ML19209B778: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19209B782
| number = ML19209B782
| issue date = 10/05/1979
| issue date = 10/05/1979
| title = Forwards LER 79-021/01T-4
| title = LER 79-021/01T-4:on 790412,found Certain Pipe Hangers Would Not Meet Structural Code Safety Margins.Caused by Inadequate Design Control.Adequacy of All Pipe Hanger Assemblies Has Been Verified
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.

Latest revision as of 06:29, 24 January 2020

Forwards LER 79-021/01T-4
Date released: 08/11/2019 Download: ML19209B778


LER 79-021/01T-4:on 790412,found Certain Pipe Hangers Would Not Meet Structural Code Safety Margins.Caused by Inadequate Design Control.Adequacy of All Pipe Hanger Assemblies Has Been Verified
ML19209B782
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/05/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209B782 (4)
Forwards LER 79-021/01T-4
ML19209B777
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/05/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209B777 (1)