ML19242A815: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19242A820
| number = ML19242A820
| issue date = 07/30/1979
| issue date = 07/30/1979
| title = Forwards LER 79-069/03L-0
| title = LER 79-069/03L-0 on 790712:inboard Steam Isolation Valve (2E51-F001) Did Not Close When Isolation Signal Given. Caused by Valve Stem Being Galled Against Packing Follower. Stem Was Replaced
| author name =  
| author name =  
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 23:19, 23 January 2020

Forwards LER 79-069/03L-0
Date released: 09/13/2019 Download: ML19242A815


LER 79-069/03L-0 on 790712:inboard Steam Isolation Valve (2E51-F001) Did Not Close When Isolation Signal Given. Caused by Valve Stem Being Galled Against Packing Follower. Stem Was Replaced
ML19242A820
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/30/1979
From:
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242A820 (1)
Forwards LER 79-069/03L-0
ML19242A814
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/30/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242A814 (1)