Richard A. Uderitz | 1.' | ||
Nuclear April 13, 1983 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. | Richard A. Uderitz Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609 935-6010 Vice President - | ||
COMPLETION OF SHORT TERM ACTION ITEMS REACTOR TRIP BREAKER FAILURE NO. 1 UNIT SALEM GENERATING STATION DOCKET NO. 50-272 The purpose of the.letter is to confirm the completion of all short term action items contained in our April 8, 1983 Corrective Action Program (Supplement 1). That report described PSE&G's corrective action program in detail and provided the basis for our confidence that Salem Unit 1 can be safely returned to power operation. | Nuclear April 13, 1983 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. | ||
The April 8, 1983 Corrective Action Program Report (Supple-ment 1) identified scheduled completion dates for certain short term action items that have since been completed. | 20555 Attention: | ||
Mr. Darrell G. Eisenhut, Director Division of Licensing Gentlemen: | |||
COMPLETION OF SHORT TERM ACTION ITEMS REACTOR TRIP BREAKER FAILURE NO. 1 UNIT SALEM GENERATING STATION DOCKET NO. 50-272 The purpose of the.letter is to confirm the completion of all short term action items contained in our April 8, 1983 Corrective Action Program (Supplement 1). | |||
p | That report described PSE&G's corrective action program in detail and provided the basis for our confidence that Salem Unit 1 can be safely returned to power operation. | ||
The April 8, 1983 Corrective Action Program Report (Supple-ment 1) identified scheduled completion dates for certain short term action items that have since been completed. | |||
These items were: | |||
Item B.2 Operator Training Conduct practical exercise in Control Room of revised procedures. | |||
Conduct analysis of exams with answer key. | |||
Review testing weaknesses, counsel each trainee. | |||
~~R4Al0 9-oaa2 -sao413-----. | |||
p OCK 05000272 PDR Scheduled Completion Date 4/12/83 4/07/83 4/12/83 | |||
Mr. Darrell G. Eisenhut U.S. Nuclear Regulatory Commission | Mr. Darrell G. Eisenhut U.S. Nuclear Regulatory Commission 2 - | ||
RPS indicators. | 4/13/83 Item Scheduled Completion Date Conduct walk through on alarms & | ||
Sincerely, CC: | RPS indicators. | ||
Conduct walk through audit of Equipment Operator knowledge of breaker location, type, & operation in ATWS related procedures. | |||
Distribute handouts to operators on ATWS training. | |||
C.7 Updating Vendor Supplied Information l.e) Formally index latest revision 4/12/83 4/12/83 4/12/83 5/01/83 All short term action items to be completed prior to startup have now been accomplished. | |||
Sincerely, CC: | |||
Mr. Richard w. Starostecki, Director Division of Project and Resident Program Region 1}} | |||
Latest revision as of 04:44, 6 January 2025
| ML18087A844 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 04/13/1983 |
| From: | Uderitz R Public Service Enterprise Group |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8304190382 | |
| Download: ML18087A844 (2) | |
Text
1.'
Richard A. Uderitz Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609 935-6010 Vice President -
Nuclear April 13, 1983 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. Darrell G. Eisenhut, Director Division of Licensing Gentlemen:
COMPLETION OF SHORT TERM ACTION ITEMS REACTOR TRIP BREAKER FAILURE NO. 1 UNIT SALEM GENERATING STATION DOCKET NO. 50-272 The purpose of the.letter is to confirm the completion of all short term action items contained in our April 8, 1983 Corrective Action Program (Supplement 1).
That report described PSE&G's corrective action program in detail and provided the basis for our confidence that Salem Unit 1 can be safely returned to power operation.
The April 8, 1983 Corrective Action Program Report (Supple-ment 1) identified scheduled completion dates for certain short term action items that have since been completed.
These items were:
Item B.2 Operator Training Conduct practical exercise in Control Room of revised procedures.
Conduct analysis of exams with answer key.
Review testing weaknesses, counsel each trainee.
~~R4Al0 9-oaa2 -sao413-----.
p OCK 05000272 PDR Scheduled Completion Date 4/12/83 4/07/83 4/12/83
Mr. Darrell G. Eisenhut U.S. Nuclear Regulatory Commission 2 -
4/13/83 Item Scheduled Completion Date Conduct walk through on alarms &
RPS indicators.
Conduct walk through audit of Equipment Operator knowledge of breaker location, type, & operation in ATWS related procedures.
Distribute handouts to operators on ATWS training.
C.7 Updating Vendor Supplied Information l.e) Formally index latest revision 4/12/83 4/12/83 4/12/83 5/01/83 All short term action items to be completed prior to startup have now been accomplished.
Sincerely, CC:
Mr. Richard w. Starostecki, Director Division of Project and Resident Program Region 1