ML19209C678: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19209C683 | | number = ML19209C683 | ||
| issue date = 10/10/1979 | | issue date = 10/10/1979 | ||
| title = | | title = LER 79-036/03L-0:on 790910,during Surveillance Testing, Loophandling Sys Infection Pump 1A Did Not Develop Required Recirculation Flow.Caused by Introduction of Fire Hose Nozzle Into Pump Line.Piping Will Be Inspected | ||
| author name = Werling J | | author name = Werling J | ||
| author affiliation = DUQUESNE LIGHT CO. | | author affiliation = DUQUESNE LIGHT CO. |
Latest revision as of 07:12, 24 January 2020
Date released: 08/11/2019 | Download: ML19209C678 |
---|---|
ML19209C683 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 10/10/1979 |
From: | Werling J DUQUESNE LIGHT CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
Download: ML19209C683 (1) | |
ML19209C677 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 10/10/1979 |
From: | Werling J DUQUESNE LIGHT CO. |
To: | GRIER B H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
Download: ML19209C677 (2) | |