LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP): Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
{{#Wiki_filter:SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. | {{#Wiki_filter:SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. | ||
Letter, Decontrolled When Separated From Enclosure. | Letter, Decontrolled When Separated From Enclosure. | ||
Omaha Public Power District | Omaha Public Power District March 28, 2019 LIC-19-0004 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 Fort Calhoun Station Independent Spent Fuel Storage Installation NRC Docket No. 72-054 10 CFR 50.54(p) 10 CFR 72.186(b) | ||
March 28, 2019 LIC-19-0004 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 Fort Calhoun Station Independent Spent Fuel Storage Installation NRC Docket No. 72-054 | |||
==Subject:== | ==Subject:== | ||
| Line 27: | Line 26: | ||
Revision 5 of the FCS Protective Strategy incorporates the removal of the Early Warning System (EWS) in relation to the Protective Strategy. | Revision 5 of the FCS Protective Strategy incorporates the removal of the Early Warning System (EWS) in relation to the Protective Strategy. | ||
A supporting narrative is in this submittal to help detail the changes made to the PSP and the Protective Strategy. The changes were evaluated and do not reduce the effectiveness of the FCS PSP. A change table is also included for the PSP and the Protective Strategy. | A supporting narrative is in this submittal to help detail the changes made to the PSP and the Protective Strategy. The changes were evaluated and do not reduce the effectiveness of the FCS PSP. A change table is also included for the PSP and the Protective Strategy. | ||
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Letter Decontrolled When Separated From Enclosure | SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Letter Decontrolled When Separated From Enclosure | ||
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Letter, Decontrolled When Separated From Enclosure U.S. Nuclear Regulatory Commission LIC-19-0004 Page 2 This letter contains no regulatory commitments. | SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Letter, Decontrolled When Separated From Enclosure U.S. Nuclear Regulatory Commission LIC-19-0004 Page 2 This letter contains no regulatory commitments. | ||
| Line 34: | Line 33: | ||
No commitments to the NRC are made in this letter. | No commitments to the NRC are made in this letter. | ||
Respectfully, 1--- /;7!/~ | Respectfully, 1--- /;7!/~ | ||
Timothy S. U~~g | Timothy S. U~~g / | ||
Senior Director, FCS Decommissioning TSU/cac | Senior Director, FCS Decommissioning TSU/cac | ||
==Enclosures:== | ==Enclosures:== | ||
: 1. FCS Physical Security Plan Rev 4 (CD - Safeguards Information) | : 1. | ||
: 2. The 10 CFR 50.54(p) screening evaluation (Security Related Information-Withhold under 10 CFR 2.390) c: | FCS Physical Security Plan Rev 4 (CD - Safeguards Information) | ||
: 2. | |||
The 10 CFR 50.54(p) screening evaluation (Security Related Information-Withhold under 10 CFR 2.390) c: | |||
S. A. Morris, NRC Regional Administrator, Region IV M. C. Layton, NRC Director, Division of Spent Fuel Management J. D. Parrott, NRC Senior Project Manager (w/o enclosures) | |||
C. D. Steely, NRC Health Physicist, Region IV (w/o enclosures) | C. D. Steely, NRC Health Physicist, Region IV (w/o enclosures) | ||
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Letter, Decontrolled When Separated From Enclosure}} | SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Letter, Decontrolled When Separated From Enclosure}} | ||
Latest revision as of 04:02, 5 January 2025
| ML19087A124 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 03/28/2019 |
| From: | Uehling T Omaha Public Power District |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| LIC-19-0004 | |
| Download: ML19087A124 (2) | |
Text
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information.
Letter, Decontrolled When Separated From Enclosure.
Omaha Public Power District March 28, 2019 LIC-19-0004 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 Fort Calhoun Station Independent Spent Fuel Storage Installation NRC Docket No.72-054 10 CFR 50.54(p) 10 CFR 72.186(b)
Subject:
Submittal of Revision 4 to the Fort Calhoun Station (FCS), Physical Security Plan (PSP)
The Omaha Public Power District (OPPD) hereby provides the U.S. Nuclear Regulatory Commission (NRC) with a copy of Revision 4 to the FCS Physical Security Plan (PSP).
Revision 4 of the PSP incorporated removal of the Early Warning System (EWS) and physical site configuration changes within the Owner Controlled Area.
Revision 5 of the FCS Protective Strategy incorporates the removal of the Early Warning System (EWS) in relation to the Protective Strategy.
A supporting narrative is in this submittal to help detail the changes made to the PSP and the Protective Strategy. The changes were evaluated and do not reduce the effectiveness of the FCS PSP. A change table is also included for the PSP and the Protective Strategy.
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Letter Decontrolled When Separated From Enclosure
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Letter, Decontrolled When Separated From Enclosure U.S. Nuclear Regulatory Commission LIC-19-0004 Page 2 This letter contains no regulatory commitments.
The enclosed compact disk (CD) contains Safeguards Information and must be controlled in accordance with 10 CFR 73.21.
If you should have any questions, please contact Mr. Bradley H. Blome at 402-533-6041.
No commitments to the NRC are made in this letter.
Respectfully, 1--- /;7!/~
Timothy S. U~~g /
Senior Director, FCS Decommissioning TSU/cac
Enclosures:
- 1.
FCS Physical Security Plan Rev 4 (CD - Safeguards Information)
- 2.
The 10 CFR 50.54(p) screening evaluation (Security Related Information-Withhold under 10 CFR 2.390) c:
S. A. Morris, NRC Regional Administrator, Region IV M. C. Layton, NRC Director, Division of Spent Fuel Management J. D. Parrott, NRC Senior Project Manager (w/o enclosures)
C. D. Steely, NRC Health Physicist, Region IV (w/o enclosures)
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Letter, Decontrolled When Separated From Enclosure