ML19253C948: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19253C978
| number = ML19253C978
| issue date = 12/07/1979
| issue date = 12/07/1979
| title = Forwards LERs 79-055/03L-0 & 79-056/03L-0
| title = LER 79-056/03L-0:on 791108,20 Dysfunctional Fire Barrier Penetrations Found During QA Audit.Caused by Misinterpretation of Tech Specs by Plant Personnel. Inoperable Penetrations Repaired
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.
Line 21: Line 21:
| number = ML19253C956
| number = ML19253C956
| issue date = 12/07/1979
| issue date = 12/07/1979
| title = Forwards LERs 79-055/03L-0 & 79-056/03L-0
| title = LER 79-055/03L-0:on 791108,borated Water Vol in Boric Acid Storage Tank Fell Below Tech Spec Limit Due to Reactor Cooldown.Boric Acid Tank Concentration Was Returned to Less than 7,700 Ppm,By 771109
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.

Latest revision as of 19:16, 23 January 2020

Forwards LERs 79-055/03L-0 & 79-056/03L-0
Date released: 09/24/2019 Download: ML19253C948


LER 79-056/03L-0:on 791108,20 Dysfunctional Fire Barrier Penetrations Found During QA Audit.Caused by Misinterpretation of Tech Specs by Plant Personnel. Inoperable Penetrations Repaired
ML19253C978
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/07/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253C978 (2)
LER 79-055/03L-0:on 791108,borated Water Vol in Boric Acid Storage Tank Fell Below Tech Spec Limit Due to Reactor Cooldown.Boric Acid Tank Concentration Was Returned to Less than 7,700 Ppm,By 771109
ML19253C956
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/07/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253C956 (2)
Forwards LERs 79-055/03L-0 & 79-056/03L-0
ML19253C947
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/07/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253C947 (1)