ML19211C727: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19211C728
| number = ML19211C728
| issue date = 01/08/1980
| issue date = 01/08/1980
| title = Forwards LER 79-130/03L-0
| title = LER 79-130/03L-0:on 791227,insufficient Clearance Discovered Between RCS Hot Leg & Pipe Whip Restraint Shims.Caused by Bechtel Design Error.Pipe Whip Restraints Modified
| author name =  
| author name =  
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 01:17, 24 January 2020

Forwards LER 79-130/03L-0
Date released: 08/13/2019 Download: ML19211C727


LER 79-130/03L-0:on 791227,insufficient Clearance Discovered Between RCS Hot Leg & Pipe Whip Restraint Shims.Caused by Bechtel Design Error.Pipe Whip Restraints Modified
ML19211C728
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1980
From:
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19211C728 (2)
Forwards LER 79-130/03L-0
ML19211C726
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19211C726 (1)