ML19092A184: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 20: | Line 20: | ||
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | ||
* Title: Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | * | ||
==Title:== | |||
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | |||
* Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | * Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | ||
* Dates: The effective date of this rule is 60 days after publication. | * Dates: The effective date of this rule is 60 days after publication. | ||
Line 38: | Line 41: | ||
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | ||
* Title: Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | * | ||
==Title:== | |||
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | |||
* Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | * Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | ||
* Dates: The effective date of this rule is 60 days after publication. | * Dates: The effective date of this rule is 60 days after publication. | ||
Line 57: | Line 63: | ||
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | ||
* Title: Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | * | ||
==Title:== | |||
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | |||
* Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | * Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | ||
* Dates: The effective date of this rule is 60 days after publication. | * Dates: The effective date of this rule is 60 days after publication. | ||
Line 75: | Line 84: | ||
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | ||
* Title: Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | * | ||
==Title:== | |||
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | |||
* Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | * Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | ||
* Dates: The effective date of this rule is 60 days after publication. | * Dates: The effective date of this rule is 60 days after publication. | ||
Line 93: | Line 105: | ||
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | ||
* Title: Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | * | ||
==Title:== | |||
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | |||
* Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | * Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | ||
* Dates: The effective date of this rule is 60 days after publication. | * Dates: The effective date of this rule is 60 days after publication. | ||
Line 111: | Line 126: | ||
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | ||
* Title: Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | * | ||
==Title:== | |||
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | |||
* Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | * Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | ||
* Dates: The effective date of this rule is 60 days after publication. | * Dates: The effective date of this rule is 60 days after publication. | ||
Line 129: | Line 147: | ||
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | ||
* Title: Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | * | ||
==Title:== | |||
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | |||
* Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | * Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | ||
* Dates: The effective date of this rule is 60 days after publication. | * Dates: The effective date of this rule is 60 days after publication. | ||
Line 147: | Line 168: | ||
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | ||
* Title: Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | * | ||
==Title:== | |||
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | |||
* Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | * Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | ||
* Dates: The effective date of this rule is 60 days after publication. | * Dates: The effective date of this rule is 60 days after publication. | ||
Line 165: | Line 189: | ||
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register: | ||
* Title: Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | * | ||
==Title:== | |||
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019. | |||
* Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | * Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees. | ||
* Dates: The effective date of this rule is 60 days after publication. | * Dates: The effective date of this rule is 60 days after publication. |
Revision as of 04:24, 30 November 2019
ML19092A184 | |
Person / Time | |
---|---|
Issue date: | 05/17/2019 |
From: | Eugene Dacus Office of Congressional Affairs |
To: | Alexander L, Barrasso J, Braun M, Kaptur M, Lowey N, Pallone F, Rush B, Shelby R, Tonko P US HR, Comm on Appropriations, US HR, Comm on Energy & Commerce, US HR, Subcomm on Energy, US HR, Subcomm on Energy & Water Development, US HR, Subcomm on Environment and Climate Change, US SEN, Comm on Appropriations, US SEN, Comm on Environment & Public Works, US SEN, Subcomm on Clean Air & Nuclear Safety, US SEN, Subcomm on Energy & Water Development |
kjd1 | |
References | |
Download: ML19092A184 (10) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 17, 2019 The Honorable John A. Barrasso Chairman, Committee on Environment and Public Works United States Senate Washington, DC 20510
Dear Mr. Chairman:
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register:
Title:
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019.
- Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees.
- Dates: The effective date of this rule is 60 days after publication.
- This is a major rule as defined by the Congressional Review Act.
For more information, see the enclosed document. Please contact me at 301-415-1776 if you have questions or need more information.
Sincerely,
/RA/
Eugene Dacus, Director Office of Congressional Affairs
Enclosure:
Federal Register notice cc: Senator Thomas R. Carper
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 17, 2019 The Honorable Mike Braun Chairman, Subcommittee on Clean Air and Nuclear Safety Committee on Environment and Public Works United States Senate Washington, DC 20510
Dear Mr. Chairman:
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register:
Title:
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019.
- Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees.
- Dates: The effective date of this rule is 60 days after publication.
- This is a major rule as defined by the Congressional Review Act.
For more information, see the enclosed document. Please contact me at 301-415-1776 if you have questions or need more information.
Sincerely,
/RA/
Eugene Dacus, Director Office of Congressional Affairs
Enclosure:
Federal Register notice cc: Senator Sheldon Whitehouse
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 17, 2019 The Honorable Frank Pallone, Jr.
Chairman, Committee on Energy and Commerce United States House of Representatives Washington, DC 20515
Dear Mr. Chairman:
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register:
Title:
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019.
- Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees.
- Dates: The effective date of this rule is 60 days after publication.
- This is a major rule as defined by the Congressional Review Act.
For more information, see the enclosed document. Please contact me at 301-415-1776 if you have questions or need more information.
Sincerely,
/RA/
Eugene Dacus, Director Office of Congressional Affairs
Enclosure:
Federal Register notice cc: Representative Greg Walden
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 17, 2019 The Honorable Bobby L. Rush Chairman, Subcommittee on Energy Committee on Energy and Commerce United States House of Representatives Washington, DC 20515
Dear Mr. Chairman:
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register:
Title:
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019.
- Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees.
- Dates: The effective date of this rule is 60 days after publication.
- This is a major rule as defined by the Congressional Review Act.
For more information, see the enclosed document. Please contact me at 301-415-1776 if you have questions or need more information.
Sincerely,
/RA/
Eugene Dacus, Director Office of Congressional Affairs
Enclosure:
Federal Register notice cc: Representative Fred Upton
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 17, 2019 The Honorable Paul Tonko Chairman, Subcommittee on Environment and Climate Change Committee on Energy and Commerce United States House of Representatives Washington, DC 20515
Dear Mr. Chairman:
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register:
Title:
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019.
- Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees.
- Dates: The effective date of this rule is 60 days after publication.
- This is a major rule as defined by the Congressional Review Act.
For more information, see the enclosed document. Please contact me at 301-415-1776 if you have questions or need more information.
Sincerely,
/RA/
Eugene Dacus, Director Office of Congressional Affairs
Enclosure:
Federal Register notice cc: Representative John Shimkus
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 17, 2019 The Honorable Nita Lowey Chairman, Committee on Appropriations United States House of Representatives Washington, DC 20515
Dear Madam Chairwoman:
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register:
Title:
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019.
- Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees.
- Dates: The effective date of this rule is 60 days after publication.
- This is a major rule as defined by the Congressional Review Act.
For more information, see the enclosed document. Please contact me at 301-415-1776 if you have questions or need more information.
Sincerely,
/RA/
Eugene Dacus, Director Office of Congressional Affairs
Enclosure:
Federal Register notice cc: Representative Kay Granger
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 17, 2019 The Honorable Richard Shelby Chairman, Committee on Appropriations United States Senate Washington, DC 20510
Dear Mr. Chairman:
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register:
Title:
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019.
- Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees.
- Dates: The effective date of this rule is 60 days after publication.
- This is a major rule as defined by the Congressional Review Act.
For more information, see the enclosed document. Please contact me at 301-415-1776 if you have questions or need more information.
Sincerely,
/RA/
Eugene Dacus, Director Office of Congressional Affairs
Enclosure:
Federal Register notice cc: Senator Patrick Leahy
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 17, 2019 The Honorable Marcy Kaptur Chairman, Subcommittee on Energy and Water Development Committee on Appropriations United States House of Representatives Washington, DC 20515
Dear Madam Chairwoman:
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register:
Title:
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019.
- Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees.
- Dates: The effective date of this rule is 60 days after publication.
- This is a major rule as defined by the Congressional Review Act.
For more information, see the enclosed document. Please contact me at 301-415-1776 if you have questions or need more information.
Sincerely,
/RA/
Eugene Dacus, Director Office of Congressional Affairs
Enclosure:
Federal Register notice cc: Representative Mike Simpson
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 17, 2019 The Honorable Lamar Alexander Chairman, Subcommittee on Energy and Water Development Committee on Appropriations United States Senate Washington, DC 20510
Dear Mr. Chairman:
The U.S. Nuclear Regulatory Commission (NRC) is publishing the following document in the Federal Register:
Title:
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019.
- Description of the document: This final rule amends the NRCs licensing inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended, which requires the NRC to recover approximately 90 percent of its annual budget through fees.
- Dates: The effective date of this rule is 60 days after publication.
- This is a major rule as defined by the Congressional Review Act.
For more information, see the enclosed document. Please contact me at 301-415-1776 if you have questions or need more information.
Sincerely,
/RA/
Eugene Dacus, Director Office of Congressional Affairs
Enclosure:
Federal Register notice cc: Senator Dianne Feinstein
ML19092A184 *via e-mail CFO-0009 OFFICE OCFO/DOB/LFPT OCFO/DOB/LFPT OCFO/DOB/LFPT NMSS/DRM/RASB OCFO/DOB NAME JJacobs WBlaney ARossi CBladey* RAllwein (JShepherd-Vladimir for)
DATE 4/2/2019 4/3/2019 4/4/2019 4/10/2019 4/16/2019 OFFICE OCFO/DOB DCFO CFO OCA NAME SCoffin LBFicks MEWylie EDacus DATE 4/17/2019 04/25/19 04/26/19 05/17/19