ML19247B784: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19247B788
| number = ML19247B788
| issue date = 08/03/1979
| issue date = 08/03/1979
| title = Forwards LER 79-076/03L-0
| title = LER 79-076/03L-0 on 790712:QA Inspector Observed Both Air Lock Doors in Reactor Bldg Open at Same Time,Breaking Containment.Caused by Malfunction in Limit Switches on Doors Causing Momentary Alarms.Repairs Under Consideration
| author name = Nix R
| author name = Nix R
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 20:58, 23 January 2020

Forwards LER 79-076/03L-0
Date released: 09/18/2019 Download: ML19247B784


LER 79-076/03L-0 on 790712:QA Inspector Observed Both Air Lock Doors in Reactor Bldg Open at Same Time,Breaking Containment.Caused by Malfunction in Limit Switches on Doors Causing Momentary Alarms.Repairs Under Consideration
ML19247B788
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/03/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19247B788 (2)
Forwards LER 79-076/03L-0
ML19247B783
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/03/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19247B783 (1)