ML19256A863: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19256A864
| number = ML19256A864
| issue date = 01/11/1979
| issue date = 01/11/1979
| title = Forwards LER 78-124/03L-0
| title = LER 78-124/03L-0 on 781216:during Surveillance testing,13 of 18 Main Steam Safety Valves Failed to Be within +/-17 of Design Setpoint,Apparently Caused by Change in Ambient Conditions
| author name = Brown R
| author name = Brown R
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 17:58, 23 January 2020

Forwards LER 78-124/03L-0
Date released: 09/27/2019 Download: ML19256A863


LER 78-124/03L-0 on 781216:during Surveillance testing,13 of 18 Main Steam Safety Valves Failed to Be within +/-17 of Design Setpoint,Apparently Caused by Change in Ambient Conditions
ML19256A864
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/11/1979
From: Brown R
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256A864 (3)
Forwards LER 78-124/03L-0
ML19256A862
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/11/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256A862 (1)