{{#Wiki_filter:DCS No.: 0500027107162008 Date: 07/16/2008 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE
{{#Wiki_filter:DCS No.: 0500027107162008                                                           Date: 07/16/2008 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-1-08-009A This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region I staff on this date.
- PNO-1-08-009A This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public  
Facility                                                 Licensee Emergency Classification Entergy Nuclear Operations, Inc.                             Notification of Unusual Event Vermont Yankee Nuclear Power Station, Unit 1                 Alert Brattleboro, VT                                               Site Area Emergency Docket No.: 50-271                                           General Emergency License No.: DPR-28                                       X Not Applicable
 
interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region I staff on this date.
Facility Entergy Nuclear Operations, Inc.
 
Vermont Yankee Nuclear Power Station, Unit 1  
 
Brattleboro, VT
 
Docket No.: 50-271  
 
License No.: DPR-28 Licensee Emergency Classification Notification of Unusual Event Alert        Site Area Emergency General Emergency  X   Not Applicable                


==SUBJECT:==
==SUBJECT:==
UPDATE - WATER LEAK IN A COOLING TOWER AT VERMONT YANKEE  
UPDATE - WATER LEAK IN A COOLING TOWER AT VERMONT YANKEE Entergy returned Vermont Yankees west cooling tower to service at approximately 4:25 a.m. on Wednesday, July 16. Entergy had removed the east and west towers from service on July 11, 2008, following the discovery of a 60 gpm leak in cell 1-1 in the east tower. The leak was attributed to a broken horizontal pipe support located directly beneath the pipe. The towers were removed from service to allow for extent of condition inspections and repairs.
 
An NRC special inspection team (SIT) was established in response to the July 11, 2008, leak.
Entergy returned Vermont Yankee's west cooling tower to service at approximately 4:25 a.m. on  
The team, which arrived on site on Monday, July 14, has completed its near-term review of the safety-related cooling tower cell (2-1) and the adjacent, seismically-qualified cell (2-2). The team reviewed the preliminary cause of the July 11 failure in cell 1-1 and ensured, through hands-on inspection, that similar degraded conditions do not exist in cells 2-1 and 2-2. The team reviewed all deficiencies identified by the licensee in cells 2-1 and 2-2 and confirmed that appropriate corrective actions were implemented. For example, the licensee replaced cracked boards, and replaced a horizontal support structure that was not in accordance with the plant drawings. Additionally, the team performed an independent structural inspection of cells 2-1 and 2-2. The team has determined that there are no conditions challenging the operability of these cells.
 
The NRC has communicated these initial SIT results to state representatives from Vermont, New Hampshire, and Massachusetts.
Wednesday, July 16. Entergy had removed the eas t and west towers from service on July 11, 2008, following the discovery of a 60 gpm leak in cell 1-1 in the east tower. The leak was  
The information presented herein has been discussed with Entergy and is current as of July 16, 2008, at 8:00 a.m.
 
This preliminary notification is being issued for information only.
attributed to a broken horizontal pipe support located directly beneath the pipe. The towers  
ADAMS Accession Number: ML081980107 Contacts:       B. Norris                     N. Sieller (610) 337-5111               (610) 337-5380 barry.norris@nrc.gov         nicole.sieller@nrc.gov
 
were removed from service to allow for extent of condition inspections and repairs.  
 
An NRC special inspection team (SIT) was established in response to the July 11, 2008, leak.
 
The team, which arrived on site on Monday, July 14, has completed its near-term review of the  
 
safety-related cooling tower cell (2-1) and the adjacent, seismically-qualified cell (2-2). The team reviewed the preliminary cause of the July 11 failure in cell 1-1 and ensured, through hands-on inspection, that similar degraded conditions do not exist in cells 2-1 and 2-2. The  
 
team reviewed all deficiencies identified by the licensee in cells 2-1 and 2-2 and confirmed that  
 
appropriate corrective actions were implemented.
For example, the licensee replaced cracked boards, and replaced a horizontal support structure that was not in accordance with the plant  
 
drawings. Additionally, the team performed an independent structural inspection of cells 2-1  
 
and 2-2. The team has determined that there are no conditions challenging the operability of  
 
these cells.
 
The NRC has communicated these initial SIT results to state representatives from Vermont, New Hampshire, and Massachusetts.  
 
The information presented herein has been discussed with Entergy and is current as of July 16, 2008, at 8:00 a.m.  
 
This preliminary notification is being issued for information only.  
 
ADAMS Accession Number: ML081980107                    
 
Contacts: B. Norris   N. Sieller (610) 337-5111 (610) 337-5380 barry.norris@nrc.gov nicole.sieller@nrc.gov  


DISTRIBUTIONS:
DISTRIBUTIONS:
BY E-MAIL:  
BY E-MAIL:
 
Chairman Klein Comm. Jaczko Comm. Lyons Comm. Svinicki OIP OCA OGC EDO OE NRR NMSS OIG RES ACRS FSME NRO NSIR OPA SECY Regional Offices Commonwealth of Massachusetts State of Vermont State of New Hampshire BY FAX:
Chairman Klein Comm. Jaczko  
DOT:Trans INPO NSAC RI Resident Office Licensee:               Entergy Nuclear Operations, Inc.
 
Vermont Yankee Region I Form 83 (Rev. Nov. 21, 2006)
Comm. Lyons Comm. Svinicki  
SUNSI Review Complete: BN                               (Reviewer=s Initials)
 
ML081980107 DOCUMENT NAME: G:\DRP\PNs\PNO-I-08-009A - VY SIT on Cooling Towers bn.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
OIP OCA OGC EDO OE NRR NMSS OIG RES ACRS FSME NRO NSIR OPA SECY Regional Offices  
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE              RI/DRP                         RI/PAO                         RI/SLO                       RI/DRP NAME                BNorris/BN                     DScrenci/DS                   NMcNamera /NM J Clifford/DCL for DATE               07/16/08                       07/16/08                       07/16/08                     07/16/08 OFFICIAL RECORD COPY}}
 
Commonwealth of Massachusetts  
 
State of Vermont  
 
State of New Hampshire  
 
BY FAX:
DOT:Trans  
 
INPO NSAC RI Resident Office Licensee:
Entergy Nuclear Operations, Inc.
Vermont Yankee Region I Form 83 (Rev. Nov. 21, 2006)
 
SUNSI Review Complete:
BN     (Reviewer
=s Initials)     ML081980107 DOCUMENT NAME: G:\DRP\PNs\PNO-I-08-009A - VY SIT on Cooling Towers bn.doc After declaring this document A An Official Agency Record
@ it will be released to the Public. To receive a copy of this document, indicate in the box:
" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure   " N" = No copy
 
O FFICE R I/DRP R I/PAO R I/SLO R I/DRP   N AME B Norris/BN  
 
D Screnci/DS
 
N McNamera /NM
 
J Clifford/DCL for
 
DATE 07/16/08 07/16/08 07/16/08 07/16/08 OFFICIAL RECORD COPY}}


{{PNO-Nav|region=I}}
{{PNO-Nav|region=I}}

Latest revision as of 15:56, 14 November 2019

PNO-I-08-009A: Vermont Yankee, Update - Water Leak in a Cooling Tower
ML081980107
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/16/2008
From: Norris B
NRC/RGN-I/DRP/PB5
To:
NORRIS, B
References
PNO-I-08-009A
Download: ML081980107 (2)


DCS No.: 0500027107162008 Date: 07/16/2008 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-1-08-009A This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region I staff on this date.

Facility Licensee Emergency Classification Entergy Nuclear Operations, Inc. Notification of Unusual Event Vermont Yankee Nuclear Power Station, Unit 1 Alert Brattleboro, VT Site Area Emergency Docket No.: 50-271 General Emergency License No.: DPR-28 X Not Applicable

SUBJECT:

UPDATE - WATER LEAK IN A COOLING TOWER AT VERMONT YANKEE Entergy returned Vermont Yankees west cooling tower to service at approximately 4:25 a.m. on Wednesday, July 16. Entergy had removed the east and west towers from service on July 11, 2008, following the discovery of a 60 gpm leak in cell 1-1 in the east tower. The leak was attributed to a broken horizontal pipe support located directly beneath the pipe. The towers were removed from service to allow for extent of condition inspections and repairs.

An NRC special inspection team (SIT) was established in response to the July 11, 2008, leak.

The team, which arrived on site on Monday, July 14, has completed its near-term review of the safety-related cooling tower cell (2-1) and the adjacent, seismically-qualified cell (2-2). The team reviewed the preliminary cause of the July 11 failure in cell 1-1 and ensured, through hands-on inspection, that similar degraded conditions do not exist in cells 2-1 and 2-2. The team reviewed all deficiencies identified by the licensee in cells 2-1 and 2-2 and confirmed that appropriate corrective actions were implemented. For example, the licensee replaced cracked boards, and replaced a horizontal support structure that was not in accordance with the plant drawings. Additionally, the team performed an independent structural inspection of cells 2-1 and 2-2. The team has determined that there are no conditions challenging the operability of these cells.

The NRC has communicated these initial SIT results to state representatives from Vermont, New Hampshire, and Massachusetts.

The information presented herein has been discussed with Entergy and is current as of July 16, 2008, at 8:00 a.m.

This preliminary notification is being issued for information only.

ADAMS Accession Number: ML081980107 Contacts: B. Norris N. Sieller (610) 337-5111 (610) 337-5380 barry.norris@nrc.gov nicole.sieller@nrc.gov

DISTRIBUTIONS:

BY E-MAIL:

Chairman Klein Comm. Jaczko Comm. Lyons Comm. Svinicki OIP OCA OGC EDO OE NRR NMSS OIG RES ACRS FSME NRO NSIR OPA SECY Regional Offices Commonwealth of Massachusetts State of Vermont State of New Hampshire BY FAX:

DOT:Trans INPO NSAC RI Resident Office Licensee: Entergy Nuclear Operations, Inc.

Vermont Yankee Region I Form 83 (Rev. Nov. 21, 2006)

SUNSI Review Complete: BN (Reviewer=s Initials)

ML081980107 DOCUMENT NAME: G:\DRP\PNs\PNO-I-08-009A - VY SIT on Cooling Towers bn.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/PAO RI/SLO RI/DRP NAME BNorris/BN DScrenci/DS NMcNamera /NM J Clifford/DCL for DATE 07/16/08 07/16/08 07/16/08 07/16/08 OFFICIAL RECORD COPY