ML19210A707: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19210A708 | | number = ML19210A708 | ||
| issue date = 05/16/1978 | | issue date = 05/16/1978 | ||
| title = | | title = Tech Spec Change Request 80 Supporting Licensee Request to Change DPR-50,App a Re Revision to Accomodate Measured Cycle 4 Power Peaks Not Meeting Acceptance Criteria of 7.5% on Total Peak | ||
| author name = Herbein J | | author name = Herbein J | ||
| author affiliation = METROPOLITAN EDISON CO. | | author affiliation = METROPOLITAN EDISON CO. |
Latest revision as of 05:58, 24 January 2020
Date released: 08/12/2019 | Download: ML19210A707 |
---|---|
ML19210A708 | |
Person / Time | |
---|---|
Site: | Three Mile Island |
Issue date: | 05/16/1978 |
From: | Herbein J METROPOLITAN EDISON CO. |
To: | |
References | |
Download: ML19210A708 (9) | |