ML19253A847: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19253A850 | | number = ML19253A850 | ||
| issue date = 09/06/1979 | | issue date = 09/06/1979 | ||
| title = | | title = LER 79-034/03L-0:on 790824,determined That Functional Surveillance Test Had Not Been Performed on Certain Seismic Monitoring Instrumentation within Specified Time.Caused by Personnel Error.Proper Procedure re-emphasized | ||
| author name = Hairston W | | author name = Hairston W | ||
| author affiliation = ALABAMA POWER CO. | | author affiliation = ALABAMA POWER CO. |
Latest revision as of 20:02, 23 January 2020
Date released: 09/24/2019 | Download: ML19253A847 |
---|---|
ML19253A850 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 09/06/1979 |
From: | Hairston W ALABAMA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19253A850 (1) | |
ML19253A846 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 09/06/1979 |
From: | Clayton F ALABAMA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19253A846 (1) | |