313 and 50-368 License Nos. DPR-51 and NPF-6 IE Bulletin 79-01 (File: 1510.1,2-1510.1)
Gentlemen:
The following is provided as a status on preparation of our response to IE Bulletin 79-01.
Work is progressing in accordance with the Bulletin. A significant amount of data has been assembled and is being reviewed. However, due to the significant effort required to respond to IE Bulletins79-05A, 79-05B, and 79.-06B, it was necessary to divert substantiel manpower to responding to those Bulletins. As a result, some slip-page occurred in our schedule to respond to IE Bulletin 79-01.
We have reassessed our schedule for responding to 79-01 and now find that it will probably not be possible to respond by Juae 14, 1979, as required. Every effort will be made to respond as soon as possible, however, a revised schedule indicates July 14, 1979, is a realistic date for submittal of our response.
We believe you are sympathetic with our situation and have our com-plete assurance that work is progressing on Bulletin 79-01 on a top priority basis and our response will be submitted as soon as possible.
Very truly yours, h
David C. Trimble Manager, Licensing DCT:JTE:lg -
T 'S q 9070 R C907 lo ME MOER M'OOLE SOUTH UTILITIES SYS TEM
~
Mr. K. V. Seyfrit, Director Page 2 May 3, 1979 cc: Mr. Ll. D. Johnson U. S. Nuclear Regulatory Comission P. O. Box 2090 Russellville, AR 72801 l