ML19259C262: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19259C265
| number = ML19259C265
| issue date = 05/30/1979
| issue date = 05/30/1979
| title = Forwards LER 79-041/01T-0
| title = LER 79-041/01T-0 on 790523:during Maint Outage,Review Indicated Solenoid on Reactor Sample Isolation Valve Did Not Have Complete Qualification Testing.Caused by Design Error. Solenoid Will Be Replaced
| author name = Greene T
| author name = Greene T
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 15:08, 23 January 2020

Forwards LER 79-041/01T-0
Date released: 09/30/2019 Download: ML19259C262


LER 79-041/01T-0 on 790523:during Maint Outage,Review Indicated Solenoid on Reactor Sample Isolation Valve Did Not Have Complete Qualification Testing.Caused by Design Error. Solenoid Will Be Replaced
ML19259C265
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/30/1979
From: Thomas Greene
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259C265 (3)
Forwards LER 79-041/01T-0
ML19259C261
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/30/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259C261 (1)