ML19242A815: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19242A820 | | number = ML19242A820 | ||
| issue date = 07/30/1979 | | issue date = 07/30/1979 | ||
| title = | | title = LER 79-069/03L-0 on 790712:inboard Steam Isolation Valve (2E51-F001) Did Not Close When Isolation Signal Given. Caused by Valve Stem Being Galled Against Packing Follower. Stem Was Replaced | ||
| author name = | | author name = | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. |
Latest revision as of 23:19, 23 January 2020
Date released: 09/13/2019 | Download: ML19242A815 |
---|---|
ML19242A820 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 07/30/1979 |
From: | GEORGIA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19242A820 (1) | |
ML19242A814 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 07/30/1979 |
From: | Manry M GEORGIA POWER CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19242A814 (1) | |