{{#Wiki_filter:December 27, 2018
{{#Wiki_filter:December 27, 2018  
EA-18-173
Mr. Brad Sawatzke
EA-18-173  
Chief Executive Officer
Energy Northwest
Mr. Brad Sawatzke  
MD 1023
Chief Executive Officer  
P.O. Box 968
Energy Northwest  
Richland, WA 99352
MD 1023  
SUBJECT:         COLUMBIA GENERATING STATION - ACKNOWLEDGMENT OF RESPONSE
P.O. Box 968  
                TO NRC BASELINE INSPECTION REPORT 05000397/2018003 AND
Richland, WA 99352  
                DISPUTED NON-CITED VIOLATION
Dear Mr. Sawatzke:
SUBJECT:  
This letter acknowledges your November 29, 2018, correspondence (ML18333A389)
COLUMBIA GENERATING STATION - ACKNOWLEDGMENT OF RESPONSE  
in response to the U.S. Nuclear Regulatory Commission (NRC) Inspection
TO NRC BASELINE INSPECTION REPORT 05000397/2018003 AND  
Report 05000397/2018003 (ML18304A362), dated October 31, 2018. In the inspection report,
DISPUTED NON-CITED VIOLATION
the NRC documented a Green non-cited violation (NCV) that was the subject of your response:
NCV 05000397/2018003-02, Green NCV of Technical Specification 5.7.2 for failure to control
Dear Mr. Sawatzke:  
workers in a high radiation area exceeding 1.0 rem/hr. The cover letter to the inspection report
requested you to respond in writing within 30 days if you contested any of the violations.
This letter acknowledges your November 29, 2018, correspondence (ML18333A389)
On November 29, 2018, the NRC received a letter from you contesting this NCV. The NRC is
in response to the U.S. Nuclear Regulatory Commission (NRC) Inspection
currently reviewing your basis for contesting the violation in accordance with Section 2.2.7 of the
Report 05000397/2018003 (ML18304A362), dated October 31, 2018. In the inspection report,  
Enforcement Manual. Accordingly, we will provide the results of our evaluations by written
the NRC documented a Green non-cited violation (NCV) that was the subject of your response:
response within 90 days of the receipt of your letter.
NCV 05000397/2018003-02, Green NCV of Technical Specification 5.7.2 for failure to control  
This letter, its enclosure, and your response (if any) will be made available for public inspection
workers in a high radiation area exceeding 1.0 rem/hr. The cover letter to the inspection report  
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
requested you to respond in writing within 30 days if you contested any of the violations.  
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Withholding.
On November 29, 2018, the NRC received a letter from you contesting this NCV. The NRC is  
                                                Sincerely,
currently reviewing your basis for contesting the violation in accordance with Section 2.2.7 of the  
                                                /RA/
Enforcement Manual. Accordingly, we will provide the results of our evaluations by written  
                                                Heather J. Gepford, Chief
response within 90 days of the receipt of your letter.  
                                                Plant Support Branch 2
                                                Division of Reactor Safety
This letter, its enclosure, and your response (if any) will be made available for public inspection  
Docket No. 50-397
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document  
License No. NPF-21
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for  
cc: Electronic Distribution
Withholding.  
Sincerely,  
/RA/  
Heather J. Gepford, Chief
Plant Support Branch 2  
Division of Reactor Safety  
Docket No. 50-397  
License No. NPF-21  
cc: Electronic Distribution  




ML18361A865
  ML18361A865  
  SUNSI Review         ADAMS:           Non-Publicly Available       Non-Sensitive     Keyword:
  SUNSI Review  
  By: HJG             Yes  No        Publicly Available           Sensitive           NRC-002
ADAMS:  
OFFICE       C:PSB2       C:DRP/A       C:PSB2           D:DRS             C:PSB2
Non-Publicly Available  
  NAME         HGepford     MHaire         HGepford         MShaffer           HGepford
Non-Sensitive  
  SIGNATURE         /RA/         /RA/           /RA/         /RA REL for/       /RA/
Keyword:
  DATE           12/21/2018   12/21/2018     12/21/2018         12/27/2018     12/27/2018
By: HJG  
Yes     No
  Publicly Available  
Sensitive
    NRC-002  
OFFICE  
C:PSB2  
C:DRP/A  
C:PSB2  
D:DRS  
C:PSB2  
   
NAME  
HGepford  
MHaire  
HGepford  
MShaffer  
HGepford  
   
SIGNATURE  
/RA/  
/RA/  
/RA/  
/RA REL for/  
/RA/  
   
DATE  
12/21/2018  
12/21/2018  
12/21/2018  
12/27/2018  
12/27/2018
}}
}}

Latest revision as of 06:54, 5 January 2025

Acknowledgement of Response to NRC Baseline Inspection Report 05000397/2018003 and Disputed Non-Cited Violation
ML18361A865
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/27/2018
From: Heather Gepford
NRC/RGN-IV/DRS/PSB-2
To: Sawatzke B
Energy Northwest
Gepford H
References
EA-18-173 IR 2018003
Download: ML18361A865 (2)


See also: IR 05000397/2018003

Text

December 27, 2018

EA-18-173

Mr. Brad Sawatzke

Chief Executive Officer

Energy Northwest

MD 1023

P.O. Box 968

Richland, WA 99352

SUBJECT:

COLUMBIA GENERATING STATION - ACKNOWLEDGMENT OF RESPONSE

TO NRC BASELINE INSPECTION REPORT 05000397/2018003 AND

DISPUTED NON-CITED VIOLATION

Dear Mr. Sawatzke:

This letter acknowledges your November 29, 2018, correspondence (ML18333A389)

in response to the U.S. Nuclear Regulatory Commission (NRC) Inspection

Report 05000397/2018003 (ML18304A362), dated October 31, 2018. In the inspection report,

the NRC documented a Green non-cited violation (NCV) that was the subject of your response:

NCV 05000397/2018003-02, Green NCV of Technical Specification 5.7.2 for failure to control

workers in a high radiation area exceeding 1.0 rem/hr. The cover letter to the inspection report

requested you to respond in writing within 30 days if you contested any of the violations.

On November 29, 2018, the NRC received a letter from you contesting this NCV. The NRC is

currently reviewing your basis for contesting the violation in accordance with Section 2.2.7 of the

Enforcement Manual. Accordingly, we will provide the results of our evaluations by written

response within 90 days of the receipt of your letter.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Heather J. Gepford, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No. 50-397

License No. NPF-21

cc: Electronic Distribution

ML18361A865

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: HJG

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

C:PSB2

C:DRP/A

C:PSB2

D:DRS

C:PSB2

NAME

HGepford

MHaire

HGepford

MShaffer

HGepford

SIGNATURE

/RA/

/RA/

/RA/

/RA REL for/

/RA/

DATE

12/21/2018

12/21/2018

12/21/2018

12/27/2018

12/27/2018