ML19208A098: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19208A099
| number = ML19208A099
| issue date = 09/06/1979
| issue date = 09/06/1979
| title = Forwards LER 79-104/01T-0
| title = LER 79-104/01T-0:on 790823,feeder Breakers to Several Electrical Penetrations Found Not Set to Protect Penetration Integrity for Range of Faults.Caused by Design Problem
| author name = Cartwright W
| author name = Cartwright W
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)

Latest revision as of 08:40, 24 January 2020

Forwards LER 79-104/01T-0
Date released: 08/10/2019 Download: ML19208A098


LER 79-104/01T-0:on 790823,feeder Breakers to Several Electrical Penetrations Found Not Set to Protect Penetration Integrity for Range of Faults.Caused by Design Problem
ML19208A099
Person / Time
Site: North Anna Dominion icon.png
Issue date: 09/06/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19208A099 (2)
Forwards LER 79-104/01T-0
ML19208A097
Person / Time
Site: North Anna Dominion icon.png
Issue date: 09/10/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19208A097 (1)