ML19191A246: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:26450 Federal Register/Vol. 84, No. 109/Thursday, June 6, 2019/Notices White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.  
{{#Wiki_filter:NRR-DRMAPEm Resource From:                            Wunder, George Sent:                            Wednesday, July 3, 2019 12:22 PM To:                              rrickman@terrestrialusa.com Cc:                             Hill, Leslie
*NRCs Clearance Officer:
A copy of the collection of information and related


instructions may be obtained without
==Subject:==
FEDERAL EGISTER NOTICE Attachments:                    2019-11855.pdf The Nuclear Regulatory Commission recently published a Federal Register Notice announcing our intent to submit information collection requests to the Office of Management and Budget (OMB) for Pre-application Interactions with Prospective Part 52 Applicants for Nuclear Power Plant Licenses. A supporting statement describing the requested information and burden estimates are available at http://regulations.gov by searching docket NRC-2019-0109.
As a potential respondent to this information collection, we are interested in your feedback. Specifically, we are seeking input on the following questions by August 5, 2019:
: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions?
Does the information have practical utility?
: 2. Is the burden estimate accurate?
: 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected?
: 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology?
Comments can be submitted by going to http://www.regulations.gov and searching for Docket No.
NRC-2019-0109. Please note that comments will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed.
1


charge by contacting the NRCs
Hearing Identifier:        NRR_DRMA Email Number:              103 Mail Envelope Properties        (BYAPR09MB26966107CC78A5BA6BBDA029F9FB0)


Clearance Officer, David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone:  
==Subject:==
FEDERAL EGISTER NOTICE Sent Date:                7/3/2019 12:21:33 PM Received Date:            7/3/2019 12:21:00 PM From:                      Wunder, George Created By:                George.Wunder@nrc.gov Recipients:
"Hill, Leslie" <Leslie.Hill@nrc.gov>
Tracking Status: None "rrickman@terrestrialusa.com" <rrickman@terrestrialusa.com>
Tracking Status: None Post Office:              BYAPR09MB2696.namprd09.prod.outlook.com Files                            Size                  Date & Time MESSAGE                          1482                  7/3/2019 12:21:00 PM 2019-11855.pdf                            221001 Options Priority:                        Standard Return Notification:              No Reply Requested:                  No Sensitivity:                      Normal Expiration Date:
Recipients Received:             ZZZ


301-415-2084; email:
26450                          Federal Register / Vol. 84, No. 109 / Thursday, June 6, 2019 / Notices White Flint North, 11555 Rockville                      application for a combined license,                   so, but the Commission is able to ensure Pike, Rockville, Maryland 20852.                        construction permit, operating license,               consideration only for comments
 
* NRCs Clearance Officer: A copy of                  operating license renewal, early site                 received on or before this date.
INFOCOLLECTS.Resource@NRC.GOV.
the collection of information and related              permit, design certification,                         ADDRESSES: You may submit comments instructions may be obtained without                    decommissioning or license termination                 by any of the following methods:
B. Submitting Comments The NRC cautions you not to include identifying or contact information in
charge by contacting the NRCs                          review, or manufacturing license, or
 
* Federal Rulemaking Website: Go to Clearance Officer, David Cullison,                      upon submittal of a petition for                       http://www.regulations.gov and search Office of the Chief Information Officer,                rulemaking.                                           for Docket ID NRC-2019-0109. Address U.S. Nuclear Regulatory Commission,                      6. Who will be required or asked to                 questions about NRC dockets to Jennifer Washington, DC 20555-0001; telephone:                  respond: Licensees and applicants                     Borges; telephone: 301-287-9127; 301-415-2084; email:                                    requesting approvals for actions                       email: Jennifer.Borges@nrc.gov. For INFOCOLLECTS.Resource@NRC.GOV.                          proposed in accordance with the                       technical questions, contact the provisions of 10 CFR parts 30, 32, 33,                 individual listed in the FOR FURTHER B. Submitting Comments 34, 35, 36, 39, 40, 50, 52, 54, 60, 61, 70,           INFORMATION CONTACT section of this The NRC cautions you not to include                  and 72.                                               document.
comment submissions that you do not
identifying or contact information in                    7. The estimated number of annual
 
* Mail comments to: David Cullison, comment submissions that you do not                    responses: 17.                                         Office of the Chief Information Officer, want to be publicly disclosed in your                    8. The estimated number of annual                   Mail Stop: T6 A10M, U.S. Nuclear comment submission. All comment                        respondents: 16.7.                                     Regulatory Commission, Washington, submissions are posted at http://                        9. An estimate of the total number of               DC 20555-0001.
want to be publicly disclosed in your
www.regulations.gov and entered into                    hours needed annually to comply with                     For additional direction on obtaining ADAMS. Comment submissions are not                      the information collection requirement                 information and submitting comments, routinely edited to remove identifying                  or request: 30,462.                                   see Obtaining Information and or contact information.                                  10. Abstract: The NRCs regulations at               Submitting Comments in the If you are requesting or aggregating                  10 CFR part 51 specify information to be               SUPPLEMENTARY INFORMATION section of comments from other persons for                        provided in environmental reports by                   this document.
 
submission to the OMB, then you                        applicants and licensees so that the NRC               FOR FURTHER INFORMATION CONTACT:
comment submission. All comment
should inform those persons not to                      can make determinations necessary to                   David Cullison, Office of the Chief include identifying or contact                          adhere to the policies, regulations, and               Information Officer, U.S. Nuclear information that they do not want to be                public laws of the United States, which               Regulatory Commission, Washington, publicly disclosed in their comment                    are interpreted and administered in                   DC 20555-0001; telephone: 301-415-submission. Your request should state                  accordance with the provisions set forth               2084; email: Infocollects.Resource@
 
that comment submissions are not                        in the National Environmental Policy                   nrc.gov.
submissions are posted at http://www.regulations.gov and entered into ADAMS. Comment submissions are not
routinely edited to remove such                        Act of 1969, as amended.                               SUPPLEMENTARY INFORMATION:
 
information before making the comment                    Dated at Rockville, Maryland, this 3rd day submissions available to the public or                  of June 2019.                                         I. Obtaining Information and entering the comment into ADAMS.                          For the Nuclear Regulatory Commission.
routinely edited to remove identifying
Submitting Comments II. Background                                          David C. Cullison,                                     A. Obtaining Information Under the provisions of the                          NRC Clearance Officer, Office of the Chief               Please refer to Docket ID NRC-2019-Paperwork Reduction Act of 1995 (44                    Information Office.                                   0109 when contacting the NRC about U.S.C. Chapter 35), the NRC recently                    [FR Doc. 2019-11848 Filed 6-5-19; 8:45 am]             the availability of information for this submitted a request for renewal of an                  BILLING CODE 7590-01-P                                 action. You may obtain publicly-existing collection of information to                                                                          available information related to this OMB for review entitled,                                                                                      action by any of the following methods:
 
Environmental Protection Regulations                  NUCLEAR REGULATORY
or contact information.
* Federal Rulemaking Website: Go to for Domestic Licensing and Related                      COMMISSION                                             http://www.regulations.gov and search Regulatory Functions. The NRC hereby                                                                        for Docket ID NRC-2019-0109.
If you are requesting or aggregating comments from other persons for
 
submission to the OMB, then you
 
should inform those persons not to
 
include identifying or contact
 
information that they do not want to be
 
publicly disclosed in their comment
 
submission. Your request should state
 
that comment submissions are not
 
routinely edited to remove such
 
information before making the comment
 
submissions available to the public or
 
entering the comment into ADAMS.
II. Background Under the provisions of the Paperwork Reduction Act of 1995 (44
 
U.S.C. Chapter 35), the NRC recently
 
submitted a request for renewal of an
 
existing collection of information to
 
OMB for review entitled, Environmental Protection Regulations
 
for Domestic Licensing and Related
 
Regulatory Functions. The NRC hereby
 
informs potential respondents that an
 
agency may not conduct or sponsor, and
 
that a person is not required to respond
 
to, a collection of information unless it
 
displays a currently valid OMB control
 
number. The NRC a Federal Register notice with a 60-day comment period on
 
this information collection on February
 
13, 2019, 84 FR 3830.
: 1. The title of the information collection:
10 CFR part 51, Environmental Protection Regulations
 
for Domestic Licensing and Related
 
Regulatory Functions.
: 2. OMB approval number:
3150-0021.
: 3. Type of submission:
Extension.
: 4. The form number if applicable:
Not applicable.
: 5. How often the collection is required or requested:
Environmental Reports are required upon submittal of an application for a combined license, construction permit, operating license, operating license renewal, early site  
 
permit, design certification, decommissioning or license termination  
 
review, or manufacturing license, or  
 
upon submittal of a petition for  
 
rulemaking.
: 6. Who will be required or asked to respond: Licensees and applicants requesting approvals for actions  
 
proposed in accordance with the  
 
provisions of 10 CFR parts 30, 32, 33, 34, 35, 36, 39, 40, 50, 52, 54, 60, 61, 70, and 72. 7. The estimated number of annual responses:
: 17. 8. The estimated number of annual respondents:
16.7. 9. An estimate of the total number of hours needed annually to comply with  
 
the information collection requirement  
 
or request:
30,462. 10. Abstract:
The NRCs regulations at 10 CFR part 51 specify information to be  
 
provided in environmental reports by  
 
applicants and licensees so that the NRC  
 
can make determinations necessary to  
 
adhere to the policies, regulations, and  
 
public laws of the United States, which  
 
are interpreted and administered in  
 
accordance with the provisions set forth  
 
in the National Environmental Policy  
 
Act of 1969, as amended.
Dated at Rockville, Maryland, this 3rd day of June 2019.
For the Nuclear Regulatory Commission.
David C. Cullison, NRC Clearance Officer, Office of the Chief Information Office.
[FR Doc. 2019-11848 Filed 6-5-19; 8:45 am]
BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION
[NRC-2019-0109]
[NRC-2019-0109]
Information Collection: Pre-Application  
informs potential respondents that an
 
* NRCs Agencywide Documents agency may not conduct or sponsor, and                  Information Collection: Pre-Application               Access and Management System that a person is not required to respond                Interactions With Prospective Part 52                 (ADAMS): You may obtain publicly-to, a collection of information unless it              Applicants for Nuclear Power Plant                     available documents online in the displays a currently valid OMB control                  Licenses                                              ADAMS Public Documents collection at number. The NRC a Federal Register                                                                            http://www.nrc.gov/reading-rm/
Interactions With Prospective Part 52  
notice with a 60-day comment period on                  AGENCY: Nuclear Regulatory                           adams.html. To begin the search, select this information collection on February                Commission.                                           ADAMS Public Documents and then 13, 2019, 84 FR 3830.                                  ACTION: Proposed information                           select Begin Web-based ADAMS
 
: 1. The title of the information                      collection; request for comment.                       Search. For problems with ADAMS, collection: 10 CFR part 51,                                                                                    please contact the NRCs Public Environmental Protection Regulations                 
Applicants for Nuclear Power Plant  
 
Licenses AGENCY: Nuclear Regulatory Commission.
ACTION: Proposed information collection; request for comment.  


==SUMMARY==
==SUMMARY==
: The U.S. Nuclear Regulatory Commission (NRC) invites public  
:   The U.S. Nuclear Regulatory                 Document Room (PDR) reference staff at for Domestic Licensing and Related                      Commission (NRC) invites public                       1-800-397-4209, 301-415-4737, or by khammond on DSKBBV9HB2PROD with NOTICES Regulatory Functions.                                comment on this proposed collection of                 email to pdr.resource@nrc.gov. The
 
: 2. OMB approval number: 3150-0021.                  information. The information collection                supporting statement for Pre-
comment on this proposed collection of  
: 3. Type of submission: Extension.                    is entitled Pre-application Interactions            application activities for prospective
: 4. The form number if applicable: Not                with Prospective Part 52 Applicants for                combined license applicants is applicable.                                            Nuclear Power Plant Licenses.                        available in ADAMS under Accession
: 5. How often the collection is required              DATES: Submit comments by August 5,                    No. ML19085A327.
or requested: Environmental Reports are                2019. Comments received after this date
* NRCs PDR: You may examine and required upon submittal of an                          will be considered if it is practical to do            purchase copies of public documents at VerDate Sep<11>2014  16:11 Jun 05, 2019  Jkt 247001  PO 00000  Frm 00054  Fmt 4703  Sfmt 4703  E:\FR\FM\06JNN1.SGM  06JNN1


information. The information collection
Federal Register / Vol. 84, No. 109 / Thursday, June 6, 2019 / Notices                                                 26451 the NRCs PDR, Room O1-F21, One                           6. Who will be required or asked to                POSTAL SERVICE White Flint North, 11555 Rockville                     respond: Applicants for combined Pike, Rockville, Maryland 20852.                       licenses for nuclear power plants have                Product ChangePriority Mail
 
* NRCs Clearance Officer: A copy of                 the option of submitting information.                 Negotiated Service Agreement the collection of information and related                  7. The estimated number of annual AGENCY:   Postal ServiceTM.
is entitled Pre-application Interactions
instructions may be obtained without                    responses: 2.
 
charge by contacting NRCs Clearance                      8. The estimated number of annual                   ACTION:   Notice.
with Prospective Part 52 Applicants for
Officer, David Cullison, Office of the                 respondents: 2.                                      
 
Nuclear Power Plant Licenses.
DATES: Submit comments by August 5, 2019. Comments received after this date
 
will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments
 
received on or before this date.
ADDRESSES: You may submit comments by any of the following methods:
*Federal Rulemaking Website:
Go to http://www.regulations.gov and search for Docket ID NRC-2019-0109. Address
 
questions about NRC dockets to Jennifer
 
Borges; telephone: 301-287-9127;
 
email: Jennifer.Borges@nrc.gov.
For technical questions, contact the
 
individual listed in the FORFURTHER INFORMATIONCONTACT section of this document.
*Mail comments to:
David Cullison, Office of the Chief Information Officer, Mail Stop: T6 A10M, U.S. Nuclear
 
Regulatory Commission, Washington, DC 20555-0001.
For additional direction on obtaining information and submitting comments, see Obtaining Information and
 
Submitting Comments in the SUPPLEMENTARYINFORMATION section of this document. FORFURTHERINFORMATIONCONTACT
: David Cullison, Office of the Chief
 
Information Officer, U.S. Nuclear
 
Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-
 
2084; email:
Infocollects.Resource@
nrc.gov. SUPPLEMENTARYINFORMATION
: I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC-2019-0109 when contacting the NRC about
 
the availability of information for this
 
action. You may obtain publicly-
 
available information related to this
 
action by any of the following methods:
*Federal Rulemaking Website:
Go to http://www.regulations.gov and search for Docket ID NRC-2019-0109.
*NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the
 
ADAMS Public Documents collection at
 
http://www.nrc.gov/reading-rm/
 
adams.html.
To begin the search, select ADAMS Public Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public
 
Document Room (PDR) reference staff at
 
1-800-397-4209, 301-415-4737, or by
 
email to pdr.resource@nrc.gov.
The supporting statement for Pre-
 
application activities for prospective
 
combined license applicants is
 
available in ADAMS under Accession
 
No. ML19085A327.
*NRCs PDR:
You may examine and purchase copies of public documents at VerDate Sep<11>2014 16:11 Jun 05, 2019Jkt 247001PO 00000Frm 00054Fmt 4703Sfmt 4703E:\FR\FM\06JNN1.SGM06JNN1 khammond on DSKBBV9HB2PROD with NOTICES 26451 Federal Register/Vol. 84, No. 109/Thursday, June 6, 2019/Notices the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville  
 
Pike, Rockville, Maryland 20852.  
*NRCs Clearance Officer:
A copy of the collection of information and related
 
instructions may be obtained without
 
charge by contacting NRCs Clearance
 
Officer, David Cullison, Office of the
 
Chief Information Officer, U.S. Nuclear
 
Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-
 
2084; email:
Infocollects.Resource@
nrc.gov. B. Submitting Comments Please include Docket ID NRC-2019-0109 in the subject line of your
 
comment submission, in order to ensure
 
that the NRC is able to make your
 
comment submission available to the
 
public in this docket.
The NRC cautions you not to include identifying or contact information in
 
comment submissions that you do not
 
want to be publicly disclosed in your
 
comment submission. The NRC will
 
post all comment submissions at http:// www.regulations.gov as well as enter the comment submissions into ADAMS, and the NRC does not routinely edit
 
comment submissions to remove
 
identifying or contact information.
If you are requesting or aggregating comments from other persons for
 
submission to the NRC, then you should
 
inform those persons not to include
 
identifying or contact information that
 
they do not want to be publicly
 
disclosed in their comment submission.
 
Your request should state that the NRC
 
does not routinely edit comment
 
submissions to remove such information
 
before making the comment
 
submissions available to the public or
 
entering the comment into ADAMS.
II. Background In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C.
 
Chapter 35), the NRC is requesting
 
public comment on its intention to
 
request the OMBs approval for the
 
information collection summarized
 
below. 1. The title of the information collection:
Pre-application Interactions with Prospective Part 52 Applicants for
 
Nuclear Power Plant Licenses.
: 2. OMB approval No.:
An OMB control number has not yet been
 
assigned to this proposed information
 
collection.
: 3. Type of submission:
New. 4. The form number, if applicable:
Not applicable.
: 5. How often the collection is required or requested:
On occasion. Information is submitted only when combined
 
license application is anticipated.
: 6. Who will be required or asked to respond: Applicants for combined licenses for nuclear power plants have
 
the option of submitting information.
: 7. The estimated number of annual responses:
: 2. 8. The estimated number of annual respondents:
: 2. 9. The estimated number of hours needed annually to comply with the
 
information collection requirement or
 
request: 50,000 hours (45,000 hours reporting + 5,000 hours recordkeeping).
: 10. Abstract:
Regulatory Guide 1.206 provides guidance for applicants for
 
combined licenses for nuclear power plants. Section C.2.1 of Regulatory Guide 1.206 deals with pre-application
 
activities for respondents who intend to
 
submit applications for combined
 
licenses for nuclear power plants. Pre-
 
application activities encompass all the
 
communications, correspondence, meetings, document submittals/reviews, and other interactions that occur
 
between the NRC staff and a prospective
 
applicant before the tendering of an
 
application under part 52 of title 10 of
 
the Code of Federal Regulations.
Participation in pre-application
 
activities is voluntary. Potential
 
applicants who engage in pre-
 
application activities benefit from an
 
early NRC staff assessment of the
 
completeness and level of detail of the
 
information that the applicant proposes
 
to submit and staff identification of
 
potential deficiencies in the application.
 
Pre-application activities are expected
 
to increase the efficiency of the staffs
 
review of those applications once they are submitted.
III. Specific Requests for Comments The NRC is seeking comments that address the following questions:
: 1. Is the proposed collection of information necessary for the NRC to
 
properly perform its functions? Does the
 
information have practical utility?
: 2. Is the estimate of the burden of the information collection accurate?
: 3. Is there a way to enhance the quality, utility, and clarity of the
 
information to be collected?
: 4. How can the burden of the information collection on respondents
 
be minimized, including the use of
 
automated collection techniques or
 
other forms of information technology?
Dated at Rockville, Maryland, this 3rd day of June 2019.
For the Nuclear Regulatory Commission.
David C. Cullison, NRC Clearance Officer, Office of the Chief Information Officer.
[FR Doc. 2019-11855 Filed 6-5-19; 8:45 am]
BILLING CODE 7590-01-P POSTAL SERVICE Product ChangePriority Mail Negotiated Service Agreement AGENCY: Postal Service TM. ACTION: Notice.  


==SUMMARY==
==SUMMARY==
: The Postal Service gives notice of filing a request with the Postal  
:   The Postal Service gives Chief Information Officer, U.S. Nuclear                    9. The estimated number of hours                    notice of filing a request with the Postal Regulatory Commission, Washington,                      needed annually to comply with the                    Regulatory Commission to add a DC 20555-0001; telephone: 301-415-                      information collection requirement or                  domestic shipping services contract to 2084; email: Infocollects.Resource@                    request: 50,000 hours (45,000 hours                    the list of Negotiated Service nrc.gov.                                                reporting + 5,000 hours recordkeeping).                Agreements in the Mail Classification
 
: 10. Abstract: Regulatory Guide 1.206                Schedules Competitive Products List.
Regulatory Commission to add a  
B. Submitting Comments                                  provides guidance for applicants for                  DATES: Date of required notice: June 6, Please include Docket ID NRC-2019-                    combined licenses for nuclear power                    2019.
 
0109 in the subject line of your                        plants. Section C.2.1 of Regulatory comment submission, in order to ensure                                                                        FOR FURTHER INFORMATION CONTACT:
domestic shipping services contract to  
Guide 1.206 deals with pre-application that the NRC is able to make your                      activities for respondents who intend to              Elizabeth Reed, 202-268-3179.
 
comment submission available to the                    submit applications for combined                      SUPPLEMENTARY INFORMATION: The public in this docket.                                  licenses for nuclear power plants. Pre-                United States Postal Service hereby The NRC cautions you not to include                  application activities encompass all the              gives notice that, pursuant to 39 U.S.C.
the list of Negotiated Service  
identifying or contact information in                  communications, correspondence,                        3642 and 3632(b)(3), on June 3, 2019, it comment submissions that you do not                    meetings, document submittals/reviews,                filed with the Postal Regulatory want to be publicly disclosed in your                  and other interactions that occur                      Commission a USPS Request to Add comment submission. The NRC will                        between the NRC staff and a prospective                Priority Mail Contract 529 to post all comment submissions at http://                applicant before the tendering of an                  Competitive Product List. Documents www.regulations.gov as well as enter the                application under part 52 of title 10 of              are available at www.prc.gov, Docket comment submissions into ADAMS,                        the Code of Federal Regulations.                      Nos. MC2019-144, CP2019-160.
 
and the NRC does not routinely edit                    Participation in pre-application                      Elizabeth Reed, comment submissions to remove                          activities is voluntary. Potential                    Attorney, Corporate and Postal Business Law.
Agreements in the Mail Classification  
identifying or contact information.                    applicants who engage in pre-                          [FR Doc. 2019-11910 Filed 6-5-19; 8:45 am]
 
If you are requesting or aggregating                  application activities benefit from an BILLING CODE 7710-12-P comments from other persons for                        early NRC staff assessment of the submission to the NRC, then you should                  completeness and level of detail of the inform those persons not to include                    information that the applicant proposes identifying or contact information that                to submit and staff identification of                  SECURITIES AND EXCHANGE they do not want to be publicly                        potential deficiencies in the application.            COMMISSION disclosed in their comment submission.                  Pre-application activities are expected                [Release No. 34-86016; File No. 013-00067]
Schedules Competitive Products List.
Your request should state that the NRC                  to increase the efficiency of the staffs does not routinely edit comment                        review of those applications once they                Initial Form ATS-N Filing; Notice of submissions to remove such information                  are submitted.                                        Extension of Commission Review before making the comment                                                                                      Period submissions available to the public or                  III. Specific Requests for Comments entering the comment into ADAMS.                                                                              June 3, 2019.
DATES: Date of required notice:
The NRC is seeking comments that address the following questions:                          On February 7, 2019, Aqua filed an II. Background                                                                                                initial Form ATS-N (Form ATS-N)
June 6, 2019. FORFURTHERINFORMATIONCONTACT
: 1. Is the proposed collection of In accordance with the Paperwork                    information necessary for the NRC to                  with the Securities and Exchange Reduction Act of 1995 (44 U.S.C.                        properly perform its functions? Does the              Commission (Commission). Pursuant Chapter 35), the NRC is requesting                      information have practical utility?                    to Rule 304 under the Securities and public comment on its intention to                        2. Is the estimate of the burden of the              Exchange Act of 1934 (Act), the request the OMBs approval for the                      information collection accurate?                      Commission may, after notice and an information collection summarized                        3. Is there a way to enhance the                    opportunity for hearing, declare an below.                                                  quality, utility, and clarity of the                  initial Form ATS-N ineffective no later
: Elizabeth Reed, 202-268-3179. SUPPLEMENTARYINFORMATION
: 1. The title of the information                      information to be collected?                          than 120 days from the date of filing collection: Pre-application Interactions                  4. How can the burden of the                        with the Commission, or, if applicable, with Prospective Part 52 Applicants for                information collection on respondents                  the extended review period. June 7, Nuclear Power Plant Licenses.                          be minimized, including the use of                    2019 is 120 calendar days from the date
: The United States Postal Servicehereby gives notice that, pursuant to 39 U.S.C.  
: 2. OMB approval No.: An OMB                          automated collection techniques or                    of filing. Pursuant to Rule control number has not yet been                        other forms of information technology?                304(a)(1)(iv)(B), the Commission may assigned to this proposed information                                                                          extend the initial Form ATS-N review khammond on DSKBBV9HB2PROD with NOTICES Dated at Rockville, Maryland, this 3rd day          period for up to an additional 120 collection.                                            of June 2019.
 
: 3. Type of submission: New.                                                                                calendar days if the initial Form ATS-
3642 and 3632(b)(3), on June 3, 2019, it  
: 4. The form number, if applicable:                    For the Nuclear Regulatory Commission.              N is unusually lengthy or raises novel Not applicable.                                        David C. Cullison,                                    or complex issues that require
 
: 5. How often the collection is required              NRC Clearance Officer, Office of the Chief            additional time for review.
filed with the Postal Regulatory  
or requested: On occasion. Information                  Information Officer.                                      Aqua was operating pursuant to an is submitted only when combined                        [FR Doc. 2019-11855 Filed 6-5-19; 8:45 am]            initial operation report on Form ATS on license application is anticipated.                    BILLING CODE 7590-01-P                                file with the Commission as of January VerDate Sep<11>2014   16:11 Jun 05, 2019  Jkt 247001  PO 00000  Frm 00055  Fmt 4703  Sfmt 4703  E:\FR\FM\06JNN1.SGM  06JNN1}}
 
Commission a USPS Request to Add Priority Mail Contract 529 to  
 
Competitive Product List.
Documents are available at www.prc.gov, Docket Nos. MC2019-144, CP2019-160.
Elizabeth Reed, Attorney, Corporate and Postal Business Law.
[FR Doc. 2019-11910 Filed 6-5-19; 8:45 am]
BILLING CODE 7710-12-P SECURITIES AND EXCHANGE COMMISSION
[Release No. 34-86016; File No. 013-00067]
Initial Form ATS-N Filing; Notice of  
 
Extension of Commission Review  
 
Period June 3, 2019.
On February 7, 2019, Aqua filed an initial Form ATS-N (Form ATS-N)  
 
with the Securities and Exchange  
 
Commission (Commission). Pursuant  
 
to Rule 304 under the Securities and  
 
Exchange Act of 1934 (Act), the  
 
Commission may, after notice and an  
 
opportunity for hearing, declare an  
 
initial Form ATS-N ineffective no later  
 
than 120 days from the date of filing  
 
with the Commission, or, if applicable, the extended review period. June 7, 2019 is 120 calendar days from the date  
 
of filing. Pursuant to Rule  
 
304(a)(1)(iv)(B), the Commission may  
 
extend the initial Form ATS-N review  
 
period for up to an additional 120  
 
calendar days if the initial Form ATS-  
 
N is unusually lengthy or raises novel  
 
or complex issues that require  
 
additional time for review.
Aqua was operating pursuant to an initial operation report on Form ATS on  
 
file with the Commission as of January VerDate Sep<11>2014 16:11 Jun 05, 2019Jkt 247001PO 00000Frm 00055Fmt 4703Sfmt 4703E:\FR\FM\06JNN1.SGM06JNN1 khammond on DSKBBV9HB2PROD with NOTICES}}

Revision as of 16:46, 19 October 2019

Opportunity to Review and Comment on an NRC Proposed Information Collection Pre-application Interactions with Prospective Part 52 Applicants for Nuclear Power Plant Licenses
ML19191A246
Person / Time
Issue date: 07/03/2019
From: George Wunder
Office of Nuclear Reactor Regulation
To:
Terrestrial Energy USA LTD
Shared Package
ML19085A324 List:
References
3150-XXXX, NRC-2019-0109
Download: ML19191A246 (4)


Text

NRR-DRMAPEm Resource From: Wunder, George Sent: Wednesday, July 3, 2019 12:22 PM To: rrickman@terrestrialusa.com Cc: Hill, Leslie

Subject:

FEDERAL EGISTER NOTICE Attachments: 2019-11855.pdf The Nuclear Regulatory Commission recently published a Federal Register Notice announcing our intent to submit information collection requests to the Office of Management and Budget (OMB) for Pre-application Interactions with Prospective Part 52 Applicants for Nuclear Power Plant Licenses. A supporting statement describing the requested information and burden estimates are available at http://regulations.gov by searching docket NRC-2019-0109.

As a potential respondent to this information collection, we are interested in your feedback. Specifically, we are seeking input on the following questions by August 5, 2019:

1. Is the proposed collection of information necessary for the NRC to properly perform its functions?

Does the information have practical utility?

2. Is the burden estimate accurate?
3. Is there a way to enhance the quality, utility, and clarity of the information to be collected?
4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology?

Comments can be submitted by going to http://www.regulations.gov and searching for Docket No.

NRC-2019-0109. Please note that comments will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed.

1

Hearing Identifier: NRR_DRMA Email Number: 103 Mail Envelope Properties (BYAPR09MB26966107CC78A5BA6BBDA029F9FB0)

Subject:

FEDERAL EGISTER NOTICE Sent Date: 7/3/2019 12:21:33 PM Received Date: 7/3/2019 12:21:00 PM From: Wunder, George Created By: George.Wunder@nrc.gov Recipients:

"Hill, Leslie" <Leslie.Hill@nrc.gov>

Tracking Status: None "rrickman@terrestrialusa.com" <rrickman@terrestrialusa.com>

Tracking Status: None Post Office: BYAPR09MB2696.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1482 7/3/2019 12:21:00 PM 2019-11855.pdf 221001 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: ZZZ

26450 Federal Register / Vol. 84, No. 109 / Thursday, June 6, 2019 / Notices White Flint North, 11555 Rockville application for a combined license, so, but the Commission is able to ensure Pike, Rockville, Maryland 20852. construction permit, operating license, consideration only for comments

  • NRCs Clearance Officer: A copy of operating license renewal, early site received on or before this date.

the collection of information and related permit, design certification, ADDRESSES: You may submit comments instructions may be obtained without decommissioning or license termination by any of the following methods:

charge by contacting the NRCs review, or manufacturing license, or

  • Federal Rulemaking Website: Go to Clearance Officer, David Cullison, upon submittal of a petition for http://www.regulations.gov and search Office of the Chief Information Officer, rulemaking. for Docket ID NRC-2019-0109. Address U.S. Nuclear Regulatory Commission, 6. Who will be required or asked to questions about NRC dockets to Jennifer Washington, DC 20555-0001; telephone: respond: Licensees and applicants Borges; telephone: 301-287-9127; 301-415-2084; email: requesting approvals for actions email: Jennifer.Borges@nrc.gov. For INFOCOLLECTS.Resource@NRC.GOV. proposed in accordance with the technical questions, contact the provisions of 10 CFR parts 30, 32, 33, individual listed in the FOR FURTHER B. Submitting Comments 34, 35, 36, 39, 40, 50, 52, 54, 60, 61, 70, INFORMATION CONTACT section of this The NRC cautions you not to include and 72. document.

identifying or contact information in 7. The estimated number of annual

  • Mail comments to: David Cullison, comment submissions that you do not responses: 17. Office of the Chief Information Officer, want to be publicly disclosed in your 8. The estimated number of annual Mail Stop: T6 A10M, U.S. Nuclear comment submission. All comment respondents: 16.7. Regulatory Commission, Washington, submissions are posted at http:// 9. An estimate of the total number of DC 20555-0001.

www.regulations.gov and entered into hours needed annually to comply with For additional direction on obtaining ADAMS. Comment submissions are not the information collection requirement information and submitting comments, routinely edited to remove identifying or request: 30,462. see Obtaining Information and or contact information. 10. Abstract: The NRCs regulations at Submitting Comments in the If you are requesting or aggregating 10 CFR part 51 specify information to be SUPPLEMENTARY INFORMATION section of comments from other persons for provided in environmental reports by this document.

submission to the OMB, then you applicants and licensees so that the NRC FOR FURTHER INFORMATION CONTACT:

should inform those persons not to can make determinations necessary to David Cullison, Office of the Chief include identifying or contact adhere to the policies, regulations, and Information Officer, U.S. Nuclear information that they do not want to be public laws of the United States, which Regulatory Commission, Washington, publicly disclosed in their comment are interpreted and administered in DC 20555-0001; telephone: 301-415-submission. Your request should state accordance with the provisions set forth 2084; email: Infocollects.Resource@

that comment submissions are not in the National Environmental Policy nrc.gov.

routinely edited to remove such Act of 1969, as amended. SUPPLEMENTARY INFORMATION:

information before making the comment Dated at Rockville, Maryland, this 3rd day submissions available to the public or of June 2019. I. Obtaining Information and entering the comment into ADAMS. For the Nuclear Regulatory Commission.

Submitting Comments II. Background David C. Cullison, A. Obtaining Information Under the provisions of the NRC Clearance Officer, Office of the Chief Please refer to Docket ID NRC-2019-Paperwork Reduction Act of 1995 (44 Information Office. 0109 when contacting the NRC about U.S.C. Chapter 35), the NRC recently [FR Doc. 2019-11848 Filed 6-5-19; 8:45 am] the availability of information for this submitted a request for renewal of an BILLING CODE 7590-01-P action. You may obtain publicly-existing collection of information to available information related to this OMB for review entitled, action by any of the following methods:

Environmental Protection Regulations NUCLEAR REGULATORY

[NRC-2019-0109]

informs potential respondents that an

  • NRCs Agencywide Documents agency may not conduct or sponsor, and Information Collection: Pre-Application Access and Management System that a person is not required to respond Interactions With Prospective Part 52 (ADAMS): You may obtain publicly-to, a collection of information unless it Applicants for Nuclear Power Plant available documents online in the displays a currently valid OMB control Licenses ADAMS Public Documents collection at number. The NRC a Federal Register http://www.nrc.gov/reading-rm/

notice with a 60-day comment period on AGENCY: Nuclear Regulatory adams.html. To begin the search, select this information collection on February Commission. ADAMS Public Documents and then 13, 2019, 84 FR 3830. ACTION: Proposed information select Begin Web-based ADAMS

1. The title of the information collection; request for comment. Search. For problems with ADAMS, collection: 10 CFR part 51, please contact the NRCs Public Environmental Protection Regulations

SUMMARY

The U.S. Nuclear Regulatory Document Room (PDR) reference staff at for Domestic Licensing and Related Commission (NRC) invites public 1-800-397-4209, 301-415-4737, or by khammond on DSKBBV9HB2PROD with NOTICES Regulatory Functions. comment on this proposed collection of email to pdr.resource@nrc.gov. The
2. OMB approval number: 3150-0021. information. The information collection supporting statement for Pre-
3. Type of submission: Extension. is entitled Pre-application Interactions application activities for prospective
4. The form number if applicable: Not with Prospective Part 52 Applicants for combined license applicants is applicable. Nuclear Power Plant Licenses. available in ADAMS under Accession
5. How often the collection is required DATES: Submit comments by August 5, No. ML19085A327.

or requested: Environmental Reports are 2019. Comments received after this date

  • NRCs PDR: You may examine and required upon submittal of an will be considered if it is practical to do purchase copies of public documents at VerDate Sep<11>2014 16:11 Jun 05, 2019 Jkt 247001 PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\06JNN1.SGM 06JNN1

Federal Register / Vol. 84, No. 109 / Thursday, June 6, 2019 / Notices 26451 the NRCs PDR, Room O1-F21, One 6. Who will be required or asked to POSTAL SERVICE White Flint North, 11555 Rockville respond: Applicants for combined Pike, Rockville, Maryland 20852. licenses for nuclear power plants have Product ChangePriority Mail

  • NRCs Clearance Officer: A copy of the option of submitting information. Negotiated Service Agreement the collection of information and related 7. The estimated number of annual AGENCY: Postal ServiceTM.

instructions may be obtained without responses: 2.

charge by contacting NRCs Clearance 8. The estimated number of annual ACTION: Notice.

Officer, David Cullison, Office of the respondents: 2.

SUMMARY

The Postal Service gives Chief Information Officer, U.S. Nuclear 9. The estimated number of hours notice of filing a request with the Postal Regulatory Commission, Washington, needed annually to comply with the Regulatory Commission to add a DC 20555-0001; telephone: 301-415- information collection requirement or domestic shipping services contract to 2084; email: Infocollects.Resource@ request: 50,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> (45,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> the list of Negotiated Service nrc.gov. reporting + 5,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> recordkeeping). Agreements in the Mail Classification
10. Abstract: Regulatory Guide 1.206 Schedules Competitive Products List.

B. Submitting Comments provides guidance for applicants for DATES: Date of required notice: June 6, Please include Docket ID NRC-2019- combined licenses for nuclear power 2019.

0109 in the subject line of your plants. Section C.2.1 of Regulatory comment submission, in order to ensure FOR FURTHER INFORMATION CONTACT:

Guide 1.206 deals with pre-application that the NRC is able to make your activities for respondents who intend to Elizabeth Reed, 202-268-3179.

comment submission available to the submit applications for combined SUPPLEMENTARY INFORMATION: The public in this docket. licenses for nuclear power plants. Pre- United States Postal Service hereby The NRC cautions you not to include application activities encompass all the gives notice that, pursuant to 39 U.S.C.

identifying or contact information in communications, correspondence, 3642 and 3632(b)(3), on June 3, 2019, it comment submissions that you do not meetings, document submittals/reviews, filed with the Postal Regulatory want to be publicly disclosed in your and other interactions that occur Commission a USPS Request to Add comment submission. The NRC will between the NRC staff and a prospective Priority Mail Contract 529 to post all comment submissions at http:// applicant before the tendering of an Competitive Product List. Documents www.regulations.gov as well as enter the application under part 52 of title 10 of are available at www.prc.gov, Docket comment submissions into ADAMS, the Code of Federal Regulations. Nos. MC2019-144, CP2019-160.

and the NRC does not routinely edit Participation in pre-application Elizabeth Reed, comment submissions to remove activities is voluntary. Potential Attorney, Corporate and Postal Business Law.

identifying or contact information. applicants who engage in pre- [FR Doc. 2019-11910 Filed 6-5-19; 8:45 am]

If you are requesting or aggregating application activities benefit from an BILLING CODE 7710-12-P comments from other persons for early NRC staff assessment of the submission to the NRC, then you should completeness and level of detail of the inform those persons not to include information that the applicant proposes identifying or contact information that to submit and staff identification of SECURITIES AND EXCHANGE they do not want to be publicly potential deficiencies in the application. COMMISSION disclosed in their comment submission. Pre-application activities are expected [Release No. 34-86016; File No. 013-00067]

Your request should state that the NRC to increase the efficiency of the staffs does not routinely edit comment review of those applications once they Initial Form ATS-N Filing; Notice of submissions to remove such information are submitted. Extension of Commission Review before making the comment Period submissions available to the public or III. Specific Requests for Comments entering the comment into ADAMS. June 3, 2019.

The NRC is seeking comments that address the following questions: On February 7, 2019, Aqua filed an II. Background initial Form ATS-N (Form ATS-N)

1. Is the proposed collection of In accordance with the Paperwork information necessary for the NRC to with the Securities and Exchange Reduction Act of 1995 (44 U.S.C. properly perform its functions? Does the Commission (Commission). Pursuant Chapter 35), the NRC is requesting information have practical utility? to Rule 304 under the Securities and public comment on its intention to 2. Is the estimate of the burden of the Exchange Act of 1934 (Act), the request the OMBs approval for the information collection accurate? Commission may, after notice and an information collection summarized 3. Is there a way to enhance the opportunity for hearing, declare an below. quality, utility, and clarity of the initial Form ATS-N ineffective no later
1. The title of the information information to be collected? than 120 days from the date of filing collection: Pre-application Interactions 4. How can the burden of the with the Commission, or, if applicable, with Prospective Part 52 Applicants for information collection on respondents the extended review period. June 7, Nuclear Power Plant Licenses. be minimized, including the use of 2019 is 120 calendar days from the date
2. OMB approval No.: An OMB automated collection techniques or of filing. Pursuant to Rule control number has not yet been other forms of information technology? 304(a)(1)(iv)(B), the Commission may assigned to this proposed information extend the initial Form ATS-N review khammond on DSKBBV9HB2PROD with NOTICES Dated at Rockville, Maryland, this 3rd day period for up to an additional 120 collection. of June 2019.
3. Type of submission: New. calendar days if the initial Form ATS-
4. The form number, if applicable: For the Nuclear Regulatory Commission. N is unusually lengthy or raises novel Not applicable. David C. Cullison, or complex issues that require
5. How often the collection is required NRC Clearance Officer, Office of the Chief additional time for review.

or requested: On occasion. Information Information Officer. Aqua was operating pursuant to an is submitted only when combined [FR Doc. 2019-11855 Filed 6-5-19; 8:45 am] initial operation report on Form ATS on license application is anticipated. BILLING CODE 7590-01-P file with the Commission as of January VerDate Sep<11>2014 16:11 Jun 05, 2019 Jkt 247001 PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:\FR\FM\06JNN1.SGM 06JNN1